This solicitation is for the Turbine Rehabilitation and Generator Rewind at Norfork Powerhouse located in Baxter County, Arkansas. The project scope includes rehabilitation of two hydraulic turbine-generator units and is estimated to cost between $25-75 million. A site visit is scheduled for October 12-14, 2021 and requests for information must be submitted by October 21, 2021. The solicitation is full and open competition with no set-asides. Reference drawings are available by request. The Department of the Army Corps of Engineers Engineering District Little Rock is the issuing agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0005 incorporates the follow ing:

1. Government Responses to RFIs submitted betw een 16 Dec 21 and 28 Jan 22.

2. Revised Pricing Schedule.

3. Revised Specification Sections 01 22 00.00 10 and 48 13 13.01 26.

4. Updated Wage Determination AR20220019, dated 18 Feb 22.

5. Updated Provisions and Clauses to most current version(s).

*Reminder: Dissolved Oxygen Studies are available via DoD SAFE. Please email sarah.n.hagood@usace.army.mil if you w ould like a copy.

1. CONTRACT ID CODE PAGE OF PAGES

1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S21R0001

X 9B. DATED (SEE ITEM 11)

30-Sep-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Feb-2022

CODE

CONTRACTING DIVISION

CORPS OF ENIGNEERS, EXECUTION BRANCH

700 W. CAPITOL

LITTLE ROCK AR 72203-0867

M4P0600 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127S21R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

ROUND 2- RFI RESPONSES

Bid Inquiry Contractor Report All Inquiries Submitted Between 16-Dec-21 and 28-Jan-22

Project: Norfork Turbine Replacement and Generator Rewind

Review: NF Turb Repl & Gen Rew Bidder Inquiry (00002) (sorted by CommentID )

Displaying 9 inquiries.

Id Discipline Sheet Detail Spec

9529894 General Section 01 22

00.00 10 : Items 0156 and 0183

Section 01 22

00.00 10 : Items 0156 and 0183

Comment Classification: Controlled Unclassified Information (CUI)

On October 8th, 9443045 was posted posted as copied below. There is more machining to do than providing a welded segment for the New Turbine Guide Bearing. Obtaining a price for that and adding in the rebabbitt price below will not cover the cost of a New Babbitted Turbine Guide Bearing. I would recommend obtaining pricing for these line items for a completed Turbine Guide Bearing including babbitt and finish machined.

9443045 Hydropower W9127S21R0001 Comment Classification: Controlled Unclassified Information (CUI) Section 01 22 00.00 10 : Items 0156 and 0183 (New turbine guide bearing shell). Can you clarify what is to be included in this bid item? Is the price for a complete new shell, independently of the refurbishment in the base cost, or for the price differential between a new shell and the refurbishment of the shell?

On: Oct 08 2021.

Government Response. . This is for the bearing shell only. In past work we have had issues with the in-service bearing shell cracking during an attempted rehab or are already cracked and not repairable. If this option is exercised, the babbit work and final machining would be done under CLIN 0089AC. On: Nov 08 2021 Current Request Status: Request Closed

On: Dec 16 2021.

Government Response. . Offerors should price in the machining of new turbine guide bearing shell for CLIN 0156 and 0183. All required machining for a new bearing to accept new babbit would be covered under this CLIN.

The new guide bearing shell should be ready for pouring and machining of new babbit, which would be under 0035AC and 0089AC On: Jan 10 2022

Current Request Status: Request Closed

Information for this report is procurement sensitive.

9530708 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

We understand from a previous answer to question 9435132, that USACE will consider alternate bonding approaches, with respect to Performance and Payment bonds. Our surety is proposing the following approach: The surety would provide separate performance and payment bonds for each Unit and provide a separate 5 year warranty bond for each Unit once the performance aspect is completed. They would issue the Performance & Payment bonds on the standard SP25 forms, however the separate warranty bonds would be issued on one of the Surety's standard forms. Would this approach be acceptable for USACE?

On: Dec 17 2021.

Government Response. . It is not customary for USACE to utilize warranty (maintenance) bonds for construction contracts. However, we will consider the following alternative bonding approach: Performance bond for Design and construction of first unit encompassing period of performance and subsequent warranty period. Performance bond for second unit encompassing period of performance and subsequent warranty period. On: Jan 14 2022

9530709 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

We understand from a previous answer to question 9435132, that USACE will consider alternate bonding approaches, with respect to Performance and Payment bonds. Our surety is proposing the following approach: The surety would provide separate performance and payment bonds for each Unit and provide a separate 5 year warranty bond for each Unit once the performance aspect is completed. They would issue the Performance & Payment bonds on the standard SP25 forms, however the separate warranty bonds would be issued on one of the Surety's standard forms. Would this approach be acceptable for USACE?

the following alternative bonding approach: Performance bond for Design and construction of first unit encompassing period of performance and

9530854 Contracting Bonds W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

Due to the expected duration of the project, our surety company proposes to issue one bond for the performance phase of the contract, inclusive of 1-year warranty. The additional stator windings and cavitation warranty would be secured under separate maintenance bonds.

Please confirm that this structure would be acceptable to the government.

the following alternative bonding approach: Performance bond for Design and construction of first unit encompassing period of performance and

9544871 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

Are the performance and payment bonds for each Unit intended to cover the 5 Year Windings Warranty referenced in section 1.5 on pg. 818? can a separate warranty bond be provided to cover the 5 Year Windings Warranty period?"

On: Jan 05 2022.

the following alternative bonding approach: Performance bond for Design and construction of first unit encompassing period of performance and

9552976 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

Per the response on item 9448450, "CLINs 0159 and 0186 (Draft Tube Liner Repair) will be removed from the bid schedule and specifications." CLINs for this scope are still in the updated price schedule (0156 and 0185) from Amendment 4. Please clarify if the bidder should include lump sum prices for these CLINs. If yes, please provide a detailed scope description.

On: Jan 11 2022.

Government Response. . The CLINS for this scope (0156 and 0185) will be removed from the bid schedule in an upcoming amendment. The contractor does not need to provide lump sum prices for these CLINs. Any draft tube liner repair work shall be covered under the most appropriate Miscellaneous CLINs. On: Jan 20 2022

9552990 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

Per Section 03 64 23.00 26 paragraph 1.1.c "Work required to do the epoxy injection work will be covered under the miscellaneous bid CLINs, Other Skilled Craftsman Hire and Welding Services."

However CLIN 0151 and 0180 ask for lump sum prices for a quantity of 20 gallons.

Please clarify if the bidder should provide lump sum prices on these CLINs.

On: Jan 11 2022.

Government Response. . Please provide lump sum prices for these two CLINS. On: Jan 20 2022

9554931 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

With regard to the amend 04 revised optional CLIN0126, "Perform stator core design and prepare die", will the government exercise this option upon the test results on the existing core or prior to the tests with sufficient time to complete the scope of this CLIN?

On: Jan 12 2022.

Government Response. . The Government will coordinate with the Contractor to award options in a timely manner to mitigate any potential impacts to the schedule. On: Jan 20 2022

9556618 Hydropower W9127S21R0001

Comment Classification: Controlled Unclassified Information (CUI)

"By referring to the Government's response #9458855, will the bidder also get compensated for the additional site running cost if an optional scope is executed and extends the critical path, e.g. the stator core replacement?

On: Jan 13 2022.

Government Response. . The process in the Government's response to 9458855 will be followed. On: Jan 20 2022

Report Complete

The following have been modified:

PRICING SCHEDULE

Line Item No. Description Quantity

Unit of Measure Unit Price Amount

BASE ITEMS (Applies to Both Units 1 & 2)

0001 Hydraulic Turbine Model 1 Job XXX $

0002 Site Mobilization and Demobilization 1 Job XXX $

0003 On-Site Lead-Based Paint Removal 17,200 Square Feet $ $

0004 Special Tools and Scaffolding 1 Job XXX $

0005 Furnish Spares XXX XXX XXX XXXXX

0005AA Spare Turbine Shaft Sleeve 1 Job XXX $

0005AB Spare Wicket Gate Stem Seal Sets 1 Job XXX $

0005AC Spare Servomotor Packing Box Stem Seals 1 Job XXX $

0005AD Furnish Spare Set of RTD's and Relays 1 Job XXX $

0005AE Furnish Spare Generator Parts 1 Job XXX $

0006 Furnish and Test Prototype Coils 1 Each XXX $

0007 Provision of Boring Bar 1 Job XXX $

0008 Governor and Lube Oil XXX XXX XXX XXXXX

0008AA Drain, Clean, and Flush System 1 Each $ $

0008AB Disposal of Old Oil 4,920 Gallon $ $

0008AC Supply and Filling of New Oil 4,920 Gallon $ $

0009 Inspect, Load Test, and Name Plate BTH Devices 1 Job XXX $

PARTIAL BASE ITEMS (Applies to Unit 1)

0010 Painting 1 Each $ $

0011 Francis Runner 1 Each $ $

0012 Pre-disassembly Investigation 1 Each $ $

Generating Unit Disassembly Including Inspections of Components 1 Each $ $

0014 Reassembly of Generating Unit 1 Each $ $

0015 Testing After Reassembly 1 Each $ $

0016 Line Bore Wicket Gate Stem Housing 1 Each $ $

0017 Stay Ring Inspection 1 Each $ $

0018 Replace Wicket Gates 1 Each $ $

0019 Supply Stationary Sealing Ring 1 Each $ $

0020 Supply Head Cover 1 Each $ $

0021 Turbine Guide Bearing Housing Refurbishment 1 Each $ $

0022 Bottom Ring Refurbishment 1 Each $ $

0023 Turbine Air Inlet Valve Refurbishment 1 Each $ $

0024 Furnish and Install All Bushings and Bearing Plates 1 Each $ $

0025 Refurbish Wicket Gate Operating Mechanism 1 Each $ $

0026 Refurbish Shear Linkages 1 Each $ $

0027 Furnish and Install Turbine Shaft Sleeve 1 Each $ $

0028 Operating Ring Refurbishment 1 Each $ $

0029 Turbine and Generator Shaft XXX XXX XXX XXXXX

0029AA Turbine and Generator Shaft Inspection 1 Each $ $

0029AB Machining of Turbine Shaft 1 Each $ $

0030 Supply and Install Main Turbine Shaft Packing Box 1 Each $ $

0031 Refurbish Wicket Gate Servomotor 1 Each $ $

0032 Thrust Runner Phase 1 Inspection 1 Each $ $

0033 Thrust Bearing Shoe Refurbishment XXX XXX XXX XXXXX

0033AA Shipment of Thrust Bearing Shoes 1 Each $ $

0033AB Refurbish Set of Shoes 1 Each $ $

0034 Guide Bearing Refurbishment XXX XXX XXX XXXXX

0034AA Shipment of Turbine Guide Bearing 1 Each $ $

0034AB Ship Set of Guide Bearing Pads 1 Each $ $

0034AC Refurbish Turbine Guide Bearing 1 Each $ $

0034AD Refurbish Set of Guide Bearing Pads 1 Each $ $

0035 Setup for Machining and Machining up to 0.020" 1 Each $ $

0036 Spiral Case Inspection 1 Each $ $

0037 Draft Tube Liner Inspection 1 Each $ $

0038 Piezometer Tap Inspection and Repair 1 Each $ $

0039 Replace Fasteners for Major Couplings 1 Each $ $

Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank 1 Each $ $

0041 Generator Brake and Manual Oil Pump Refurbishment 1 Each $ $

0042 Inspect Generator Brake Rings 1 Each $ $

0043 High Pressure Lift System 1 Each $ $

Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $

Miscellaneous Electrical Work As Described in 26 05

00.00 26 1 Each $ $

Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $

0047 Inspect, Clean, and Test Stator Core 1 Each $ $

0048 Inspect, Clean, and Test Rotor 1 Each $ $

0049 Install and Test Stator Winding 1 Each $ $

0050 Perform Special Field Tests (Unit 1 Only) 1 Each $ $

0051 Replace Existing Current Transformers 1 Each $ $

0052 Collector Ring Assembly Inspection 1 Each $ $

0053 Chrome Plate Piston Rods 1 Each $ $

0054 Machining of Curb Ring 1 Each $ $

0055 Void Mapping of Draft Tube Liner 1 Each $ $

0056 Surface Air Coolers 9 Each $ $

0057 Replace Thrust Bearing Oil Cooling Coils 16 Each $ $

0058 Thrust Sump Kidney Loop Filter 1 Each $ $

0059 Head Cover Drainage Improvement 1 Each $ $

Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $

0061 Remove Farval Grease System 1 Each $ $

PARTIAL BASE ITEMS (Applies to Unit 2)

0062 Painting 1 Each $ $

0063 Francis Runner 1 Each $ $

0064 Pre-disassembly Investigation 1 Each $ $

Generating Unit Disassembly Including Inspections of Components 1 Each $ $

0066 Reassembly of Generating Unit 1 Each $ $

0067 Testing After Reassembly 1 Each $ $

0068 Line Bore Wicket Gate Stem Housing 1 Each $ $

0069 Stay Ring Inspection 1 Each $ $

0070 Replace Wicket Gates 1 Each $ $

0071 Supply Stationary Sealing Ring 1 Each $ $

0072 Supply Head Cover 1 Each $ $

0073 Turbine Guide Bearing Housing Refurbishment 1 Each $ $

0074 Bottom Ring Refurbishment 1 Each $ $

0075 Turbine Air Inlet Valve Refurbishment 1 Each $ $

0076 Furnish and Install All Bushings and Bearing Plates 1 Each $ $

0077 Refurbish Wicket Gate Operating Mechanism 1 Each $ $

0078 Refurbish Shear Linkages 1 Each $ $

0079 Furnish and Install Turbine Shaft Sleeve 1 Each $ $

0080 Operating Ring Refurbishment 1 Each $ $

0081 Turbine and Generator Shaft XXX XXX XXX XXXXX

0081AA Turbine and Generator Shaft Inspection 1 Each $ $

0081AB Machining of Turbine Shaft 1 Each $ $

0082 Supply and Install Main Turbine Shaft Packing Box 1 Each $ $

0083 Refurbish Wicket Gate Servomotor 1 Each $ $

0084 Thrust Runner Phase 1 Inspection 1 Each $ $

0085 Thrust Bearing Shoe Refurbishment XXX XXX XXX XXXXX

0085AA Shipment of Thrust Bearing Shoes 1 Each $ $

0085AB Refurbish Set of Shoes 1 Each $ $

0086 Guide Bearing Refurbishment XXX XXX XXX XXXXX

0086AA Shipment of Turbine Guide Bearing 1 Each $ $

0086AB Ship Set of Guide Bearing Pads 1 Each $ $

0086AC Refurbish Turbine Guide Bearing 1 Each $ $

0086AD Refurbish Set of Guide Bearing Pads 1 Each $ $

0087 Setup for Machining and Machining up to 0.020" 1 Each $ $

0088 Spiral Case Inspection 1 Each $ $

0089 Draft Tube Liner Inspection 1 Each $ $

0090 Piezometer Tap Inspection and Repair 1 Each $ $

0091 Replace Fasteners for Major Couplings 1 Each $ $

Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank 1 Each $ $

0093 Generator Brake and Manual Oil Pump Refurbishment 1 Each $ $

0094 Inspect Generator Brake Rings 1 Each $ $

0095 High Pressure Lift System 1 Each $ $

Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $

Miscellaneous Electrical Work As Described in 26 05

00.00 26 1 Each $ $

Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $

0099 Inspect, Clean, and Test Stator Core 1 Each $ $

0100 Inspect, Clean, and Test Rotor 1 Each $ $

0101 Install and Test Stator Winding 1 Each $ $

0102 Replace Existing Current Transformers 1 Each $ $

0103 Collector Ring Assembly Inspection 1 Each $ $

0104 Chrome Plate Piston Rods 1 Each $ $

0105 Machining of Curb Ring 1 Each $ $

0106 Void Mapping of Draft Tube Liner 1 Each $ $

0107 Surface Air Coolers 9 Each $ $

0108 Replace Thrust Bearing Oil Cooling Coils 16 Each $ $

0109 Thrust Sump Kidney Loop Filter 1 Each $ $

0110 Head Cover Drainage Improvement 1 Each $ $

Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $

0112 Remove Farval Grease System 1 Each $ $

TOTAL BASE PROPOSAL

OPTIONAL MISCELLANEOUS ITEMS (Applies to Both Units)

0113 Miscellaneous Parts and Materials Not to Exceed Each $ 1.00 $ 100,000.00

0114 Welding Services 300 Pounds $ $

0115 Machinist Hire 200 Man Hours $ $

0116 Electrical Hire 200 Man Hours $ $

0117 Painter Hire 300 Man Hours $ $

0118 Other Skilled Craftsman Hire 200 Man Hours $ $

0119 General Laborer Hire 400 Man Hours $ $

0120 Liquid Penetrant Method 50 Man Hours $ $

0121 Magnetic Particle Method 50 Man Hours $ $

0122 Ultrasonic Method 50 Man Hours $ $

0123 Radiographic Method 20 Man Hours $ $

0124 Thermal Spraying 20 Man Hours $ $

0125 Visual 50 Man Hours $ $

OPTIONAL ITEMS (Applies to Both Units)

0126 Perform Stator Core Design and Prepare Die 1 Job XXX $

0127 Thrust Bearing Phase 2 Inspection (Spare Only) XXX XXX XXX XXXXX

0127AA

Thrust Bearing Phase 2 Inspection without Splitting (Spare Only) 1 Job XXX $

0127AB

Thrust Bearing Phase 2 Inspection with Splitting (Spare Only) 1 Job XXX $

0128 FEA Stress Analysis of Supporting Structures 1 Job XXX $

OPTIONAL ITEMS (Applies to Unit 1)

0129 Additional Stay Ring Mounting Surface Machining 1 Each $ $

0130 Additional Head Cover Flange Machining 1 Each $ $

0131 Additional Bottom Ring Flange Machining 1 Each $ $

0132 Additional Bearing Housing Machining 1 Each $ $

0133 Additional Curb Ring Machining 1 Each $ $

0134 Refurbish Generator Brake Rings 1 Each $ $

0135 Thrust Bearing Phase 2 Inspection XXX XXX XXX XXXXX

0135AA Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $

0135AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $

0136 Generator Thrust Bearing Runner and Guide Runner XXX XXX XXX XXXXX

0136AA Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $

0136AB Resurfacing Thrust Bearing Runner and Backside 1 Each $ $

0136AC

Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $

0136AD Thrust Guide Runner Refurbishment 1 Each $ $

0137 Refurbish Rotor Field Poles 1 Each $ $

0138 Reinsulate Rotor Field Leads 1 Each $ $

Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $

0140 Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $

Perform Additional Stator Core Interlaminar Insulation Test 1 Job XXX $

Manufacture Stator Laminations, Remove Existing Stator Core, and Install New Stator Core 1 Each $ $

0143 Governor Pumps Additional Machine Work - Level A 1 Each $ $

0144 Governor Pumps Additional Machine Work - Level B 1 Each $ $

0145 Governor Pumps Additional Machine Work - Level C 1 Each $ $

0146 Governor Pumps Additional Machine Work - Level D 1 Each $ $

Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $

0148 Turbine Guide Bearing Build up of the O.D. Spigot Fits 1 Each $ $

0149 Stator Core Repair 200 Man Hours $ $

Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $

0151 Epoxy Injection in Draft Tube Liner 20 Gallon $ $

0152 New Turbine Guide Bearing Shell 1 Each $ $

0153 New Turbine Guide Bearing Housing 1 Each $ $

0154 Restore Servomotor Head Spigot Fit 1 Each $ $

Additional Cylinder Bore 7nd Replace Servomotor Pistons 1 Each $ $

0156 Draft Tube Liner Repair 1 Each $ $

0156 Machine Condition Monitoring System 1 Each $ $

OPTIONAL ITEMS (Applies to Unit 2)

0157 Additional Stay Ring Mounting Surface Machining 1 Each $ $

0158 Additional Head Cover Flange Machining 1 Each $ $

0159 Additional Bottom Ring Flange Machining 1 Each $ $

0160 Additional Bearing Housing Machining 1 Each $ $

0161 Additional Curb Ring Machining 1 Each $ $

0162 Refurbish Generator Brake Rings 1 Each $ $

0163 Thrust Bearing Phase 2 Inspection XXX XXX XXX XXXXX

0163AA Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $

0163AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $

0164 Generator Thrust Bearing Runner and Guide Runner XXX XXX XXX XXXXX

0164AA Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $

0164AB Resurfacing Thrust Bearing Runner and Backside 1 Each $ $

0164AC

Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $

0164AD Thrust Guide Runner Refurbishment 1 Each $ $

0165 Refurbish Rotor Field Poles 1 Each $ $

0166 Reinsulate Rotor Field Leads 1 Each $ $

Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $

0168 Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $

Perform Additional Stator Core Interlaminar Insulation Test 1 Each $ $

Manufacture Stator Laminations, Remove Existing Stator Core, and Install New Stator Core 1 Each $ $

0171 Governor Pumps Additional Machine Work - Level A 1 Each $ $

0172 Governor Pumps Additional Machine Work - Level B 1 Each $ $

0173 Governor Pumps Additional Machine Work - Level C 1 Each $ $

0174 Governor Pumps Additional Machine Work - Level D 1 Each $ $

Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $

0176 Turbine Guide Bearing Build up of the O.D. Spigot Fits 1 Each $ $

0177 Stator Core Repair 200 Man Hours $ $

Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $

0179 Epoxy Injection in Draft Tube Liner 20 Gallon $ $

0180 New Turbine Guide Bearing Shell 1 Each $ $

0181 New Turbine Guide Bearing Housing 1 Each $ $

0182 Restore Servomotor Head Spigot Fit 1 Each $ $

Additional Cylinder Bore and Replace Servomotor Pistons 1 Each $ $

0185 Draft Tube Liner Repair 1 Each $ $

0184 Machine Condition Monitoring System 1 Each $ $

TOTAL OPTIONAL PROPOSAL

TOTAL PROPOSAL AMOUNT (BASE PLUS OPTIONAL ITEMS)

SECTION 00 21 00 - INSTRUCTIONS

The following included by reference have been revised:

52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021

SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is $39,500,000.00.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees if the acquisition--

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.)

This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $92,319, the provision with its Alternate II applies.

(D) If the acquisition value is $92,319 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

X (i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph

(c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment

DEC 2021

52.209-13 Violation of Arms Control Treaties or Agreements -- Certification

DEC 2021

SECTION 00 72 00 - GENERAL CONDITIONS

52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2021)

(a) Definitions. As used in this clause--

Caribbean Basin country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Designated country means any of the following countries:

(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);

(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.

Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

Domestic construction material means--

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if--

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Least developed country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

Free Trade Agreement country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.

Least developed country construction material means a construction material that—

(1) Is wholly the growth, product, or manufacture of a least developed country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

United States means the 50 States, the District of Columbia, and outlying areas.

WTO GPA country construction material means a construction material that--

(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or

(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.

(b) Construction materials.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction material, excluding COTS fasteners. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition.

Therefore, the Buy American restrictions are waived for designated country construction materials.

(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.

(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows: NONE.

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1:

Foreign construction material Domestic construction material Item 2:

Foreign construction material Domestic construction material [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

(End of clause)

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the completion of all HYDRAULIC TURBINE MODEL TESTING in Section 48 13 13.01 26 to include the cavitation testing outlined in Part 1.5.3.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor , in writing , within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract , the Contractor shall

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed,…