1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AM-0001 21 Mar 16
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
CECT – Contracting Division USACE, Honolulu District Bldg 252 (CECT-POH) Ft Shafter, HI 96858-5440
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
W9128A-16-B-0002 X
9B. DATED (SEE ITEM 11)
02/26/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return _ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
FY14 MCA PN 059779 Echo Pier Restoration, U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands
See Page 2 of 2 Pages
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Am-0001 Standard Form 30
RFP No. W9128A-16-B-0002 Page 2 of 2 Pages
Item No. 14 (Continued)
1. CHANGES TO SPECIFICATIONS. Attached hereto are revised pages/paragraphs to the specifications.
Revised pages replace like-numbered pages. The revision mark (Am-0001) is shown on each revised page.
A. NEW SECTIONS. The following are added to the sections.
Section 00 73 00, Appendix A, Site Visit Attendees
Section 00 73 00, Appendix B, Pre-bid Slides
Section 00 73 00, Appendix C, Requests for Information (RFIs), #1 and 2
2. The bid opening remains unchanged. See SF 1442, Page 1, Block 13A.
Print Name
PttvtL.- S ~Dov.S "-1
O:Av1.D C)l-~~
1/cAC 1 \GAZu 1~ :;_ (-.J.
~ 1 r, f\l1A·~~ \\!\ \i.J:.,~
.110R..l5 A0.Ui_1
3 ·l' ; o....,,., L £AO-"-lai.
"E>L .A.~-t.- DNo ~(.I H
1l~C> .
STift/~
Sign In Sheet - Site Visit W9128A-16-B-0002 W9128A-16-B-0002 FY14 MCA PN 059779 Echo Pier Restoration, USAG-KA, RMI
17-Mar-16
Signature
~ '"",._.-t-'
<L2. ( _.c
__ ;"/}f-£"~, ~ L·
·--..._/1 \ ,,+-- ~ r\ /1 r, ' ' ·i \ 11 1 ·\!\ l·v v v f' VI / 1, \ . /, 1Jc.k~u 1 ~~
\j u-'1fi_,, Cn.~ ;0_;(--
Company
U.5A-C...E
\}(.(.\lb- - !<:.A-
Cc;:
USAC-t
U0AC-C'
C-A.-J.o L'- l-
/l-1/b?..S#;t/"- /Si.A.IJJ> '23,;;·a~.t<S ;:n;
Ht EL t0 4 rJ, /.JC
Nfhlf1 /lifl
(' v/" c / · f,,.' ._ ....c,_, C.{"t~:C
J ut. ~ $ e L - o. l< ,, CC)//"'\
8'i""1 -5Gu-6E!i?..~
7-f'O'-/", Mt e<.J//yt:/"' ec:Ji ho/~. rV»(_.
·s-- tiS1'5 l i a J< ;,. <J:.'» Yi a v'I h 4 e;.1t?.. .' • • r· .:.M--
B·occ ·· 1s-1~ z;1c;r /}1L:/ tvl4H.~__,;v ~f I~ /ff.I' cum
Print Name
? J\.,-\1.. 511:1:1 ti.,;S l<-1
'r I .~C/
--(l...-,,,-1. c:._.._, j~,L l--t.-i. v1fi.....::-...,;..__,,...
TrrJJ4 rt'{~ A-; J, - ';',TG' b.o.!lf- VWns,~L1•-I
9A:J ~ tJ C.t\S I J f
6i1T°'- Gl--CA.dfA._ l6 /J.0wJrrz /
Sign In Sheet - Site Visit
W9128A-16-B-0002 FY14 MCA PN 059779 Echo Pier Restoration, USAG-KA, RMI
18-Mar-16
Signature f7 ~ __d ,,_.t,.-+f-'
/// ~-:r-- ~::/l---; l·
Company l>,..S Q,..c...,E.
- .4-,.. = '\ -'.J V'iJ:;::
07.AG-- ~I).
G\jA-CE c5/!C;t.
Pc-vJc,f /
CA_'{() LLL
fJIK\SorJ g1
!1f!JA{;6
Phone Number
0 n ... S<i?l -b'U-C::8
G7/- ~~01·-r1oq
Section 00173 00, Appendix A m-0001
W9128A-16-B-0002
.C Co4"0
US Army Corps of Engineers
BUILDING STRONG®
Pre-Bid Conference
FY14 MCA PN 059779 Echo Pier
Restoration, U.S. Army Kwajalein Atoll
17 March 2016
W9128A-16-B-0002
Section 00 73 00, Appendix B
(Am-0001) - Page 1
Government Team
Brad Scully, Project Manager
Dorinda Won, Construction Services
Paul Sadowski, Resident Engineer
Tracy Kazunaga, Cost Engineer
Doris Aguilar, Program Analysis
Dayna Matsumura, Contract Specialist
Jennifer Ko, Contracting Officer
W9128A-16-B-0002
(Am-0001) - Page 2
Conference
Conference is not being recorded.
There will not be a transcript made of what is said at this conference or the site visit.
The presentation slides will be posted on
FBO as an amendment early next week.
W9128A-16-B-0002
(Am-0001) - Page 3
Must be in Writing
Submit questions in writing
►Index cards at this conference and also by email.
Gov Responses
►Verbal for conference, but …
►Will be in writing, issued as amendment
►Only amendments count!
►Only amendments are contractual!
W9128A-16-B-0002
(Am-0001) - Page 4
(Am-0001) - Page 5
(Am-0001) - Page 6
(Am-0001) - Page 7
(Am-0001) - Page 8
Project Description
Deck and foundation replacement
►Complete between Charlie/Delta/Echo
►Deck only between Bravo/Foxtrot
Support utilities
►Potable & non-potable water, fire protection, sewer force main, electricity, communications
2 warehouses
►Pier and on-shore
W9128A-16-B-0002
(Am-0001) - Page 9
Project Location
Pier Warehouse
On-shore Warehouse
W9128A-16-B-0002
(Am-0001) - Page 10
Project Facilities
W9128A-16-B-0002
(Am-0001) - Page 11
Bravo Berth
W9128A-16-B-0002
(Am-0001) - Page 12
Charlie Berth
W9128A-16-B-0002
(Am-0001) - Page 13
Delta Berth
W9128A-16-B-0002
(Am-0001) - Page 14
Echo Berth
W9128A-16-B-0002
(Am-0001) - Page 15
Foxtrot Berth
W9128A-16-B-0002
(Am-0001) - Page 16
Echo Pier Piling
W9128A-16-B-0002
(Am-0001) - Page 17
Phasing Objectives
►Maintain operations during construction
• Container ship
• Worthy berthing
• Ferry service
►Maintain pedestrian access
►Maintain utility services
►New on-shore warehouse must be operational before existing pier warehouse can be demolished
W9128A-16-B-0002
(Am-0001) - Page 18
(Am-0001) - Page 19
(Am-0001) - Page 20
Phasing (cont)
Sequence of work within Phases (Phasing plans) is not mandatory
Develop phasing plan
► Submit early
► No additional cost
Meet phasing objectives
► Accessibility
► Utilities
►Addendum 1 Phasing Guidelines
• Phases A, B, C
W9128A-16-B-0002
(Am-0001) - Page 21
Phase A
On-Shore
Warehouse
W9128A-16-B-0002
(Am-0001) - Page 22
Phase B
Pier Warehouse
BL A Sta 6+48.52
On-Shore
Warehouse
W9128A-16-B-0002
(Am-0001) - Page 23
Phase C
BL A Sta 6+48.52
On-Shore
Warehouse
Pier
Warehouse
BL A Sta 0+00
W9128A-16-B-0002
(Am-0001) - Page 24
Phasing (cont)
Safety considerations
►Separate construction area from public
►Pedestrians
►Vehicles
• Operations
• Fire and emergency
W9128A-16-B-0002
(Am-0001) - Page 25
Typical Berthing
Worthy Container ship
Great
Bridge
Ferries
W9128A-16-B-0002
(Am-0001) - Page 26
Container Ship Operations
Schedule construction activities to accommodate – NO exceptions
►Arrives approximately every 2 weeks
►Unload and load approximately 2 days
►Subject to change; communicate with RE and
Marine Operations offices
Vehicle access from shore, 20-feet wide
Structural loading, see S-001
W9128A-16-B-0002
(Am-0001) - Page 27
Container Operation Area during Phase A
W9128A-16-B-0002
(Am-0001) - Page 28
Container Operation Area during construction between
Charlie-Delta-Echo berths – Phase B
W9128A-16-B-0002
(Am-0001) - Page 29
Drawing Labels
Base Bid as shown, Options breakdown
Utilities along Bravo and Foxtrot
►Required regardless of station on bid schedule
►Before station: in concrete utility trench or buried
►After station: in above grade concrete encasement
Addendum 1, Table 1
W9128A-16-B-0002
(Am-0001) - Page 30
Naming Conversion C o n d it io n
For work Between BL A station 6+48.52 to BL A station 4+00
For work Between BL A station 4+00 and BL A station 2+00
For work Between BL A station 2+00 and BL A station 0+00
Final station (as bid) See Work labeled on Drawings as:
1 No work beyond BL A station 6+48.52 Base Bid, Phase 2 Base Bid, Phase 2 Base Bid, Phase 2
2 Between BL A station 6+48.52 to BL A station 4+00
Option 1
(Temporary utilities required in Phase B)
Base Bid, Phase 2
Must be completed in
Phase B
Base Bid, Phase 2
Must be completed in
Phase B
3 Between BL A station 4+00 and BL A station
2+00
Option 1
(Temporary utilities required in Phase B)
Option 2
(Temporary utilities required in Phase B)
Base Bid, Phase 2
Must be completed in
Phase B
4 Between BL A station 2+00 and BL A station
0+00
Option 1
(Temporary utilities required in Phase B)
Option 2
(Temporary utilities required in Phase B)
Option 3
(Temporary utilities required in Phase B)
W9128A-16-B-0002
(Am-0001) - Page 31
Example: Condition 2 Bid Station = 5+64.66
CU105
CU102
W9128A-16-B-0002
(Am-0001) - Page 32
Bid Schedule
$56,087,246 max
• Enter complete bid for all items: Bid + LSC
• Award basis: TOTAL Base
Bid plus ALL options
• Award funding limited
• 270 cd to exercise options
• Options exercised in order
W9128A-16-B-0002
(Am-0001) - Page 33
Evaluation Preference
Bids from firms that do not qualify as
United States firms or Marshallese firms will be evaluated by adding 20 percent to the bid, unless application of the factor would not result in award to a United
States firm.
See full text in DFARS clause 252.236-
7012 (IFB Section 00 45 00)
W9128A-16-B-0002
(Am-0001) - Page 34
Working on Kwajalein
Sponsorship
LSC
K-Clauses located: Section 00 73 00
(highlighted in the following slides)
W9128A-16-B-0002
(Am-0001) - Page 35
K-Clauses
K-10 Restrictions on Local Hire
Local hire is limited to Marshallese and to citizens or legal alien residents of the U.S.
and shall be subject to the written approval of the Commander of USAKA.
W9128A-16-B-0002
(Am-0001) - Page 36
K-11 MOVEMENT OF CARGO VIA CONTRACTOR-CHARTERED
COMMERCIAL VESSELS
K-12COMMUNICATION FACILITIES
K-13ON-LOADING AND OFF-LOADING OF CARGO FROM
SURFACE VESSELS OR AIRCRAFT; TRANSPORTATION TO
JOBSITE
K-14HOUSING FACILITIES - CONTRACTOR PROVIDED
MANCAMP
K-15COMPLIANCE WITH LOCAL LAWS
K-16DEPENDENTS
K-17MEDICAL AND DENTAL SERVICES
K-18POSTAL FACILITIES
W9128A-16-B-0002
(Am-0001) - Page 37
K-19MANAGEMENT AT JOBSITE
K-20POL PRODUCTS
K-21ORDNANCE DISPOSAL
K-22STORM PROTECTION
K-25MECHANICAL DIGGING PERMIT
K-27DELAYS TO WORK DUE TO MISSILE LAUNCHES
K-28MARSHALLESE INCOME TAX
K-29RESTRICTIONS ON HAULING
K-30MESSING FACILITIES
K-31WARRANTY IMPLEMENTATION
K-32 RATES FOR VARIOUS PRODUCTS AND SERVICES
K-33SAILING INSTRUCTIONS, PORT OF KWAJALEIN
W9128A-16-B-0002
(Am-0001) - Page 38
K-34TRANSPORTATION AND PROCESSING OF PERSONNEL,
MATERIALS AND EQUIPMENT
K-36VEHICLE REGISTRATION
K-37WORKERS COMPENSATION INSURANCE (DEFENSE BASE
ACT)
K-6 UTILITY OUTAGES
K-8 AVAILABILITY AND USE OF UTILITY SERVICES
K-9 CLEARANCE, ENTRY AND SECURITY REQUIREMENTS
W9128A-16-B-0002
(Am-0001) - Page 39
K-7 UTILIZATION OF MARSHALL ISLANDS SUBCONTRACTORS
AND EMPLOYMENT OF MARSHALL ISLANDS PERSONNEL
Employment preference shall be given by the Contractor, without discrimination, to citizens, nationals, and permanent resident aliens of the
Marshall Islands and of the United States
Low bidder must submit its Subcontracting and Hiring Plan (the Plan) to the
Contracting Officer NO LATER THAN five (5) calendar days after bid opening date. The Plan addresses the contractor's plan as to how it will subcontract and employ, as much as reasonably practicable, local contractors and Marshall
Islands personnel.
No award will be made to the apparently successful offeror unless and until it submits a Plan that is satisfactory to and approved by the Contracting Officer.
W9128A-16-B-0002
(Am-0001) - Page 40
FY14 PN 059779 Echo Pier Restoration, U.S. Army Kwajalein Atoll (USAKA), Republic of the Marshall Islands
W9128A‐16‐B‐0002
RFI # Question Issued Response
Please advise what percentage of contract value will be required for bonding, payment & performance bond both.
See Section 00 21 13, Provision 52.228-1 Bid Guarantee, S-28.1 Execution of Bid Bond, and S-28.2 Penal Sum and Form of Bid Bond for bid bond. See Section 00 73 00, S-28.8, Performance and Payment Bonds.
In Section 00 10 00-1, bid schedule shows option bids 1 to 8 from Stations BL A 6+48.52 to 0+00.00.
On several drawings such as sheets G-007, CG-107, CG-108, CG-109, CP-105, CP-106, CP-107, etc., they are showing Options 1 to 3 only with different stationing per option.
Please confirm if Options 1 to 3 showing on plans will prevail over the Bid Schedule. If so, issue a revised Bid Schedule. See Section 01 90 00, Addendum 1
Section 00 73 00, Appendix C, Requests for Information ‐ Page 1 (Am‐0001)
| Am-0001 - SF30 |
| Section 00 73 00, Appendix A, Site Vist Attendees |
| Pre-bid Conference |
| Pre-bid Site Visit |
| Section 00 73 00, Appendix B, Pre-bid Slides |
| Section 00 73 00, Appendix C, Requests for Information |