Smk Det Zones.doc
DOC document 3 KB Posted
- Attached to
- Essayons Overhaul FY27
- Solicitation number
- W9127N26BA029
About this file
This file is a smoke detection zone reference document that identifies 19 distinct zones aboard the Dredge ESSAYONS with their corresponding locations throughout the vessel. The zones are distributed across multiple deck levels including the main deck, hold deck, upper deck, bridge deck, and 15'-6" level, covering critical operational and machinery spaces such as the steering gear room, auxiliary machinery rooms, generator rooms, engine rooms, pump rooms, bow thruster room, and various storage and support facilities including the welding shop, paint locker, machine shop, and incinerator room.
This document serves as a schematic reference for the smoke detection system configuration on the vessel in relation to the USACE Portland District's solicitation for the Essayons Overhaul FY27 (W9127N26BA029). The zone designations and locations are relevant to the comprehensive overhaul, maintenance, and repair work that contractors will perform at their own facilities under the firm fixed price Job Order contract. Understanding these zone locations is critical for contractors planning the scope of work, particularly for any fire safety system modifications, inspections, or upgrades that may be required during the vessel's overhaul and dry docking.
View the file
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Zone | Description | Location | ||
| 1 | Steering gear Room | main deck | ||
| 2 | Aux Machinery Rm | hold deck | ||
| 3 | Aux machinery Rm | 15'-6" Level | ||
| 4 | Gen Rm | main deck | ||
| 5 | Gen Rm | hold deck | ||
| 6 | Gen Rm | 15'-6" Level | ||
| 7 | Engine Rm | main deck | ||
| 8 | Engine Rm | held deck | ||
| 9 | Engine Rm | 15'-6" Level | ||
| 10 | Pump Rm | Upper Deck | ||
| 11 | Pump Rm | main Declc | ||
| 12 | Pump Rm | Hold deck | ||
| 13 | Bow Thruster Rm | main deck | ||
| 14 | Bosn Stores (weld shop) | upper deck | ||
| 15 | paint Locker | upper deck | ||
| 16 | Aft store Rm (engine) | main deck | ||
| 17 | Em Gen Rm | bridge deck | ||
| 18 | Incinerator Rm | upper deck | ||
| 19 | Machine shop | main deck |
File details come from the government source that posted it. Updated .