FY14 MCA PN 059779 Echo Pier Restoration W912A-09-D-0023 U.S. Army Kwajalein Atoll (USAKA)
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 90 00
MISCELLANEOUS PROVISIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PROJECT MANAGEMENT ORGANIZATION
1.3.1 General
1.3.2 Organization Plan
1.3.3 Organizational Changes
1.3.4 Project Manager
1.3.5 Project Superintendent
1.4 DOCUMENTATION OF MEETINGS
1.5 CONTRACTOR QUALITY CONTROL
1.6 PRODUCTS CONTAINING RECOVERED MATERIALS
1.7 AS-BUILT DRAWINGS
1.8 INSPECTION OF EXISTING CONDITIONS
1.9 DUST CONTROL
1.10 PROTECTION
1.10.1 Warning Signs and Barricades
1.10.2 Protection of Grassed and Landscaped Areas
1.10.3 Protection of Trees and Plants
1.10.4 Protection of Building From the Weather
1.11 RESTORATION WORK
1.12 REMOVAL AND DISPOSAL
1.12.1 Title to Materials
1.12.2 Rubbish and Debris
1.12.3 Grass Cutting
1.13 INTERFERENCE WITH GOVERNMENT OPERATIONS
1.13.1 Coordination
1.13.2 Utilities and Facilities
1.13.2.1 Outage Request
1.13.2.2 Staking and Flagging Existing Utilities
1.14 PROCEDURES FOR ROAD CLOSURES
1.15 CONTRACTOR'S OPERATIONS OR STORAGE AREA
1.16 WORKING HOURS
1.17 STAINLESS STEEL TYPE 316
1.18 WATER AND ENERGY CONSERVATION
1.19 ELECTRONIC FILES
1.20 ADDENDUM 1
1.21 SUPPLEMENTAL INFORMATION
1.22 PROJECT TRANSPORTATION
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
SECTION 01 90 00 Page 1 (Am-0004)
-- End of Section Table of Contents --
SECTION 01 90 00 Page 2
SECTION 01 90 00
MISCELLANEOUS PROVISIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM A240/A240M (2014) Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
1.2 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals;
Organization Plan; G
Provide a diagram depicting the proposed management organization. The chart shall clearly identify lines of authority and areas of responsibility. Include a narrative description of how the management team will operate, and the specific duties and responsibilities of the key individuals.
The narrative shall describe the Contractor's on-site organization and structure, and shall describe how the Contractor intends to monitor and control timeliness, quality, and safety of the work at the job site, including the work of any subcontractors on all phases of the contract.
Identify the individuals who will fill the key management positions: Project Manager, Project Superintendent, Contractor Quality Control System Manager, , Site Safety and Health Officer.
Provide resumes for each individual. Resumes must support the individual's qualifications to perform in the selected position.
Provide copies of letters of direction to each key personnel from an appropriate officer of the company.
Dig Permit
Condition of Contractor's Operations or Storage Area
The Contractor shall submit to the Contracting Officer
SECTION 01 90 00 Page 3 photographs and/or videos depicting the condition of the Contractor's Operation or Storage Area.
SD-06 Test Reports
Inspection of Existing Conditions
Dust Control; G
Method(s) of dust control.
SD-07 Certificates
Products Containing Recovered Materials
1.3 PROJECT MANAGEMENT ORGANIZATION
1.3.1 General
The Contractor is responsible for ensuring that the contract is adequately staffed to manage all of the work in full accordance and compliance with the contract requirements.
1.3.2 Organization Plan
The Contractor shall submit an organization plan describing the organization for managing this contract. The plan shall include lines of authority, position responsibilities, and qualifications of the staff.
The project staff shall minimally consist of the following key personnel:
Project Manager, Project Superintendent, Contractor Quality Control System Manager, and Site Safety and Health Officer. Each of the individuals selected to fill these positions is subject to acceptance by the Contracting Officer.
1.3.3 Organizational Changes
The Contractor shall maintain the project management staff at full strength at all times. When it is necessary to make changes to the staff, the Contractor shall revise the Organization Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance at least 14 calendar days prior to implementation of the changes.
Substitutions for any accepted key personnel must be submitted for review and acceptance by the Contracting Officer prior to the start of work by that individual. The Contractor is informed that the Government shall be allowed at least 30 days to respond. Any delays resulting from this process shall be the responsibility of the Contractor and shall not be a basis for any equitable contract adjustment.
1.3.4 Project Manager
The Project Manager shall be responsible for the Contractor's overall management and coordination of this contract and shall be the central point of contact with the Government for performance of all work under this contract, including warranty. The Project Manager shall oversee construction accomplishment, administer all instructions, and answer all questions from the Contracting Officer pertaining to the work during the life of the contract, including the warranty period. The Project Manager shall be responsible for the complete coordination of all work in this
SECTION 01 90 00 Page 4 contract. The Project Manager shall be responsible for ensuring that adequate internal controls and review procedures are followed in order to eliminate conflicts, errors and omissions, and for ensuring that all technical requirements are met. Another individual may be designated to temporarily act (no longer than 2 weeks) for the Project Manager, however, forty-eight (48) hours advance notice in writing of such change shall be requested to the Contracting Officer, and no change shall be made without prior acceptance by the Contracting Officer.
The Project Manager shall have a bachelor's degree from an accredited university or college with a major in engineering, architecture, or related technical field, and at least ten (10) years experience in managing and supervising construction projects of similar size and scope.
The Project Manager shall be assigned no other duties.
1.3.5 Project Superintendent
A Project Superintendent shall be assigned. This individual shall have a minimum of ten (10) years experience as a superintendent on construction projects similar in size and scope to this contract. The project superintendent shall have overall responsibility for all operations on the jobsite. The superintendent shall be assigned no other duties.
1.4 DOCUMENTATION OF MEETINGS
All meetings involving the Contractor and the Government shall be documented. Except for the Preconstruction Meeting and the CQC and Safety coordination/mutual understanding meetings which will be documented by the Government, the Contractor shall be responsible for accurately recording minutes of meetings and producing written documentation of meeting discussions. The minutes shall include meeting specifics such as:
contract number, date, time, purpose/subject, attendees, and summary of discussions in outline form, including pending actions, responsible party, and suspenses. Prior to distribution of the minutes, a Draft of the minutes shall be prepared and forwarded within 24 hours of the meeting’s conclusion to all meeting attendees for review and comment. The Final minutes shall be completed and distributed within 3 working days following the meeting.
1.5 CONTRACTOR QUALITY CONTROL
To assure compliance with contract requirements, the Contractor shall establish and maintain quality control for materials and work, covered by all sections of the TECHNICAL REQUIREMENTS in accordance with Section 01 45 04 CONTRACTOR QUALITY CONTROL. Records shall be maintained for all operations including sampling and testing.
1.6 PRODUCTS CONTAINING RECOVERED MATERIALS
The Contractor shall submit manufacturer's certification attesting that product meets or exceeds EPA's recovered material guidelines.
1.7 AS-BUILT DRAWINGS
As-built drawings shall be in accordance with Section 01 78 00 CLOSEOUT
SUBMITTALS.
SECTION 01 90 00 Page 5
1.8 INSPECTION OF EXISTING CONDITIONS
A written report with color photographs noting the condition of the existing facilities at the time of the inspection. One copy of the report including photographs shall be submitted to the Contracting Officer, prior to construction.
1.9 DUST CONTROL
The amount of dust resulting from the Contractor's work shall be controlled to prevent the spread of dust to occupied portions of the construction site and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.] Measures shall also be taken for dust control along haul routes and equipment parking areas.
1.10 PROTECTION
The Contractor shall take all necessary precautions to insure that no damages to private or public property will result from his operations.
Any such damages shall be repaired or property replaced by the Contractor in accordance with the CONTRACT CLAUSES entitled "PERMITS AND RESPONSIBILITIES" and "PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS", without delay, and at no cost to the Government.
1.10.1 Warning Signs and Barricades
The Contractor shall be responsible for posting warning signs or erecting temporary barricades to provide for safe conduct of work and protection of property.
1.10.2 Protection of Grassed and Landscaped Areas
The Contractor's vehicles shall be restricted to paved roadways and driveways. Vehicles shall not be driven or parked on grassed and/or landscaped areas except when absolutely necessary for the performance of the work and approved in advance by the Contracting Officer. Grassed or landscaped areas damaged by the Contractor shall be restored to their original condition without delay and at no cost to the Government.
1.10.3 Protection of Trees and Plants
Where necessary, tree branches and plants interfering with the work may be temporarily tied back by the Contractor to permit accomplishment of the work in a convenient manner, so long as they will not be permanently damaged thereby. If this is not feasible, they may be pruned, subject to written approval by the Contracting Officer.
1.10.4 Protection of Building From the Weather
The interior of the building and all materials and equipment shall be protected from the weather at all times.
1.11 RESTORATION WORK
Existing conditions or areas damaged or disturbed by the Contractor's operations shall be restored to their original condition, or near original
SECTION 01 90 00 Page 6 condition as possible, to the satisfaction of the Contracting Officer.
1.12 REMOVAL AND DISPOSAL
The Contractor shall salvage or recycle waste to the maximum extent practical as it relates to the capabilities of local industries. A record of the quantity of salvaged or recycled materials shall be maintained by the Contractor during the length of the project and submitted to the Contracting Officer at acceptance of the project. Quantities shall be recorded in the unit of measure of the industry. Reuse of materials on the site shall be considered a form of recycling. An example of such reuse would be the use of acceptable excavated materials as fill.
1.12.1 Title to Materials
Title to all materials and equipment to be removed, except as indicated or specified otherwise, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after the Contractor's receipt of notice to proceed. Items indicated to be removed shall be removed and disposed of by the Contractor outside the limits of Government-controlled property at the Contractor's responsibility and expense before the completion and final acceptance of the work, and such materials shall not be sold on the site.
1.12.2 Rubbish and Debris
Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation.
Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
1.12.3 Grass Cutting
The Contractor is responsible for cutting/trimming all grassed areas within the project limits, regardless of the location of any project fencing. Maintain grass height no taller than 2 inches at all times.
1.13 INTERFERENCE WITH GOVERNMENT OPERATIONS
The Contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area. Free passage into adjoining or adjacent buildings not in the contract will not be permitted except as approved by the Contracting Officer. Procedures and methods shall also provide for safe conduct of work and protection of property which is to remain undisturbed.
1.13.1 Coordination
The Contractor shall coordinate all work with the Contracting Officer to minimize interruption and inconvenience to the occupants or to the Government. Scheduling and programming of work will be established during the pre-construction conference.
1.13.2 Utilities and Facilities
All utilities and facilities within the area shall remain operable and shall not be affected by the Contractor's work, unless otherwise approved in writing in advance by the Contracting Officer.
SECTION 01 90 00 Page 7
1.13.2.1 Outage Request
All electrical and water outages require ten (10) calendar days advance notice.
Water: Stan Jazwinski (Liquid Plants Supervisor) 805-355-1847 Electrical: Generator Shop 805-355-3426 or 805-355-3100
1.13.2.2 Staking and Flagging Existing Utilities
The Contractor, prior to start of any excavation or trenching work, shall complete the Dig Permit Application (Attachment A) and shall verify the location of all utility lines shown on the drawings which are within the areas of work, and shall mark, stake, or flag each utility line along trench alignments and under areas of excavation under this project, as approved. Existing utility lines shall be located by walking trench alignments with approved equipment for locating underground pipes and cables. Utility lines so located shall be noted on the drawings. See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, EXCAVATIONS paragraph for additional requirements.
1.14 PROCEDURES FOR ROAD CLOSURES
Notify Police/Fire/EMS and USAG-KA DPW five (5) working days in advance of scheduled closure.
1.15 CONTRACTOR'S OPERATIONS OR STORAGE AREA
At the request of the Contractor, an open operations or storage area will be made available within the installation, the exact location of which will be determined by the Government. The Contractor shall be responsible for the security necessary for protection of his equipment and materials, and shall maintain the area free of debris. No rusty or unsightly materials shall be used for providing the secure measure and such measure shall be erected in a workmanlike manner. Before any construction commences on establishing the operation/storage area, Contractor shall take photographs and/or videos of the site in order to establish the original conditions of the site. A duplicate set shall be made and submitted to the Government for its files. Upon completion and prior to the final acceptance of the contract work, the Contractor shall restore the area to its original condition.
1.16 WORKING HOURS
All work shall be performed between the hours of 0730 to 1600 local time, Tuesday through Saturday. No work shall be accomplished on Sundays, Mondays and all Federal holidays without written permission from the Contracting Officer. Such written permission shall be available at the job site at all times during construction.
1.17 STAINLESS STEEL TYPE 316
All stainless steel shall be Type 316.
1.18 WATER AND ENERGY CONSERVATION
The Contractor is responsible for water and energy conservation at the job site and shall appoint an individual responsible for ensuring compliance.
SECTION 01 90 00 Page 8
The designated individual shall check the jobsite at the close of business each day to ensure all lights, utilities, and equipment are properly secured, turned off and powered down.
1.19 ELECTRONIC FILES
All paper documents submitted to the government, including, but not limited to meeting minutes, bonds, insurance certificates, correspondence, weekly payrolls, proposals, accident reports, submittals, etc shall be accompanied by an electronic copy of the document in pdf format, at the same time that the paper document is submitted. The PDF copy shall be identical to the paper copy including signatures where applicable. The file name shall consist of the document type/name, subject and document date. Electronic files may be submitted on CD, DVD or by email. Include a list of the documents included in the electronic submittal.
1.20 ADDENDUM 1
The plans and specifications HAVE NOT been updated with the latest requirements. The attached pages designated as Addendum 1 identify revisions that must be considered when pricing and executing the work.
1.21 SUPPLEMENTAL INFORMATION
The attached reports are information supplemental to the drawings and specifications. The information contained within these reports indicate the conditions encountered only at the locations and times designated, and may not represent conditions at other locations or at present. Conditions may differ from those depicted in these reports due to the passage of time, weather events, or other changes.
These reports are furnished for the convenience of the bidder. No assurance is given that the conditions shown in the reports are representative of the conditions to be encountered during construction.
The bidder is solely responsible for all assumptions, deductions, or conclusions which he may make or derive from his examination of the information contained in these reports.
Attachment B: HAZARDOUS MATERIALS SURVEY REPORT, dated October 2013
Attachment C: SEDIMENT SAMPLING AND ANALYSIS REPORT, dated October
Attachment D: FINAL HYDROGRAPHIC SURVEY ECHO PIER, KWAJALEIN ATOLL, dated October 2012
1.22 PROJECT TRANSPORTATION
Provide one (1) electric golf cart for exclusive use by the government for the duration of the contract with the following minimum configuration:
Eight 6 V (48 V) batteries
4 passengers with rear flip seat
Roof
Foldable tinted windshield
SECTION 01 90 00 Page 9
Rear view mirrors on both sides
Horn, reverse beep, parking brake
Street legal lighting package: headlights, taillights, brake lights, turn signals
High/low speed switch
Battery indicator
Automatic battery charger
20 A, 48 V to 12 V voltage reducer for all accessories
Vehicle shall be available within 60 calendar days from Notice to Proceed. The cost of maintenance shall be borne by the Contractor. Upon completion of the contract, the golf cart shall be disposed of by the Contractor.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 90 00 Page 10
FY14 MCA PN 059779 Echo Pier Restoration W9128A-09-D-0023
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 50 13
MISCELLANEOUS METAL FABRICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALIFICATION OF WELDERS
1.4 DELIVERY, STORAGE, AND PROTECTION
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
2.1.2 Structural Tubing
2.1.3 Steel Pipe
2.1.4 Fittings for Steel Pipe
2.1.5 Stainless Steel
2.1.5.1 Shapes - Type 316
2.1.5.2 Shapes - Type 316L
2.1.5.3 Sheet, Strip, Plate, and Flat Bars
2.1.6 Gratings
2.1.7 Anchor Bolts
2.1.7.1 Bolts, Nuts, Studs and Rivets
2.1.7.2 Powder Actuated Fasteners
2.1.7.3 Screws
2.1.7.4 Washers
2.1.8 Aluminum Alloy Products
2.1.9 High Strength Bolts, Nuts and Washers
2.1.10 Tie Rod System for Sheet Piling
2.1.11 Mooring Cleats and Bollards
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
2.2.2 Galvanize
2.2.3 Repair of Zinc-Coated Surfaces
2.2.4 Shop Cleaning and Painting
2.2.4.1 Surface Preparation
2.2.4.2 Pretreatment, Priming and Painting
2.2.5 Nonferrous Metal Surfaces
2.3 ACCESS DOORS AND PANELS
2.4 CORNER GUARDS AND SHIELDS
2.5 GUARD POSTS (BOLLARDS/PIPE GUARDS)
2.6 LADDERS
2.6.1 General
2.6.2 Stainless Steel Ladders
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
SECTION 05 50 13 Page 1 Am-0004
3.2 WORKMANSHIP
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
3.4 BUILT-IN WORK
3.5 WELDING
3.6 FINISHES
3.6.1 Dissimilar Materials
3.6.2 Field Preparation
3.6.3 Environmental Conditions
3.7 ACCESS PANELS
3.8 INSTALLATION OF GUARD POSTS (BOLLARDS/PIPE GUARDS)
3.9 INSTALLATION OF MARINE BOLLARDS AND CLEATS
3.10 INSTALLATION OF LADDERS
3.11 WALER AND TIE ROD INSTALLATION
3.11.1 Erect Waler and Tie Rod Anchorages
3.11.2 Tie Rod Installation
-- End of Section Table of Contents --
SECTION 05 50 13 Page 2
SECTION 05 50 13
MISCELLANEOUS METAL FABRICATIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 303 (2010) Code of Standard Practice for Steel Buildings and Bridges
AMERICAN LADDER INSTITUTE (ALI/LADDER)
ALI/LADDER A14.3 (2008) Ladders - Fixed - Safety Requirements
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.3 (2006) Operations - Safety Requirements for Powder Actuated Fastening Systems
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1 (2012; Errata 2011) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A123 (2012) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153 (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A36 (2012) Standard Specification for Carbon Structural Steel
ASTM A47 (1999; R 2009) Standard Specification for Ferritic Malleable Iron Castings
ASTM A48 (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM A480 (2011a) Standard Specification for General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet, and Strip
SECTION 05 50 13 Page 3
ASTM A500 (2010a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A53 (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615 (2009b) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A653 (2011) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A780 (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A924 (2013) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B108 (2012; E 2012) Standard Specification for Aluminum-Alloy Permanent Mold Castings
ASTM B209 (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2012) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B26 (2012) Standard Specification for Aluminum-Alloy Sand Castings
ASTM D1187 (1997; E 2011; R 2011) Asphalt-Base Emulsions for Use as Protective Coatings for Metal
ASTM D1784 (2011) Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM F2329 (2013) Standard Specification for Zinc-coating, Hot-Dip, Requirements for Application to Carbon and Alloy Steel Bolts, Screws. Washers, Nuts and Special Threaded Fasteners
MASTER PAINTERS INSTITUTE (MPI)
MPI 79 (Oct 2009) Alkyd Anti-Corrosive Metal Primer
SECTION 05 50 13 Page 4
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM MBG 531 (2009) Metal Bar Grating Manual
NAAMM MBG 532 (2009) Heavy Duty Metal Bar Grating Manual
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
U.S. DEPARTMENT OF LABOR, OCCUPATIONAL HEALTH & SAFETY
ADMINISTRATION (OSHA)
OSHA 29 CFR 1910.27 Fixed Ladders
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Access panels, installation drawings;
Mooring bollards and cleats
Corner Guards;
Rope Rub Rail
Guard Ports (Bollards);
Safety Ladder
Submit fabrication drawings showing layout(s), connections to structural system, and anchoring details as specified in AISC 303.
Submit templates, erection and installation drawings indicating thickness, type, grade, class of metal, and dimensions. Show construction details, reinforcement, anchorage, and installation with relation to the building construction.
Mooring Bollards and Cleats
Indicate materials, sizes, thicknesses and dimensions and attachment details.
Tie Rods and Settlement Ducts
Indicate materials and couplings. Include details for sealing ends of ducts and connectors to prevent soil from entering annulus between tie rod and duct. Provide details for terminations at back of cap wall, CRM wall, deadman, etc. inclucing provision to allow ducts to settle as soil settles and maintain seal.
SECTION 05 50 13 Page 5
SD-03 Product Data
Access doors and panels
Tie rod system for sheet piling
SD-05 Design Data
Mooring Bollards and Cleats
Provide detailed design calculations demonstrating fittings meet the loading requirements indicated at the safety factors specified herein. Calculations shall be stamped/sealed and signed by a Professional Engineer licensed in any State.
1.3 QUALIFICATION OF WELDERS
Qualify welders in accordance with AWS D1.1. Use procedures, materials, and equipment of the type required for the work.
1.4 DELIVERY, STORAGE, AND PROTECTION
Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Structural Carbon Steel
ASTM A36.
2.1.2 Structural Tubing
ASTM A500.
2.1.3 Steel Pipe
ASTM A53, Type E or S, Grade B.
2.1.4 Fittings for Steel Pipe
Standard malleable iron fittings ASTM A47.
2.1.5 Stainless Steel
2.1.5.1 Shapes - Type 316
ASTM A240, Type 316, hot or cold finished.
ASTM A666, Type 316. Strip shall have a square No. 1 edge, in accordance with ASTM A480. Finishes shall conform to ASTM A480; plate shall be hot-rolled, annealed, and pickled; sheet and strip shall have a No.1 finish.
SECTION 05 50 13 Page 6
2.1.5.2 Shapes - Type 316L
AASTM A276, Type 316L, hot or cold finished, Condition A.
ASTM A666, Type 316L. Strip shall have a square No. 1 edge, in accordance with ASTM A480. Finishes shall conform to ASTM A480; plate shall be hot-rolled, annealed, and pickled; sheet and strip shall have a No.1 finish.
2.1.5.3 Sheet, Strip, Plate, and Flat Bars
ASTM A666, Type 316. Strip shall have a square No. 1 edge, in accordance with ASTM A480. Finishes shall conform to ASTM A480; plate shall be hot-rolled, annealed, and pickled; sheet and strip shall have a No.1 finish.
2.1.6 Gratings
a. Gray cast iron ASTM A48 , Class 40.
b. Metal plank grating, non-slip requirement, aluminum ASTM B209, 6061-T6;
steel ASTM A653, G90.
c. Metal bar type grating NAAMM MBG 531NAAMM MBG 532.
2.1.7 Anchor Bolts
ASTM A320 Grade Class 1 B8M, Stainless Steel Type 316. Where exposed, shall be of the same material, color, and finish as the metal to which applied.
2.1.7.1 Bolts, Nuts, Studs and Rivets
Bolts: ASTM A320 Grade Class 1 B8M, Stainless Steel Type 316 Nuts: ASTM A194, Stainless Stel Type 316
2.1.7.2 Powder Actuated Fasteners
Follow safety provisions of ASSE/SAFE A10.3. Fasteners shall meet minimum Type 316 Stainless Steel.
2.1.7.3 Screws
ASTM F593 Stainless Steel Type 316.
2.1.7.4 Washers
Provide beveled washers for American Standard beams and channels, square or rectangular, tapered in thickness, and smooth. ASTM 240 Stainless Steel Type 316.
2.1.8 Aluminum Alloy Products
Conform to ASTM B209 for sheet plate, ASTM B221 for extrusions and ASTM B26 or ASTM B108 for castings, as applicable. Provide aluminum extrusions at least 1/8 inch thick and aluminum plate or sheet at least 0.050 inch thick.
SECTION 05 50 13 Page 7
2.1.9 High Strength Bolts, Nuts and Washers
Bolts: ASTM A320 Grade Class 2 B8M, Stainless Steel Type 316 Nuts: ASTM A194 Stainless Steel Type 316 Washers: ASTM 240 Stainless Steel Type 316
2.1.10 Tie Rod System for Sheet Piling
Tie rod system consisting of tie rods, couplers, nuts, and washers as shown on the drawings. All components shall be galvanized per manfacturer's recommendations.
Tie Rods: ASTM A615 Grade 75 threaded bar with diameter specified on drawings.
Couplers and nuts: Capable of developing the full ultimate strength of the tie rods. Couplers and turnbuckles shall have a tensile yield strength of 125% of the tensile yield strength of the tie rod. PVC pipe: AASHTO M278.
PVC: ASTM D1784, Class 13464-B.
2.1.11 Mooring Cleats and Bollards
Stress relieved cast steel ASTM A27 or ductile iron ASTM A536 capable of withstanding loads as shwon on the drawings at a factor of safety against yielding at 2.0 and against braking of 3.5. Provide a 6" hole at top of bollards for field filling with concrete. Deliver fitting to site shop primed in accordance with Section 09 97 13.26 COATING OF STEEL WATERFRONT
STRUCTURES.
2.2 FABRICATION FINISHES
2.2.1 Galvanizing
Hot-dip galvanize items specified to be zinc-coated, after fabrication where practicable. Galvanizing: ASTM A123, ASTM A153, ASTM A653, ASTM A924, G90, ASTM F2329as applicable.
2.2.2 Galvanize
Anchor bolts, grating fasteners, washers, and parts or devices necessary for proper installation, unless indicated otherwise.
2.2.3 Repair of Zinc-Coated Surfaces
Repair damaged surfaces with galvanizing repair method and paint conforming to ASTM A780 or by application of stick or thick paste material specifically designed for repair of galvanizing, as approved by Contracting Officer. Clean areas to be repaired and remove slag from welds. Heat surfaces to which stick or paste material is applied, with a torch to a temperature sufficient to melt the metallics in stick or paste; spread molten material uniformly over surfaces to be coated and wipe off excess material.
SECTION 05 50 13 Page 8
2.2.4 Shop Cleaning and Painting
2.2.4.1 Surface Preparation
Blast clean surfaces in accordance with SSPC SP 6/NACE No.3. Clean ladders, bollards and cleats in accordance with Section 09 97 13.26 COATING OF STEEL WATERFRONT STRUCTURES. Surfaces that will be exposed in spaces above ceiling or in attic spaces, crawl spaces, furred spaces, and chases may be cleaned in accordance with SSPC SP 3 in lieu of being blast cleaned. Wash cleaned surfaces which become contaminated with rust, dirt, oil, grease, or other contaminants with solvents until thoroughly clean.
Steel to be embedded in concrete shall be free of dirt and grease. Do not paint or galvanize bearing surfaces, including contact surfaces within slip critical joints, but coat with rust preventative applied in the shop.
2.2.4.2 Pretreatment, Priming and Painting
Apply pretreatment, primer, and paint in accordance with manufacturer's printed instructions. On surfaces concealed in the finished construction or not accessible for finish painting, apply an additional prime coat to a minimum dry film thickness of 1.0 mil. Tint additional prime coat with a small amount of tinting pigment.
2.2.5 Nonferrous Metal Surfaces
Protect by plating, anodic, or organic coatings.
2.3 ACCESS DOORS AND PANELS
Provide flush type access doors and panels unless otherwise indicated.
Fabricate frames for access doors of stainless steel not lighter than 14 gage with welded joints and anchorage for securing into construction.
Provide access doors with a minimum of 12" by 12" inches and of not lighter than 14 gage stainless steel, with stiffened edges and welded attachments.
Provide access doors hinged to frame and with a flush-face, turn-screw-operated latch. Provide exposed metal surface with a bright directional satin finish: NO. 4 or dull satin finish: NO. 6.316 type stainless steelfinish.
2.4 CORNER GUARDS AND SHIELDS
For jambs of openings and edges of platforms provide steel shapes anchored in masonry or concrete with welded steel straps or end-weld stud anchors.
Form corner guards, extend 5 feet above the top of floor or to the top of the wainscot, whichever is less, and securely anchor to the supporting wall. Corner guards on exterior shall be stainless steel.
2.5 GUARD POSTS (BOLLARDS/PIPE GUARDS)
Provide 6 inch stainless steel extra strong weight steel pipe as specified in ASTM A53. Anchor posts in concrete as indicated and fill solidly with concrete with minimum compressive strength of 2500 psi.
2.6 LADDERS
2.6.1 General
a. Structural Performance of Ladders: Provide ladders capable of withstanding the effects of loads and stresses within limits and
SECTION 05 50 13 Page 9 under conditions specified in ALI/LADDER A14.3
b. Fabricate vertical ladders conforming to OSHA 29 CFR 1910.27.
c. Space side rails as indicated.
d. Support each ladder as indicated with welded or bolted brackets, made from same metal as ladder.
e. Space rungs 12 inches apart. Install ladders so that the distance from the rungs to the finished wall surface will not be less than 7 inches. Provide heavy clip angles riveted or bolted to the stringer and drilled for not less than two 1/2 inch diameter using adhesive, grouted and expansion anchor bolts as indicated.
2.6.2 Stainless Steel Ladders
a. Stainless steel shall conform to the requirements of Section 05 50
13 MISCELLANEOUS METAL FABRICATIONS, 2.1.5.2.
b. Side rails: Continuous, stainless steel flat bars size as indicated, with eased edges.
c. Rungs: Stainless steel bars size as indicated.
d. Fit rungs in centerline of side rails; plug-weld and grind smooth on outer rail faces.
e. Provide nonslip surfaces on top of each rung, either by coating rung with aluminum-oxide granules set in epoxy-resin adhesive or by using a type of manufactured rung filled with aluminum-oxide grout..
e. (DELETED)
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Install items at locations indicated, according to manufacturer's instructions. Verify all measurements and take all field measurements necessary before fabrication. Exposed fastenings shall be compatible materials, shall generally match in color and finish, and harmonize with the material to which fastenings are applied. Include materials and parts necessary to complete each item, even though such work is not definitely shown or specified. Poor matching of holes for fasteners shall be cause for rejection. Conceal fastenings where practicable. Thickness of metal and details of assembly and supports shall provide strength and stiffness.
Form joints exposed to the weather shall be formed to exclude water. Items listed below require additional procedures.
3.2 WORKMANSHIP
Provide miscellaneous metalwork that is well formed to shape and size, with sharp lines and angles and true curves. Drilling and punching shall produce clean true lines and surfaces. Provide continuous welding along the entire area of contact except where tack welding is permitted. Do not tack weld exposed connections of work in place and ground smooth. Provide
SECTION 05 50 13 Page 10 a smooth finish on exposed surfaces of work in place and unless otherwise approved, flush exposed riveting. Mill joints where tight fits are required. Corner joints shall be coped or mitered, well formed, and in true alignment. Accurately set work to established lines and elevations and securely fastened in place. Install in accordance with manufacturer's installation instructions and approved drawings, cuts, and details.
3.3 ANCHORAGE, FASTENINGS, AND CONNECTIONS
Provide anchorage where necessary for fastening miscellaneous metal items securely in place. Include for anchorage not otherwise specified or indicated slotted inserts, expansion shields, and powder-driven fasteners, when approved for concrete; toggle bolts and through bolts for masonry;
machine and carriage bolts for steel; through bolts, lag bolts, and screws for wood. Do not use wood plugs in any material. Provide non-ferrous attachments for non-ferrous metal. Make exposed fastenings of compatible materials, generally matching in color and finish, to which fastenings are applied. Conceal fastenings where practicable.
3.4 BUILT-IN WORK
Form for anchorage metal work built-in with concrete or masonry, or provide with suitable anchoring devices as indicated or as required. Furnish metal work in ample time for securing in place as the work progresses.
3.5 WELDING
Perform welding, welding inspection, and corrective welding, in accordance with AWS D1.1. Use continuous welds on all exposed connections. Grind visible welds smooth in the finished installation.
3.6 FINISHES
3.6.1 Dissimilar Materials
Where dissimilar metals are in contact, protect surfaces with a coat conforming to MPI 79 to prevent galvanic or corrosive action. Where aluminum is in contact with concrete, plaster, mortar, masonry, wood, or absorptive materials subject to wetting, protect with ASTM D1187, asphalt-base emulsion.
3.6.2 Field Preparation
Remove rust preventive coating just prior to field erection, using a remover approved by the rust preventive manufacturer. Surfaces, when assembled, shall be free of rust, grease, dirt and other foreign matter.
3.6.3 Environmental Conditions
Do not clean or paint surface when damp or exposed to foggy or rainy weather, when metallic surface temperature is less than 5 degrees F above the dew point of the surrounding air, or when surface temperature is below 45 degrees F or over 95 degrees F, unless approved by the Contracting Officer.
3.7 ACCESS PANELS
Install a removable access panel not less than 12 by 12 inches directly below each valve, flow indicator, damper, or air splitter that is located
SECTION 05 50 13 Page 11 above the ceiling, other than an acoustical ceiling, and that would otherwise not be accessible.
3.8 INSTALLATION OF GUARD POSTS (BOLLARDS/PIPE GUARDS)
Set pipe guards vertically in concrete piers. Construct piers of, and the hollow cores of the pipe filled with, concrete having a compressive strength of 3000 psi.
3.9 INSTALLATION OF MARINE BOLLARDS AND CLEATS
a. Install mooring fittings at locations and as per details shown on the Contract Drawings and as recommended by the manufacturer.
b. Hold anchor bolts and, where and if indicates inside sleeves in place with templates that match mooring fitting manufacturers bolt pattern. Use templates to ensure proper location of bolts and sleeves during placement of concrete.
c. Level mooring fittings using optional leveling nuts on exposed bolts and secured to bolts using additional nuts and washers within bollard base. Hand-tighten nuts before grouting of base with grout as specified in Section 03 31 29 MARINE CONCRETE.
After grouting has cured for seven days, tighten nuts to the snug condition. Fill areas around nuts in bollard base with hot poured zinc or molten lead to prevent standing water. To prevent damage to vessel mooring lines, grind smooth any sharp edges around bolting area after installation. Fill bollards with Class 3A concrete conforming to the requirements of Section 03 31 29 MARINE
CONCRETE.
D. Prepare surfaces to mooring fittings and paint in accordance with Section 09 97 13.26 COATING OF STEEL OF WATERFRONT STRUCTURES after installation is complee.
3.10 INSTALLATION OF LADDERS
a. Secure to adjacent construction as indicated on the Contract Drawings. Install brackets as required for securing of ladders welded or bolted to structural steel or built into the concrete.
b. Provide anchor bolts, grating fasteners, washers, and all parts or devices necessary for proper installation. Provide lock washers under nuts.
3.11 WALER AND TIE ROD INSTALLATION
3.11.1 Erect Waler and Tie Rod Anchorages
Erect waler and tie rod anchorages including the connection of the wales to the sheeting as indicated on the drawings.
a. Ensure walers are properly seated on support brackets attached to sheet piles to prevent sagging or twisting when loaded vertically due to concreting or filling. Fill gaps which occur between the sheet piles and walers to ensure uniform load distribution to the wales. Fillings between sheet pile and waling may be plates or wedges of steel, wood or plastic. Bags filled with concrete or cement mortar may also be used.
SECTION 05 50 13 Page 12
3.11.2 Tie Rod Installation
The requirements below are general in nature and reflect the design intent. Sequence and detailed methods shall be part of the Contractor's construction sequence.
a. Backfill in accordance with Contractor's approved construction sequence and approach.
b. Temporarily prop tie rods every 25 feet maximum and at couplers.
c. Assemble tie rods and connect to walers. Assemble adjacent lengths of tie rods with couplers. Minimum screw in length shall be one (1) times nominal thread diameter. Seal space where tie rod passes through bulkhead to prevent leaking of fill.
d. Install corrosion protection system over tie rods or at connections if tie rods protection system is shop applied in accordance with Section 09 97 13.28, "Protection of Buried Steel Bulkhead Tierods" except omit at couplings until settlement ducts are in place.
e. During tie rod assembly fit the 6-inch PVC settlement ducts over protected rods. Use a short length of 8-inch PVC at couplers and prop ducts to ensure that rod is near bottom of duct. Seal annulus to prevent soil leaking into pipes between 6 and 8 inch pipes with neoprene or 2-inch wide foam seals wrapped around the 6" pipe or other approved method that allows the 8-inch pipe to be slid into position after tensioning. Use of slip couplings with reducers is also permitted. Seal ducts at bulkhead caps, deadmen, CRM walls and wherever terminated to prevent fill from entering annulus.
f. Tension from the outside of the bulkhead wall and behind the deadman to take up tie rod slack.
-- End of Section --
SECTION 05 50 13 Page 13
SECTION TABLE OF CONTENTS
DIVISION 08 - OPENINGS
SECTION 08 33 23
OVERHEAD COILING DOORS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 OVERHEAD COILING DOOR DETAIL SHOP DRAWINGS
1.4 WARRANTY, OPERATION AND MAINTENANCE DATA
1.5 DELIVERY AND STORAGE
PART 2 PRODUCTS
2.1 DESCRIPTION
2.2 PERFORMANCE REQUIREMENTS
2.2.1 Wind Loading
2.2.2 Operational Cycle Life
2.3 OVERHEAD COILING DOORS
2.3.1 Curtain Materials and Construction
2.3.2 Insulated Curtains
2.3.3 Curtain Bottom Bar
2.3.4 Locks
2.3.5 Weather Stripping
2.3.6 Locking Devices
2.3.7 Safety Interlock
2.4 HARDWARE
2.4.1 Guides
2.5 COUNTERBALANCING MECHANISM
2.5.1 Brackets
2.5.2 Counterbalance Barrels
2.5.2.1 Barrel
2.5.2.2 Spring Balance
2.5.3 Torsion Rod for Counter Balance
2.5.4 Counterbalance Shaft Assembly
2.5.4.1 Barrel
2.5.4.2 Spring Balance
2.6 ELECTRIC DOOR OPERATORS
2.6.1 Door-Operator Types
2.6.2 Electric Motors
2.6.3 Motor Bearings
2.6.4 Motor Starters, Controls, and Enclosures
2.6.5 Control Enclosures
2.6.6 Safety-Edge Device
2.6.7 Remote-Control Stations
2.6.8 Speed-Reduction Units
2.6.9 Chain Drives
2.6.10 Brakes
2.6.11 Clutches
2.6.12 Weather/Smoke Seal Sensing Edge
SECTION 08 33 23 Page 1
2.7 SURFACE FINISHING
PART 3 EXECUTION
3.1 GENERAL
3.2 PROTECTION OF CONTACT OF DISSIMILAR MATERIALS
3.2.1 Metal
3.3 ACCEPTANCE PROVISIONS
3.3.1 Maintenance and Adjustment
3.3.2 CLEANING
3.4 OPERATION AND MAINTENANCE
-- End of Section Table of Contents --
SECTION 08 33 23 Page 2
SECTION 08 33 23
OVERHEAD COILING DOORS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASME INTERNATIONAL (ASME)
ASME B29.400 (2001; R 2008) Combination, "H" Type Mill Chains, and Sprockets
ASTM INTERNATIONAL (ASTM)
ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A27/A27M (2010) Standard Specification for Steel Castings, Carbon, for General Application
ASTM A307 (2012) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A653/A653M (2011) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A924/A924M (2013) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B209 (2010) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2012) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM D2000 (2012) Standard Classification System for Rubber Products in Automotive Applications
SECTION 08 33 23 Page 3
ASTM F568M (2007) Standard Specification for Carbon and Alloy Steel Externally Threaded Metric Fasteners
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2011) Enclosures
NEMA MG 1 (2011; Errata 2012) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2011; Errata 2 2012) National Electrical Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Overhead Coiling Doors;
Counterbalancing Mechanism;
Electric Door Operators;
Bottom Bars;
Guides;
Mounting Brackets;
Installation Drawings;
SD-03 Product Data
Overhead Coiling Doors;
Hardware; G
Counterbalancing Mechanism;
Electric Door Operators;
SD-05 Design Data
Overhead Coiling Doors;
Hardware;
Counterbalancing Mechanism;
SECTION 08 33 23 Page 4
Electric Door Operators;
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals;
Materials; ]
Devices;
Procedures;
Manufacture's Brochures;
Parts Lists;
Cleaning;
1.3 OVERHEAD COILING DOOR DETAIL SHOP DRAWINGS
Provide installation drawings for overhead coiling door assemblies which show: elevations of each door type, shape and thickness of materials, finishes, details of joints and connections, details of guides and fittings, rough opening dimensions, location and description of hardware, anchorage locations, and counterbalancing mechanism and door operator details. Show locations of replaceable fusible links on wiring diagrams for power, signal and controls. Include a schedule showing the location of each door with the drawings.
1.4 WARRANTY, OPERATION AND MAINTENANCE DATA
Submit Operation and Maintenance Manuals for Overhead Coiling Door Assemblies, including the following items:
Materials;
Devices;
Electric Door Operators;
Hood;
Counterbalancing Mechanism;
Procedures;
Manufacture's Brochures;
Parts Lists;
Furnish a written guarantee that the helical spring and counterbalance mechanism are free from defects in material and workmanship for not less than two years after completion and acceptance of the project.
Warrant that upon notification by the Government, any defects in material, workmanship, and door operation are immediately correct within the same time period covered by the guarantee, at no cost to the Government.
SECTION 08 33 23 Page 5
1.5 DELIVERY AND STORAGE
Deliver doors to the jobsite wrapped in a protective covering with the brands and names clearly marked thereon. Store doors in an adequately ventilated dry location that is free from dirt and dust, water, or other contaminants. Store in a manner that permits easy access for inspection and handling.
PART 2 PRODUCTS
2.1 DESCRIPTION
Doors to be coiling type, with interlocking double-walled slats, complete with anchoring and door hardware, guides, hood, and operating mechanisms, and designed for use on openings as indicated. Use grease-sealed or self-lubricating bearings for rotating members.
2.2 PERFORMANCE REQUIREMENTS
2.2.1 Wind Loading
Certified and tested to withstand winds in excess of 133 miles per hour.
2.2.2 Operational Cycle Life
Design all portions of the door, hardware and operating mechanism that are subject to movement, wear, or stress fatigue to operate through a minimum number of 10 cycles per day. One complete cycle of door operation is defined as when the door is in the closed position, moves to the fully open position, and returns to the closed position.
2.3 OVERHEAD COILING DOORS
2.3.1 Curtain Materials and Construction
Provide curtain slats fabricated from double-walled aluminum ASTM B209 with integral rubber weather seal between slats.
Slats are double-walled, insulated, aluminum slats are 6 inches high by 1-3/16 inches thick.
2.3.2 Insulated Curtains
Form Curtains from manufacturer's standard shapes of interlocking slats.
2.3.3 Curtain Bottom Bar
Install curtain bottom bars as pairs of angles from the manufacturer's standard aluminum extrusions not less than 2.0 by 2.0 inches by 0.188 inch.
Aluminum extrusions conforming to ASTM B221.
Provide an aluminum bottom bar with control reliable, electric reversing edge.
2.3.4 Locks
Provide end and/or wind locks of stainless steel conforming to ASTM A27/A27M, galvanized in accordance with ASTM A653/A653M , ASTM A153/A153M and ASTM A924/A924M . Secure locks at every other curtain
SECTION 08 33 23 Page 6 slat.
2.3.5 Weather Stripping
Ensure weather-stripping at the door-head and jamb is 1/8-inch thick sheet of natural or neoprene rubber with air baffles. Secure weather stripping to the insides of hoods with stainless steel fasteners through continuous aluminum pressure bars at least 5/8-inch wide and 1/8-inch thick.
Ensure threshold weather-stripping is 1/8-inch thick sheet…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .