Price List.xlsx
XLSX spreadsheet 81 KB Posted
- Attached to
- Essayons Overhaul FY27
- Solicitation number
- W9127N26BA029
About this file
This is a pricing schedule template for a firm fixed price Job Order under a Master Ship and Repair Agreement (MSRA) for the overhaul, maintenance, and repair of the Dredge Essayons for the U.S. Army Corps of Engineers (USACE), Portland District. The price list is organized into two primary categories: Category A work items (82 line items) and Category B work items (11 line items), with all unit prices and amounts currently blank at $0, indicating this is an unfilled template awaiting contractor pricing submissions.
Category A includes routine and preventive maintenance services such as transportation, crane services, drydocking facilities, vessel inspections, machinery overhauls, and system maintenance across propulsion, steering, jetting, ballast, and auxiliary equipment. Category B items encompass specialized services including tug operations, valve replacements, sheave overhauls, and major component replacements such as rudder and steering systems. The schedule also includes sections for Over & Above Work with 13,000 hours of ship repair labor at a fully burdened rate (to be priced), materials estimated at $920,000, and daily rate extensions for dry-docking (10 days) and pier side operations (14 days), all with pricing to be supplied by the contractor. This template requires offerors to complete pricing for all listed work items to submit a responsive bid for the Essayons FY27 overhaul project.
View the file
Other files
Show 40 more
Latest 50 of 100 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAT A
| Category A Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Transportation | 5.1.1 | 4 | Each | $ - 0 | |
| Crane Services | 5.1.3 | 75 | Hour | $ - 0 | |
| Connection/Disconnection of Services | 5.1.4 | 1 | Job | $ - 0 | |
| Field Office | 5.1.5 | 1 | Job | $ - 0 | |
| Parking | 5.1.6 | 1 | Job | $ - 0 | |
| Drydocking Lift Day | 5.2.1 | 1 | Job | $ - 0 | |
| Drydock Lay Day | 5.2.2 | 60 | Day | $ - 0 | |
| Wet Berth | 5.2.3 | 15 | Day | $ - 0 | |
| Electricity | 5.2.4 | 1 | Job | $ - 0 | |
| Steam/Chill Water | 5.2.5 | 75 | Day | $ - 0 | |
| Marine Chemist Certifications | 5.3.1 | 1 | Job | $ - 0 | |
| Fire Suppression Services | 5.4.1 | 1 | Job | $ - 0 | |
| Galley Hood Service and Modification | 5.4.2 | 1 | Job | $ - 0 | |
| Install 1ea 6” fire pump suction valve | 5.4.3 | 1 | Job | $ - 0 | |
| Bilge Maintenance and Cleaning | 5.5.1 | 1 | Job | $ - 0 | |
| Hull Surface Prep and Coat | 5.6.1 | 1 | Job | $ - 0 | |
| Port Well Deck Preservation | 5.6.2 | 1 | Job | $ - 0 | |
| Lower Hopper Urethane Coating Repair | 5.6.4 | 1 | Job | $ - 0 | |
| Hopper Jetting Gate Valve (12”) Replacement | 5.8.5 | 1 | Job | $ - 0 | |
| Drag Arm Sheave Inspection | 5.10.3 | 1 | Job | $ - 0 | |
| Water Block Swivel Inspection | 5.10.8 | 1 | Job | $ - 0 | |
| Discharge Piping Inspection | 5.11.1 | 1 | Job | $ - 0 | |
| Discharge Pipe Epoxy Repairs | 5.11.2 | 1 | Job | $ - 0 | |
| Discharge Piping Repair and Replacement | 5.11.3 | 1 | Job | $ - 0 | |
| Hopper Jetting System Cleaning | 5.13.2 | 1 | Job | $ - 0 | |
| Weir Seal Inspection | 5.13.3 | 1 | Job | $ - 0 | |
| Anti-Turbidity Valve Replacement | 5.13.5 | 1 | Job | $ - 0 | |
| Hopper Inspection Staging | 5.14.1 | 1 | Job | $ - 0 | |
| Tower Staging | 5.14.3 | 50 | Each | $ - 0 | |
| Port and Stbd Steering Bearing, Stock Inspection and Bushing Replacement | 5.15.1 | 1 | Job | $ - 0 | |
| Jastram Potentiometer Replacement and Calibration | 5.15.3 | 1 | Job | $ - 0 | |
| Propeller Blade Inspection | 5.16.1 | 1 | Job | $ - 0 | |
| Propeller Blade Replacement | 5.16.2 | 1 | Job | $ - 0 | |
| Stern Tube Shaft Seal Replacement | 5.16.5 | 1 | Job | $ - 0 | |
| Bow Thruster - Lower Gearbox (LGB) / Pod Change Out | 5.17.4 | 1 | Job | $ - 0 | |
| Bow Thruster Tunnel Hull Inlet Modification and Center Section Preservation | 5.17.6 | 1 | Job | $ - 0 | |
| Temporary Electric Motor Heaters | 5.19.2 | 1 | Job | $ - 0 | |
| Jetting Pump Repairs | 5.21.5 | 1 | Job | $ - 0 | |
| Fast System Overhaul | 5.21.7 | 1 | Job | $ - 0 | |
| Sewage Vent Modifications | 5.21.8 | 1 | Job | $ - 0 | |
| Drag Arm Winch Motor Overhaul | 5.22.3 | 2 | Each | $ - 0 | |
| ABS Support | 5.24.0 | 1 | Job | $ - 0 | |
| Audio Gauge Reading | 5.24.1 | 1 | Job | $ - 0 | |
| Internal Tank Inspection | 5.24.4 | 1 | Job | $ - 0 | |
| Anchor Chain and Chain Locker Inspection | 5.26.3 | 1 | Job | $ - 0 | |
| Life Raft Annual Service | 5.28.1 | 1 | Job | $ - 0 | |
| Crane LMI, ATB and Swing Motor Service, Repair, and Corrosion Control | 5.28.2 | 1 | Job | $ - 0 | |
| Sludge Tanks Annual Maintenance | 5.29.1 | 1 | Job | $ - 0 | |
| Strut and Stern Tube Bearing Inspection | 5.31.1 | 1 | Job | $ - 0 | |
| Rudder Bushing Clearance Documentation | 5.31.2 | 1 | Job | $ - 0 | |
| Dock and Sea Trials | 5.33.1 | 1 | Job | $ - 0 | |
| Frame 88, 68 Upper Hopper Athwartship Support Replacement | 5.44.1 | 1 | Job | $ - 0 | |
| Upper Hopper Steel Repairs | 5.44.2 | 1 | Job | $ - 0 | |
| Aft Peak Ballast Tank Steel Repair | 5.44.3 | 1 | Job | $ - 0 | |
| Lifting Eye Inspection and Testing | 5.44.6 | 1 | Job | $ - 0 | |
| Hopper Deck Steel Repairs | 5.44.7 | 1 | Job | $ - 0 | |
| Hopper Door Actuating Rod Replacement | 5.44.8 | 1 | Job | $ - 0 | |
| Helo Deck Hatch for Steering Gear Access | 5.44.9 | 1 | Job | $ - 0 | |
| Rescue Boat Davit Replacement | 5.45.2 | 1 | Job | $ - 0 | |
| Fan Overhauls | 5.46.1 | 1 | Job | $ - 0 | |
| Galley Refrigeration Equipment Annual Inspection | 5.46.2 | 1 | Job | $ - 0 | |
| Steam Heating Pipe Insulation | 5.46.3 | 1 | Job | $ - 0 | |
| Watertight Door Replacement | 5.46.6 | 1 | Job | $ - 0 | |
| Jetting Pipe Repairs | 5.47.1 | 1 | Job | $ - 0 | |
| General Service Salt Water System Refurbishment | 5.47.2 | 1 | Job | $ - 0 | |
| Chilled Water Supply and Return Piping Modification | 5.47.3 | 1 | Job | $ - 0 | |
| Engine Room Fuel Manifold Overhaul | 5.47.4 | 1 | Job | $ - 0 | |
| Captain's Office P-Way Deck Drain Renewal | 5.47.5 | 1 | Job | $ - 0 | |
| Centerline Collection Valve Flushing Water Piping Removal | 5.47.6 | 1 | Job | $ - 0 | |
| Deck Drain Installation, Repair, and Clearing | 5.47.8 | 1 | Job | $ - 0 | |
| Fwd Air Compressor Procurement and Replacement | 5.47.9 | 1 | Job | $ - 0 | |
| Caterpillar Engine Top End Adjustment | 5.48.3 | 1 | Job | $ - 0 | |
| Oil Distribution (OD) Box Overhaul | 5.48.4 | 1 | Job | $ - 0 | |
| Exhaust Leak Repair | 5.48.5 | 1 | Job | $ - 0 | |
| Rescue Boat, Launch, and Lifeboat Davit Inspections | 5.53.1 | 1 | Job | $ - 0 | |
| Essayons Launch Service | 5.53.2 | 1 | Job | $ - 0 | |
| Navigation Equipment Annual Service | 5.54.1 | 1 | Job | $ - 0 | |
| Furnish and Install Public Address System | 5.54.2 | 1 | Job | $ - 0 | |
| Transformer Maintenance | 5.54.3 | 1 | Job | $ - 0 | |
| Total Category A Work Items | $ - 0 |
CAT B
| Category B Work Item Description | PWS Paragraph | Qty | Unit | Unit Price | Amount |
| Tug Service | 5.1.2 | 1 | Job | $ - 0 | |
| Deep Cleaning of Vessel Hotel Spaces | 5.1.7 | 1 | Job | $ - 0 | |
| Sluice Valve Replacement | 5.8.1 | 1 | Job | $ - 0 | |
| Hopper Jetting Valve (10") Replacement | 5.8.3 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Sheave Guide | 5.10.4 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave Water Block | 5.10.5 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Single Sheave | 5.10.6 | 1 | Each | $ - 0 | |
| Drag Arm Sheave Overhaul, Swell Comp Single Sheave | 5.10.7 | 1 | Each | $ - 0 | |
| Weir Seal Replacement | 5.13.4 | 1 | Job | $ - 0 | |
| Port and Stbd Rudder and Rudder Stock Replacement | 5.15.2 | 1 | Job | $ - 0 | |
| Sewage Pipe Repairs | 5.21.6 | 1 | Job | $ - 0 | |
| Main Sea Chest Strainer Annual Inspection | 5.47.7 | 1 | Job | $ - 0 | |
| Total Category B Work Items | $ - 0 |
Over & Above Work
| Over & Above Work | |||||
| SCHEDULE OF PRICES/RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED) | |||||
| Over & Above Work | |||||
| Item Description | PWS | ||||
| Paragraph | Required Level | ||||
| Of Effort Hours | Materials | Fully Burdened | |||
| Labor Rate | Material Burden Rate | Total Cost | |||
| Ship Repair Labor Rate | 6.1 | 13,000 | $0.00 | ||
| Materials & Subcontractor | 6.1 | $ 920,000.00 | $ 920,000.00 |
| SCHEDULE OF PRICES/RATES FOR THE PURPOSES OF A GOVERNMENT REQUIRED EXTENSION: DAILY RATES FOR PIER SIDE AND DRY-DOCKING (FULLY BURDENED) | ||||||
| Over & Above Work | ||||||
| Item Description | PWS | |||||
| Paragraph | Qty | Unit | Unit Price | Total Cost | ||
| Dry-Docking Extension Cost | 6.1 | 10 | Days | $ - 0 | ||
| Pier Side Extension Costs | 6.1 | 14 | Days | $ - 0 | ||
| Total Over & Above Work Items | $920,000.00 |