This solicitation package seeks proposals for the Oahe Switchyard Disconnect Switch Replacement project. Key details include replacement of 115kV and 230kV disconnect switches, suspension insulators, and bus sections at the Oahe Dam facility in Pierre, South Dakota. Work also involves inspection and repair of existing buswork. The estimated construction cost is between $5-10 million. The solicitation will close on July 6, 2023, with a 730-day period of performance. Site visits are scheduled for June 14, 2023. Responses should be submitted through SAM.gov. The primary NAICS code is 237130. The contracting office is the U.S. Army Corps of Engineers Omaha District.

View the file

Other files for this federal contract opportunity

Other files attached to Oahe Switchyard Disconnect Switch Replacement, newest first.
File Type Posted
W9128F23R0003_Am 0003.pdf PDF
W9128F23R0003 Sign-in_Sheet_061423.pdf PDF
W91238F23R0003_AM0002.pdf PDF
W9128F23R0003 Sign-in_Sheet_062723.pdf PDF
13 48 00.00 26 Am-0002.pdf PDF
E-202 Am-0001.pdf PDF
W91238F23R0003_AM0001.pdf PDF
REGISTER Am-0001.pdf PDF
33 75 10.00 26 Am-0001.pdf PDF
01 12 00 Am-0001.pdf PDF
01 11 00 Am-0001.pdf PDF
E-201 Am-0001.pdf PDF
OA Switchyard W9128F23R0003 Solicitation 1 of 4.pdf PDF
OA Switchyard W9128F23R0003 Contract Dwgs 3 of 4.pdf PDF
OA Switchyard W9128F23R0003 Specs 2 of 4.pdf PDF
OA Switchyard W9128F23R0003 Ref Drawings 4 of 4.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Switchyard Disconnect Switch Replacement Oahe Dam OAA2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL

1.1.1 General Information

1.1.2 Retainage of Payment

1.2 MEASUREMENT

1.2.1 General

1.3 PAYMENT

1.3.1 Base Bid Items

1.3.2 Optional Bid Items

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 1

Am-0001

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 GENERAL

1.1.1 General Information

Payment items for the work of this contract for which contract per job payments will be made are listed in the BID SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.2 Retainage of Payment

Retainage in the amount of 5% of original contract amount will be withheld until the final submittals for Final Operation and Maintenance Manuals and Parts Catalogs, Final Approved Versions of Contractor Prepared Drawings and As-Built Contract Drawings have been approved by the Government, in accordance with Section 01 78 23: OPERATION AND MAINTENANCE DATA, and Section 01 78 39.00 24: AS-BUILT DRAWINGS.

1.2 MEASUREMENT

1.2.1 General

Items measured as a Lump Sum will be measured for payment as a completed job, in place, in the locations indicated. This measurement includes measurement of all incidental work and materials that are necessary to make a complete job. Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided. Unless the payment paragraph makes a specific exception of an item, incidental items will not be measured under another item, even though there is another listing for the work or material.

SECTION 01 22 00 Page 2

1.3 PAYMENT

1.3.1 Base Bid Items

a. CLIN 0001: Mobilization and Demobilization

Payment for the Mobilization and Demobilization will be made in a lump sum under CLIN 0001. Price and payment shall constitute full compensation for furnishing of all material, labor, and equipment for Mobilization and Demobilization.

b. CLIN 0002: Remove and Dispose of Nine (9) 230kV Motor Operated Disconnect Switches

Payment for the removal and disposal of nine (9) 230kV motor operated disconnect switches including motor contollers and all wiring will be made at the job bid price under CLIN 0002. Field verify all existing power and control wiring to the motor controllers before removal to attain information such as function, origins, and terminations. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

c. CLIN 0003: Remove and Dispose of Twenty-seven (27) 230kV Disconnect Switches and Ten (10) Ground Switches

Payment for the removal and disposal of twenty-seven (27) 230kV disconnect switches and ten (10) ground switches will be made at the job bid price under CLIN 0003. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

d. CLIN 0004: Remove and Dispose of 1.5 Inch Tubular Bus Sections in the 230kV Switchyard Bays

Payment for the removal and disposal of all 1.5 inch tubular bus sections in the 230kV switchyards will be made at the job bid price under CLIN 0004. The sections that will be removed are shown on the contract drawings and will consist of sections between existing disconnect swithes, SF6 breakers, and suspension insulators. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

e. CLIN 0005: Remove and Dispose of *Am-1 Forty-five (45) Sixty (60) **Am-1 Unit and Transmission Line Suspension Insulators in the 230kV Switchyard

Payment for the removal and disposal *Am-1 forty-five (45) sixty (60) **Am-1 unit and transmission line suspension insulators will be made at the job bid price under CLIN 0005. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

f. CLIN 0006: Furnish and Install Nine (9) 230kV Motor Operated Disconnect Switches, Complete with Wiring, an O&M Manual, and the *Am-1 Manufacturer's **Am-1 Erecting Engineer Services

Payment for furnish and install nine (9) 230kV motor operated disconnect Switches, complete with wiring, an O&M manual, and the *Am-1 manufacturer's **Am-1 erecting engineer services will be paid

SECTION 01 22 00 Page 3 for under CLIN 0006. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing nine (9) 230kV motor operated disconnect switches, expansion fittings and 3 1/2 inch aluminum tubular bus as shown, running wiring to the power and control sources, coiling 20 feet of slack cable in the Spread Room for termination by the Government, preparing an Operations and Maintenance Manual for the 230kV motor operated disconnect and switches, and furnishing the services of the switch manufacturer's Erecting Engineer certified to supervise installation and commissioning of the switches. Includes travel, lodging and per diem.

g. CLIN 0007: Furnish and Install Twenty-seven (27) 230kV Disconnect Switches and Ten (10) Ground Switches, Complete with O&M Manual, and the *Am-1 Manufacturer's **Am-1 Erecting Engineer Services

Payment for furnish and install twenty-seven (27) 230kV disconnect switches and ten (10) ground switches, complete with O&M manual, and the *Am-1 manufacturer's **Am-1 erecting engineer services will be paid for under CLIN 0007. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing twenty-seven (27) 230kV disconnect switches, ten (10) of which shall be equipped with a grounding switch, expansion fittings as shown, 3 1/2 inch aluminum tubular bus and 1272kcmil AAC conductors as shown, preparing an Operations and Maintenance Manual for the 230kV disconnect and ground switches, and furnishing the services of the switch *Am-1 manufacturer's **Am-1 Erecting Engineer certified to supervise installation and commissioning of the switches. Includes travel, lodging and per diem.

h. CLIN 0008: Furnish and Install *Am-1 Forty-five (45) Sixty (60) **Am-1 Unit and Transmission Line Suspension Insulators in the 230kV Switchyard, Complete with 1272kcmil AAC and 3 1/2-inch Aluminum Tubular Bus Connections to Existing Equipment

Payment for furnish and install *Am-1 forty-five (45) sixty (60) **Am-1 unit and transmission line suspension insulators in the 230kV switchyard, complete with 1272kcmil AAC and 3 1/2-inch aluminum tubular bus connections to existing equipment will be paid for under CLIN 0008. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing forty-five (45) unit and transmission line suspension insulators in the 230kV switchyard, 1272kcmil AAC equipment drops to the existing equipment including: 230kV CCPDs, 230kV suspension and bus insulators, complete with tensioners, and connecting hardware, and 3 1/2-inch tubular aluminum bus with expansion fittings.

i. CLIN 0009: Inspect Existing Buswork in the 230kV Switchyards and Provide Up to Forty (40) inches of Weld Repair for any Deficiencies.

Payment for inspect existing buswork in the 230kV switchyard and provide a maximum of up to forty (40) inches of weld repair for any deficiencies will be paid for under CLIN 0009. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for an inspection of the 230kV switchyard 3 1/2" aluminum tubular main and auxiliary buses, including a total of forty (40) total inches of welding to repair cracks found during the inspection.

SECTION 01 22 00 Page 4

j. CLIN 0010: System Testing and Commissioning, 230kV Equipment

Payment for Systems Testing and Commissioning, 230kV Equipment will be paid for under CLIN 0010, 230kV Equipment. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for: commissioning nine (9) 230kV motor operated disconnect switches, field acceptance testing twenty-seven (27) 230kV disconnect switches and ten (10) ground switches.

k. CLIN 0011: Contractor-Furnished Training of Government Personnel, 230kV Equipment

Payment for Contractor-Furnished Training of Government Personnel, 230kV Equipment will be paid for under CLIN 0011. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for prepaing operational and maintenance training on the 230kV disconnect switches and ground switches. The instruction for the disconnect switches shall be facilitated by the equipment manufacturer's factory-trained representative. Instruction shall cover, as a minimum, the theory of operation, conrols, operation, routine mainenance, and troubleshooting.

l. CLIN 0012: Prepare and Furnish As-Built Corrections to Contract Drawings, 230kV Work

Payment for Prepare and Furnish As-Built Corrections to Contract Drawings, 230kV Work will be paid for under CLIN 0012. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing as-built corrections to the Contract Drawings.

m. CLIN 0013: All Remaining Work Not Included in the Base Items Above

Payment for All Remaining Work Not Included in the Base Items Above will be paid for under CLIN 0013. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for performing any work clearly required by the plans and specifications that are not already covered in the above descriptions for CLINS 0001 through 0012. The work included in this item includes, but is not limited to: performance and payment bonds; taxes; permits;

site preparation; inspections, and Quality Control/Quality Assurance;

all management, supervisory, and specialized personnel; all office and field overhead; construction scheduling; site maintenance and cleanup;

and all other work not specified in the above bid items.

n. CLIN 0014: All Spare Parts Associated with the Base Items Above

Payment for All Spare Parts Associated in the Base Items Above will be paid for under CLIN 0014. Price and payment shall be full compensation for furnishing all spare parts required by the plans and specifications that are not already covered in the above descriptions for CLINS 0001 through 0013.

1.3.2 Optional Bid Items

a. CLIN 0015: Remove and Dispose of Four (4) 115kV Motor Operated Disconnect Switches

SECTION 01 22 00 Page 5

Payment for the removal and disposal of four (4) 115kV motor operated disconnect switches including motor controllers and all wiring will be made at the job bid price under CLIN 0015. Field verify all existing power and control wiring to the motor controllers before removal to attain information such as function, origins, and terminations. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

b. CLIN 0016: Remove and Dispose of Thirteen (13) 115kV Disconnect Switches and Five (5) Ground Switches

Payment for the removal and disposal of thirteen (13) 115kV disconnect switches and five (5) ground switches will be made at the job bid price under Line Item No. 0016. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

c. CLIN 0017: Remove and Dispose of 1.5 Inch Tubular Bus Sections in the 115kV Switchyard Bays

Payment for the removal and disposal of all 1.5 inch tubular bus sections in the 115kV switchyard will be made at the job bid price under CLIN 0017. The sections that will be removed are shown on the contract drawings and will consist of sections between existing disconnect swithes, SF6 breakers, and suspension insulators. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

d. CLIN 0018: Remove and Dispose of Twenty-seven (27) Unit and Transmission Line Suspension Insulators in the 115kV Switchyard

Payment for the removal and disposal twenty-seven (27) unit and transmission line suspension insulators will be made at the job bid price under CLIN 0018. Price and payment will constitute full compensation for the furnishing of all material, labor, and equipment to accomplish this work.

e. CLIN 0019: Furnish and Install Four (4) 115kV Motor Operated Disconnect Switches, Complete with Wiring, an O&M Manual, and the *Am-1 Manufacturer's **Am-1 Erecting Engineer Services

Payment for furnish and install four (4) 115kV motor operated disconnect Switches, complete with wiring, an O&M manual, and the *Am-1 manufacturer's **Am-1 erecting engineer services will be paid for under CLIN 0019. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing four (4) 115kV motor operated disconnect switches, expansion fittings and 3 1/2 inch aluminum tubular bus as shown, running wiring to the power and control sources, coiling 20 feet of slack cable in the Spread Room for termination by the Government, preparing an Operations and Maintenance Manual for the 115kV motor operated disconnect and switches, and furnishing the services of the switch *Am-1 manufacturer's **Am-1 Erecting Engineer certified to supervise installation and commissioning of the switches. Includes travel, lodging and per diem.

f. CLIN 0020: Furnish and Install Thirteen (13) 115kV Disconnect Switches and Five (5) Ground Switches, Complete with O&M Manual, and

SECTION 01 22 00 Page 6 the *Am-1 Manufacturer's **Am-1 Erecting Engineer Services

Payment for furnish and install thirteen (13) 115kV disconnect switches and five (5) ground switches, complete with O&M manual, and the *Am-1 manufacturer's **Am-1 erecting engineer services will be paid for under CLIN 0020. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing thirteen (13) 115kV disconnect switches, five (5) of which shall be equipped with a grounding switch, expansion fittings as shown, 3 1/2 inch aluminum tubular bus and 1272kcmil ASCR conductors as shown, preparing an Operations and Maintenance Manual for the 115kV disconnect and ground switches, and furnishing the services of the switch *Am-1 manufacturer's **Am-1 Erecting Engineer certified to supervise installation and commissioning of the switches. Includes travel, lodging and per diem.

g. CLIN 0021: Furnish and Install Twenty-seven (27) Unit and Transmission Line Suspension Insulators in the 115kV Switchyard, Complete with 1272kcmil AAC and 3 1/2-inch Aluminum Tubular Bus Connections to Existing Equipment

Payment for furnish and install twenty-seven (27) unit and transmission line suspension insulators in the 115kV switchyard, complete with 1272kcmil AAC and 3 1/2-inch aluminum tubular bus connections to existing equipment will be paid for under CLIN 0021.

Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing and installing twenty-seven (27) unit and transmission line suspension insulators in the 115kV switchyard, 1272kcmil AAC equipment drops to the existing equipment including: 115kV CCPDs, 115kV suspension and bus insulators, complete with tensioners, and connecting hardware, and 3 1/2-inch tubular aluminum bus with expansion fittings.

h. CLIN 0022: Inspect Existing Buswork in the 115kV Switchyard and Provide Up to Twenty (20) inches of Weld Repair for any Deficiencies.

Payment for inspect existing buswork in the 115kV switchyard and provide a maximum of up to twenty (20) inches of weld repair for any deficiencies will be paid for under CLIN 0022. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for an inspection of the 115kV switchyard 3 1/2" aluminum tubular main and auxiliary buses, including a total of twenty (20) total inches of welding to repair cracks found during the inspection.

i. CLIN 0023: System Testing and Commissioning, 115kV Equipment

Payment for Systems Testing and Commissioning, 115kV Equipment will be paid for under CLIN 0023. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for: commissioning four (4) 115kV motor operated disconnect switches, and field acceptance testing thirteen (13) 115kV disconnect switches and five (5) ground switches.

j. CLIN 0024: Contractor-Furnished Training of Government Personnel, 115kV Equipment

Payment for Contractor-Furnished Training of Government Personnel, 115kV Equipment will be paid for under CLIN 0024. Price and payment

SECTION 01 22 00 Page 7 shall be full compensation for furnishing all labor, materials, services, and equipment for prepaing operational and maintenance training on the 115kV disconnect switches and ground switches. The instruction for the disconnect switches shall be facilitated by the equipment manufacturer's factory-trained representative. Instruction shall cover, as a minimum, the theory of operation, conrols, operation, routine mainenance, and troubleshooting.

k. CLIN 0025: Prepare and Furnish As-Built Corrections to Contract Drawings, 115kV Work

Payment for Prepare and Furnish As-Built Corrections to Contract Drawings, 115kV Work will be paid for under CLIN 0025. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for furnishing as-built corrections to the Contract Drawings.

l. CLIN 0026: All Remaining Work Not Included in the Optional Items Above

Payment for All Remaining Work Not Included in the Optional Items Above will be paid for under CLIN 0026. Price and payment shall be full compensation for furnishing all labor, materials, services, and equipment for performing any work clearly required by the plans and specifications that are not already covered in the above descriptions for CLINS 0015 through 0025. The work included in this item includes, but is not limited to: performance and payment bonds; taxes; permits;

site preparation; inspections, and Quality Control/Quality Assurance;

all management, supervisory, and specialized personnel; all office and field overhead; construction scheduling; site maintenance and cleanup;

and all other work not specified in the above bid items.

m. CLIN 0027: All Spare Parts Associated with the Optional Items Above

Payment for All Spare Parts Associated in the Optional Items Above will be paid for under CLIN 0027. Price and payment shall be full compensation for furnishing all spare parts required by the plans and specifications that are not already covered in the above descriptions for CLINS 0015 through 0027.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 22 00 Page 8