About this file

This submittal register and federal contract opportunity document outline requirements for replacing disconnect switches at the Oahe Dam switchyard. The U.S. Army Corps of Engineers, Omaha District is soliciting to replace 40 manual switches, 13 motor-operated disconnects, and 15 grounding switches with new equipment. Additional work includes replacing suspension insulators, bus sections, feeder and control cables. The estimated construction cost is between $5-10 million. Offerors must register in the System for Award Management to access the solicitation, with a response due by July 6, 2023. A site visit is scheduled for June 14. The primary NAICS code is 237130 and the place of performance is the Oahe Dam in Pierre, South Dakota.

View the file

Other files for this federal contract opportunity

Other files attached to Oahe Switchyard Disconnect Switch Replacement, newest first.
File Type Posted
W9128F23R0003_Am 0003.pdf PDF
W9128F23R0003 Sign-in_Sheet_061423.pdf PDF
W91238F23R0003_AM0002.pdf PDF
W9128F23R0003 Sign-in_Sheet_062723.pdf PDF
13 48 00.00 26 Am-0002.pdf PDF
01 12 00 Am-0001.pdf PDF
01 11 00 Am-0001.pdf PDF
E-202 Am-0001.pdf PDF
W91238F23R0003_AM0001.pdf PDF
33 75 10.00 26 Am-0001.pdf PDF
01 22 00 Am-0001.pdf PDF
E-201 Am-0001.pdf PDF
OA Switchyard W9128F23R0003 Ref Drawings 4 of 4.pdf PDF
OA Switchyard W9128F23R0003 Solicitation 1 of 4.pdf PDF
OA Switchyard W9128F23R0003 Contract Dwgs 3 of 4.pdf PDF
OA Switchyard W9128F23R0003 Specs 2 of 4.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES

Switchyard Disconnect Switch Replacement Oahe Dam

01 12 00 SD-01 Preconstruction Submittals

G AOProposed Methods of Operation

1.11 G AOProgress Charts

1.2Construction Right-of-Way

1.7.1State and Federal Highways

1.7.2State and Local Public Roads

SD-02 Shop Drawings

1.4 G AOCare of Water

SD-11 Closeout Submittals

1.12Warranty of Construction

01 30 00.24 SD-01 Preconstruction Submittals

1.5AT Level I Training Sign In

Sheets

G POSecurity Personnel List

1.5 G POPersonnel Risk Assessment

1.5iWATCH and/or CorpsWatch

Training Sign In Sheets

1.5OPSEC Training Sign In Sheets

1.5E-Verify

01 33 00 SD-01 Preconstruction Submittals

1.8 G AOSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 G AOACCIDENT PREVENTION PLAN

(APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am-0001

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES

01 35 26 1.12Notifications and Reports

1.12.2 G AOAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.4Crane Operators/Riggers

1.7.3.1 G AOStandard Lift Plan

1.7.3.2 G AOCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Hot Work Permit

1.12.4Certificate of Compliance

1.14License Certificates

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G AOContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 G -AOEnvironmental Protection Plan

01 78 23 SD-10 Operation and Maintenance

Data

G G-AOO&M Database

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES

01 78 39.00 24 SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

05 05 23.16 26 SD-01 Preconstruction Submittals

1.4.1 G HDCFabricator's Welding Quality

Control Plan

1.4.1.2 G HDCWitness Points

1.4.2 G HDCWelding Procedure Specifications

(WPS)

1.4.2 G HDCProcedure Qualification Records

(PQR)

1.4.3 G HDCWelder Performance Qualification

Records (WPQR)

SD-03 Product Data

3.2.1 G HDCNonconformance Reports

2.2 GWelding Electrodes and Rods

3.5.2 GHeat Straightening Procedure

2.2 GShielding Gas

SD-06 Test Reports

3.2.1 G HDCTest and Inspection Report

1.4.1.1 GNDT Equipment Calibration

Records

SD-07 Certificates

1.4.4 GInspector Qualifications

05 14 00.13 26 SD-01 Preconstruction Submittals

1.4.1 G HDCFabricator's Welding Quality

Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES

05 14 00.13 26 1.4.1.2 G ECWitness Points

1.4.2 G HDCWelding Procedure Specifications

(WPS)

1.4.2 G HDCProcedure Qualification Records

(PQR)

1.4.3 G HDCPerformance Qualification Test

Records

SD-03 Product Data

3.2.1 G HDCNonconformance Reports

2.2 GWelding Electrodes and Rods

3.5.2 GAluminum Straightening

Procedure

2.2 GShielding Gas

SD-06 Test Reports

3.2.1 G HDCTest and Inspection Report

1.4.1.1 GNDT Equipment Calibration

Records

SD-07 Certificates

1.4.4 GInspector Qualifications

05 50 04.01 26 SD-02 Shop Drawings

2.1.3 G HDCDetail Drawings

SD-03 Product Data

2.1.2 G HDCProduct Data

SD-06 Test Reports

2.1.1 G HDCMaterials List

2.1.1 G HDCMaterial Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES

13 48 00.00 26 SD-02 Shop Drawings

1.5 G HDCDetail Drawings

SD-03 Product Data

1.4.3 G HDCSeismic Equipment Certification

SD-05 Design Data

1.5 G HDCStructural Design Calculations for

Seismic Restraints

26 05 00.00 26 SD-01 Preconstruction Submittals

3.1.1 G HDCEquipment Replacement Plan

SD-03 Product Data

2.2 G HDCEnclosures

2.3 G HDCTubular Bus and Expansion

Terminals

2.4 G HDCSwitchyard Suspension Insulators

2.5 G HDCAAC Conductor

2.6 G HDCMolded Case Circuit Breakers

2.7.1 G HDCTerminal Blocks

2.8 G HDCEscutcheons and Nameplates

SD-06 Test Reports

3.6 G HDCInspections And Field Testing

SD-08 Manufacturer’s Instructions

2.9 G HDCSpare Parts

26 05 19.00 26 SD-03 Product Data

2.1 G HDCInsulated Wire and Cable

2.3.1 G HDCSignal and Communications

Cable

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES

26 05 19.00 26 3.1.8 G HDCCable Supports

2.3.2Ground Conductors

3.1.10Wire Marking

2.4Terminations

SD-06 Test Reports

1.5 G HDCFactory Inspection and Tests

3.2.1 G HDCInsulation Resistance Test

3.2.1 G HDCShield Resistance Test

3.2 G HDCField Acceptance Testing

33 75 10.00 26 SD-02 Shop Drawings

1.6.1Bill of Materials

1.6.3 G HDCOutline Drawings

1.6.3 G HDCMounting Details

1.6.3 G HDCSchematic Diagrams

1.6.3 G HDCWiring Diagrams

1.6.2Manufacturer's Nameplate

SD-03 Product Data

2.1.1 G HDCDisconnect Switch

2.1.1 G HDCGrounding Switch

2.1.1 G HDCManual Switch Operators

2.1.1 G HDCMotorized Switch Operators

2.1.15 G HDCSwitch Insulators

2.1.17 G HDCGround Switch Interlocking

2.4 G HDCMechanical Interlock

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES

33 75 10.00 26 2.1.3 G HDCStructural Design Criteria and

Seismic Calculations

SD-06 Test Reports

3.3.1 G HDCFactory Tests

3.3.3 G HDCFactory Tests

3.3.5 G HDCInsulator Tests

3.3.2Type Tests

SD-07 Certificates

3.7 G HDCErecting Engineer's Qualifications

SD-10 Operation and Maintenance

Data

3.5 G HDCOperation and Maintenance

Manuals

3.6 G HDCContractor-Furnished Training of

Government Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .