Meck Elect_Pre-Proposal Conf 04-01-2022.pdf
PDF 1 MB Posted
- Solicitation number
- W9128A22R0012
About this file
This document summarizes a pre-proposal conference for a federal solicitation seeking design-build construction services. The solicitation seeks replacement of the 4,160 V medium voltage electrical distribution system at Meck Island, U.S. Army Garrison - Kwajalein Atoll in the Republic of the Marshall Islands. Offerors must provide all labor, materials, equipment, tools, transportation, and supervision to remove the existing electrical distribution system and install a new 4,160 V medium voltage system as defined in the specifications and drawings. The base contract and option 1 are for replacement of overhead and underground distribution lines, switchgear, and transformers. The pre-proposal conference presentation covered the project scope, contractor requirements for quality control and safety plans, logistics for travel and lodging on Meck Island, and coordination with the resident office for submittals, requests for information, and schedule updates. The solicitation is available through SAM.gov and phase 1 proposals are due by May 9, 2022.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
PDT Includes:
Michael Howe, Project Manager
Brad Scully, Program Manager
Reid Yamada, Technical Lead
Blair Jones P.E., Kwajalein Resident Engineer
Merbby Nicolas, Contract Specialist
Tracy Tenholder, Contracting Officer
SOLICITATION NO. W9128A22R0012
DESIGN-BID-BUILD (DBB) ELECTRICAL DISTRIBUTION SYSTEM, U.S. MISSILE
DEFENSE AGENCY, MECK ISLAND, MARSHALL ISLANDS
PRE-PROPOSAL CONFERENCE
DATE: 01 APRIL 2022
BUILDING STRONG®
Intro of Government Personnel POH Staff
Rules of conference
Quick tips for solicitations
Contracting requirements
Project Overview
General construction requirements
Typical Challenges For Contractors
DISCUSSION OVERVIEW
RULES FOR CONFERENCE
Unofficial and non-binding If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern
Gov providing photos only of areas relevant to the scope of this contract
All Questions / Inquiries shall be submitted via the PROJNET Bidder Inquiry Model at: https://www.projnet.org/projnet/
Bidder Inquiry Key: 4JGRP3-S4AXDX **RFIs are requested to be submitted NLT 15 April 2022 5pm HST** https://www.projnet.org/projnet/
Review all the solicitation requirements
Follow solicitation format as required
Acknowledge all amendment(s)
Respond to every submission requirement
Solicitations will be accepted from Prime Contractors only
QUICK TIPS FOR ALL SOLICITATIONS
RFP SOLICITATION FORMAT
Standard Form 1442 Section 00 10 00, CLIN Schedule Section 00 21 16, Instructions to Proposers ProjNet Key/RFIs Proposal Submission Basis for Award Evaluation Criteria Rating Criteria
Section 00 45 00, Reps and Certs Section 00 70 00, Contract Clauses Section 00 72 00, S & K Supplementary Terms & Conditions Section 00 73 00, Attachments
UES, Quarantine Expectations, Catalog of Services, Meck LSA, etc.
Division 01 100% Design Specifications and Drawings
Make sure to note the proposal due date and time in Block 13A of
SF1442.
Phase 1 Proposals are due 09 May 2022, 2:00pm HST.
Offers shall be no less than 90 calendar days for Government acceptance (see block 13D).
Fill out Blocks 14, 15, 16, 18, 19, 20A, 20B, and 20C.
STANDARD FORM (SF) 1442
PROJECT OVERVIEW
• This project is for the replacement of the 4,160 V medium voltage (MV) electrical distribution system located at Meck Island, U.S. Army Garrison – Kwajalein Atoll, Republic of the Marshall Islands.
• The project consists of Base contract and Option 1
• Refer to bid schedule for CLINs and provided
Plans/Specifications.
• Lodging
• Life Support Area (LSA) or “man-camp” will be provided by the government on Meck Island.
• Life Support Area on Meck consists of 8 Tents; 3 shower tents (2M, 1F), 1 MWR tent and 4 sleeping tents that can support 90 personnel and was constructed in 2012.
• Two latrine and shower tents for male personnel that have eight showers, toilets and sinks each
• One shower tent for females has four showers, toilets and sinks and supports the hot water for all shower facilities
• Laundry facility located on Meck
• Meals
• Meals will be provided by the government at and at the government’s expense at the Meck Island Dining Facility.
• The Meck DFAC can support up to 50 personnel.
• Logistics
• Travel to Meck Island
• Catamaran running 4 days per week.
• Meck Island does have helicopter landing area.
• Shipping to Meck coordinated through Marine Department
• Medical services provided on Kwajalein Island at Kwajalein Hospital.
• Important documents for Kwajalein projects:
• Republic of the Marshall Islands Travel Advisory
• Latest versions provided by U.S. Army Garrison Kwajalein Atoll
• K-Clauses
• Kwajalein Atoll special considerations
• USAG-KA Environmental Standard 16th Edition
• USAG-KA Catalog of Services
• Shipping materials to Meck Island
• Fuel costs – subject to change
• Kwajalein Installation Design Guide
CONSTRUCTION GENERAL REQUIREMENTS
This project is required to complete documentation through the RMS 3.0 Contractor Module system.
This contract is required to implement the Three Phase Inspection process for all features of work as part of the Contractor’s Quality Control Plan.
Schedule reviews and updates shall be made and submitted monthly with the requested progress payments.
The project will be required to follow latest version EM 385-1-1.
Construction regular working hours are Tues ~ Sat 9 hour days.. Sunday, federal holiday, and other than normal working hours may be arranged if coordinated 21 calendar days in advance and if approved by the government.
USACE RESIDENT OFFICE COMMITMENT TO
CONTRACTORS
• Success can never be one sided. Together the Contractor and the USACE RO will work together as a team to complete this project on time, within the budgeted amount, and with no time lost to accidents.
• Help the Contractor be successful with all aspects of this project
• Submittals
• Request for Information (RFI)
• Coordination with the installation
• Overall Documentation
• Communication
• Openly
• Honestly
• Timely
• Assumptions
• Contractors know how to build
• USACE RO focus on areas where assistance is required
TYPICAL PROJECT ORGANIZATION AT USACE
RESIDENT OFFICE FOR RMI
Project Engineer/ Quality Assurance
Rep.
Honolulu Engineer District
USACE Quality Assurance
Representatives
Omaha District Center of Expertise for Airfield paving
Resident Engineer/Administrative
Contracting Officer Administrative Assistant
US Army Garrison Kwajalein Atoll
Base Operations Contractor
File Name
TYPICAL CHALLENGES FOR CONTRACTORS
Logistics
Scheduling
Understanding requirements
Impacts to project schedules on long lead items
Submittal documentation
Security requirements for contractor personnel
USACE RESIDENT OFFICE’S APPROACH TO CHALLENGES
Logistics ► RO will advise and assist as needed with base operations to aid in shipping issues
Scheduling ► On-going communication, collaboration and coordination ► RO will aid in coordinating locations, times, dates of work hours with
USAG-KA as necessary to ensure smooth coordination ► Discuss expectations up front ► Submittal duration ► RFI duration ► Contract modification duration ► Constant monitoring
File Name
USACE RESIDENT OFFICE’S APPROACH TO CHALLENGES
Understanding Requirements ► RO is available and tasked to interpret the contract requirement as they are presented in the contract.
► The contractor is responsible read and understand the entire contract as it is written.
Impacts to project schedules on long lead items ► RO will place priority on submittal reviews for long lead items ► Contractor is responsible for make RO aware of long lead submittals and submitting them within the appropriate time limits
Submittal documentation ► RO will provide timely reviews of submittals with specific comments directly referenced within the specifications.
► Contractor is responsible for fully reviewing and approving each submittal before it is submitted to RO for review as outlined within the QC process.
FORMULA FOR SUCCESS
File Name
• The Contractor and the U.S. Army Corps of Engineers are one team.
• Success can never be one sided. Together the Contractor and the RO will work together as a team to complete this project on time, within the budgeted amount, meet quality requirements, and no time lost from accidents.
• RO wants the Contractor to bid on future U.S. Army Corps of Engineer projects
• Your success means that we as a team succeed.
THANK YOU!
*REMINDER: Please submit RFIs in ProjNet by 15 April 2022 5pm HST*
| �Solicitation No. W9128A22R0012�Design-BID-Build (DBB) Electrical Distribution System, U.S. Missile Defense Agency, Meck island, Marshall islands��pre-PROPOSAL conference�date: 01 APRIl 2022�� � | |
| Discussion overview� | |
| Rules for conference � | |
| Slide Number 4 | |
| �RFP SOLICITATION FORMAT� | |
| Slide Number 6 | |
| Project Overview� | |
| Project Overview� | |
| Project Overview� | |
| Project Overview� | |
| CONSTRUCTION General requirements� | |
| Slide Number 12 | |
| Slide Number 13 | |
| Slide Number 14 | |
| Slide Number 15 | |
| Slide Number 16 | |
| Formula for Success | |
| Slide Number 18 |
File details come from the government source that posted it. Updated .