About this file

This is a pricing schedule template for a firm fixed price Job Order under a Master Ship and Repair Agreement (MSRA) for the overhaul, maintenance, and repair of the Dredge Essayons for the U.S. Army Corps of Engineers (USACE), Portland District. The price list is organized into two primary categories: Category A work items (82 line items) and Category B work items (11 line items), with all unit prices and amounts currently blank at $0, indicating this is an unfilled template awaiting contractor pricing submissions.

Category A includes routine and preventive maintenance services such as transportation, crane services, drydocking facilities, vessel inspections, machinery overhauls, and system maintenance across propulsion, steering, jetting, ballast, and auxiliary equipment. Category B items encompass specialized services including tug operations, valve replacements, sheave overhauls, and major component replacements such as rudder and steering systems. The schedule also includes sections for Over & Above Work with 13,000 hours of ship repair labor at a fully burdened rate (to be priced), materials estimated at $920,000, and daily rate extensions for dry-docking (10 days) and pier side operations (14 days), all with pricing to be supplied by the contractor. This template requires offerors to complete pricing for all listed work items to submit a responsive bid for the Essayons FY27 overhaul project.

View the file

Other files

File Type Posted
Solicitation Amendment W9127N26BA0270001 SF 30.pdf PDF
354-D655-01 REV -.pdf PDF
Service Contract Act WD 2015-5691.pdf PDF
Service Contract Act WD 2015-5563.pdf PDF
681-0869-301 Combined.pdf PDF
Service Contract Act WD 2015-5535.pdf PDF
IMG_2159.jpeg JPEG file
IMG_2167.jpeg JPEG file
IMG_2158.jpeg JPEG file
IMG_2165.jpeg JPEG file
IMG_2166.jpeg JPEG file
IMG_2168.jpeg JPEG file
681-0700-124 Rev 3 (2 of 2).pdf PDF
681-0700-124 Rev 3 (1 of 2).pdf PDF
Asst Marine Dwg 390-01 Rudder Stock.pdf PDF
354-D025-01_Rescue Boat Davit Test Memorandum.pdf PDF
E 1710 SERIES.pdf PDF
390-VGR-02.pdf PDF
20210706_134605.pdf PDF
480 220 xfmr 2.pdf PDF
681-0713-102 Rev 2 (1 of 4).pdf PDF
600 480 bus tie xfmr 2.pdf PDF
D581015.pdf PDF
70.010-2775-001.pdf PDF
HRP 1601682003.pdf PDF
70.010-5109-906.pdf PDF
Reference K. Jastram JQ-101365 O and M Manual.pdf PDF
354-D185-01_FRB Maintenance-Test Requirements.pdf PDF
354-D798-02 Rev -.pdf PDF
EDG transformer 480 208.pdf PDF
Smk Det Zones.doc DOC document
NPDS3500H_Technical_description.pdf PDF
70.010-5109-907 Rev A (1 of 1).pdf PDF
70.010-2730-917 Rev A (1 of 1).pdf PDF
354-D445-01 REV -.pdf PDF
681-0713-102 Rev 2 (4 of 4).pdf PDF
70.010-5058-918.pdf PDF
Port OSDP xfmr.pdf PDF
20210706_135558.pdf PDF
70.010-4013-901.pdf PDF
681-0713-201 Rev 6 (3 of 3).pdf PDF
681-0700-135 Rev 2 (1 of 1).pdf PDF
681-0713-102 Rev 2 (3 of 4).pdf PDF
70.010-5058-919 Rev B (1 of 1).pdf PDF
480 220 xfmr.pdf PDF
681-0919-203 Combined.pdf PDF
681-0713-202 Rev 0 Combined.pdf PDF
681-0700-201-5 Rev 2 Combined.pdf PDF
Jastram O and M Manual Pg 41.pdf PDF
E-1740-35.pdf PDF
Show 40 more

Latest 50 of 100 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAT A

Category A Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Transportation5.1.14Each$ - 0
Crane Services5.1.375Hour$ - 0
Connection/Disconnection of Services5.1.41Job$ - 0
Field Office5.1.51Job$ - 0
Parking5.1.61Job$ - 0
Drydocking Lift Day5.2.11Job$ - 0
Drydock Lay Day5.2.260Day$ - 0
Wet Berth5.2.315Day$ - 0
Electricity5.2.41Job$ - 0
Steam/Chill Water5.2.575Day$ - 0
Marine Chemist Certifications5.3.11Job$ - 0
Fire Suppression Services5.4.11Job$ - 0
Galley Hood Service and Modification5.4.21Job$ - 0
Install 1ea 6” fire pump suction valve5.4.31Job$ - 0
Bilge Maintenance and Cleaning5.5.11Job$ - 0
Hull Surface Prep and Coat5.6.11Job$ - 0
Port Well Deck Preservation5.6.21Job$ - 0
Lower Hopper Urethane Coating Repair5.6.41Job$ - 0
Hopper Jetting Gate Valve (12”) Replacement5.8.51Job$ - 0
Drag Arm Sheave Inspection5.10.31Job$ - 0
Water Block Swivel Inspection5.10.81Job$ - 0
Discharge Piping Inspection5.11.11Job$ - 0
Discharge Pipe Epoxy Repairs5.11.21Job$ - 0
Discharge Piping Repair and Replacement5.11.31Job$ - 0
Hopper Jetting System Cleaning5.13.21Job$ - 0
Weir Seal Inspection5.13.31Job$ - 0
Anti-Turbidity Valve Replacement5.13.51Job$ - 0
Hopper Inspection Staging5.14.11Job$ - 0
Tower Staging5.14.350Each$ - 0
Port and Stbd Steering Bearing, Stock Inspection and Bushing Replacement5.15.11Job$ - 0
Jastram Potentiometer Replacement and Calibration5.15.31Job$ - 0
Propeller Blade Inspection5.16.11Job$ - 0
Propeller Blade Replacement5.16.21Job$ - 0
Stern Tube Shaft Seal Replacement5.16.51Job$ - 0
Bow Thruster - Lower Gearbox (LGB) / Pod Change Out5.17.41Job$ - 0
Bow Thruster Tunnel Hull Inlet Modification and Center Section Preservation5.17.61Job$ - 0
Temporary Electric Motor Heaters5.19.21Job$ - 0
Jetting Pump Repairs5.21.51Job$ - 0
Fast System Overhaul5.21.71Job$ - 0
Sewage Vent Modifications5.21.81Job$ - 0
Drag Arm Winch Motor Overhaul5.22.32Each$ - 0
ABS Support5.24.01Job$ - 0
Audio Gauge Reading5.24.11Job$ - 0
Internal Tank Inspection5.24.41Job$ - 0
Anchor Chain and Chain Locker Inspection5.26.31Job$ - 0
Life Raft Annual Service5.28.11Job$ - 0
Crane LMI, ATB and Swing Motor Service, Repair, and Corrosion Control5.28.21Job$ - 0
Sludge Tanks Annual Maintenance5.29.11Job$ - 0
Strut and Stern Tube Bearing Inspection5.31.11Job$ - 0
Rudder Bushing Clearance Documentation5.31.21Job$ - 0
Dock and Sea Trials5.33.11Job$ - 0
Frame 88, 68 Upper Hopper Athwartship Support Replacement5.44.11Job$ - 0
Upper Hopper Steel Repairs5.44.21Job$ - 0
Aft Peak Ballast Tank Steel Repair5.44.31Job$ - 0
Lifting Eye Inspection and Testing5.44.61Job$ - 0
Hopper Deck Steel Repairs5.44.71Job$ - 0
Hopper Door Actuating Rod Replacement5.44.81Job$ - 0
Helo Deck Hatch for Steering Gear Access5.44.91Job$ - 0
Rescue Boat Davit Replacement5.45.21Job$ - 0
Fan Overhauls5.46.11Job$ - 0
Galley Refrigeration Equipment Annual Inspection5.46.21Job$ - 0
Steam Heating Pipe Insulation5.46.31Job$ - 0
Watertight Door Replacement5.46.61Job$ - 0
Jetting Pipe Repairs5.47.11Job$ - 0
General Service Salt Water System Refurbishment5.47.21Job$ - 0
Chilled Water Supply and Return Piping Modification5.47.31Job$ - 0
Engine Room Fuel Manifold Overhaul5.47.41Job$ - 0
Captain's Office P-Way Deck Drain Renewal5.47.51Job$ - 0
Centerline Collection Valve Flushing Water Piping Removal5.47.61Job$ - 0
Deck Drain Installation, Repair, and Clearing5.47.81Job$ - 0
Fwd Air Compressor Procurement and Replacement5.47.91Job$ - 0
Caterpillar Engine Top End Adjustment5.48.31Job$ - 0
Oil Distribution (OD) Box Overhaul5.48.41Job$ - 0
Exhaust Leak Repair5.48.51Job$ - 0
Rescue Boat, Launch, and Lifeboat Davit Inspections5.53.11Job$ - 0
Essayons Launch Service5.53.21Job$ - 0
Navigation Equipment Annual Service5.54.11Job$ - 0
Furnish and Install Public Address System5.54.21Job$ - 0
Transformer Maintenance5.54.31Job$ - 0
Total Category A Work Items$ - 0

CAT B

Category B Work Item DescriptionPWS ParagraphQtyUnitUnit PriceAmount
Tug Service5.1.21Job$ - 0
Deep Cleaning of Vessel Hotel Spaces5.1.71Job$ - 0
Sluice Valve Replacement5.8.11Job$ - 0
Hopper Jetting Valve (10") Replacement5.8.31Each$ - 0
Drag Arm Sheave Overhaul, Sheave Guide5.10.41Each$ - 0
Drag Arm Sheave Overhaul, Single Sheave Water Block5.10.51Each$ - 0
Drag Arm Sheave Overhaul, Single Sheave5.10.61Each$ - 0
Drag Arm Sheave Overhaul, Swell Comp Single Sheave5.10.71Each$ - 0
Weir Seal Replacement5.13.41Job$ - 0
Port and Stbd Rudder and Rudder Stock Replacement5.15.21Job$ - 0
Sewage Pipe Repairs5.21.61Job$ - 0
Main Sea Chest Strainer Annual Inspection5.47.71Job$ - 0
Total Category B Work Items$ - 0

Over & Above Work

Over & Above Work
SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphRequired Level
Of Effort HoursMaterialsFully Burdened
Labor RateMaterial Burden RateTotal Cost
Ship Repair Labor Rate6.113,000$0.00
Materials & Subcontractor6.1$ 920,000.00$ 920,000.00
SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED)
Over & Above Work
Item DescriptionPWS
ParagraphQtyUnitUnit PriceTotal Cost
Dry-Docking Extension Cost6.110Days$ - 0
Pier Side Extension Costs6.114Days$ - 0
Total Over & Above Work Items$920,000.00