13 48 00.00 26 Am-0002.pdf
PDF 588 KB Posted
- Attached to
- Oahe Switchyard Disconnect Switch Replacement Federal contract opportunity
- Solicitation number
- W9128F23R0003
About this file
This document contains a federal solicitation for the replacement of disconnect switches at the Oahe Dam switchyard. The U.S. Army Corps of Engineers, Omaha District is seeking to replace manual and motor operated disconnect switches, suspension insulators, horizontal and vertical bus sections at the 115kV and 230kV switchyards. Additional work includes inspection and repair of aluminum buses. The estimated construction cost is between $5,000,000 and $10,000,000. The NAICS code is 237130 and small business size standard is $45 million. The solicitation will close on July 6, 2023 and work must be completed within 730 calendar days of notice to proceed. Questions shall be submitted through ProjNet and site visits are scheduled for June 14, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F23R0003_Am 0003.pdf | ||
| W9128F23R0003 Sign-in_Sheet_061423.pdf | ||
| W91238F23R0003_AM0002.pdf | ||
| W9128F23R0003 Sign-in_Sheet_062723.pdf | ||
| E-202 Am-0001.pdf | ||
| W91238F23R0003_AM0001.pdf | ||
| REGISTER Am-0001.pdf | ||
| 33 75 10.00 26 Am-0001.pdf | ||
| 01 12 00 Am-0001.pdf | ||
| 01 11 00 Am-0001.pdf | ||
| 01 22 00 Am-0001.pdf | ||
| E-201 Am-0001.pdf | ||
| OA Switchyard W9128F23R0003 Solicitation 1 of 4.pdf | ||
| OA Switchyard W9128F23R0003 Contract Dwgs 3 of 4.pdf | ||
| OA Switchyard W9128F23R0003 Specs 2 of 4.pdf | ||
| OA Switchyard W9128F23R0003 Ref Drawings 4 of 4.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Switchyard Disconnect Switch Replacement Oahe Dam OAA2
SECTION TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION 13 48 00.00 26
SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
PART 1 GENERAL
1.1 SCOPE OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DESIGN OF SEISMIC RESTRAINT
1.4.1 General Requirements
1.4.2 Code Requirements for Equipment Restraint
1.4.3 Requirements for Equipment Certification
1.5 EQUIPMENT
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 13 48 00.00 26 Page 1
Am-0002
SECTION 13 48 00.00 26
SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
PART 1 GENERAL
1.1 SCOPE OF WORK
The work covered in this section consists of furnishing all labor, equipment and materials to select, design, and provide seismic restraints for new switches provided as part of work performed for Oahe Dam.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 693 (2018) Recommended Practice for Seismic Design of Substations
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G, HDC
SD-03 Product Data
Seismic Equipment Certification; G, HDC
SD-05 Design Data
Structural Design Calculations for Seismic Restraints; G, HDC
1.4 DESIGN OF SEISMIC RESTRAINT
1.4.1 General Requirements
Apply the requirements for seismic protection measures described in this section to the equipment and systems below. Accomplish resistance to lateral forces induced by earthquakes without consideration of friction
SECTION 13 48 00.00 26 Page 2 resulting from gravity loads. Existing concrete strength is taken as f'c = 3,000 pounds per square inch (psi).
Submit detail drawings as per paragraphs "EQUIPMENT" and "SYSTEMS" within 90 calendar days prior to installation. Submit together with Structural Design Calculations for Seismic Restraints.
For detail drawings include catalog cuts, templates, anchorage system including mechanical specifications of anchor bolts, erection and installation details for the items listed. Provide submittals complete in detail; indicate thickness, type, grade, class of metal, and dimensions;
and show construction details, anchorage, and installation. Stamp all drawings with the Professional Engineer (PE) stamp who performs and stamps the calculations required above.
Submit structural design calculations performed by a qualified civil or structural engineer who is presently a registered professional engineers (PE). The calculations verify the capability of the seismic restraints and of structural members to which seismic restraint are attached for carrying the seismic design loads. The design includes seismic anchorage design and details. Provide all calculations stamped and signed by a PE.
1.4.2 Code Requirements for Equipment Restraint
Complete seismic design for all equipment restraint in accordance with Chapter 13, "Seismic Design Requirements for Nonstructural Components," of ASCE 7-16 with the seismic design force computed as per Section 13.3 "Seismic Demands on Nonstructural Components" at minimum. For electrical equipment restraint, design in accordance with the applicable provisions in IEEE 693 , or Section 13.3 of ASCE 7-16 whichever produces the more adverse seismic effects. For ASCE 7-16 , use a spectral acceleration S DS = 0.113, I P = 1.50, and z/h=1. For IEEE 693 , use a seismic qualification level of *Am-2 moderate low **Am-2 .
1.4.3 Requirements for Equipment Certification
Design, construct, and assemble all equipment listed in paragraph "Equipment", to be provided under this contract to withstand the seismic forces specified in paragraph "Code Requirements for Equipment Restraint." Provide Seismic Equipment Certification supported by testing or analysis stating the seismic capability of the equipment.
1.5 EQUIPMENT
Develop the structural design calculations for seismic restraints and detail drawings for mounting the following new equipment provided under this contract to existing structures in accordance with the requirements of this specification:
(a) Electrical Switches
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
SECTION 13 48 00.00 26 Page 3
-- End of Section --