B.08.02 W9127S21R0001.pdf
PDF 3 MB Posted
- Solicitation number
- W9127S21R0001
About this file
This is a solicitation for a turbine rehabilitation and generator rewind project at Norfork Powerhouse in Baxter County, Arkansas. The project has an estimated value between $25-75 million and is a full and open competition. A site visit is scheduled for October 12-14, 2021 and questions can be submitted through an online portal until October 21. Drawings are available by email request. The solicitation requires rehabilitation of two hydroelectric turbine-generator units including replacement of stator windings, refurbishment of turbine components, and upgrades to achieve specified hydraulic efficiencies. Proposals are due by November 17, 2021 and will be evaluated based on past performance, technical approaches, schedule, quality control, and price. At least 10% small business participation is required.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Turbine Rehabilitation and Generator Rew ind, Norfork Lake, Dam and Pow erhouse, White River Basin, Baxter County, Arkansas
Project Number: 401258
Magnitude of Construction: Betw een $25,000,000 and $75,000,000
Set-Aside: Full and Open Competition
NAICS: 237990, Other Heavy and Civil Engineering Construction SBA Size Standard: $39,500,000
Site Visit: An organized Site Visit has been scheduled for October 12-14, 2021, at the Norfork Pow erhouse. Please see FAR 52.236-27 Alt 1 in section 00 21 00 for complete details.
Bidder Inquiry: A Request for Information (RFI) Review has been set up at w w w .projnet.org for this solicitation. The Projnet Inquiry Key is M3SKC3-9A73UQ. The review is open from September 30, 2021, until October 21, 2021.
Reference Draw ings: This f ile is too large to post on SAM. Please email sarah.n.hagood@usace.army.mil if you w ould like a copy of this document sent to you via DoD SAFE.
SARAH N HAGOOD 501-340-1277
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
30-Sep-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1975 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________00 72 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Nov 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USACE, LITTLE ROCK (W9127S)
700 W. CAPITOL AVE, RM 7315
LITTLE ROCK AR 72201-3225
W9127S
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
12:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(501) 324-5196FAX:TEL: (501) 340-5720 TEL: FAX:
W9127S21R0001 1 OF 86
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9127S21R0001
Section 00 10 00 - Solicitation
PRICING SCHEDULE
Line Item No. Description Quantity
Unit of Measure Unit Price Amount
BASE ITEMS (Applies to Both Units 1 & 2) 0001 Hydraulic Turbine Model 1 Job XXXX $ 0002 Site Mobilization and Demobilization 1 Job XXXX $ 0003 On-Site Lead-Based Paint Removal 17,200 Square Feet $ $ 0004 Special Tools and Scaffolding 1 Job XXXX $ 0005 Furnish Spares
0005AA Spare Turbine Shaft Sleeve 1 Job XXXX $ 0005AB Spare Wicket Gate Stem Seal Sets 1 Job XXXX $ 0005AC Spare Servomotor Packing Box Stem Seals 1 Job XXXX $ 0005AD Furnish Spare Set of RTD's and Relays 1 Job XXXX $ 0005AE Furnish Spare Generator Parts 1 Job XXXX $
0006 Furnish and Test Prototype Coils 1 Each XXXX $ 0007 Provision of Boring Bar 1 Job XXXX $ 0008 Governor and Lube Oil
0008AA Drain, Clean, and Flush System 1 Each $ $ 0008AB Disposal of Old Oil 4,920 Gallon $ $ 0008AC Supply and Filling of New Oil 4,920 Gallon $ $
Inspect, Load Test, and Name Plate BTH Devices 1 Job XXXX $
0010 Asbestos Survey and Abatement 1 Job XXXX $ 150,000.00
PARTIAL BASE ITEMS (Applies to Unit 1) 0011 Painting 1 Each $ $ 0012 Francis Runner 1 Each $ $ 0013 Pre-disassembly Investigation 1 Each $ $
Generating Unit Disassembly Including Inspections of Components 1 Each $ $
0015 Reassembly of Generating Unit 1 Each $ $ 0016 Testing After Reassembly 1 Each $ $ 0017 Line Bore Wicket Gate Stem Housing 1 Each $ $ 0018 Stay Ring Inspection 1 Each $ $ 0019 Replace Wicket Gates 1 Each $ $ 0020 Supply Stationary Sealing Ring 1 Each $ $ 0021 Supply Head Cover 1 Each $ $ 0022 Turbine Guide Bearing Housing Refurbishment 1 Each $ $ 0023 Bottom Ring Refurbishment 1 Each $ $ 0024 Turbine Air Inlet Valve Refurbishment 1 Each $ $
Furnish and Install All Bushings and Bearing Plates 1 Each $ $
0026 Refurbish Wicket Gate Operating Mechanism 1 Each $ $ 0027 Refurbish Shear Linkages 1 Each $ $ 0028 Furnish and Install Turbine Shaft Sleeve 1 Each $ $ 0029 Operating Ring Refurbishment 1 Each $ $ 0030 Turbine and Generator Shaft
0030AA Turbine and Generator Shaft Inspection 1 Each $ $ 0030AB Machining of Turbine Shaft 1 Each $ $
Supply and Install Main Turbine Shaft Packing Box 1 Each $ $
0032 Refurbish Wicket Gate Servomotor 1 Each $ $ 0033 Thrust Runner Phase 1 Inspection 1 Each $ $ 0034 Thrust Bearing Shoe Refurbishment
0034AA Shipment of Thrust Bearing Shoes 1 Each $ $ 0034AB Refurbish Set of Shoes 1 Each $ $
0035 Guide Bearing Refurbishment 0035AA Shipment of Turbine Guide Bearing 1 Each $ $ 0035AB Ship Set of Guide Bearing Pads 1 Each $ $ 0035AC Refurbish Turbine Guide Bearing 1 Each $ $ 0035AD Refurbish Set of Guide Bearing Pads 1 Each $ $
Setup for Machining and Machining up to 0.020" 1 Each $ $
0037 Spiral Case Inspection 1 Each $ $ 0038 Draft Tube Liner Inspection 1 Each $ $ 0039 Piezometer Tap Inspection and Repair 1 Each $ $ 0040 Replace Fasteners for Major Couplings 1 Each $ $
Replacement of Turbine Bearing Pumps and Installation of New Oil Sump Tank 1 Each $ $
Generator Brake and Manual Oil Pump Refurbishment 1 Each $ $
0043 Inspect Generator Brake Rings 1 Each $ $ 0044 High Pressure Lift System 1 Each $ $
Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $
Miscellaneous Electrical Work As Described in 26 05 00.00 26 1 Each $ $
Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $
0048 Remove Stator Winding 1 Each $ $ 0049 Inspect, Clean, and Test Stator Core 1 Each $ $ 0050 Inspect, Clean, and Test Rotor 1 Each $ $ 0051 Install and Test Stator Winding 1 Each $ $ 0052 Perform Special Field Tests (Unit 1 Only) 1 Each $ $ 0053 Replace Existing Current Transformers 1 Each $ $ 0054 Collector Ring Assembly Inspection 1 Each $ $ 0055 Chrome Plate Piston Rods 1 Each $ $ 0056 Machining of Curb Ring 1 Each $ $ 0057 Void Mapping of Draft Tube Liner 1 Each $ $ 0058 Surface Air Coolers 9 Each $ $ 0059 Machine Condition Monitoring System 1 Each $ $ 0060 Replace Thrust Bearing Oil Coolers 16 Each $ $ 0061 Thrust Sump Kidney Loop Filter 1 Each $ $ 0062 Head Cover Drainage Improvement 1 Each $ $
Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0064 Remove Farval Grease System 1 Each $ $ PARTIAL BASE ITEMS (Applies to Unit 2)
0065 Painting 1 Each $ $ 0066 Francis Runner 1 Each $ $ 0067 Pre-disassembly Investigation 1 Each $ $
0068 Generating Unit Disassembly Including Inspections of Components 1 Each $ $
0069 Reassembly of Generating Unit 1 Each $ $ 0070 Testing After Reassembly 1 Each $ $ 0071 Line Bore Wicket Gate Stem Housing 1 Each $ $ 0072 Stay Ring Inspection 1 Each $ $ 0073 Replace Wicket Gates 1 Each $ $ 0074 Supply Stationary Sealing Ring 1 Each $ $ 0075 Supply Head Cover 1 Each $ $ 0076 Turbine Guide Bearing Housing Refurbishment 1 Each $ $ 0077 Bottom Ring Refurbishment 1 Each $ $ 0078 Turbine Air Inlet Valve Refurbishment 1 Each $ $ 0079 Furnish and Install All Bushings and Bearing
Plates 1 Each $ $ 0080 Refurbish Wicket Gate Operating Mechanism 1 Each $ $ 0081 Refurbish Shear Linkages 1 Each $ $ 0082 Furnish and Install Turbine Shaft Sleeve 1 Each $ $ 0083 Operating Ring Refurbishment 1 Each $ $ 0084 Turbine and Generator Shaft
0084AA Turbine and Generator Shaft Inspection 1 Each $ $ 0084AB Machining of Turbine Shaft 1 Each $ $
0085 Supply and Install Main Turbine Shaft Packing Box 1 Each $ $
0086 Refurbish Wicket Gate Servomotor 1 Each $ $ 0087 Thrust Runner Phase 1 Inspection 1 Each $ $ 0088 Thrust Bearing Shoe Refurbishment
0088AA Shipment of Thrust Bearing Shoes 1 Each $ $ 0088AB Refurbish Set of Shoes 1 Each $ $
0089 Guide Bearing Refurbishment 0089AA Shipment of Turbine Guide Bearing 1 Each $ $ 0089AB Ship Set of Guide Bearing Pads 1 Each $ $ 0089AC Refurbish Turbine Guide Bearing 1 Each $ $ 0089AD Refurbish Set of Guide Bearing Pads 1 Each $ $
0090 Setup for Machining and Machining up to 0.020" 1 Each $ $
0091 Spiral Case Inspection 1 Each $ $ 0092 Draft Tube Liner Inspection 1 Each $ $ 0093 Piezometer Tap Inspection and Repair 1 Each $ $ 0094 Replace Fasteners for Major Couplings 1 Each $ $ 0095 Replacement of Turbine Bearing Pumps and
Installation of New Oil Sump Tank 1 Each $ $ 0096 Generator Brake and Manual Oil Pump
Refurbishment 1 Each $ $ 0097 Inspect Generator Brake Rings 1 Each $ $ 0098 High Pressure Lift System 1 Each $ $
Disassemble, Inspect, Overhaul, and Reinstall Governor Pumps 1 Each $ $
Miscellaneous Electrical Work As Described in 26 05 00.00 26 1 Each $ $
Furnish Complete Set of Stator Coils, Supplies, and Accessories 1 Each $ $
0102 Remove Stator Winding 1 Each $ $ 0103 Inspect, Clean, and Test Stator Core 1 Each $ $
0104 Inspect, Clean, and Test Rotor 1 Each $ $ 0105 Install and Test Stator Winding 1 Each $ $ 0106 Replace Existing Current Transformers 1 Each $ $ 0107 Collector Ring Assembly Inspection 1 Each $ $ 0108 Chrome Plate Piston Rods 1 Each $ $ 0109 Machining of Curb Ring 1 Each $ $ 0110 Void Mapping of Draft Tube Liner 1 Each $ $ 0111 Surface Air Coolers 9 Each $ $ 0112 Machine Condition Monitoring System 1 Each $ $ 0113 Replace Thrust Bearing Oil Coolers 16 Each $ $ 0114 Thrust Sump Kidney Loop Filter 1 Each $ $ 0115 Head Cover Drainage Improvement 1 Each $ $
Miscellaneous Turbine Pit Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0117 Remove Farval Grease System 1 Each $ $
TOTAL PARTIAL BASE ITEMS $
Miscellaneous Items (Applies to Both Units)
0118 Miscellaneous Parts and Materials Not to Exceed Each $ 1.00 $ 100,000.00
0119 Welding Services 150 Man Hours $ $ 0120 Machinist Hire 200 Man Hours $ $ 0121 Electrical Hire 100 Man Hours $ $ 0122 Painter Hire 50 Man Hours $ $ 0123 Other Skilled Craftsman Hire 100 Man Hours $ $ 0124 General Laborer Hire 100 Man Hours $ $ 0125 Liquid Penetrant Method 50 Man Hours $ $ 0126 Magnetic Particle Method 50 Man Hours $ $ 0127 Ultrasonic Method 50 Man Hours $ $ 0128 Radiographic Method 20 Man Hours $ $ 0129 Thermal Spraying 30 Man Hours $ $ 0130 Visual 100 Man Hours $ $
TOTAL MISCELLANEOUS ITEMS $
TOTAL BASE PROPOSAL $
OPTIONAL ITEMS (Applies to Both Units) 0131 Prepare Die and Stamp Stator Laminations 1 Job XXXX $ 0132 Thrust Bearing Phase 2 Inspection (Spare Only)
0132AA
Thrust Bearing Phase 2 Inspection without Splitting (Spare Only) 1 Job XXXX $
0132AB
Thrust Bearing Phase 2 Inspection with Splitting (Spare Only) 1 Job XXXX $ OPTIONAL ITEMS (Applies to Unit 1)
Additional Stay Ring Mounting Surface Machining 1 Each $ $
0134 Additional Head Cover Flange Machining 1 Each $ $ 0135 Additional Bottom Ring Flange Machining 1 Each $ $ 0136 Additional Bearing Housing Machining 1 Each $ $ 0137 Additional Curb Ring Machining 1 Each $ $ 0138 Refurbish Generator Brake Rings 1 Each $ $ 0139 Thrust Bearing Phase 2 Inspection
0139AA
Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $
0139AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $ 0140 Generator Thrust Bearing Runner and Guide Runner
0140AA
Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $
0140AB
Resurfacing Thrust Bearing Runner and Backside 1 Each $ $
0140AC
Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $
0140AD Thrust Guide Runner Refurbishment 1 Each $ $ 0141 Refurbish Rotor Field Poles 1 Each $ $ 0142 Reinsulate Rotor Field Leads 1 Each $ $
Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $
Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $
Perform Additional Stator Core Interlaminar Insulation Test 1 Job XXXX $
Remove Existing Stator Core, Install New Stator Core 1 Each $ $
Governor Pumps Additional Machine Work - Level A 1 Each $ $
Governor Pumps Additional Machine Work - Level B 1 Each $ $
Governor Pumps Additional Machine Work - Level C 1 Each $ $
Governor Pumps Additional Machine Work - Level D 1 Each $ $
Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $
Turbine Guide Bearing Build up of the O.D.
Spigot Fits 1 Each $ $
0153 Gate Distributing Valve Components 0153AA Furnish Gate Distributing Valve Plunger 1 Each $ $ 0153AB Furnish Gate Distributing Valve Bushing 1 Each $ $ 0153AC Furnish Gate Distributing Valve Piston 1 Each $ $ 0153AD Furnish Gate Distributing Valve Stem 1 Each $ $
Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0155 Epoxy Injection in Draft Tube Liner 20 Gallon $ $ 0156 New Turbine Guide Bearing Shell 1 Each $ $ 0157 Restore Servomotor Head Spigot Fit 1 Each $ $
Additional Cylinder Bore and Replace Servomotor Pistons 1 Each $ $
0159 Draft Tube Liner Repair 1 Each $ $ OPTIONAL ITEMS (Applies to Unit 2)
Additional Stay Ring Mounting Surface Machining 1 Each $ $
0161 Additional Head Cover Flange Machining 1 Each $ $ 0162 Additional Bottom Ring Flange Machining 1 Each $ $ 0163 Additional Bearing Housing Machining 1 Each $ $ 0164 Additional Curb Ring Machining 1 Each $ $
0165 Refurbish Generator Brake Rings 1 Each $ $ 0166 Thrust Bearing Phase 2 Inspection
0166AA
Thrust Bearing Phase 2 Inspection without Splitting 1 Each $ $
0166AB Thrust Bearing Phase 2 Inspection with Splitting 1 Each $ $ 0167 Generator Thrust Bearing Runner and Guide Runner
0167AA
Shipment of Thrust Bearing Runner and Guide Runner 1 Each $ $
0167AB
Resurfacing Thrust Bearing Runner and Backside 1 Each $ $
0167AC
Resurfacing Thrust Bearing Runner Running Surface Only 1 Each $ $
0167AD Thrust Guide Runner Refurbishment 1 Each $ $ 0168 Refurbish Rotor Field Poles 1 Each $ $ 0169 Reinsulate Rotor Field Leads 1 Each $ $
Refurbish Collector Rings and Replace Brushes, and Brush Holders 1 Each $ $
Replace Collector Rings, Brushes, and Brush Holders 1 Each $ $
Perform Additional Stator Core Interlaminar Insulation Test 1 Each $ $
Remove Existing Stator Core, Install New Stator Core 1 Each $ $
Governor Pumps Additional Machine Work - Level A 1 Each $ $
Governor Pumps Additional Machine Work - Level B 1 Each $ $
Governor Pumps Additional Machine Work - Level C 1 Each $ $
Governor Pumps Additional Machine Work - Level D 1 Each $ $
Turbine Guide Bearing Build up of the Split Flange Faces 1 Each $ $
Turbine Guide Bearing Build up of the O.D.
Spigot Fits 1 Each $ $
0180 Gate Distributing Valve Components 0180AA Furnish Gate Distributing Valve Plunger 1 Each $ $ 0180AB Furnish Gate Distributing Valve Bushing 1 Each $ $ 0180AC Furnish Gate Distributing Valve Piston 1 Each $ $ 0180AD Furnish Gate Distributing Valve Stem 1 Each $ $
Core Drilling for Piping Work as Described in Section 22 00 00.00 26 1 Each $ $
0182 Epoxy Injection in Draft Tube Liner 20 Gallon $ $ 0183 New Turbine Guide Bearing Shell 1 Each $ $ 0184 Restore Servomotor Head Spigot Fit 1 Each $ $
Additional Cylinder Bore and Replace Servomotor Pistons 1 Each $ $
0186 Draft Tube Liner Repair 1 Each $ $
TOTAL OPTIONAL PROPOSAL $
TOTAL PROPOSAL AMOUNT (BASE PLUS OPTIONAL ITEMS) $
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
FOB: Destination
96721H
0002 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0003 1975 dys. ANP 17,200 (SAME AS PREVIOUS LOCATION)
0004 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005 N/A N/A N/A N/A
0005AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0005AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0005AE 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0006 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0007 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0008 N/A N/A N/A N/A
0008AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0008AB 1975 dys. ANP 4,920 (SAME AS PREVIOUS LOCATION)
0008AC 1975 dys. ANP 4,920 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0009 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0010 1975 dys. ANP 150,000 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0011 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0012 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0013 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0014 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0015 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0016 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0017 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0018 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0019 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0020 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0021 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0022 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0023 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0024 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
96721H
0025 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION) FOB: Destination
0026 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0027 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0028 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0029 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0030 N/A N/A N/A N/A
0030AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0030AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0031 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0032 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0033 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0034 N/A N/A N/A N/A
0034AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0034AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0035 N/A N/A N/A N/A
0035AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0035AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0035AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0035AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0036 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0037 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0038 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0039 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0040 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0041 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0042 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0043 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0044 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0045 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0046 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0047 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0048 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0049 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0050 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0051 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0052 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0053 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0054 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0055 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0056 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0057 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0058 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0059 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0060 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0061 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0062 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0063 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0064 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0065 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0066 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0067 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0068 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0069 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0070 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0071 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0072 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0073 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0074 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0075 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0076 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0077 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0078 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0079 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0080 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0081 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0082 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0083 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0084 N/A N/A N/A N/A
0084AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0084AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0085 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0086 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0087 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0088 N/A N/A N/A N/A
0088AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0088AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0089 N/A N/A N/A N/A
0089AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0089AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0089AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0089AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0090 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0091 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0092 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0093 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0094 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0095 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0096 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0097 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0098 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0099 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0100 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0101 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0102 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0103 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0104 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0105 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0106 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0107 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0108 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0109 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0110 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0111 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0112 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0113 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0114 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0115 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0116 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0117 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0118 1975 dys. ANP 100,000 (SAME AS PREVIOUS LOCATION)
0119 1975 dys. ANP 150 (SAME AS PREVIOUS LOCATION)
0120 1975 dys. ANP 200 (SAME AS PREVIOUS LOCATION)
0121 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)
0122 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)
0123 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)
0124 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)
0125 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)
0126 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)
0127 1975 dys. ANP 50 (SAME AS PREVIOUS LOCATION)
0128 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)
0129 1975 dys. ANP 30 (SAME AS PREVIOUS LOCATION)
0130 1975 dys. ANP 100 (SAME AS PREVIOUS LOCATION)
0131 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0132 N/A N/A N/A N/A
0132AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0132AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0133 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0134 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0135 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0136 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0137 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0138 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0139 N/A N/A N/A N/A
0139AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0139AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0140 N/A N/A N/A N/A
0140AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0140AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0140AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0140AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0141 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0142 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0143 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0144 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0145 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0146 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0147 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0148 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0149 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0150 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0151 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0152 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0153 N/A N/A N/A N/A
0153AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0153AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0153AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0153AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0154 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0155 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)
0156 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0157 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0158 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0159 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0160 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0161 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0162 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0163 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0164 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0165 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0166 N/A N/A N/A N/A
0166AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0166AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0167 N/A N/A N/A N/A
0167AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0167AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0167AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0167AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0168 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0169 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0170 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0171 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0172 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0173 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0174 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0175 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0176 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0177 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0178 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0179 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0180 N/A N/A N/A N/A
0180AA 1975 dys. ANP 1 NORFORK POWERHOUSE
1487 HIGHWAY 177
SALESVILLE AR 72653
0180AB 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0180AC 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0180AD 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0181 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0182 1975 dys. ANP 20 (SAME AS PREVIOUS LOCATION)
0183 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0184 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0185 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
0186 1975 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.225-10 Notice of Buy American Requirement--Construction
Materials
MAY 2014
52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 52.237-10 Identification of Uncompensated Overtime MAR 2015 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.215-7008 Only One Offer JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price (FFP) Construction contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
3.3% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Norfork Powerhouse, Salesville, Baxter County, Arkansas.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Joseph C. Daniels Contracting Officer Post Office Box 867 700 West Capitol, Room 7315 Little Rock, Arkansas 72203
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized Site Visit has been scheduled for October 12 – 14, 2021 at 10:00 AM CST
(c) Participants will meet at Norfork Powerhouse 1487 Highway 177 Salesville, Arkansas 72653
**All attendees will be limited to two (2) representatives at the site visit. All attendees shall comply with the social distancing guidelines found at https://www.cdc.gov/.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 16 - Supplementary Instructions to Proposers
SECTION 00 22 16 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION
CRITERIA, AND BASIS OF AWARD
GENERAL REQUIREMENTS
The proposal shall describe the capability of the Offeror to perform the requirements of the Specifications. The proposal should be specific and complete in every detail; and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.
In order to evaluate all proposals effectively and equitably, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failure to submit and organize proposals as requested may adversely affects an Offeror's evaluation.
Proposals shall not exceed the page limits described. Provide all information in bookmarked sections. Appendices and/or attachments are not permitted and will not be evaluated.
SUBMISSION FORMAT
METHOD OF SUBMISSION. Offerors shall submit one (1) electronic copy of their proposal via DoD SAFE (https://safe.apps.mil/) before the time and date specified in the solicitation (Standard Form 1442).
1. Send an email to the Contracting Officer AND Contract Specialist to receive the link to drop off your proposal. This shall be completed no later than five (5) business days prior to the proposal due date.
i. Contracting Officer: joseph.c.daniels@usace.army.mil
ii. Contract Specialist: sarah.n.hagood@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Once in DoD SAFE, please add your files in accordance with the File Format section below. Please add ‘W9127S21R0001- Firm Name’ in the Short Note to the Recipients box.
4. Add the Contracting Officer AND Contract Specialist as recipients.
5. Ensure everything is correct, and then click “Drop-off Files” to send.
Should DoD SAFE be unavailable, proposals may be submitted via Compact Disk (CD) and delivered to
US Army Corps of Engineers ATTN: Sarah Hagood Solicitation W9127S21R0001 700 West Capitol Avenue Little Rock, AR 72203
FILE FORMAT. Files shall be in Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. There shall only be three files in each Offerors’ submission: ‘W9127S21R0001- Firm Name- Volume I, Technical Submission,’ W9127S21R0001- Firm Name- Volume II, Small Business/Subcontracting Submission’ and ‘W9127S21R0001- Firm Name- Volume III, Price Submission.’
FONT SIZE. Shall not be less than 10 point. Each page shall be identified with the appropriate page number centered at the bottom of the page.
SHEET SIZE. Shall be 8-1/2 inches x 11 inches; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Sheets which are 11 x 17 inch will be counted as two 8-1/2-inch x 11-inch sheets. All sheets shall be dated and numbered.
COVER SHEET & TABLE OF CONTENTS. Proposals shall consist of three (3) volumes. A cover sheet identifying the Offeror (name, address, point of contact) and solicitation number shall be provided. The second sheet shall be a table of contents. The proposal shall contain a detailed table of contents. Offers violating these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. Neither the cover sheet nor the table of contents count toward the page limitations.
BOOKMARKS. Proposals shall be bookmarked and labeled as specified in a manner to afford easy identification from the Table of Contents. Additional bookmarks may be provided but shall be nested under the appropriate tab bookmark.
HYPERLINKS. Hyperlinks are not permitted. This includes hyperlinks within the document, such as Figure or Table references to the page containing content, and hyperlinks to websites.
ATTACHMENTS. Attachments/appendices are not permitted.
PAGE LIMITS. The proposal shall not exceed the specified page limits. The Government will not review any information in excess of the page limits or information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers not meeting these requirements may be subject to rejection.
SUBMISSION REQUIREMENTS
Offerors shall submit their proposals in accordance with the following:
VOLUME I:
BOOKMARK A— Standard Form 1442 and Proposal Data Sheet (Attachment A). Proposal must include Offeror’s telephone number, FAX number, email address, and DUNS number. DUNS number will be used to access CPARS Data.
BOOKMARK B – Factor 1 – Past Performance
1.1 – Turbine Rehabilitation
1.2 – Generator Rewind BOOKMARK C – Factor 2 – Turbine Rehabilitation Technical Approach BOOKMARK D – Factor 3 – Generator Rewind Technical Approach BOOKMARK E – Factor 4 – Schedule BOOKMARK F – Factor 5 – Quality Control
VOLUME II:
BOOKMARK A — Small Business Participation Plan BOOKMARK B — Subcontracting Plan
VOLUME III:
BOOKMARK A — Price Schedule BOOKMARK B — Offer Guarantee
FACTOR 1 – PAST PERFORMANCE (VOL 1, BOOKMARK B)
SUBMISSION REQUIREMENT: Under each sub-factor, the Offeror shall submit information on projects completed within the past twenty (20) years or currently under contract and more than 50% complete to demonstrate the organization's/team’s recent and relevant experience. Project completion dates shall be submitted as part of package. Information shall be submitted utilizing the template found as Attachment B below.
For each submitted project, the Offeror shall request a Past Performance Questionnaire (PPQ), found as Attachment C below, from those Government agencies or private sector companies’ Point of Contact identified for each project.
These agency or company contacts must have detailed information concerning the performance of the project in order to accurately complete the PPQ for the Offeror. The POCs may be contacted by the SSEB to assess the scope of work performed and to evaluate performance of the projects listed under the previous experience tab of this volume, if necessary; therefore, it is imperative to ensure correct telephone and email addresses are identified for the client POCs on each PPQ. Completed Past Performance Questionnaires shall be submitted with your proposal if they are able to be received from the POC prior to the proposal due date. Offerors shall follow-up with clients/references to ensure timely submittal of questionnaires. If the Offeror’s client requests, he/she may submit the questionnaire directly to the Contract Specialist, Sarah Hagood at Sarah.N.Hagood@usace.army.mil prior to proposal closing date.
PPQs previously completed by the example project's POC may be submitted in lieu of requesting the POC to re-complete the form; however, Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
NOTE: For Department of Defense (DoD) projects, the Offeror need not submit a copy of the Contractor Performance Assessment Reporting System (CPARS) Evaluations (ACASS & CCASS) for each DoD project; instead, provide written notification current ratings are available for the Government to evaluate. CPARS evaluations shall not be submitted by the Offeror in place of a PPQ.
TEAMING ARRANGEMENTS AND JOINT VENTURES (JV). Provide a copy of the teaming/joint venture agreement. Offerors may submit experience of an affiliated entity where the affiliated entity has made a firm commitment to participate meaningfully in the performance of the contract. If required, JV approval must be obtained in accordance with Small Business Administration policy.
EVALUATION CRITERIA: There are two aspects to the Government’s past performance evaluation: relevancy and quality of performance. The Government will first evaluate how relevant the past performance is to the work required by these specifications and then the Government will evaluate how well the Offeror performed on the submitted projects. In doing this, Government will use the relevancy and confidence ratings discussed below.
In addition to the PPQs, the Government may review and consider any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror (including information from Government personnel and databases).
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The Government intends to assess the relative risks associated with the Offeror’s performance based on the past performance information provided in the proposal and, if applicable, information obtained from available sources identified previously. A significant achievement, unexplained or unresolved problem, or lack of relevant data may significantly impact the risk rating by the Government. Therefore, it is incumbent upon the Offeror to include all relevant information, including demonstrated corrective actions, in its proposal.
In addition to the project information requested in this section, the Offeror shall also provide notification and information concerning any projects where it’s right to proceed was terminated for the convenience of the Government or for default/cause during the last five (5) years, or so state that there were none. If any contracts were terminated, whether for convenience or default/cause, the Offeror shall list each, providing the contract number, title, brief type of work effort, and the reason for the termination.
NOTE: Although the SSEB may not rate an offeror that lacks recent, relevant past performance favorably or unfavorably with regard to past performance, the SSAC may recommend and the SSA may determine, that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating in a best value tradeoff as long as the determination is consistent with stated solicitation criteria.
FACTOR 1.1 – TURBINE REHABILITATION PAST PERFORMANCE
Project Narratives shall:
1. Be no more than four (4) pages per project.
2. Include the following when describing Turbine Rehabilitation Experience:
a. Submit no less than three (3) but no more than five (5) projects for this type of experience.
b. Only include 130-inch or greater Francis turbine project(s)
c. Identify the capabilities and experience that company design personnel have with Francis turbine design and evaluating hydro turbine design conditions similar to those found at Norfork Dam Powerhouse.
d. Identify the Offeror as regularly engaged in the design, manufacture, and installation of Francis turbine runners for hydroelectric generators of 20 – 80 megawatt (MW) or identify partnering or…
This is the start of the file's text. The full file is on GovTribe.