This federal solicitation seeks proposals for a turbine rehabilitation and generator rewind project at the Norfork Powerhouse located in Baxter County, Arkansas. The project magnitude is estimated between $25 million to $75 million. It has a full and open competitive set-aside. An organized site visit was held in October 2021 and bidder inquiries are accepted through October 2021 via the ProjNet website. Interested offerors should contact the specified Army Corps of Engineers representative if they require a copy of the large reference drawings. The opportunity involves rehabilitating two turbine-generator units including replacing runners, wicket gates, and refurbishing numerous turbine, generator, and ancillary components. Offerors must demonstrate experience with projects of similar scope and magnitude, preferably involving Francis turbines and generators of comparable size to those specified. The opportunity is open to all qualified vendors with a proposal due date to be determined.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
In addition to the "Summary of Changes" listed in Amendment 0003, Amendment 0004 incorporates the follow ing:
1. ProjNet w ill be reopened from December 16, 2021, until January 28, 2022 for additional bidder inquiries.
2. The proposal deadline is extended until March 23, 2022 at 12:00 PM CDT.
3. The clause DFARS 252.223-7999 (Dev) has been removed.
4. Specification Section 01 11 10.00 26 paragraph 1.7.c has been removed.
1. CONTRACT ID CODE PAGE OF PAGES
1 40
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127S21R0001
X 9B. DATED (SEE ITEM 11)
30-Sep-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Dec-2021
CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127S21R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Jan-2022 12:00 PM to 23-Mar-2022 12:00 PM.
The required performance has changed from Project Title: Turbine Rehabilitation and Generator Rewind, Norfork Lake, Dam and Powerhouse, White River Basin, Baxter County, ArkansasProject Number:
401258Magnitude of Construction: Between $25,000,000 and $75,000,000Set-Aside: Full and Open CompetitionNAICS: 237990, Other Heavy and Civil Engineering ConstructionSBA Size Standard: $39,500,000Site Visit: An organized Site Visit has been scheduled for October 12-14, 2021, at the Norfork Powerhouse. A secondary site visit is scheduled for November 01-02, 2021. Please see FAR 52.236-27 Alt 1 in section 00 21 00 for complete details.Bidder Inquiry: A Request for Information (RFI) Review has been set up at www.projnet.org for this solicitation. The Projnet Inquiry Key is M3SKC3-9A73UQ. The review is open from September 30, 2021, until November 09, 2021Reference Drawings: This file is too large to post on SAM. Please email sarah.n.hagood@usace.army.mil if you would like a copy of this document sent to you via DoD SAFE. to Project Title: Turbine Rehabilitation and Generator Rewind, Norfork Lake, Dam and Powerhouse, White River Basin, Baxter County, ArkansasProject Number: 401258Magnitude of Construction: Between $25,000,000 and $75,000,000Set-Aside: Full and Open CompetitionNAICS: 237990, Other Heavy and Civil Engineering ConstructionSBA Size Standard: $39,500,000Site Visit: An organized Site Visit has been scheduled for October 12- 14, 2021, at the Norfork Powerhouse. A secondary site visit is scheduled for November 01-02, 2021. Please see FAR 52.236-27 Alt 1 in section 00 21 00 for complete details.Bidder Inquiry: A Request for Information (RFI) Review has been set up at www.projnet.org for this solicitation. The Projnet Inquiry Key is M3SKC3-9A73UQ. The review is open from September 30, 2021, until November 09, 2021. The RFI Review will be reopened for additional inquiries from December 16, 2021, until January 28, 2022.Reference Drawings: This file is too large to post on SAM. Please email sarah.n.hagood@usace.army.mil if you would like a copy of this document sent to you via DoD
SAFE..
SUBCLIN 0008AA
The unit of issue has changed from Job to Each.
The following have been modified:
PRICING SCHEDULE
Line Item No. Description Quantity
Unit of Measure Unit Price Amount
BASE ITEMS (Applies to Both Units 1 & 2)
0001 Hydraulic Turbine Model 1 Job XXX $
0002 Site Mobilization and Demobilization 1 Job XXX $
0003 On-Site Lead-Based Paint Removal 17,200 Square Feet $ $
0004 Special Tools and Scaffolding 1 Job XXX $
0005 Furnish Spares XXX XXX XXX XXXXX
0005AA Spare Turbine Shaft Sleeve 1 Job XXX $
0005AB Spare Wicket Gate Stem Seal Sets 1 Job XXX $
0005AC Spare Servomotor Packing Box Stem Seals 1 Job XXX $
0005AD Furnish Spare Set of RTD's and Relays 1 Job XXX $
0005AE Furnish Spare Generator Parts 1 Job XXX $
0006 Furnish and Test Prototype Coils 1 Each XXX $
0007 Provision of Boring Bar 1 Job XXX $
0008 Governor and Lube Oil XXX XXX XXX XXXXX
0008AA Drain, Clean, and Flush System 1 Each $ $
0008AB Disposal of Old Oil 4,920 Gallon $ $
0008AC Supply and Filling of New Oil 4,920 Gallon $ $
0009 Inspect, Load Test, and Name Plate BTH Devices 1 Job XXX $
0010 Asbestos Survey and Abatement 1 Job XXX $150,000
PARTIAL BASE ITEMS (Applies to Unit 1)
0010 Painting 1 Each $ $
0011 Francis Runner 1 Each $ $
0012 Pre-disassembly Investigation 1 Each $ $
Generating Unit Disassembly Including Inspections of Components 1 Each $ $
0014 Reassembly of Generating Unit 1 Each $ $
0015 Testing After Reassembly 1 Each $ $
0016 Line Bore Wicket Gate Stem Housing 1 Each $ $
0017 Stay Ring Inspection 1 Each $ $
0018 Replace Wicket Gates 1 Each $ $
0019 Supply Stationary Sealing Ring 1 Each $ $
0020 Supply Head Cover 1 Each $ $
0021 Turbine Guide Bearing Housing Refurbishment 1 Each $ $
0022 Bottom Ring Refurbishment 1 Each $ $
0023 Turbine Air Inlet Valve Refurbishment 1 Each $ $
0024 Furnish and Install All Bushings and Bearing Plates 1 Each $ $
0025 Refurbish Wicket Gate Operating Mechanism 1 Each $ $
0026 Refurbish Shear Linkages 1 Each $ $
0027 Furnish and Install Turbine Shaft Sleeve 1 Each $ $
0028 Operating Ring Refurbishment 1 Each $ $
0029 Turbine and Generator Shaft XXX XXX XXX XXXXX
0029AA Turbine and Generator Shaft Inspection 1 Each $ $
0029AB Machining of Turbine Shaft 1 Each $ $
0030 Supply and Install Main Turbine Shaft Packing Box 1 Each $ $
0031 Refurbish Wicket Gate Servomotor 1 Each $ $
0032 Thrust Runner Phase 1 Inspection 1 Each $ $
0033 Thrust Bearing Shoe Refurbishment XXX XXX XXX XXXXX
0033AA Shipment of Thrust Bearing Shoes 1 Each $ $
0033AB Refurbish Set of Shoes 1 Each $ $
0034 Guide Bearing Refurbishment XXX XXX XXX XXXXX
0034AA Shipment of Turbine Guide Bearing 1 Each $ $
0034AB Ship Set of Guide Bearing Pads 1 Each $ $
0034AC Refurbish Turbine Guide Bearing 1 Each $ $
0034AD Refurbish Set of Guide Bearing Pads 1 Each $ $
0035 Setup for Machining and Machining up to 0.020" 1 Each $ $
0036 Spiral Case Inspection 1 Each $ $
0037 Draft Tube Liner Inspection 1 Each $ $
0038 Piezometer Tap Inspection and Repair 1 Each $ $
0039 Replace Fasteners for Major Couplings 1 Each $ $
Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank 1 Each $ $
0041 Generator Brake and Manual Oil Pump Refurbishment 1 Each $ $
0042 Inspect Generator Brake Rings 1 Each $ $
0043 High Pressure Lift System 1 Each $ $
Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $
Miscellaneous Electrical Work As Described in 26 05
00.00 26 1 Each $ $
Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $
0047 Remove Stator Winding 1 Each
0047 Inspect, Clean, and Test Stator Core 1 Each $ $
0048 Inspect, Clean, and Test Rotor 1 Each $ $
0049 Install and Test Stator Winding 1 Each $ $
0050 Perform Special Field Tests (Unit 1 Only) 1 Each $ $
0051 Replace Existing Current Transformers 1 Each $ $
0052 Collector Ring Assembly Inspection 1 Each $ $
0053 Chrome Plate Piston Rods 1 Each $ $
0054 Machining of Curb Ring 1 Each $ $
0055 Void Mapping of Draft Tube Liner 1 Each $ $
0056 Surface Air Coolers 9 Each $ $
0057 Replace Thrust Bearing Oil Cooling Coils 16 Each $ $
0058 Thrust Sump Kidney Loop Filter 1 Each $ $
0059 Head Cover Drainage Improvement 1 Each $ $
Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0061 Remove Farval Grease System 1 Each $ $
PARTIAL BASE ITEMS (Applies to Unit 2)
0062 Painting 1 Each $ $
0063 Francis Runner 1 Each $ $
0064 Pre-disassembly Investigation 1 Each $ $
Generating Unit Disassembly Including Inspections of Components 1 Each $ $
0066 Reassembly of Generating Unit 1 Each $ $
0067 Testing After Reassembly 1 Each $ $
0068 Line Bore Wicket Gate Stem Housing 1 Each $ $
0069 Stay Ring Inspection 1 Each $ $
0070 Replace Wicket Gates 1 Each $ $
0071 Supply Stationary Sealing Ring 1 Each $ $
0072 Supply Head Cover 1 Each $ $
0073 Turbine Guide Bearing Housing Refurbishment 1 Each $ $
0074 Bottom Ring Refurbishment 1 Each $ $
0075 Turbine Air Inlet Valve Refurbishment 1 Each $ $
0076 Furnish and Install All Bushings and Bearing Plates 1 Each $ $
0077 Refurbish Wicket Gate Operating Mechanism 1 Each $ $
0078 Refurbish Shear Linkages 1 Each $ $
0079 Furnish and Install Turbine Shaft Sleeve 1 Each $ $
0080 Operating Ring Refurbishment 1 Each $ $
0081 Turbine and Generator Shaft XXX XXX XXX XXXXX
0081AA Turbine and Generator Shaft Inspection 1 Each $ $
0081AB Machining of Turbine Shaft 1 Each $ $
0082 Supply and Install Main Turbine Shaft Packing Box 1 Each $ $
0083 Refurbish Wicket Gate Servomotor 1 Each $ $
0084 Thrust Runner Phase 1 Inspection 1 Each $ $
0085 Thrust Bearing Shoe Refurbishment XXX XXX XXX XXXXX
0085AA Shipment of Thrust Bearing Shoes 1 Each $ $
0085AB Refurbish Set of Shoes 1 Each $ $
0086 Guide Bearing Refurbishment XXX XXX XXX XXXXX
0086AA Shipment of Turbine Guide Bearing 1 Each $ $
0086AB Ship Set of Guide Bearing Pads 1 Each $ $
0086AC Refurbish Turbine Guide Bearing 1 Each $ $
0086AD Refurbish Set of Guide Bearing Pads 1 Each $ $
0087 Setup for Machining and Machining up to 0.020" 1 Each $ $
0088 Spiral Case Inspection 1 Each $ $
0089 Draft Tube Liner Inspection 1 Each $ $
0090 Piezometer Tap Inspection and Repair 1 Each $ $
0091 Replace Fasteners for Major Couplings 1 Each $ $
Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank 1 Each $ $
0093 Generator Brake and Manual Oil Pump Refurbishment 1 Each $ $
0094 Inspect Generator Brake Rings 1 Each $ $
0095 High Pressure Lift System 1 Each $ $
Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $
Miscellaneous Electrical Work As Described in 26 05
00.00 26 1 Each $ $
Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $
0101 Remove Stator Winding 1 Each
0099 Inspect, Clean, and Test Stator Core 1 Each $ $
0100 Inspect, Clean, and Test Rotor 1 Each $ $
0101 Install and Test Stator Winding 1 Each $ $
0102 Replace Existing Current Transformers 1 Each $ $
0103 Collector Ring Assembly Inspection 1 Each $ $
0104 Chrome Plate Piston Rods 1 Each $ $
0105 Machining of Curb Ring 1 Each $ $
0106 Void Mapping of Draft Tube Liner 1 Each $ $
0107 Surface Air Coolers 9 Each $ $
0108 Replace Thrust Bearing Oil Cooling Coils 16 Each $ $
0109 Thrust Sump Kidney Loop Filter 1 Each $ $
0110 Head Cover Drainage Improvement 1 Each $ $
Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0112 Remove Farval Grease System 1 Each $ $
TOTAL BASE PROPOSAL
(am0004) OPTIONAL MISCELLANEOUS ITEMS (Applies to Both Units)
0113 Miscellaneous Parts and Materials Not to Exceed Each $ 1.00 $ 100,000.00
0114 Welding Services 300 Pounds $ $
0115 Machinist Hire 200 Man Hours $ $
0116 Electrical Hire 200 Man Hours $ $
0117 Painter Hire 300 Man Hours $ $
0118 Other Skilled Craftsman Hire 200 Man Hours $ $
0119 General Laborer Hire 400 Man Hours $ $
0120 Liquid Penetrant Method 50 Man Hours $ $
0121 Magnetic Particle Method 50 Man Hours $ $
0122 Ultrasonic Method 50 Man Hours $ $
0123 Radiographic Method 20 Man Hours $ $
0124 Thermal Spraying 20 Man Hours $ $
0125 Visual 50 Man Hours $ $
OPTIONAL ITEMS (Applies to Both Units)
0126 Perform Stator Core Design and Prepare Die 1 Job XXX $
0127 Thrust Bearing Phase 2 Inspection (Spare Only) XXX XXX XXX XXXXX
0127AA
Thrust Bearing Phase 2 Inspection without Splitting (Spare Only) 1 Job XXX $
0127AB
Thrust Bearing Phase 2 Inspection with Splitting (Spare Only) 1 Job XXX $
0128 FEA Stress Analysis of Supporting Structures 1 Job XXX $
OPTIONAL ITEMS (Applies to Unit 1)
0129 Additional Stay Ring Mounting Surface Machining 1 Each $ $
0130 Additional Head Cover Flange Machining 1 Each $ $
0131 Additional Bottom Ring Flange Machining 1 Each $ $
0132 Additional Bearing Housing Machining 1 Each $ $
0133 Additional Curb Ring Machining 1 Each $ $
0134 Refurbish Generator Brake Rings 1 Each $ $
0135 Thrust Bearing Phase 2 Inspection XXX XXX XXX XXXXX
0135AA Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $
0135AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $
0136 Generator Thrust Bearing Runner and Guide Runner XXX XXX XXX XXXXX
0136AA Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $
0136AB Resurfacing Thrust Bearing Runner and Backside 1 Each $ $
0136AC
Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $
0136AD Thrust Guide Runner Refurbishment 1 Each $ $
0137 Refurbish Rotor Field Poles 1 Each $ $
0138 Reinsulate Rotor Field Leads 1 Each $ $
Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $
0140 Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $
Perform Additional Stator Core Interlaminar Insulation Test 1 Job XXX $
Manufacture Stator Laminations, Remove Existing Stator Core, and Install New Stator Core 1 Each $ $
0143 Governor Pumps Additional Machine Work - Level A 1 Each $ $
0144 Governor Pumps Additional Machine Work - Level B 1 Each $ $
0145 Governor Pumps Additional Machine Work - Level C 1 Each $ $
0146 Governor Pumps Additional Machine Work - Level D 1 Each $ $
Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $
0148 Turbine Guide Bearing Build up of the O.D. Spigot Fits 1 Each $ $
0149 Stator Core Repair 200 Man Hours $ $
0153AA Furnish Gate Distributing Valve Plunger 1 Each
0153AB Furnish Gate Distributing Valve Bushing 1 Each
0153AC Furnish Gate Distributing Valve Piston 1 Each
0153AD Furnish Gate Distributing Valve Stem 1 Each
Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0151 Epoxy Injection in Draft Tube Liner 20 Gallon $ $
0152 New Turbine Guide Bearing Shell 1 Each $ $
0153 New Turbine Guide Bearing Housing 1 Each $ $
0154 Restore Servomotor Head Spigot Fit 1 Each $ $
Additional Cylinder Bore and Replace Servomotor Pistons 1 Each $ $
0156 Draft Tube Liner Repair 1 Each $ $
0157 Machine Condition Monitoring System 1 Each $ $
OPTIONAL ITEMS (Applies to Unit 2)
0158 Additional Stay Ring Mounting Surface Machining 1 Each $ $
0159 Additional Head Cover Flange Machining 1 Each $ $
0160 Additional Bottom Ring Flange Machining 1 Each $ $
0161 Additional Bearing Housing Machining 1 Each $ $
0162 Additional Curb Ring Machining 1 Each $ $
0163 Refurbish Generator Brake Rings 1 Each $ $
0164 Thrust Bearing Phase 2 Inspection XXX XXX XXX XXXXX
0164AA Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $
0164AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $
0165 Generator Thrust Bearing Runner and Guide Runner XXX XXX XXX XXXXX
0165AA Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $
0165AB Resurfacing Thrust Bearing Runner and Backside 1 Each $ $
0165AC
Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $
0165AD Thrust Guide Runner Refurbishment 1 Each $ $
0166 Refurbish Rotor Field Poles 1 Each $ $
0167 Reinsulate Rotor Field Leads 1 Each $ $
Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $
0169 Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $
Perform Additional Stator Core Interlaminar Insulation Test 1 Each $ $
Manufacture Stator Laminations, Remove Existing Stator Core, and Install New Stator Core 1 Each $ $
0172 Governor Pumps Additional Machine Work - Level A 1 Each $ $
0173 Governor Pumps Additional Machine Work - Level B 1 Each $ $
0174 Governor Pumps Additional Machine Work - Level C 1 Each $ $
0175 Governor Pumps Additional Machine Work - Level D 1 Each $ $
Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $
0177 Turbine Guide Bearing Build up of the O.D. Spigot Fits 1 Each $ $
0178 Stator Core Repair 200 Man Hours $ $
0180AA Furnish Gate Distributing Valve Plunger 1 Each
0180AB Furnish Gate Distributing Valve Bushing 1 Each
0180AC Furnish Gate Distributing Valve Piston 1 Each
0180AD Furnish Gate Distributing Valve Stem 1 Each
Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0180 Epoxy Injection in Draft Tube Liner 20 Gallon $ $
0181 New Turbine Guide Bearing Shell 1 Each $ $
0182 New Turbine Guide Bearing Housing 1 Each $ $
0183 Restore Servomotor Head Spigot Fit 1 Each $ $
Additional Cylinder Bore and Replace Servomotor Pistons 1 Each $ $
0185 Draft Tube Liner Repair 1 Each $ $
0186 Machine Condition Monitoring System 1 Each $ $
TOTAL OPTIONAL PROPOSAL
TOTAL PROPOSAL AMOUNT (BASE PLUS OPTIONAL ITEMS)
SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS
The following have been modified:
SUBMISSION REQUIREMENTS
SECTION 00 22 16 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION
CRITERIA, AND BASIS OF AWARD
GENERAL REQUIREMENTS
The proposal shall describe the capability of the Offeror to perform the requirements of the Specifications. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.
In order to evaluate all proposals effectively and equitably, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.
Proposals shall not exceed the page limits described. Provide all information in bookmarked sections. Appendices and/or attachments are not permitted and will not be evaluated.
SUBMISSION FORMAT
METHOD OF SUBMISSION. Offerors shall submit one (1) electronic copy of their proposal via DoD SAFE (https://safe.apps.mil/) before the time and date specified in the solicitation (Standard Form 1442).
1. Send an email to the Contracting Officer AND Contract Specialist to receive the link to drop off your proposal. This shall be completed no later than five (5) business days prior to the proposal due date.
i. Contracting Officer: joseph.c.daniels@usace.army.mil
ii. Contract Specialist: sarah.n.hagood@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Once in DoD SAFE, please add your files in accordance with the File Format section below. Please add ‘W9127S21R0001- Firm Name’ in the Short Note to the Recipients box.
4. Add the Contracting Officer AND Contract Specialist as recipients.
5. Ensure everything is correct, and then click “Drop-off Files” to send.
Should DoD SAFE be unavailable, proposals may be submitted via Compact Disk (CD) and delivered to
US Army Corps of Engineers ATTN: Sarah Hagood Solicitation W9127S21R0001 700 West Capitol Avenue Little Rock, AR 72203
FILE FORMAT. Files shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. There shall only be three files in each Offerors’ submission: ‘W9127S21R0001- Firm Name- Volume I, Technical Submission,’ W9127S21R0001- Firm Name- Volume II, Small Business/Subcontracting Submission’ and ‘W9127S21R0001- Firm Name- Volume III, Price Submission.’
FONT SIZE. Shall not be less than 10 point. Each page shall be identified with the appropriate page number centered at the bottom of the page.
SHEET SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Sheets which are 11 x 17 inch will be counted as two 8-1/2-inch x 11-inch sheets. All sheets shall be dated and numbered.
COVER SHEET & TABLE OF CONTENTS. Proposals shall consist of three (3) volumes. A cover sheet identifying the Offeror (name, address, point of contact) and solicitation number shall be provided. The second sheet shall be a table of contents. The proposal shall contain a detailed table of contents. Offers violating these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.
BOOKMARKS. Proposals shall be bookmarked and labeled as specified in a manner to afford easy identification from the Table of Contents. Additional bookmarks may be provided but shall be nested under the appropriate tab bookmark.
HYPERLINKS. Hyperlinks are not permitted. This includes hyperlinks within the document, such as Figure or Table references to the page containing content, and hyperlinks to websites.
ATTACHMENTS. Attachments/appendices are not permitted.
PAGE LIMITS. The proposal shall not exceed the specified page limits. The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers not meeting these requirements may be subject to rejection.
SUBMISSION REQUIREMENTS
Offerors shall submit their proposals in accordance with the following:
VOLUME I:
BOOKMARK A— Standard Form 1442 and Proposal Data Sheet (Attachment A). Proposal must include Offeror’s telephone number, FAX number, email address, and DUNS number. DUNS number will be used to access CPARS Data.
BOOKMARK B – Factor 1 – Past Performance
1.1 – Turbine Rehabilitation
1.2 – Generator Rewind BOOKMARK C – Factor 2 – Turbine Rehabilitation Technical Approach BOOKMARK D – Factor 3 – Generator Rewind Technical Approach BOOKMARK E – Factor 4 – Schedule BOOKMARK F – Factor 5 – Quality Control
VOLUME II:
BOOKMARK A — Small Business Participation Plan BOOKMARK B — Subcontracting Plan
VOLUME III:
BOOKMARK A — Price Schedule BOOKMARK B — Offer Guarantee
FACTOR 1 – PAST PERFORMANCE (VOL 1, BOOKMARK B)
SUBMISSION REQUIREMENT: Under each sub-factor, the Offeror shall submit information on projects completed within the past twenty (20) years or currently under contract and more than 50% complete to demonstrate the organization's/team’s recent and relevant experience. Project completion dates shall be submitted as part of package. Information shall be submitted utilizing the template found as Attachment B below.
For each submitted project, the Offeror shall request a Past Performance Questionnaire (PPQ), found as Attachment C below, from those Government agencies or private sector companies’ Point of Contact identified for each project.
These agency or company contacts must have detailed information concerning the performance of the project in order to accurately complete the PPQ for the Offeror. The POCs may be contacted by the SSEB to assess the scope of work performed and to evaluate performance of the projects listed under the previous experience tab of this volume, if necessary; therefore, it is imperative to ensure correct telephone and email addresses are identified for the client POCs on each PPQ. Completed Past Performance Questionnaires shall be submitted with your proposal if they are able to be received from the POC prior to the proposal due date. Offerors shall follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror’s client requests, he/she may submit the questionnaire directly to the Contract Specialist, Sarah Hagood at Sarah.N.Hagood@usace.army.mil prior to proposal closing date.
PPQs previously completed by the example project's POC may be submitted in lieu of requesting the POC to re-complete the form; however, Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
NOTE: For Department of Defense (DoD) projects, the Offeror need not submit a copy of the Contractor Performance Assessment Reporting System (CPARS) Evaluations (ACASS & CCASS) for each DoD project; instead, provide written notification current ratings are available for the Government to evaluate. CPARS evaluations shall not be submitted by the Offeror in place of a PPQ.
TEAMING ARRANGEMENTS AND JOINT VENTURES (JV). Provide a copy of the teaming/joint venture agreement. Offerors may submit experience of an affiliated entity where the affiliated entity has made a firm commitment to participate meaningfully in the performance of the contract. If required, JV approval must be obtained in accordance with Small Business Administration policy.
EVALUATION CRITERIA: There are two aspects to the Government’s past performance evaluation: relevancy and quality of performance. The Government will first evaluate how relevant the past performance is to the work required by these specifications and then the Government will evaluate how well the Offeror performed on the submitted projects. In doing this, Government will use the relevancy and confidence ratings discussed below.
In addition to the PPQs, the Government may review and consider any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror (including information from Government personnel and databases).
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The Government intends to assess the relative risks associated with the Offeror’s performance based on the past performance information provided in the proposal and, if applicable, information obtained from available sources identified previously. A significant achievement, unexplained or unresolved problem, or lack of relevant data may significantly impact the risk rating by the Government. Therefore, it is incumbent upon the Offeror to include all relevant information, including demonstrated corrective actions, in its proposal.
In addition to the project information requested in this section, the Offeror shall also provide notification and information concerning any projects where it’s right to proceed was terminated for the convenience of the Government or for default/cause during the last five (5) years, or so state that there were none. If any contracts were terminated, whether for convenience or default/cause, the Offeror shall list each, providing the contract number, title, brief type of work effort, and the reason for the termination.
NOTE: Although the SSEB may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably with regard to past performance, the SSAC may recommend and the SSA may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated solicitation criteria.
FACTOR 1.1 – TURBINE REHABILITATION PAST PERFORMANCE
Project Narratives shall:
1. Be no more than four (4) pages per project.
2. Include the following when describing Turbine Rehabilitation Experience:
a. Submit no less than three (3) but no more than five (5) projects for this type of experience.
(am0004) Only include 130-inch or greater Francis turbine project(s)
b. Identify the capabilities and experience that company design personnel have with Francis turbine design and evaluating hydro turbine design conditions similar to those found at Norfork Dam Powerhouse. (am0004) It is estimated that the current turbine runner has a power-based specific speed of 44.4.
c. (am0004) Identify the Offeror as regularly engaged in the design, manufacture, and installation of 130-inch or greater Francis turbine runners for hydroelectric generators of 20 – 80 megawatt (MW) or identify partnering or subcontracting agreements with firms other than the Offeror providing this experience.
d. (am0004) Provide design projects that have incorporated a dissolved oxygen (DO) amelioration system for the purposes of increasing DO levels in the tailwater discharge. The included designs shall show improvements of DO from ranges of near 0 mg/L parts per million (PPM) to at least 6 mg/L PPM. Submitted designs can show improvements to DO levels by use of naturally aspirating designs or by forced air designs or a combination of both.
FACTOR 1.2 – GENERATOR REWIND PAST PERFORMANCE
Project Narratives shall:
1. Be no more than four (4) pages per project.
2. Include the following when describing Generator Rewind Experience:
a. Submit no less than three (3) but no more than five (5) projects for this type of experience.
b. Identify the experience that company design personnel have in addressing design conditions like those found at Norfork Dam Powerhouse.
c. (am0004) Identify the Offeror as regularly engaged in the design, manufacture, installation and repair of stator coils and stator core laminations for hydroelectric generators of 20-80200 MVA or identify partnering or subcontracting agreements with firms other than the Offeror providing this experience.
d. Provide applicable stator winding and stator core replacement contracts in accordance with this factor. The projects shall show where the Offeror has designed, manufactured, installed, and tested a complete winding and at least a portion of stator core for a large hydroelectric generator. Examples shall have the same or similar insulation system as Norfork Dam Powerhouse, be of separate design and/or location (i.e. do not submit three projects for this section that took place in the same powerhouse). Project examples shall identify the firms providing this experience and their relationship to the Offeror during said project, e.g. prime contractor (same as Offeror), subcontractor, material supplier, not associated with the Offeror, etc.
FACTOR 2 – TURBINE REHABILITATION TECHNICAL APPROACH (VOL 1, BOOKMARK C)
SUBMISSION REQUIREMENT: Factor Page Limit – (am0004) One hundred thirty (130) twenty (120) Pages.
The Offeror shall submit information for Turbine Efficiency; Modification of Existing Components; Cavitation Requirements as outlined below:
Turbine Efficiency (35 pages) The Offeror shall provide turbine prototype hydraulic efficiency, in accordance with 48 13 13.01 26, paragraph 1.5.2 and Table 1 below for the purpose of determining the weighted turbine efficiency:
Table 1: Turbine Efficiency
Prototype Net
Head (ft)
Efficiency Factor at Turbine Power (hp) & Offeror’s Guaranteed
Efficiency
Efficiency Factor at Turbine Power (hp) &
160 0.001 27,000 0.003 40,500 0.005 48,100 (am000
4) 0.003
50,600
170 0.040 32,000 0.084 45,000 0.140 54,000 0.110 58,000
175 0.052 35,000 0.107 47,800 0.180 57,200 0.141 63,630
190 0.009 36,300 0.019 47,800 0.031 57,100 0.025 63,630
205 0.005 38,200 0.011 47,800 0.019 57,100 0.015 63,630
The weighted efficiencies of the turbine will be evaluated using the Contractor supplied information requested in Table 1. The following formula shall be used for determining the weighted efficiency where: Exxxft/xxxxxhp= Contractor provided turbine efficiency for the required net heads and turbine powers:
(am0004)Weighted Efficiency = 0.001*E160ft/27000hp + 0.003* E160ft/40500hp + 0.005* E160ft/48100hp + 0.003* E160ft/50600hp + 0.040* E170ft/32000hp + 0.084* E170ft/45000hp + 0.140* E170ft/54000hp + 0.110* E170ft/58000hp + 0.052* E175ft/35000hp + 0.107* E175ft/47800hp + 0.180* E175ft/57200hp + 0.141* E175ft/63630hp + 0.009* E190ft/36300hp + 0.019* E190ft/47800hp + 0.031* E190ft/57100hp
+ 0.025* E190ft/63630hp + 0.005* E205ft/38200hp + 0.011* E205ft/47800hp + 0.019* E205ft/57100hp + 0.015* E205ft/63630hp
The minimum allowed weighted efficiency is 89.5%.
The Offeror shall provide the following information:
a. Performance curves at designated net heads from Table 1 with cavitation limits shown.
b. Predicted Hill chart for the proposed Norfork prototype turbine with cavitation limits shown.
In addition, the Offeror shall provide a maximum guarantee turbine prototype hydraulic efficiency while aeration system is operating for one unit.
Table 2: Turbine Efficiency During Aeration
Net
Head (ft)
Efficiency Factor at Turbine Power (hp) &
160 0.001 27,000 0.003 40,500 0.005 48,100
(am000 4)
0.003 50,600
170 0.040 32,000 0.084 45,000 0.140 54,000 0.110 58,000
175 0.052 35,000 0.107 47,800 0.180 57,200 0.141 63,630
190 0.009 36,300 0.019 47,800 0.031 57,100 0.025 63,630
205 0.005 38,200 0.011 47,800 0.019 57,100 0.015 63,630
The weighted efficiencies of the turbine will be evaluated using the Contractor supplied information requested in Table 2. The following formula shall be used for determining the weighted efficiency where: Exxxft/xxxxxhp= Contractor provided turbine efficiency for the required net heads and turbine powers:
(am0004)Weighted Efficiency = 0.001*E160ft/27000hp + 0.003* E160ft/40500hp + 0.005* E160ft/48100hp + 0.003* E160ft/50600hp + 0.040* E170ft/32000hp + 0.084* E170ft/45000hp + 0.140* E170ft/54000hp + 0.110* E170ft/58000hp + 0.052* E175ft/35000hp + 0.107* E175ft/47800hp + 0.180* E175ft/57200hp + 0.141* E175ft/63630hp + 0.009* E190ft/36300hp + 0.019* E190ft/47800hp + 0.031* E190ft/57100hp
+ 0.025* E190ft/63630hp + 0.005* E205ft/38200hp + 0.011* E205ft/47800hp + 0.019* E205ft/57100hp + 0.015* E205ft/63630hp
The Offeror shall provide the following information:
a. Performance curves, while aerating, at designated net heads from Table 2 with cavitation limits shown.
b. Predicted Hill chart, while aerating, for the proposed Norfork prototype turbine with cavitation limits shown.
Modification of Existing Components (50 pages) The Offeror shall submit their approach to modifying existing components, per minimum requirements listed in Specifications Section 48 13 13.01 26, paragraph 1.1.3, by submitting form Other Specific Prototype Turbine Information (Attachment D).
Drawings and descriptive data shall be included, and as a minimum include the following: turbine runner and rotating parts modifications; non-rotating parts modification, as allowed. Where applicable, show axial-cross section cuts, plan and elevation views, general construction and overall and principal dimensions, elevations, and a distinction between existing and modified items.
Proposed modifications to existing components shall be clearly shown. The Offeror shall clearly identify the turbine modifications that are required to achieve the turbine performance offered in the Offeror’s proposal. The Offeror is required to provide all that is necessary to furnish and install a rehabilitated turbine which is homologous to the Offeror’s model turbine and which achieves the performance stated in the specification and in the Offeror’s proposal.
If the Offeror’s proposed modifications impact other systems or components, the Offeror shall modify or replace components or systems in such a manner as to maintain the functions and functionality which existed prior to commencing the upgrade.
Cavitation Requirements (35 pages)
The Offeror shall submit guarantee/Cavitation Limits Table 3 in accordance with 48 13 13.01 26, paragraph 1.5.3.1.
Table 3 Cavitation Limits
Net Head (ft)
Required Minimum
Power (hp)
Required Maximum
Power (hp)
Offeror Minimum
Power (hp)
Offeror Maximum
Power (hp)
Offeror Cavitation Free
Range (hp)
160 27,000 50,600 170 32,000 58,000 175 35,000 63,630 190 36,300 63,630 205 38,200 63,630
For each prototype net head:
1. Required Minimum Power (hp) is the minimum turbine power that is free from visible cavitation
2. Required Maximum Power (hp) is the maximum turbine power that is free from visible cavitation
3. Offeror Maximum Power (hp) is the maximum turbine power that is free from visible cavitation. Can be more than the Required Maximum Power (hp)
4. Offeror Minimum Power (hp) is the minimum turbine power that is free from visible cavitation. Can be less than the Required Minimum Power (hp)
5. Offeror Cavitation Free Range (hp) = Offeror Maximum Power (hp)net_head - Offeror Minimum Power (hp)net_head.
The cavitation free guarantee ranges of the turbine will be evaluated using the Contractor supplied information requested in Table 3.
(am0004) Dissolved Oxygen Requirements (10 pages) The Offeror shall submit their approach to meet dissolved oxygen requirements, per minimum requirements listed in Specifications Section 48 13 13.01 26, Part 1.6.
Schematic drawings and narrative descriptions shall be included with turbine runner and rotating parts modifications and non-rotating parts modification, as applicable. Demonstrate the Offeror’s plan to satisfy negative pressure requirements of the specifications.
Proposed modifications to existing components shall be clearly shown. The Offeror shall clearly identify the turbine modifications that are required to achieve the dissolved oxygen requirements of the solicitation. If the Offeror’s proposed modifications impact other systems or components, describe how the Offeror will maintain the functions and functionality which existed prior to commencing the upgrade.
EVALUATION CRITERIA – The proposal will be evaluated to determine the extent to which it:
- Demonstrates an understanding of the proposed turbine’s required weighted hydraulic efficiency (am0004) during non-aeration operation. A higher weighted efficiency will be rated more favorably than a lower weighted efficiency.
Weighted efficiencies below 89.5% will be rated unfavorable.
- Demonstrates an understanding of the proposed turbine’s hydraulic efficiency whilst the aeration system is in operation. (am0004) A higher weighted efficiency will be rated more favorably than a lower weighted efficiency.
- Demonstrates an understanding of modification to existing components requirements in technical specifications section 48 13 13.01 26, paragraph 1.1.3.
- Demonstrates an understanding of cavitation requirements in technical specifications section 48 13 13.01 26, paragraph 1.5.3.1. (am0004) A greater cavitation free range, given in horsepower, for each net head in table 3 will be rated more favorably than a smaller cavitation free range. Offeror proposed maximum powers, given in horsepower, for each net head in Table 3 will be rated unfavorable if they are less than the required maximum power in Table 3.
(am0004) - Demonstrates an understanding of dissolved oxygen requirements in technical specification section 48 13
13.01 26, part 1.6.
FACTOR 3 – GENERATOR REWIND TECHNICAL APPROACH (VOL 1, BOOKMARK D)
SUBMISSION REQUIREMENT: Factor Page Limit – Forty (40) Pages. The Offeror shall submit information for Stator Winding Losses; Stator Winding Manufacturing and Installation Process as outlined below:
Stator Winding Losses (4 pages) The Offeror shall present guaranteed combined DC I2R (R corrected to 75 °C) loss and stray load loss for their proposed winding in kW at 46,500 kVA, 0.9 power factor.
Stator Winding Manufacturing and Installation Process (36 pages) The Offeror shall submit a complete description in narrative form of their stator winding manufacturing and installation process.
The Stator Winding Manufacturing Narrative shall include the following details:
1. Coil insulation system, including strand, turn and ground-wall insulation material and thickness.
2. Cross sectional dimensions.
3. Designed dielectric stress of the ground-wall insulation at rated voltage.
4. Ground-wall insulation application method (hand-wound, machine wound with/without scarf joint, etc.)
5. Identify the location and name(s) of the owning interest in the winding manufacturing facility.
The Stator Winding Installation Narrative shall include the following details:
1. Side packing system.
2. Wedging system – including type, dimensions, and materials of wedges, total number of wedges per slot, number of check wedges per slot and end wedge securing method.
3. Spring deflection measurement method.
4. Brazing method.
5. Quality assurance procedures.
EVALUATION CRITERIA – The proposal will be evaluated to determine the extent to which it:
- Demonstrates an understanding of stator winding losses requirements in technical specifications section 48 13 16.00 26 paragraph 1.4.3 (am0004) and paragraph 1.6.
- Demonstrates an understanding of stator winding manufacturing and installation process requirements in technical specifications section 48 13 16.00 26.
FACTOR 4 – SCHEDULE (VOL 1, BOOKMARK E)
SUBMISSION REQUIREMENT: Provide a schedule in Gantt chart format using the critical path method (MS Project 2007 or Primavera P6 software) showing a planned schedule to complete the project including: the design;
procurement of major supplies; manufacturing; transportation; on-site demolition, on-site assembly/erection; on-site testing; and commissioning of equipment. The schedule shall also include on-site mobilization and demobilization, any identified work windows, critical submittals, interim milestones, and contract completion date. The schedule must:
1. Be graphically represented, task oriented and meet the proposed contract duration.
2. Provide enough detail to demonstrate an understanding of the requirement including any constraints which can be anticipated (e.g. labor or material availability, permits, weather, etc.).
3. Show planned sequencing of major activities and phases (e.g. design, procurement, fabrication, permitting activities, disassembly, cutover and temporary power (as applicable), construction, and commissioning) for completing the project.
4. Be in Calendar days with appropriate logic and task duration
5. Show overall construction phase for major item(s) such as: site work, design, procurement, fabrication, permitting activities, disassembly, construction, and commissioning.
6. Show milestones to include the completion of each generator rewind.
7. Show turnover of the project as well as any proposed phased turnovers (if applicable). NOTE: The time to complete the project and turnover to the Government must consider the requirement for the Contractor’s CQC completion inspection and the subsequent joint Contractor-Government turnover inspection
8. Clearly identifies any float in the schedule
9. Shows the duration by total calendar days from Notice to Proceed (NTP) to the completion of all work
EVALUATION CRITERIA – The proposal will be evaluated to determine the extent to which it:
-Demonstrates the Offeror’s overall understanding of the Scope of Work by clearly identifying the major tasks in a logical sequence and identifying critical path items.
-Demonstrates the Offeror’s schedule is realistic considering the schedule constraint contained in FAR Clause 52.211- 10 – Commencement, Prosecution, and Completion of Work (APR 1984).
FACTOR 5 – QUALITY CONTROL (VOL 1, BOOKMARK F)
SUBMISSION REQUIREMENT: Factor Page Limit – Twenty (20) Pages. The offeror shall provide a detailed narrative of its corporate Quality Control (QC) Program and its business practices, which demonstrates adherence to the QC Program as stated in Section 01 45 00.00 10 (Quality Control). The narrative should provide the following criteria:
1. Describe the factory quality control approach for the project; include a description of the systems and capabilities to maintain factory quality control throughout the project.
2. Describe the proposed factory quality control organization, including the proposed staffing plan with qualifications and staff training.
3. Describe the on-site quality control approach for the project; include a description of the systems and capabilities to maintain on-site quality control throughout the project.
4. Describe the proposed on-site quality control organization, including the proposed staffing plan with qualifications and staff training.
5. Describe how internal and external requests for information, shop drawings, progress meetings, site visits, contract completion, closeout, as built, and completion documentation will be handled.
6. Describe how the team will meet USACE three phase quality control requirements.
NOTE: There is no need to submit a quality control plan as the successful offeror will provide that after award.
EVALUATION CRITERIA – The proposal will be evaluated to determine the extent to which it:
- Demonstrates an understanding of technical specifications section 01 45 00.00 10.
- Demonstrates a clear, detailed, and complete representation of the Offeror’s QC Program.
SMALL BUSINESS PARTICIPATION PLAN (VOL 2, BOOKMARK A)
SUBMISSION REQUIREMENT: The purpose of this criterion is to evaluate the amount of work to be performed by small businesses as a prime contractor or subcontractors in relation to the total value of the project, as well as the types of work small businesses will be performing, and the Offeror’s past performance complying with contract requirements contained in clauses FAR 52.219-8, Utilization of Small Business Concerns and FAR.52.219-9, Small Business Subcontracting Plan.
1. All Offerors (both large and small businesses) shall submit a Small Business Participation Plan (SBPP, Attachment E) to identify the extent to which small businesses will participate in the performance of the proposed acquisition.
a. Large businesses may achieve the small business participation goals through subcontracting to small businesses.
b. Small business prime contractors may achieve small business participation goals through their own performance/participation as a prime contractor and also through subcontracting to other small businesses.
A mandatory minimum Total Small Business Participation goal of 10% of the total contract value (through small business participation from small, small disadvantaged, HUBZone, Service-Disabled Veteran Owned, Veteran Owned, or Woman Owned small businesses) is required based on the nature of the work for this project. The Offeror should articulate how small businesses will participate through performance as either a small business prime contractor or as a subcontractor, as well as demonstrating their past performance in complying with requirements of the clauses at FAR 52.219- 8, Utilization of Small Business Concerns and 52.219-9, Small Business Subcontracting Plan.
2. Submit information on up to three (no less than one) project(s) which demonstrates the degree (both by dollar and by percent of total contract value) to which the contractor utilized small business firms in performing the project.
For small business Offerors, consideration will be given to self-performance if a small business for a project, as well as for providing subcontracting opportunities to small businesses—as is the policy of the Government.
For large business Offerors, in addition to the submitted project information, consideration may also include review of ISRs (Individual Subcontract Reports) and SSRs (Summary Subcontract Reports) from the eSRS (Electronic Subcontracting Reporting System).
The project information submitted for the small business participation plan evaluation does not have to be the same as those listed in the Experience and Past Performance factors.
EVALUATION CRITERIA: Small Business Participation Plans will be evaluated using adjectival ratings, which are defined in “SMALL BUSINESS PARTICIPATION RATING ADJECTIVES.”…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .