W9127N24R0001 TRGR Draft 100 Percent Specifications 1.pdf

PDF 46 MB Posted

Attached to
John Day Dam Turbine Runner Replacement and Generator Rewind Project-100% Review
Solicitation number
W9127N24R0001
Issued by

View the file

Other files

File Type Posted
PLA Request for Input 06 16 2025.docx DOCX document
Draft Turbine Performance 48 13 13.01 26.pdf PDF
PLA Request for Input.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications Specs+A1-A23.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A24.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A25.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 1 USACE.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent RFP.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4b.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 5.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4a.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 7.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 6.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings.pdf PDF
W9127N24R0001 TRGR Draft 95 RFP and Specifications.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 1 USACE.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JDTRGR24 - OIL FREE JDTRGR24OILFREE

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.00 25 CONTRACT ADMINISTRATION DATA

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 11 00.00 25 SUMMARY OF WORK

01 22 00.00 25 MEASUREMENT AND PAYMENT

01 32 01.00 25 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 16.10 26 HYDRAULIC DESIGN PROCESS

01 33 16.11 26 HYDRAULIC TURBINE DESIGN

01 33 16.12 26 COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS

01 33 16.13 26 PERFORMANCE MODEL TESTING

01 33 16.14 26 OBSERVATIONAL MODEL TESTING

01 33 16.15 26 DRAFT TUBE MODIFICATION DESIGN (OPTIONAL)

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 23.00 25 OPERATION AND MAINTENANCE DATA

01 78 39.00 25 PROJECT RECORD DOCUMENTS

DIVISION 02 - EXISTING CONDITIONS

02 41 00.00 25 DEMOLITION AND DISPOSAL

02 82 14.00 25 ASBESTOS ABATEMENT WORK

02 83 13.00 25 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 31 26.10 25 SELF-CONSOLIDATING CONCRETE (OPTIONAL)

03 37 13.00 25 DRAFT TUBE SHOTCRETE (OPTIONAL)

03 40 00.00 25 DRAFT TUBE PRECAST CONCRETE (OPTIONAL)

03 50 00.00 26 DISCHARGE RING/DRAFT TUBE LINER AND STAY VANE CONCRETE

WORK (OPTIONAL)

03 60 00.00 26 CONCRETE DEMOLITION (OPTIONAL)

DIVISION 05 - METALS

05 05 19.00 25 DRAFT TUBE SHOTCRETE ANCHORS AND MISC PROVISIONS (OPTIONAL)

05 50 03.01 26 STRUCTURAL METALWORK FABRICATION, MACHINE WORK, AND

MISCELLANEOUS PROVISIONS

05 50 03.02 26 PRESSURIZED METALWORK FABRICATION, MACHINE WORK, AND

MISCELLANEOUS PROVISIONS

05 50 03.20 26 MISCELLANEOUS STEEL STRUCTURES

DIVISION 09 - FINISHES

09 97 02.23 26 PAINTING: HYDRAULIC STRUCTURES

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS

PROJECT TABLE OF CONTENTS Page 1

T

ID

TE S

FTUBE PRE

AFTRGE RING

AF(OPTIO

RAFNCRETE D

DRA

METALS

D5 DDRDS

0%

L

0%

KKRK

N

10NG 1

Rev iewiewOR MODE

26 05 19.00 26 INSULATED WIRE AND CABLE

DIVISION 40 - PROCESS INTERCONNECTIONS

40 05 13.00 26 PIPING AND EQUIPMENT

40 05 13.96 26 WELDING, PIPING

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

42 13 19.00 26 SURFACE AIR COOLERS

42 13 19.01 26 THRUST BEARING OIL COOLERS

DIVISION 48 - ELECTRICAL POWER GENERATION

48 13 13.01 26 PROTOTYPE TURBINE DESIGN AND SUPPLY

48 13 13.02 26 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC TURBINE-GENERATOR

UNITS

48 13 13.03 26 GENERATOR THRUST BEARING HIGH PRESSURE OIL INJECTION SYSTEM

48 13 13.04 26 EXISTING TURBINE COMPONENT REFURBISHMENT AND REPLACEMENT

48 13 13.05 26 DISASSEMBLY AND REASSEMBLY OF HYDRAULIC TURBINE-GENERATOR

UNITS FOR STANDALONE REWIND (OPTIONAL)

48 13 13.06 26 GENERATOR THRUST BEARING INSPECTION AND OPTIONAL

REFURBISHMENT

48 13 13.07 26 GUIDE BEARING INSPECTION AND OPTIONAL REFURBISHMENT

48 13 13.08 26 CAVITATION, CRACK REPAIR AND DISCHARGE RING WELD OVERLAY

48 13 13.11 26 MISCELLANEOUS PARTS, MATERIALS, AND SERVICES (OPTIONAL)

48 13 13.24 26 GENERATOR BRAKE SYSTEM REFURBISHMENT

48 13 16.00 26 REWIND OF HYDRAULIC-TURBINE DRIVEN GENERATORS

48 13 16.02 26 MACHINE CONDITION MONITORING SYSTEM SENSORS

48 70 01.00 26 NERC COMPLIANCE FOR HYDROGENERATORS (OPTIONAL)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

DRAFT 10

0%

TE

% REFUR

0%

URBINE

%ONITORI

%FOR HYDR

10tents -

Rev ieww

L I ewT AND iewULIC TUR vieAL) ev ieON AND

ReD OPTIONA

ReND DISCHRLS,R

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00.00 25

CONTRACT ADMINISTRATION DATA

PART 1 GENERAL

1.1 REFERENCES

1.2 MEANING OF TERMS

1.3 CONTRACTING OFFICER

1.4 SERIAL LETTER CORRESPONDENCE

1.4.1 Numbering

1.4.2 Subcontractors

1.4.3 Transmittals

1.5 EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL

1.6 PROJECT-SPECIFIC MANAGEMENT PLAN

1.7 LETTERS OF AUTHORITY

1.8 CONSTRUCTION LABOR STANDARDS

1.8.1 Coverage

1.8.2 Wages

1.8.3 Overtime

1.8.4 Deductions

1.8.5 Apprentices

1.8.6 Payrolls

1.8.7 Supply and Use of Electronic Software for Processing Wage Rate

Requirements

1.8.8 Records

1.8.9 Labor Standard Interviews

1.9 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.10 PARTNERING

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.12 BASIS FOR SETTLEMENT OF PROPOSALS

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 10 00.00 25 Page 1

DRAFTTd In

FTMENT EM

RAFOWNERSH

RAOR SETT

DRUCTS - N

0%

0lectronic iewvieANUAL

SECTION 01 10 00.00 25

CONTRACT ADMINISTRATION DATA

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 5.5 Contract Provisions and Related Matters

1.2 MEANING OF TERMS

a. Specification Sections of this Contract are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," "must," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

b. Wherever "directed," "required," "prescribed," or other similar words are used, the "direction," "requirement," or "order" of the Contracting Officer (CO) is intended. Similarly, wherever "approved," "acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by," "acceptable to," or "satisfactory to" the

CO.

c. The word "will" generally pertains to decisions or actions of the CO.

d. Wherever "Construction" is used, it is referring to the installation phase of work on-site, and existing equipment that is refurbished off-site.

1.3 CONTRACTING OFFICER

The CO who signed this Contract is the primary CO for the Contract.

Nevertheless, any CO assigned to the Portland District and acting within his/her authority may take formal action on this Contract when a Contract action needs to be taken and the primary CO is unavailable. All correspondence must be through the CO or, upon notification, their authorized Representative (COR).

SECTION 01 10 00.00 25 Page 2

DRAFTT

pl

T"mus

FTsubject

AFTying mat

RA"direct

DRA

used, the

DRing OffiDle," Dea

0%

% ct Pro

0of this C

10nces us10 1

Rev ieww nd H vieand De ev iepment

Revse Sche

ReADMINISR

1.4 SERIAL LETTER CORRESPONDENCE

All letters must be electronically submitted to the Government and must be sent to designated parties via email and exported via the RMS interface.

All letters must be signed in accordance with the letters of authority.

Send any documents requiring original hardcopy/signatures to: Vancouver Resident Office, 4480 SE Columbia Way, Vancouver, WA 98661.

1.4.1 Numbering

All serial letter correspondence must be independently numbered sequentially with no numbers missing or duplicated, commencing with number one. Each letter must show the Contract number, description, and subject matter. Only one subject should be covered in the same letter.

1.4.2 Subcontractors

Subcontractors must not correspond with either the Resident or District offices; the Prime Contractor must handle all correspondence.

1.4.3 Transmittals

Transmittals of signed pay estimates, payrolls, submittals, and other similar correspondence will not require a Serial Letter.

1.5 EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS MANUAL

The latest version in effect on the date of the Solicitation for this Contract (in accordance with EM 385-1-1 Paragraph 4 General, will be contractually binding as part of this Contract). The latest version, including all errata and changes, must be used for this Contract and is obtainable at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals /EM_385-1-1.pdf.

1.6 PROJECT-SPECIFIC MANAGEMENT PLAN

Submit SD-01, Preconstruction Submittals (listed on the submittal register, Attachment A1, and defined in Section 01 33 00, SUBMITTAL PROCEDURES). The listed components of the Project-Specific Management Plan (PSMP) must be submitted separately under the appropriate Specifications Section. Upon approval, the components must be combined into a single PSMP binder that will be kept onsite. Update the PSMP whenever the plans contained within are updated or amended. The COR will periodically review the onsite copy of the PSMP. If a current version of the PSMP is not available and up to date, site work may be stopped until deficiencies are corrected.

Acceptance of the PSMP is required prior to mobilization.

The PSMP must include:

a. Section I - Accident Prevention Program.

(1) Accident Prevention Plan (EM 385-1-1 and Section 01 35 26.00 25, GOVERNMENTAL SAFETY REQUIREMENTS).

(2) Drug-free workplace policy.

(3) Global Harmonization program (EM 385-1-1).

SECTION 01 10 00.00 25 Page 3

DDDRAFT TsaceT

AFMANAGE

RAeconstru

DRA

and defi

DRnents of DaratelDomp

0%

% REMENT

%date of

%85-1-0%

0f this Co

10es, must1

Rev iewew ident o iewspondence

Rells, subm

Reerial LR

(4) Activity hazard analysis (EM 385-1-1).

(5) Equipment certification.

b. Section II - Environmental Protection Plan (Section 01 57 19.00 25, TEMPORARY ENVIRONMENTAL CONTROLS).

c. Section III - Construction Quality Control System (Section 01 45 00.00 25, QUALITY CONTROL).

(1) Contractor's quality control (CQC) plan.

(2) CQC Daily Report form.

d. Project Work Plan. The following are examples:

(1) Roadway Access Agreement.

(2) Temporary electrical systems.

(3) Welder qualifications.

(4) Welding procedures.

(5) Bolt pre-tensioning procedure.

e. Schedule for Construction.

f. Submittal Register.

1.7 LETTERS OF AUTHORITY

a. To authenticate actions required under terms of this Contract, furnish a letter of authority to the CO and Resident Engineer that indicates the names of individual or individuals who are authorized to perform the following functions on behalf of the company:

(1) Sign progress payment estimates.

(2) Sign final payment estimate.

(3) Accept Government-furnished property (if applicable).

(4) Sign Contract modifications, supplemental agreements and consent of surety.

(5) Monitor and report on the environmental protection plan, management plan, quality control plan, and safety plan.

(6) Supervise the field activities.

(7) Sign Release of Claims.

(8) Sign Correspondence.

b. This letter of authority must bear the typewritten names and the handwritten signatures of each individual and be signed by the person whose signature appears on the final Contract.

SECTION 01 10 00.00 25 Page 4

Ttion

FTauthor

AFTs of ind

AFowing f

RA progre

DRSign finDep

0% re iew

1.8 CONSTRUCTION LABOR STANDARDS

This paragraph applies to all onsite work. The Contractor and all subcontractors must comply with the following labor standards, statutes, and regulations: Davis-Bacon Act; Contract Work Hours and Safety Standards Act; Copeland Act; Secretary of Labor's regulations (Parts 3 and 5, Subtitle A, Title 29, Code of Federal Regulations). Submit a serial letter identifying the crafts and wage rates for all Prime and subcontractor employees to whom the Contract's construction wage rate requirements apply. The Government will review these crafts and rates for conformance with the wage determination.

1.8.1 Coverage

Contract provisions relating to wages, overtime, payroll deductions, and other labor standards requirements cover foremen, laborers, and mechanics, including owner-operators of other than hauling equipment and other individual enterprises performing the duties of a laborer or mechanic.

Bona fide owner-operators of hauling equipment, such as trucks, who are independent Contractors, are not covered, and the certified payrolls, including the names of such owner-operators, need not show hours worked nor rates paid, but only the notation "owner-operator".

1.8.2 Wages

Wages must be paid at least once a week and be computed at hourly rates not less than those set forth in the Contract wage schedule, as set by the Davis-Bacon Act wage determinations, for the particular classifications of work performed.

1.8.3 Overtime

Pay overtime for work in excess of 40 hours in any workweek at not less than one and a half times the basic rate of pay. Rates paid for fringe benefits are excluded in the computations of overtime.

1.8.4 Deductions

Deductions from wages earned may be only those that are permitted by the Copeland Act (Anti-Kickback) regulations.

1.8.5 Apprentices

Comply with the requirements of 29 CFR 5.5 (a)(4)(i) with respect to apprentices.

1.8.6 Payrolls

Prepare and submit correct Weekly Payrolls, including those of subcontractors. Incorrect and delinquent payrolls will delay processing of partial payment estimates.

1.8.7 Supply and Use of Electronic Software for Processing Wage Rate Requirements

a. The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, SECTION 01 10 00.00 25 Page 5

DRAFTTexce

FTes the b

AFTin the c

DRA

m wages e

DR(Anti-KDes

0%

% k and b

0% act wag

% for th ieww wandewrer or iewh as truc vieertifie ev ienot sh

Revr".

R processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.

b. If the Contractor uses an electronic payroll processing system, then the Contractor is responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required to comply with the Wage Rate Requirements statute. When the Contractor uses an electronic payroll system, the electronic payroll service must be used by the Contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this Contract and the electronic payroll service must be capable of preserving these payrolls and related basic records for the required three years after Contract completion. If the Contractor chooses to use an electronic payroll system, then the Contractor must obtain and provide electronic system access to the Government, over the duration of this construction Contract. The access must include electronic review access by the Government to the electronic payroll processing system used by the Contractor.

c. Provision and use of an electronic payroll processing system must meet the following basic functional criteria:

(1) commercially available;

(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the Federal Acquisition Regulation (FAR);

(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the Contract;

(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export in an Excel spreadsheet to be imported into the Contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn must export payroll data to the Government's RMS;

(5) demonstrated security of data and data entry rights;

(6) ability to produce Contractor-certified electronic versions of weekly payroll data;

(7) ability to identify erroneous entries and track the date/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the Government over the life of the Contract;

(8) capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the Contract closeout. This durable record copy of data from the electronic payroll processing system must be provided to the Government during Contract closeout.

d. All incurred costs related to the Contractor's provision and use of an electronic payroll processing service must be included in the Contractor's price for the overall work under the Contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services must not be a separately bid or reimbursed item under this Contract.

SECTION 01 10 00.00 25 Page 6

T duc

Tof

FTbe impo

AFTersion o

AFport pa

RAnstrate

DRability Dy pay

0%

% e Wage

0% eral Ac

%the requ

0to be em

10an1

Rev ieww ns wacceewstem us ev ieproces

Rea:

1.8.8 Records

Maintain payroll and Employment Records during the course of work and for three years thereafter. They are subject to inspection by the CO and the U.S. Department of Labor.

1.8.9 Labor Standard Interviews

A Government representative will interview Contractor and subcontractor employees from time to time during working hours on the job.

1.9 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) Contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE Contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant Contract, USACE Contractors are encouraged to seek out highly qualified veterans to perform services under this Contract. The following resources are available to assist USACE Contractors in their outreach efforts:

a. U.S. Department of Labor Veterans employment: www.vets.gov/

b. Federal veteran employment information:

www.fedshirevets.gov/index.aspx

c. Veterans' Employment and Training Service (VETS):

http://www.dol.gov/vets/

d. Veterans Opportunity to Work (VOW) Program:

http://benefits.va.gov/vow/

e. Hiring Our Heroes initiative:

www.uschamberfoundation.org/hiring-our-heroes

1.10 PARTNERING

a. The Government intends to encourage the foundation of a cohesive partnership with the Contractor and its subcontractors. This partnership will be structured to draw on the strengths of each organization to identify and achieve reciprocal goals. Among the objectives are effective and efficient Contract performance and are intended to achieve completion within budget, on schedule, and in accordance with the plans and specifications; and to develop a single cooperative management team focused on the success of the project to mutual benefit of all stakeholders. This partnership will be bilateral in makeup, and participation will be totally voluntary. Any cost associated with effectuating this partnership will be agreed to by both parties, and will be shared equally with no change to the Contract price. An integral aspect of partnering is the resolution of disputes in a timely, professional, and non-adversarial manner through the use of issue clarification and problem solving. Alternate Dispute Resolution (ADR) methodologies will be encouraged in place of the more formal dispute resolution procedures. ADR will assist in promoting and maintaining an amicable working relationship to preserve the

SECTION 01 10 00.00 25 Page 7

DRAFAFAFT Tty t

FTgov/vow/

FT

AFroes in

RAFoundation

RA

D

G

DvernmDw ormation

0000010 0d Trainin

Rev ieww s wncouewhile pe iewreference viee resul ev iey qual

Revwing r

Reir outre

Rloy partnership. ADR is a voluntary, non-binding procedure available for use by the parties to this Contract to resolve any dispute that may arise during performance.

b. Contractor participation in partnering is mandatory, key on-site and home office management personnel will be required to attend a full day partnering session as directed by the Government with an outside facilitator. The cost of this facilitated session is anticipated to be around $5,000 and will be shared equally between the Contractor and the Government.

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

a. This special Contract requirement does not apply to terminations.

See FAR Part 49.

b. Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier must be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment must be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VIII. Working conditions must be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations must apply. For retroactive pricing, the schedule in effect at the time the work was performed must apply.

c. Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the Contracting Officer must request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data must be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

1.12 BASIS FOR SETTLEMENT OF PROPOSALS

a. Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis.

b. In evaluating a termination settlement proposal using the total cost basis, the following principles will be applied to determine allowable equipment costs:

SECTION 01 10 00.00 25 Page 8

DDDRAFT T

io

Tthe

AFTl costs

AF) and F

RAForganiza

RA, and s

DRA

le, excep

DRrom an oDed prDd

101010 0%

% gion V

0% etermin

%wise by

%e schedu

0rate may

10For fo10mus1

Rev ieww d wisheewsed on iewimilar se vieership ev ies. Whe

Revr any p

Repment fro

Repment mRnstR

(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the Contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a Contract using predetermined rates, those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(4) Ownership costs (depreciation) will be determined using the Contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).

(5) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the Contractor charges these costs directly to Contracts, they will be recovered through the indirect expense rate.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 10 00.00 25 Page 9

DRAFT 10

0% e Rev ieww e wontrewe recov

Ron

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

1.2 REFERENCES

1.3 SUBMITTALS

1.4 GOVERNMENT ACTIVITIES

1.5 FIELD VERIFICATION OF SITE CONDITIONS

1.6 GOVERNMENT ISSUED ITEMS

1.7 EQUIPMENT LIST

1.8 TESTING OF EQUIPMENT

1.9 DISPOSITION OF REMOVED EQUIPMENT

1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES

1.11 ASBESTOS

1.12 PRE-WORK AND POST WORK SURVEYS

1.13 CARE OF DRAINS

1.14 PROTECTION OF POWERHOUSE FLOORS

1.15 FIRE CONTROL

1.16 PROJECT MANAGERS

1.17 DESIGN QUALITY CONTROL MANAGER

1.18 INSTALLATION SUPERVISOR

1.19 PROJECT SUPERINTENDENT

1.20 COMMISSIONING AGENT

1.21 CONTRACTOR'S GENERAL PERSONNEL

1.22 INCLEMENT WEATHER CONSTRUCTION

1.23 TURBINE MAINTENANCE PLATFORM (TMP)

1.24 UNIT GENERATOR DEWATERING AND LOCKOUT TAG OUT

1.24.1 Main Unit Access

1.24.2 Refilling of Lubrication and Hydraulic Systems

1.24.3 Watering the Unit

1.25 NOTIFICATION OF EQUIPMENT OUTAGE

1.26 NOTIFICATION OF UNIT OUTAGE

1.27 UTILITY OUTAGE REQUEST AND UTILITY CONNECTION REQUEST

1.28 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK

1.29 WEEKLY COORDINATION MEETINGS

1.30 CONTRACTOR EMPLOYEES

1.31 PAGERS

1.32 ACCESS AGREEMENTS

1.32.1 Access Agreements

1.32.2 Work Areas

1.32.3 Employee Access and Parking

1.33 SECURITY PROCEDURES

1.33.1 Project Security

1.33.2 Verification of Employment Eligibility

1.33.3 Identification of Employees

1.33.4 Non-US Citizens

1.33.5 Safeguarding of Information

1.34 SUPPLEMENTAL SECURITY REQUIREMENTS

1.34.1 Seven Year Criminal Background Check

SECTION 01 10 10.00 25 Page 1

DRAFTT

T

TERAL

FTHER CON

AFTENANCE P

AFTOR DEW

RAFt Acce

RAilling o

DRA

atering t

DRFICATIONDFICATIDY

0%

RS

%ANAGE

11T 1

Rev

RevFACILI

1.34.2 NERC Critical Infrastructure Protection (CIP) Training

1.34.3 Quarterly NERC CIP Security Awareness Program

1.35 SECURITY TRAINING

1.36 DECK ACCESS RESTRICTIONS

1.37 CONSTRUCTION PROJECT IDENTIFICATION SIGN

1.38 UTILITIES

1.38.1 Sanitary Facilities

1.38.2 Electrical Power

1.38.2.1 General

1.38.3 Water

1.39 CONTRACTOR'S EQUIPMENT

1.39.1 Contractor's Planned Equipment Methods

1.39.2 Plant and Equipment List

1.39.3 Movement of Equipment by the Contractor

1.40 CONTRACTOR USE OF GOVERNMENT CRANES

1.41 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS

1.42 GAS, VAPOR, FUME, DUST, AND MIST CONTROL IN POWERHOUSE

1.42.1 General

1.42.2 Additional Provisions

1.43 DAILY CLEANUP AND DISPOSAL

1.44 DISPOSAL OF EQUIPMENT AND MISCELLANEOUS MATERIALS

1.45 SALVAGE

1.46 PROTECTION OF MATERIAL AND WORK

1.47 PROTECTION OF EXISTING UTILITIES

1.48 RESTORATION OF PROJECT ROADS

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 10 10.00 25 Page 2

DRAFT T

Co 10

10nts ieww

HO

vieTERIALS

SECTION 01 10 10.00 25

CONTRACTOR'S OPERATIONS AND REQUIREMENTS

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

This Section covers general requirements applicable to specific Contractor's operations and equipment.

1.2 REFERENCES

The publications listed below form a part of this Specification to the extent referenced. The publications are referred to in the text by basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO LRFD (8th Edition; 2017) Bridge Design Specifications

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B30.2 (2022) Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual

EP 310-1-6A (2006; 2019 Change 2) Project Operation -- Sign Standards Manual, VOL 1

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.94 Ventilation

29 CFR 1910.1000 Air Contaminants

29 CFR 1910.179 Overhead and Gantry Cranes

29 CFR 1926.52 Occupational Noise Exposure

29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and Mists

29 CFR 1926.57 Ventilation

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00, SUBMITTAL PROCEDURES:

SECTION 01 10 10.00 25 Page 3

DRAFT T

EN

DRNATIONA

0%

% ENGIN

%22) Ove

%Running

0Top Run

10EER

Rev ieww at whe t vieRANSPO

Ren; 2017)

RonsR

SD-01 Preconstruction Submittals

Utility Outage Request

Utility Connection Request

Access Agreements; G

Security Procedures; G

Security Training; G

Contractor's Planned Equipment Methods; G

Loading Diagram; G

Notification Of Equipment Outage; G

Notification Of Unit Outage; G

Equipment List

Water Piping Removal Plan

Plant And Equipment List

Gas, Vapor, Fume, Dust, And Mist Control Program

Pre-Work Survey

Annual Inspection

Watering The Unit

Refilling Of Lubrication And Hydraulic Systems

SD-07 Certificates

Installation Supervisor

Project Superintendent

Project Manager For Construction And Supply

Project Manager (PM) For Design Phase

Contractor's General Personnel

Design Quality Control Manager

Commissioning Agent

SD-11 Closeout Submittals

Government Issued Items

Post-Work Survey

SECTION 01 10 10.00 25 Page 4

DRAFT

F it

AFLubric

RAicates

DRallationDS ist Con

1.4 GOVERNMENT ACTIVITIES

For each unit, the Contractor must allow for and schedule the following Government Activities:

a. De-water and prepare the unit for Contractor access (including installation of the work platform) after successful completion of 72 hour run in - 10 working days.

b. Removal of work platform, re-water, and prepare the unit for Commissioning - one week.

1.5 FIELD VERIFICATION OF SITE CONDITIONS

Field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect new construction.

Any deviations will be updated by the Contractor as per Section 01 78 39.00 25, PROJECT RECORD DOCUMENTS, paragraph WORKING AS-BUILT DRAWINGS.

1.6 GOVERNMENT ISSUED ITEMS

Return to the Government all items issued to the Contractor from the Government, including but not limited to the following: keys, ID and security badges, radios, pagers, and excess/unused Government Furnished Property/Equipment. Submit documentation signed by the Contractor and Contracting Officer (CO) indicating items have been returned or fully accounted for. Format of submittal will be discussed and agreed upon at the Pre-Work Meeting.

1.7 EQUIPMENT LIST

Furnish a complete list of all equipment to be used on the Project 30 days prior to commencement of on-site work. Submit a revised list in the event of change of equipment. Lists to include rented equipment as well as lease-purchase or sale-leaseback equipment. The initial list and the revised lists must indicate dates equipment is assigned to or removed from the Project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.8 TESTING OF EQUIPMENT

Before any machinery or mechanized equipment is put to use on the job, it must be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes or derricks must be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1.

Equipment must be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests. Submit test results for all equipment that has been determined to be in safe operating condition along with the equipment list submittal.

1.9 DISPOSITION OF REMOVED EQUIPMENT

Unless otherwise specified in other Sections of the specifications, all existing equipment removed and not reinstalled must become the property of the Contractor, removed from the Project site, and disposed of in a legal manner. Materials that cannot be removed daily may be temporarily stored

SECTION 01 10 10.00 25 Page 5

DRAFTT

al

Ton-s

FT Lists

AFTleaseba

AFndicate

RAFequate id

RAing manu

DRA

serial n

DRal or rDEQ

0% n

% ems hav

0% ll be d

10qui1

Rev ieww w wectiewRAWINGS

RevContr

Ree followi

Re/unusedRgneR on-site at an approved area. Salvaged materials must not be sold on the project site.

1.10 PROTECTION AND RESTORATION OF EXISTING FACILITIES

Protect all existing facilities whether or not shown on the drawings or referenced in the specifications. Upon completion of the work, all the existing facilities, not included as a portion of the work, must be left in a condition equal to the original condition prior to the Contract. Costs for repair and restoration of any facilities must be considered to be incidental to the work and included in the Contract price.

1.11 ASBESTOS

Asbestos Abatement will be performed by the Government. The Government performed an Asbestos Survey in 2022; this survey is included in Attachment A24. The Government anticipates Asbestos Work as follows:

a. General Conditions. Prior to work on each unit, the Government will perform extensive pre-disassembly wipe sampling for ACM. If the testing shows greater than or equal to 100,000 structures per square centimeter, the Government will have an abatement contractor clean the generator, air housing, and other affected areas to the best that can be accomplished prior to any disassembly. Additionally, for work during disassembly and removal of existing windings, disturbed areas containing ACM in amounts greater than or equal to 100,000 structures per square centimeter, the Government will have the areas abated.

b. Air Housing Wiring. Most of the units still contain Asbestos Wiring within the Air Housing. If the Unit selected for TRGR still contains Asbestos Wiring, the wiring will be removed prior to turning the unit over to the Contractor. The Government will remove the affected wiring and conduits in their entirety and will exercise the option for the Contractor to re-establish the circuits during TRGR.

c. Rotor and Stator. Bulk sampling has not revealed Asbestos in the Rotor and Stator. However, it is known that Asbestos Brake Pads were used for many years. The Government has determined it is a best practice to wipe down the rotor and stator once the unit has been disassembled. This will be completed by the Government. After disassembly, the Contractor must erect a containment structure around the rotor to facilitate the cleaning by the Government. The Contractor must also provide a safe working platform and overhead enclosure within the barrel for working on the stator. It is permissible to use the existing brake bracket as the working platform. The Contractor must include this work on their schedule with the duration described in 52.211-10. The Contractor must notify the Government at least 60 days in advance of the enclosures being ready.

d. Gaskets (Air Piping, Vacuum Breaker, Nose Cone). Most of the Asbestos gaskets have been removed and replaced, but the Government did not maintain detailed records. Unless tested otherwise, these gaskets should be assumed to be ACM. Provide a Notification for Gasket Removal at least 14 calendar days prior to breaking the connection. When the Contractor is ready to break the connection, Government Asbestos Workers will be made available to remove the gasket. If the Government can demonstrate the Gasket is not ACM, the Contractor will be responsible for removal in its entirety.

SECTION 01 10 10.00 25 Page 6

DRAFT T

du

Tctor

AFTtor. Bul

AF. Howev

RAFyears. Th

RAwipe do

DRA

ed. This

DRbly, theDto fDro

0% a

% ent wi

%f the u

%g. If th

0the wirin

10actor. 10in1

Rev iewwew t, the iewpling for viestructu ev iement co

Revareas t

Rey. Additi

Redings, Rr eR

e. Water Piping. The Asbestos Survey shows existing water piping to have Asbestos in the insulation. The Contractor must develop and submit a Water Piping Removal Plan identifying what piping will be disturbed, the extent of insulation removal required, and when the insulation must be removed. The Government will remove the asbestos insulation. The Contractor will be responsible for providing new insulation upon re-establishment of the piping. Submit the plan at least 90 calendar days prior to planned date for water piping work.

1.12 PRE-WORK AND POST WORK SURVEYS

Conduct a pre-work survey for each definable feature of work prior to start of on-site work and a post-work survey during project closeout, with the CO Representative, of the Government facilities at the work areas. The results of the surveys must be documented by digital photographs and descriptive narrative reports. A color copy of the survey photographs and narrative reports must be submitted to the CO within five days after survey has been completed.

1.13 CARE OF DRAINS

Existing Powerhouse floor drains must not be used for disposal of any solid material or any liquids other than clear water. The Contractor must demonstrate that the pipes and drains are unobstructed when so directed.

1.14 PROTECTION OF POWERHOUSE FLOORS

a. Prevent damage to floors (tile and non-tile) and curbs within floor areas used for storing material for extended time. Protection must include a continuous layer of oil-impervious Kraft paper over the existing floor surface with joints of the Kraft paper joined with an appropriate tape. In addition, tongue and groove 3/4-inch-thick Oriented Strand Board (OSB) plywood must be installed over the Kraft paper at all work and storage areas. Plywood joints must be fastened to ensure edges of plywood sheets are, and remain, flush with each other and do not pose a tripping hazard during execution of this work.

Minimum 4-inch by 4-inch wood timbers must be installed along existing curb features within the contractor work areas and along perimeters of the work areas. Wood timbers used for curb protection must be secured in place without anchoring into the existing floors or curbs.

b. Pipe trenches to remain accessible even if covered. All designations relating to fire protection equipment that get covered must be remarked by the Contractor after covering. Provide additional blocking and timbers when required. Also suitably protect other surfaces of work. Damage to floors or curbs caused by Contractor's operation must be repaired at no additional cost to Government.

Repairs must match surrounding area in color, texture, and surface finish and are subject to approval. Work in the Powerhouse must not start until floor and curb protection is completed, as specified.

c. Do not exceed the floor design loads as listed below and shown on Contract Drawings JDP-8-0-0/33, JDP-8-0-0/37, and JDP-8-0-0/41, unless approved by the CO. Do not stage materials on, drive vehicles on, or otherwise load hatch covers.

(1) All Bays, Intake Deck, El. 281.0 - 1000 psf

(2) All Bays, Tailrace Deck, El. 185.0 - 500 psf

SECTION 01 10 10.00 25 Page 7

DRAFTT

OS

Tsto

FTwood she

AFTtripping

AFy 4-inc

RAFwithin th

RAas. Wo

DRA

ithout an

DrenchDs and non

%for ex

%f oil-im

0h joints

10ion, ton10ply1

Rev ieww da ev iefor di

Rev The C

Renobstruct

(3) Assembly Bay, El. 185.0 - 1000 psf

(4) Assembly Bay, El. 168.5 - 500 psf

(5) Generator Bays, El. 168.5 - 500 psf

(6) All other floors - 200 psf or 300 psf (see Reference Drawings)

1.15 FIRE CONTROL

Each piece of internal combustion engine driven equipment used at the work site must be equipped with a fire extinguisher in accordance with recommendation National Fire Protection Association (NFPA) as appropriate.

The minimum approved rating of extinguishers must not be less than 5-B:C.

1.16 PROJECT MANAGERS

a. Project Manager (PM) for Design Phase:

The PM will be a representative of the Contractor who is technically and managerially qualified to lead and manage the overall project during the design phase. The PM must have a minimum of 10 years experience in the design of hydropower turbines and generators. At least five years of this experience must be in full-time management. The PM must be fluent in both the spoken and written English language.

The representative must report immediately in writing to the CO any project cost or schedule impacts that deviate from the contract requirements as awarded or as modified. Potential project manager substitutes must have the same qualifications as Project Manager and must be submitted to the CO for approval.

b. Project Manager for Construction and Supply of new equipment phases:

The PM will be a representative of the Contractor who is technically and managerially qualified to lead and manage the overall project, for the supply, installation and commissioning phases. The PM must have a minimum of 10 years combined experience in hydropower design, fabrication, field installations, commissioning and senior level management, with at least five years experience in full time management positions. The representative must report immediately in writing to the CO any project cost or schedule impacts that deviate from the contract requirements as awarded or as modified.

The PM must be fluent in both the spoken and written English language. Potential project manager substitutes must have the same qualifications as Project Manager and must be submitted to the CO for approval.

1.17 DESIGN QUALITY CONTROL MANAGER

During the design phase, the Contractor must provide a Design Integrator that is responsible for coordinating the hydraulic and prototype design of the turbines and design of the generators. Coordination includes the integration of computational fluid dynamics, performance model testing, Engineer Research and Development Center (ERDC) observational model testing, and prototype design for both the adjustable-blade and fixed-blade turbine designs, as well as ensuring the integration of Government feedback

SECTION 01 10 10.00 25 Page 8

DRAFT Tr Co

AFTa repre

AFand man

RAFroject, f

RAThe PM

DRA

ropower d

DRissioninDementDmen

% h langu t immed

%e impac

%awarded

0st have t

10bmitted1

Rev iewvieractor ev ielead

Rev The P

Rehe design

Refive yeRe PR on the designs and ensuring accurate technical information is included in presentations and documentation provided as part of the hydraulic design process in accordance with SECTION 01 33 16.10 26 HYDRAULIC DESIGN PROCESS.

The Design Quality Control Manager must be a senior engineer with a minimum of 10 years experience in hydroelectric turbine design with at least five years of experience in hydroelectric turbine hydraulic design. The Design Integrator must be fluent in both the spoken and written English language.

1.18 INSTALLATION SUPERVISOR

The Installation Supervisor is the Contractors representative and must be technically qualified to supervise all work required, including the preparation, installation, and testing of turbines and generators similar to the type, size and magnitude as those at this project. The Installation Supervisor must have a minimum of 10 years combined experience in hydropower field installations and commissioning. The installation supervisor(s) must be present at the work site at all times when a turbine and turbine components are under installation, and when a generator is being rehabilitated or repaired. The Installation Supervisor, or approved substitute, must be available at all times and must be experienced in all aspects of turbine and generator replacement and rehabilitations. The representative must report immediately in writing to the CO any work not in accordance with the manufacturer's recommendation or any special conditions which may result in an unsatisfactory job. Potential installation substitutes must have the same qualifications as the Installation Supervisor and must be submitted to the CO for approval.

1.19 PROJECT SUPERINTENDENT

A Project Superintendent is required only during the Construction Phase.

Identify an individual, within the onsite work organization, as Project Superintendent. The Project Superintendent must have a minimum of five years experience in a verifiable Project Superintendent role on jobs similar to this Contract. The designated Project Superintendent must be acceptable to the Contracting Officer (CO). The Project Superintendent must be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer (CO) for non-compliance with the quality requirements specified in the Contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the Project Superintendent. The Project Superintendent must maintain a physical presence at the site at all times, except as otherwise acceptable to the CO, and must be responsible for all construction and construction related activities at the site. The Project Superintendent must have no other duties; they may not perform the duties of an equipment operator, flagger, laborer, or any other position. Identify an alternate for the Project Superintendent to serve in the event of the Project Superintendent's absence and/or to cover work performed on additional shift. The requirements for the alternate are the same as the designated Project Superintendent.

1.20 COMMISSIONING AGENT

a. Qualifications. Furnish a Commissioning Agent with a minimum of five years experience in performing commissioning testing of equipment of comparable type and complexity. Submit the Commissioning Agent's Qualifications in résumé format for Contracting Officer's approval at the same time as the commissioning plan.

SECTION 01 10 10.00 25 Page 9

DRAFTT

ia

T Th

FTacting O

AFTle for t

AFntracti

RAFts specif

RAnager re

DRA

ncluding

DRnt. The Dhe sitDre

0%

C

%red onl

0the onsit

10uperinte10Pr1

Rev ieww s wgenewervisor iewbe exper viehabilit ev ieto the

Revn or a

RePotential

Rens as tRor

b. Responsibilities. The Commissioning Agent's responsibilities include, but are not limited to, the following:

(1) Direction and oversight of the Contractor's commissioning activities, including subcontractor activities for all commissioning phases.

(2) Participation in weekly coordination meetings to discuss and schedule commissioning activities.

(3) Coordination with Government personnel.

(4) Verification of Submission of reassembly test phase test results.

(5) Oversight of Contractor's craftwork and test personnel.

1.21 CONTRACTOR'S GENERAL PERSONNEL

Prepare an organizational chart for the design phase, supply phase and construction phase. Revise whatever organizational changes occur.

Maintain a complete organizational chart of all positions that will be working on the project.

1.22 INCLEMENT WEATHER CONSTRUCTION

The Contractor's schedule must reflect adverse weather days in all weather dependent activities as defined in Contract Clause 52.236-4, PHYSICAL DATA. Protect work areas from inclement weather, wind damage, and precipitation so that no delay in the prosecution of critical work items, or damage to Government property occurs. No time extensions will be authorized for materials, work in place, or equipment damaged due to negligence during periods of inclement weather.

1.23 TURBINE MAINTENANCE PLATFORM (TMP)

The TMP may be used by the Contractor during the performance of work. The platform will be assembled and disassembled one time for Contractor by the Government. Government training will be provided to Contractor to allow subsequent Contractor installation and removal. The Contractor is liable for damage to Government-furnished equipment, excluding reasonable wear and tear. Contractor must comply with the TMP Operations and Maintenance (O&M) Manual in attachment A20.

1.24 UNIT GENERATOR DEWATERING AND LOCKOUT TAG OUT

1.24.1 Main Unit Access

a. The Government will secure the main unit for safe access.

b. The Government will un-water the main unit and maintain the un-watered condition until the completion of the respective unit repairs or refurbishments.

c. The Government will open the man door to the draft tube. Once opened, barricade or close the access ways unless manned or otherwise approved.

d. The Government will open the scroll case hatch on the generator

SECTION 01 10 10.00 25 Page 10

DRAFTT

f

FTE PLATF

AFby the

RAFssembled

RAernment

DRA

tractor i

DRo GovernmDtor muDhme

0%

% adver

0% tract C

%ement we

%the pr

0y occurs

10in plac10em

Rev iewiewe, supply viechange ev ieosition floor. The Government will furnish a scroll case elevator for the Contractor to gain access to the scroll case. Ladders are not permanently installed in the scroll case.

e. Install Government-furnished turbine blade scaffolding to allow safer access for blade tip readings. It will only be available to facilitate disassembly alignment checks. It must be turned back over to the Government when not in use for the alignment checks to facilitate other maintenance.

f. The Government will drain the necessary hydraulic and lube oil systems, including the runner hub. Clean, flush, handle, and remove all residual oil from the unit necessary to perform work under these specifications.

1.24.2 Refilling of Lubrication and Hydraulic Systems

Upon completion of the repairs, the Government will refill all hydraulic and lube oil systems, unless specified otherwise. Provide a Completion Date Notification for the turbine work to the Government's onsite representative. Coordinate the refilling of the hydraulic and lube oil systems with the Government's on-site representative at least 15 days in advance of the date required.

1.24.3 Watering the Unit

The Government will water the unit. Provide a written request to the Government on-site representative a minimum of 14 calendar days prior to the day the unit will be available to the Government for watering. It is anticipated that it will require the Government three to five days to water the unit prior to returning the unit to the Contractor for work.

1.25 NOTIFICATION OF EQUIPMENT OUTAGE

Where an equipment outage is required to accomplish the work outlined in this Contract, notify the Government 14 days in advance. This will allow the Government to de-energize the equipment for Contractor access.

1.26 NOTIFICATION OF UNIT OUTAGE

For outages required to a unit, submit a request in writing to the CO at least 100 calendar days in advance of the time required.

1.27 UTILITY OUTAGE REQUEST AND UTILITY CONNECTION REQUEST

a. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated or specified to be removed but indicated in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

b. Schedule work to hold outages to a minimum. Coordinate with CO and Project POC to schedule outages during work windows.

c. Arrange utility outages and connections required during the prosecution of work that affect existing systems, at the convenience of the…

This is the start of the file's text. The full file is on GovTribe.