Region 5 Site Visit Briefing Slides.pdf

PDF 554 KB Posted

Attached to
FACILITY INVESTMENT SERVICES FOR THE 63RD READINESS DIVISION (RD) FOR REGION 5
Solicitation number
W9127S21Q0057
Issued by

View the file

Other files

File Type Posted
Contactor guidance doc_20210922 (002).pdf PDF
21Q0057_Amendment_0005_20211101.pdf PDF
63d RD_REGION 5_FIS_PWS_Final Rev 4_20211029.pdf PDF
FY22-FY24 Region 5-FIS_Index of Files_20211029.xlsx XLSX spreadsheet
W9127S21Q0057_Combined_Solicitation_Synopsis_Amend_4.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 5_20211029.xlsx XLSX spreadsheet
W9127S21Q0057_AMENDMENT_4_20211029.pdf PDF
Region5_FIS_PWS_Section J_TE-01_Facilities Site Index and Maps_20211028.pdf PDF
TE-11-2_DIESEL FIRE PUMP ASSEMBLIES.pdf PDF
Region 5 Site Visit Minutes.pdf PDF
TE-11-15_FIRE HYDRANT ANNUAL INSPECTION.pdf.pdf PDF
TE-10-5_ENG_FORM_3394_2021Aug.pdf PDF
TE-10-3_GSA_FORM_376_11-1967.pdf PDF
FIS_PWS_Section J_TE-07_2018_GSA_PM Guide_FINAL.pdf PDF
DA_Fm5477_MAR2008.pdf PDF
TE-11-3_DRY PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
TE-11-4_ELECTRIC FIRE PUMP ASSEMBLIES.pdf PDF
Region5_FIS_PWS_Section J_TE-03_Detailed Equipment Inventory_20211028.pdf PDF
TE-11-10_MASS NOTIFICATION SYSTEM SUPP RECORD OF INSP AND TEST.pdf PDF
Site_Visit_Attendance_Sheet_21Q0057.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS_Region 5_20211026.xlsx XLSX spreadsheet
TE-11-7_FIRE DEPARTMENT CONNECTIONS.pdf PDF
TE-11-13_WET PIPE FIRE SPRINKLER SYSTEMS.pdf PDF
Projnet_Inquiries_Region_5.pdf PDF
TE-10-1_Certification of Work.pdf PDF
Region5_FIS_PWS_Section J_TE-06_Quality Assurance Surveillance Plan_20211028.pdf PDF
TE-11-9_MAIN DRAIN TEST.pdf PDF
TE-11-11_NOTIFICATION AND INITIATING APPLIANCE SUPPLEMENT.pdf PDF
63d RD_REGION 5_FIS_PWS_Final Rev 3_20211028.pdf PDF
TE-11-12_PORTABLE FIRE EXTINGUISHER ANNUAL INSPECTION.pdf PDF
Region5_FIS_PWS_Section J_TE-02_Summary Equipment Inventory_20211028.pdf PDF
FIS_PWS_Section J_TE-09_Acronym_Definitions_20211028.pdf PDF
TE-11-1_DELUGE FIRE SPRINKLER SYSTEMS.pdf PDF
TE-10-2_Work Request Estimate and Completion Form.pdf PDF
W9127S21Q0057_Combined Solicitation And Synopsis_Amend 3.pdf PDF
TE-11-14_WATER STORAGE TANKS.pdf PDF
FY22-FY24 Region 5-FIS_Index of Files_20211028.xlsx XLSX spreadsheet
W9127S21Q0057_AMENDMENT 3_20211028.pdf PDF
TE-10-6_SPILL RESPONSE INCIDENT REPORT FORM.pdf PDF
TE-11-5_EMERGENCY LIGHT ANNUAL INSPECTION.pdf PDF
TE-11-6_FIRE ALARM ANNUAL INSP TESTING REPORT.pdf PDF
TE-11-8_KITCHEN HOOD SYSTEM ANNUAL INSPECTION.pdf PDF
Region5_FIS_PWS_Section J_TE-04_Government Points of Contact_20211028.pdf PDF
DA_Fm5479_MAR2008.pdf PDF
FIS_PWS_Sect J_ATCH-05_ELINs_FIS-ENV_Region 5_20211026.xlsx XLSX spreadsheet
Region5_FIS_PWS_Section J_TE-08_HVAC-Refrigeration Temp Standards_20211028.pdf PDF
TE-10-4_GSA_FORM_55_07-2002.pdf PDF
Region5_FIS_PWS_Section J_TE-05_Deliverables_20211028.pdf PDF
63d RD_REGION 5_FIS_PWS_Final Rev 2_20210928.pdf PDF
W9127S21Q0057_Combined Solicitation And Synopsis_Amend 2_10-5-2021.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/28/2021

US Army Corps of Engineers

BUILDING STRONG®

Site Visit:

Solicitation NO: W9127S21Q0057

Project Name: Region 5 FIS, 63rd Readiness Division

Marcus Mitchell

Contracting Officer

Little Rock District

October 14, 2021

BUILDING STRONG®2

Agenda

Introductions

Purpose of Site Visit

Contract Terms & Conditions

Submission Requirements

Offer Evaluation

BUILDING STRONG®3

Purpose of Site Visit

FAR Part 15.201 – A pre-proposal conference is a technique used to promote the early exchange of information.

Exchanges of information among all interested parties, from the earliest identification of a requirement through receipt of proposals, are encouraged. Any exchange of information must be consistent with procurement integrity requirements.

The purpose of exchanging information is to improve the understanding of Government requirements and industry capabilities, thereby allowing potential offerors to judge whether or how they can satisfy the Government’s requirements, and enhancing the Government’s ability to obtain quality supplies and services at reasonable prices, and increase efficiency in proposal preparation, proposal evaluation, negotiation, and contract award.

BUILDING STRONG®4

Ground Rules There will be NO questions at this conference to allow for fair and even access to all information pertaining to this project.

Offerors will submit their questions after the conference for any technical and contractual type questions via the Projnet site. https://www.projnet.org/projnet

For Bidder’s inquires for a Request for Information (RFI) Review has been set up for this solicitation in ProjNet. The Bidder’s Key to access this solicitation is: WVT4Q5-3TN4UB

BUILDING STRONG®

Statement of Need

This is a requirement to provide Facility Investment Services for various sites within the responsibility of Region 5. These services are broken into 2 components: Service Calls/Work Orders & Preventive Maintenance.

5 BUILDING STRONG®

Contract Type

Firm Fixed Price Contract

This will be a streamlined evaluation IAW 12.6 utilizing the tradeoff process

1 2

3 4

5 6

BUILDING STRONG®

Offer Submission Instructions Each Offeror must submit a Price Volume and a Technical Volume. They must be submitted in separate binders.

The Price Volume will consist of the following:

• Cover Sheet

• Acknowledgement of Amendments

• ELINSs Spreadsheets(FIS & Environmental

• JV Agreement (If Applicable)

• Offeror Representations & Certifications

The Technical Volume will consist of the following factors:

• Corporate Experience

• Understanding of the Work

• Past Performance

7 BUILDING STRONG®

Evaluation

The The Technical Evaluators will evaluate the offers and assign a consensus rating for each evaluation factor

BUILDING STRONG®

Typical Offer Shortfalls

Instructions not followed.

Statements in the offer are not well supported.

Offers are not well organized and makes the evaluator hunt for the information.

Deficiencies preclude award. Offer is non-compliant to the requirements.

Not acknowledging Amendments

Not signing Offer.

9 BUILDING STRONG®

Schedule of Events

Solicitation release date October 5, 2021

Pre-proposal conference October 14, 2021

Deadline for receipt of questions October 19, 2021

Deadline for submission of proposals October 29, 2021

12:00 PM CST

Anticipated date of award November 22, 2021

BUILDING STRONG®

Follow-on Communications All follow-on communications shall be coordinated via the Contracting Officer and/or Contract Specialist listed below:

Contracting Officer

Marcus Mitchell

Telephone Number: (501) 340-1253

Email: marcus.d.mitchell@usace.army.mil

Contract Specialist

Staci Allen

Telephone Number: (501) 340-1254

Email: staci.c.allen@usace.army.mil

11 BUILDING STRONG®

Statement of Need (Additional Detail)

While this contract is a continuation of 63d Readiness Division Region 5 FIS Services, there have been changes introduced based on lessons learned across the 63d RD Area of Responsibility.

The PWS has been restructured to improve readability and simplify management of changes going forward.

While the work can generally be categorized in 2 major components: (1) service calls/work orders, and (2) preventive maintenance; these include: general service calls, preventive maintenance, inspection/test/certification, other recurring services, individual task order work, and environmental services.

It is important for each vendor to read and understand the entire scope and requirements of the solicitation; however, there are some areas that we would like to highlight.

7 8

9 10

11 12

BUILDING STRONG®

Statement of Need (Additional Detail)

Under “Management and Administration” ► Updates and clarifications to terms and definitions to address confusing language ► Updates to key personnel requirements need to be reviewed for:

• Program Manager

• Quality Control Manager

• Site Safety & Health Officer

► A new level of emphasis on Quality & Implementation of a Quality Management System to ensure deliverables, services, and the workforce fully satisfy contract requirements.

► Comprehensive utilization of MAXIMO as the CMMS system of record to track all aspects of the contract & administration .

• All orders & maintenance actions are captured, tracked, and documented.

► Key “Select Submittals” have been called out to ensure progress toward a more Preventive Maintenance Centric Program & Timely Status communication for the duration of the contract.

► Transition Support has been separately priced to ensure phase-in & phase-out readiness to ensure successful execution

► Quarterly & Annual Program Performance Reporting & Presentation will ensure open communication with 63d RD Customer Leadership and early identification of successes and challenges for the Region.

13 BUILDING STRONG®

Statement of Need (Additional Detail)

Under “Facilities Investment” ► Implementation of RSMeans, as designed, in planning & pricing work to include RSMeans defined use of co-efficients.

• It is important to ensure work is “Pre-Priced” and NOT tailored by the work order service call. (e.g., procurable quantities, consistent labor, proper location consideration)

► Redefined “Contractor Efficiency Factor” from “Contractor Co-efficient” to help avoid confusion with other RSMeans defined co-efficients.

► Introduced Real Property Installed Equipment (RPIE) Asset Inventory

• Physical Asset Inventory & Workload data validation

• Asset inspection record tagging

• Initial identification of omissions/errors in equipment inventory for possible equitable adjustment to PM Program value. {We know there are items missing that fall within the scope of the contract and want to ensure omissions are a customer decision and not an oversite.}

► Introduce the GSA Preventive Maintenance Guide to provide a basis for PM checklists used. {This does not preclude the contractor from including items they find useful, but they should provide the foundation.}

BUILDING STRONG®

Statement of Need (Additional Detail)

Under “Environmental Services” ► There were very few changes introduced to the environmental services beyond updates to governing regulations and references.

13 14