AM0002 W9128F25BA002Narrative.pdf
PDF 96 KB Posted
- Attached to
- Fort Peck PH 1 Surge Tank Roof Replacement
- Solicitation number
- W9128F25BA002
About this file
This document is an Amendment (No. 0002) to a solicitation for the Construction of FP PH1 Surge Tank Roof Replacement at Fort Peck, Montana. The amendment, issued on 03 JUN 2025 by the U.S. Army Engineer District in Omaha, modifies the original solicitation (W9128F25BA002) by adding and revising specification pages and introducing new contract drawings. Specifically, the amendment includes updates to specification section 01 12 00 and adds five new drawing sheets related to deck plans, penthouse sections, reinforcement, architectural plans, and exterior elevations.
The solicitation remains open for electronic bids until 2:00 p.m. local time on 05 JUN 2025. Prospective bidders are required to acknowledge receipt of this amendment, which is considered part of the bidding papers. All other conditions and requirements of the original specifications remain unchanged. Bidders are directed to Section 00 21 00 for guidance on submitting electronic bids, and the amendment retains the original project scope of restoring the Surge Tank roof at the Ft. Peck Powerhouse while maintaining historical preservation standards.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0002 - 2
(Continuation of SF 30)
03 JUN 2025
Solicitation No. W9128F25BA002
Date of Issue: 06 MAY 2025
Date of Opening: 05 JUN 2025
SUBJECT: Amendment No. 0002 to Specifications and Drawings for Construction of FP PH1 SURGE TANK ROOF
REPLACEMENT FORT PECK, MONTANA.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “Am-2” in the areas of added revisions.
(underlining of added text and/or strikeout of deleted text.)
Pages or Sections Deleted Pages or Sections Substituted or Added
01 12 00 01 12 00 Am-0002
b. Drawings (New). The following new drawings are hereby added to the contract drawings and are issued with this amendment.
(1) Sheet FP17-60-20, Plan of Deck and Framing at Top of Deck
(2) Sheet FP17-60-24, Penthouse Sections and Details - Concrete
(3) Sheet FP17-60-34, Penthouse Floor Plan – EL 2299.0
Reinforcement
(4) Sheet FP17-70-108, Penthouse Plans Architectural
(5) Sheet MFP78-84E101, Power Plan No. 1 Exterior Elevations
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged.
a. See Section 00 21 00, paragraph: GENERAL BIDDING INFORMATION, on how to submit electronic bids.
3. Electric bids will be received until 2:00 p.m., local time at place of bid opening, 05 JUN 2025.
Attachments:
Spec Pages listed in 1.a. above
Dwgs. listed in 1.b above
U.S. Army Engineer District, Omaha
Corps of Engineers
1616 Capitol Avenue
Omaha, Nebraska 68102-4901
03 JUN 2025
JNS/2179
File details come from the government source that posted it. Updated .