John Day Dam Turbine Runner Replacement and Generator Rewind Project-100% Review
Solicitation number
W9127N24R0001
Issued by

View the file

Other files

File Type Posted
PLA Request for Input 06 16 2025.docx DOCX document
Draft Turbine Performance 48 13 13.01 26.pdf PDF
PLA Request for Input.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications Specs+A1-A23.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A24.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A25.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 1 USACE.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4b.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 5.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4a.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 1.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 7.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 6.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings.pdf PDF
W9127N24R0001 TRGR Draft 95 RFP and Specifications.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 1 USACE.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual

DRAFT 10

0%

R ev iew

TOC-1

John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon

TABLE OF CONTENTS

00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)

00 10 00 SOLICITATION

00 21 00 INSTRUCTIONS

00 21 16 INSTRUCTIONS TO PROPOSERS

00 70 00 CONDITIONS OF THE CONTRACT SUPPLY CLAUSES

00 72 00 GENERAL CONDITIONS

00 73 00 SUPPLEMENTARY CONDITIONS

GENERAL AND TECHNICAL REQUIREMENTS: SEE PROJECT TABLE OF CONTENTS

ATTACHMENTS

A1: Submittal Register

A2: Transmittal Form ENG Form 4025-R

A3: Construction Sign

A4: Spill Emergency - Initial Report Form

A5: Oil Accountability Form

A6: Adjustable Blade Flow Chart

A7: Fixed Blade Flow Chart

A8: Figure 1, Tables 1-6

A9: Blade Angle Definition

A10: Tables 1-6

A11: Tables 1-5

DRAFT 10

0%

R ev iew

USESE

SEE PROJEE PRO

m ENG Fom ENG F n Signn Sign mergencymergency

AccountAccoun tata

TOC-2

John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon

TABLE OF CONTENTS

A12: Instrument List

A13: Cable and Conduit Removal and Install

A14: Commissioning Plan

A15: Tolerance Sheets

A16: Anchor Detail

A17: Generator Test Report

A18: Project 95 Schedule

A19: Davis Bacon Wage Determination

A20: JDD TMP Operations and Maintenance Manual

A21: Work Over Water

A22: Haz Material Survey Report

A23: OA Work Request Template

A24: John Day Hydropower Unit Asbestos Survey Report

A25: System O&M for the current BLH Units ationt d MainteMaint

Survey Surve

Request quest

Day HydDay H mm

PROJECT TITLE: John Day Dam Turbine Replacement and Generator Rew ind

LOCATION OF PERFORMANCE: John Day Lock and Dam, Rufus, OR 97050

MAGNITUDE OF CONSTRUCTION: Over $500,000,000.

SOCIOECONOMIC: Unrestricted, Full and Open Competition

CAROLYN J RANDOLPH

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Jun-2024

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Oct 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______360 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE, PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204

W9127N

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9127N24R0001 194

DRAFT 10

0%

R ev iew

7050050 wieviOCUMENTSUMENTS

(Inc

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

20B. SIGNATU0B. SIGNAT

ewievieev igive numbe

RevRe o be completebe complete00

FTAND APPROPRAND APPROP

AF

WN INWN IN

DR

F

CODEOD

Rev

R

Section 00 10 00 - Solicitation

PRICE SCHEDULE

1. The price schedule is divided into categories/tables for the following:

Hydraulic Turbine Design (0100s) Prototype Design (0200s) Miscellaneous Equipment, Spare Parts, and Oil Disposal (0300s) Unit AA Prototype Supply and Install (0400s) Unit AB Prototype Supply and Install (0500s) Unit FA Prototype Supply and Install (0600s) Unit AC Prototype Supply and Install (0700s) Unit FB Prototype Supply and Install (0800s) Unit AD Prototype Supply and Install (0900s) Unit FC Prototype Supply and Install (1000s) Unit AE Prototype Supply and Install (1100s) Unit FD Prototype Supply and Install (1200s) Unit AF Prototype Supply and Install (1300s) Unit FE Prototype Supply and Install (1400s) Unit FF Prototype Supply and Install (1500s) Optional Unit AG Prototype Supply and Install (1600s) Optional Unit FG Prototype Supply and Install (1700s) Optional Unit AH Prototype Supply and Install (1800s) Optional Unit FH Prototype Supply and Install (1900s) Optional Unit AI Prototype Supply and Install (2000s) Optional Unit FI Prototype Supply and Install (2100s) Optional Unit AJ Prototype Supply and Install (2200s) Optional Unit FJ Prototype Supply and Install (2300s)

2. The first letter following “Unit” designates the turbine type; ‘A’ identifies adjustable blade and ‘F’ identifies fixed blade. The second letter following the turbine type designator identifies the order of the unit (alphabetical order). For example, Unit AA is the first unit with an adjustable-blade turbine runner.

3. Where variations of an item are priced under one CLIN, the first item (AA) will be awarded as the base requirement. As required based on the final turbine configuration chosen by the Government, subsequent items (optional) will be awarded based upon the outcome of the hydraulic design. No more than one subsequent item (optional) will be awarded for each CLIN and this optional item represents the incremental price difference relative to the first item (AA). All mandatory and optional CLINs will be evaluated during the selection process consistent with the evaluation factor instructions within the solicitation. The solicitation will state, for award purposes, that price will be evaluated based on the total sum anticipated for all base and option CLINs. Evaluation of the option shall not obligate the Government to exercise the option.

4. The price schedule categories provided generally align with the phases of work as defined in Section 01

11.00 00 25 (with some overlapping exceptions).

5. The tables include a column that delineates which CLINs are governed by supply clauses and those that are governed by construction clauses. The Supply clauses defined in this contract apply to the CLINs with an ‘S’ designation in the tables and the Construction clauses apply to the CLINs with a ‘C’ designation in the tables.

00 10 00-3

DRAFT 10

0%

R ev iew tall (1600s)all (1600s) nstall (1700s)nstall (170 nd Install (180nd Install (18 y and Install (and Install ( ply and Instaly and Insta upply and Inspply and In pe Supply andpe Supply a type Supply atype

Unit” designaUnit” design The second lethe second

For exampleFor example ns of an itemns of an item As requiredAs require

l) will bl) will

(op(o

6. Certain CLINs will be adjusted in accordance with Clause 52.216-4 ECONOMIC PRICE ADJUSTMENT

– LABOR AND MATERIAL and WAGE DETERMINATION. CLINs eligible for economic price adjustment are designated in the bases as “Eligible for economic price adjustment” and CLINs affected by wage determination will include “Percent of the CLIN that is labor subject to Davis-Bacon: ___%” in the bases. CLINS eligible for economic price adjustment will be eligible for both supply labor and/or material adjustments.

7. The basis for some CLINs include blanks where the Offeror must provide weights, surface area, and labor and material percentages. All weights signify finished weights in U.S. pounds and must be inclusive of any and all markups. All surface areas signify square footage of finished surfaces. The sum of the percentages provided must be no more than 100%. Some CLINs will be eligible for certain adjustments based on hydraulic design. This will be noted in the bases as “Eligible for material weight adjustment” and/or “Eligible for surface area labor adjustment.” Following acceptance of the final hydraulic design, the contractor shall submit to the contracting officer adjusted weights and surface areas for a contract modification for hydraulic design to be initiated by the government. The adjustments will be made solely to the labor and material percentages provided. These bases will be used to determine/calculate the material weight adjustment and the supply CLIN labor. Descriptions and examples of these two types of adjustments are detailed below.

a. MATERIAL WEIGHT ADJUSTMENT: First, the material price at award, in the year of award dollars, will be determined/calculated. The material weight of some prototype CLINs will be dependent on the outcome of the hydraulic and prototype designs. For these CLINs, if the weight(s) of material(s) (quantities) change(s) as a result of the collaborative hydraulic design process, an adjustment will be made on the material weight(s). These CLINs have been identified as “ELIGIBLE FOR MATERIAL WEIGHT ADJUSTMENT” in the basis. All other CLINs, which do not include this identifier, will not be adjusted for material weight(s) due to the hydraulic design. The basis, specification technical requirements, and Offeror’s proposal define the configuration of the item for material price award.

i. For those CLINs identified as “Eligible for material weight adjustment” in the basis, the stainless-steel price at award (SSAward), carbon steel price at award (CSAward), and Concrete (CAward ) (and/or grout) will be calculated by multiplying the total CLIN price by the percentage of each material in the basis and by the ratio of the final design material weight divided by the awarded design material weight (Equations 1-4).

Equation 1

Equation 2

Equation 3

b. SURFACE AREA LABOR ADJUSTMENT: Certain CLINs are eligible for an adjustment to labor quantity (not labor rates) based on changes in surface area during the iterative design process (this accounts for increases or decreases to manufacturing labor)

00 10 00-4

DRAFT

r grour gr f each matf each m vided by the vided by the

0% materma

HT ADJUSHT ADJU

ll notnot be adjube adju

0%cation techniction techni material pricematerial pric ntified as “Elitified as “E at award (award (SS will bll

Rev iew men ermine/camine/c s of these twothese tw rial price at aprice at weight of somght of som ototype desigototype desig a result of ta result of weigwe

c. TOTAL CLIN ADJUSTMENT: Sum of unadjusted portion, material adjustment and labor adjustment. = (100% )= + + + +

8. This paragraph shows an example of how prices will be adjusted for material and labor. This is an example for CLIN 0401AA Supply Adjustable Five Blade Runner (Base Requirement). This is just an example to illustrate how material weight and supply CLIN labor adjustments will be made.

a. CLIN 0401AA Supply Adjustable Five Blade Runner (Base Requirement)

i. Values at award

1. CLIN 0401AA award price: $10,000,000

2. Pounds of stainless-steel: 300,000

3. Pounds of carbon steel: 200,000

4. Surface area (square feet): 2,000

5. Percent of total CLIN price that is stainless-steel: 25%

6. Percent of total CLIN price that is carbon steel: 10%

7. Percent of total CLIN price that is labor: 50%

ii. Values at NTP of Unit AA supply

1. Pounds of stainless-steel (final design): 285,000

2. Pounds of carbon steel (final design): 220,000

3. Surface area (square feet): 2,250

b. MATERIAL WEIGHT ADJUSTMENT: Adjust for change in weight as this CLIN is eligible for material weight adjustment= $10,000,000 0.25 285,000300,000 = $2,375,000

= $10,000,000 0.10 220,000200,000 = $1,100,000

c. LABOR ADJUSTMENT ON SUPPLY CLINS: Adjust for change in labor as this CLIN is eligible for material weight adjustment

= $10,000,000 0.50 2,2502,000 = $5,625,000

d. TOTAL CLIN ADJUSTMENT: Sum the unadjusted with the adjustments= $10,000,000 (1 0.25 0.1 0 0.5) = $1,500,000= $1,500,000 + $2,375,000 + $1,100,000 + $0 + $5,625,000 = $10,600,000

9. Prototype bid item “Description” column verbs are defined as follows:

Design – Prototype design/engineering including analysis and the preparation of design documentation (reports, drawings, etc.).

Furnish – Design/engineering, manufacturing, procurement, and delivery of components to John Day Powerhouse.

00 10 00-5

DRAFT ntnt$10$10,00000 ,0 == $10$10

BOR BO ADJUADJU

aterial aterial

0%

(finafin l de l (final desig(final desi e feet): 2,250e feet): 2,250

USTMENT: ASTMENT

Rev iewainlessless--steel: steel:

carbon steelcarbon ste t is labor: 50%t is labor: 50% gn)gn

Supply – Manufacturing/procurement and delivery to John Day Powerhouse Install (Installation) – Field work to incorporate new, modified, and/or existing components into the finished generating unit.

Provide – Furnish and install.

Refurbish (Refurbishment) – Rehabilitation of existing components (including incorporation of replacement/modified components) for usage in the rebuilt generating unit.

Replace (Replacement) – Removal of existing component (if require for installation of replacement components) and installation of replacement component.

Hydraulic Turbine Design

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

Pre-Iteration Coordination, Design, Analysis, and Performance Model Construction

1 JOB S $________ N/A

Adjustable Blade Iteration 1A Base Design Work

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 299.5-inch Diameter CFD (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 317-inch Diameter CFD (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 1A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)

1 JOB S $________ N/A

Adjustable Blade Iteration 2A Base Design Work

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 2A - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 2A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)

1 JOB S $________ N/A

00 10 00-6

DRAFTJOBJ

AFFT

e ry Design Design ance Model ance Mode (Diamete(Diame tionationa

AFAFAFFFAFF

0% iewv_______ N/AN/AvvvieevReeee

Adjustable Blade Iteration 3A Base Design Work

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 1 (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 2 (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 3A - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 4A Design Work (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 4A - ERDC Observational Model Testing Coordination (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 5A Design Work (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Iteration 5A - ERDC Observational Model Testing Coordination (Optional)

1 JOB S $________ N/A

Adjustable Blade Final Design Performance Model Testing

1 JOB S $________ N/A

0118 Fixed Blade Iteration 1F Base Design Work 1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 1F - Preliminary Design Five Blade, 319-inch Diameter CFD (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 1F - Preliminary Design Five Blade, 327-inch Diameter CFD (Optional)

1 JOB S $________ N/A

00 10 00-7

1 1 JOBJOBT

AFFT

RDC C

al Model al Model oordination oordination nal)nal)

AFAFAFTFTFT

AFFT

ble Bladeble Blad gngnD

0%

S S

Rev iewN/AN/A w evReeee

(Optional)

Fixed Blade Iteration 1F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)

1 JOB S $________ N/A

0122 Fixed Blade Iteration 2F Base Design Work 1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 2F - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 2F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)

1 JOB S $________ N/A

0125 Fixed Blade Iteration 3F Base Design Work 1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 3F - Preliminary Design CFD With Modified Distributor (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 1 (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 2 (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 3F - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration 4F Design Work (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Iteration

4F - ERDC

Observational Model Testing Coordination (Optional)

1 JOB S $________ N/A

00 10 00-8

DRAFTFT

ith ion 2 on 2 nal)nal)

FTFTFT

AFFT

ade Iteraade Iter inainaD

0%

B S S

0%%% iewv______ N/AN/AvvvieevReeee

Fixed Blade Final Design Performance Model Testing

1 JOB S $________ N/A

(Optional)

Supply Set of Model Wicket Gates (Optional)

2 SET S $________ N/A

Hydraulic Design Sub-Total $_____________

Prototype Design

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

Discharge Ring Diameter Preliminary Analyses

1 JOB S $________ N/A

Adjustable Blade Runner Prototype Design

1 JOB S $________ N/A

Adjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design

1 JOB S $________ N/A

Adjustable Blade Stay Vane Modifications Prototype Design

1 JOB S $________ N/A

Adjustable Blade Wicket Gate Prototype Design

1 JOB S $________ N/A

Adjustable Blade Lower Turbine Shaft and Blade Servomotor Shaft Prototype Design

1 JOB S $________ N/A

(Optional)

Adjustable Blade Replacement Inner Head Cover Prototype Design (Optional)

1 JOB S $________ N/A

0208 Fixed Blade Runner Prototype Design 1 JOB S $________ N/A

Fixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design

1 JOB S $________ N/A

(Optional)

Fixed Blade Stay Vane Modifications Prototype Design (Optional)

1 JOB S $________ N/A

00 10 00-9

DRAFT

ft signsign

1 1 JOTT

AFFT

Ae Blade Blade ement Inner ement Inner over ove

DesiDesi

RAAAA

0% %S S $___$%%%%

B S S0011

Rev iew

/A w

____________ N/AN

ie evR

Fixed Blade Wicket Gate Prototype Design (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Replacement Inner Head Cover Prototype Design (Optional)

1 JOB S $________ N/A

(Optional)

Modified Outer Head Cover Prototype Design (Optional)

1 JOB S $________ N/A

(Optional)

Replacement Outer Head Cover Prototype Design (Optional)

1 JOB S $________ N/A

(Optional)

Modified Intermediate Head Cover Prototype Design (Optional)

1 JOB S $________ N/A

0216 Surface Air Coolers Design 1 JOB S $________ N/A

Prototype Stator Bar Design, Manufacture, and Test

1 JOB S $________ N/A

(Optional)

Thrust Bearing Structural Analysis (Optional)

1 JOB S $________ N/A

(Optional)

Adjustable Blade Draft Tube Modification Design (Optional)

1 JOB S $________ N/A

(Optional)

Fixed Blade Draft Tube Modification Design (Optional)

1 JOB S $________ N/A

Prototype Design Sub-Total $_____________

Miscellaneous Equipment, Spare Parts, Oil Disposal, and Optional Rewinds

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

Design and Supply One Stator Core Including Materials, Accessories, and Factory Testing

1 JOB S $________

Eligible for economic price adjustment.

Percent of the total CLIN 0463 price that is carbon steel: ___%

Percent of the total CLIN 0463 price that is labor: ___%

0302 Mobilization and Demobilization 1 JOB C $________ Percent of the CLIN that is labor subject to Davis-Bacon: ___%

0303 Supply Spare Wicket Gates 1 JOB S $________ Eligible for economic price adjustment.

00 10 00-10

DRAFT JOBJ

FFT

on onal)onal)

1 1 FFFTFTFT

RAAFAAFT 10

0%

S S 0%%%

11101

Rev iewN/AN/A w v______________ N/NvvvievR

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

As shown on proposal drawings:

______ pounds of stainless-steel

_______ square feet of all wetted surfaces

Percent of the total CLIN 0303 price that is stainless-steel steel material: ___%

Percent of the total CLIN 0303 price that is labor: ___%

0304 Supply Generator Spare Parts 1 JOB S $________ N/A

Supply Spare Surface Air Cooler Assemblies

1 JOB S $________

Eligible for economic price adjustment.

Percent of the total CLIN 0305 price that is carbon steel: ___%

Percent of the total CLIN 0305 price that is copper: ___%

Percent of the total CLIN 0305 price that is labor: ___%

Supply Other Required Spare Parts

1 JOB S $________ N/A

(Optional)

Oil Disposal – 4,000 Gallons (Optional)

12 EA C

Unit Price

Total

Percent of the CLIN that is labor subject to Davis-Bacon: ___%

(Optional)

Oil Disposal - 500 Gallons (Optional) 5 EA C

Unit Price

Total

Percent of the CLIN that is labor subject to Davis-Bacon: ___%

Miscellaneous Equipment, Spare Parts, and Oil Disposal Sub-Total $_____________

00 10 00-11

DR

osal osal – – onsonsDRAFT

AFT

are are 1AAAFFF

RAF

DR

0%

B SS0

Rev iew en price that e tha material: _aterial:

PercePerc pripvie$________$_______evvvR v RRReR

Unit AA Prototype Supply and Install

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

0401AA

Supply Adjustable Five Blade Runner (Base Requirement)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Fully spherical hub, 309-inch blade tip diameter.

Runner construction method as shown on proposal drawings.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces of the hub and blades

Percent of total CLIN 0401AA price that is stainless-steel material:

Percent of total CLIN 0401AA price that is carbon steel material:

Percent of total CLIN 0401AA price that is labor: ___%

0401AB

(Optional)

Supply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN 0401AA (Optional)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Fully spherical hub, 309-inch blade tip diameter.

Runner construction method as shown on proposal drawings.

00 10 00-12

AFT 10

Rev iew

Rev iew metet propospropo ew

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces of the hub and blades

Percent of the sum of CLINs 0401AA and 0401AB prices that is stainless-steel material:

Percent of the sum of CLINs 0401AA and 0401AB prices that is carbon steel material:

Percent of the sum of CLINs 0401AA and 0401AB prices that is labor: ___%

0402AA

Supply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner (Base Requirement)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Spherical outer blade profile, 309-inch blade tip diameter

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of total CLIN 0402AA price that is stainless-steel material:

Percent of total CLIN 0402AA price that is

00 10 00-13

DRAFT

PermanentPermanent e Ringe Ring

II

0000%

Rev iew

PercePercen

CLICLI

carbon steel material:

Percent of total CLIN 0402AA price that is labor: ___%

0402AB

(Optional)

Supply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0402AA (Optional)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Spherical outer blade profile, 317-inch blade tip diameter

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the sum of CLINs 0402AA and 0402AB prices that is stainless-steel material:

Percent of the sum of CLINs 0402AA and 0402AB prices that is carbon steel material:

Percent of the sum of CLINs 0402AA and 0402AB prices that is labor: ___%

0403AA

Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner (Base Requirement)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only;

excludes weld filler material.

309-inch blade tip diameter.

______ pounds of concrete and grout

00 10 00-14

DRAFT

AFT 10

0% S S

Rev iew

SpherSphe profileprofil diamdiam

Percent of total CLIN 0403AA price that is concrete and grout material ___(concrete index will be used for economic price adjustment)%

Percent of CLIN 0403AA price that is labor subject to Davis-Bacon: ___%

0403AB

(Optional)

Install Embedded Discharge Ring Section for Adjustable Blade Runner (Excluding Demolition) - Incremental Difference Relative to CLIN 0403AA (Optional)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only;

excludes weld filler material.

317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs 0403AA and 0403AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%

Percent of the sum of CLINs 0403AA and 0403AB price that is labor subject to Davis-Bacon:

0404AA

Supply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner (Base Requirement)

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter.

______ pounds of martensitic stainless steel

00 10 00-15

DRAFT

AFT

DR

0%

C C

Rev iew

Con excluexclu materimater

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of total CLIN 0404AA price that is stainless-steel material:

Percent of total CLIN 0404AA price that is carbon steel material:

Percent of total CLIN 0404AA price that is labor: ___%

0404AB

(Optional)

Supply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0404AA (Optional)

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

317-inch blade tip diameter.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the sum of CLINs 0404AA and 0404AB prices that is stainless-steel material:

Percent of the sum of CLINs 0404AA and 0404AB prices that is carbon steel material:

Percent of the sum of CLINs 0404AA and

00 10 00-16

DRAFT

tion for tion for

Blade Blade IncrementalIncremental nce Relativnce Relativ 0404A0404A

AFT 10

iew

PercenPerce 040040 lalewviee

RR

0404AB prices that is labor: ___%

0405AA

Modify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner (Base Requirement)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only;

excludes weld filler material.

309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN 0405AA price that is grout material (concrete index will be used for economic price adjustment): ___%

Percent of total CLIN 0405AA price that is labor subject to Davis-Bacon:

0405AB

(Optional)

Install Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0405AA (Optional)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only;

excludes weld filler material.

317-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs 0405AA and 0405AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%

Percent of the sum of CLINs 0405AA and 0405AB prices that is labor subject to Davis- Bacon: ___%

(Optional)

Demolition of Discharge Ring and Draft Tube Liner

300 Cubic Yard C

Unit Price

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

00 10 00-17

DRAFT

r ction ction g tion) for tion) for able Bladeable Blad

IncreIncre

AFT 10

0%

Rev iew PercenPerce 0405A0405A mam

Transition – Cubic Yard (Optional)

Total

0407AA

Refurbish Existing Outer Head Cover (Base Requirement)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0407AB

(Optional)

Refurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN 0407AA (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

309-inch blade tip diameter.

0407AC

(Optional)

Supply Replacement Outer Head Cover - Incremental Difference Relative to CLIN 0407AA (Optional)

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

317-inch blade tip diameter.

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the sum of CLINs 0407AA, 0407AB, and 0407AC prices that is carbon steel material:

Percent of the sum of CLINs 0407AA, 0407AB, and 0407AC prices that is labor: ___%

0408AA

Refurbish Existing Intermediate Head Cover (Base Requirement)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0408AB

(Optional)

Refurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN 0408AA (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

317-inch blade tip diameter.

00 10 00-18

DRAFT

JOB OB

Rev iew weiei

EligiEligibb labolab

0409AA

Refurbish Existing Inner Head Cover (Base Requirement)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0409AB

(Optional)

Supply Replacement Inner Head Cover - Incremental Difference Relative to CLIN 0409AA (Optional)

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

317-inch blade tip diameter.

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the sum of CLINs 0409AA and 0409AB prices that is carbon steel material:

Percent of the sum of CLINs 0409AA and 0409AB prices that is labor: ___%

Supply Stay Vane Modification Components

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Leading and trailing edge extensions or alternate method as shown on proposal drawings

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the total CLIN 0410 price that is carbon steel material: ___%

00 10 00-19

DRAFTTT

Rev iew steelsteel

Percent of the total CLIN 0410 price that is labor:

Refurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0412 Supply Wicket Gates 1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

Existing wicket gate size and shape.

______ pounds of stainless-steel

_______ square feet of all wetted surfaces

Percent of the total CLIN 0412 price that is stainless-steel steel material: ___%

Percent of the total CLIN 0412 price that is labor:

Supply Wicket Gate Operating Mechanism Bushings and Bearing Plate

1 JOB S $________ N/A

Supply Head Cover and Bottom Ring Facing Plates

1 JOB S $________

Eligible for material weight adjustment

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter.

______ pounds of austenitic stainless steel

_______ square feet of all wetted surfaces

00 10 00-20

DRAFT

AFT

Gate te m Bushings m Bushings aring Platearing Plate

AFAFAFAF

D

Rev iew

Eligg price aprice

ExisExi aa

Percent of the CLIN 0414 price that is stainless-steel material: ___%

Supply Blade Servomotor Shaft and Appurtenances

1 JOB S $________

Eligible for material weight adjustment

Eligible for economic price adjustment.

______ pounds of carbon-steel

Percent of the total CLIN 0415 price that is carbon steel: ___%

Percent of the total CLIN 0415 price that is labor:

Supply Lower Turbine Shaft and Appurtenances

1 JOB S $________

Eligible for material weight adjustment

Eligible for economic price adjustment.

______ pounds of stainless-steel

______ pounds of carbon-steel

Percent of the total CLIN 0416 price that is stainless-steel: ___%

Percent of the total CLIN 0416 price that is carbon steel: ___%

Percent of the total CLIN 0416 price that is labor:

Supply Oil and Water Basin at the Blade Servomotor

1 JOB S $________ N/A

0418 Supply Turbine Shaft Packing Box 1 JOB S $________ N/A

Supply Turbine Guide Bearing Oil Sump

1 JOB S $________ N/A

0420 Supply Complete Set of Stator Bars, 1 JOB S $________ Eligible for economic price adjustment.

00 10 00-21

DRAFT1 T

AFT 10

iew Per 0415 p0415 steel: _steel:

PP

R

RRRevR

Including Supplies and Accessories for a Complete New Winding Including Factory Testing

Percent of the total CLIN 0420 price that is copper:

Percent of the total CLIN 0420 price that is labor:

Remove Existing Stator Winding and Install and Test New Stator Winding

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0422 Supply Surface Air Coolers 1 JOB S $________

Eligible for economic price adjustment.

Percent of the total CLIN 0422 price that is carbon steel: ___%

Percent of the total CLIN 0422 price that is copper:

Percent of the total CLIN 0422 price that is labor:

0423 Install Surface Air Coolers 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Pre-Disassembly Watered Operational Testing

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0425 Generating Unit Disassembly 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Refurbish Existing Turbine Shaft to Become Intermediate Shaft

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0427 Not Used N/A N/A N/A N/A N/A 0428 Not Used N/A N/A N/A N/A N/A

Machine Stay Ring Head Cover Mounting Flange

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0430 Refurbish Bottom Ring 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Refurbish Miscellaneous Wicket Gate Operating Mechanism Components

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

00 10 00-22

DRe e DRAFT 1 1

T

1 FTTT

AFT

xisting xisting haft to haft to A IntermediaIntermediRAAAA D

0JOBOB 000%

JOBB11100010

Rev iew____________

Perr 0422 p0422 steel: _steel:

PP

Line Boring and Installation of Wicket Gate Stem Bushings

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Refurbish Automatic Air Valves and Replace Gate Valves, Scroll Case Drain Valves and Floor Grating, and Draft Tube Drain Valves

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0434 Refurbish Wicket Gate Operating Ring 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0435 Refurbish Wicket Gate Servomotors 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Bore and Hone Wicket Gate Servomotors (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Provide Wicket Gate Servomotor Piston Rings (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Provide Water and Oil Piping Systems and Components

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Provide Electrical Devices, Temperature Indicating Devices, and Wiring/Cable

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Provide High Pressure Oil Injection System Components

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0441 Thrust Bearing Phase 1 Inspections 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Thrust Bearing Phase 2 Inspections (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Thrust Bearing Shoes (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Thrust Bearing Runner and Collar (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Upper Generator Guide Bearing NDT (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Upper Generator Guide Bearing Shoes (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

00 10 00-23

DRBearing PhaBearing PhDRAFT Tn ntsnts

1 TTT

AFT

ng Phase ng Phase onss AFAFAFAF tions tions DR

0%

C C

JOBJOB

000%

Rev iew is lala BaconBacow___________

PercenPerce is lais la

BB

wwwew

$_____$ evRRRRR

Lower Generator Guide Bearing NDT (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Lower Generator Guide Bearing Shoes (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Turbine Guide Bearing NDT (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Turbine Guide Bearing (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0451 Refurbish Oil Head 1 JOB C $________ Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0452 Not Used N/A N/A N/A N/A N/A

Refurbish and Modify Blade Servomotor Oil Pipes

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0454 Not Used N/A N/A N/A N/A N/A

0455 Provide Thrust Bearing Oil Coolers 1 JOB C $________

Eligible for economic price adjustment.

Percent of the total CLIN 0455 price that is carbon steel: ___%

Percent of the total CLIN 0455 price that is copper:

Percent of the total CLIN 0455 price that is labor:

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0456 Refurbish Draft Tube Personnel Entry Door 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Lead Based Paint Removal and Disposal

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0458 Painting 1 JOB C $________ Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0459AA

(Optional)

Draft Tube Floor Fill Modification (Optional)

1 JOB C $________

Eligible for concrete weight adjustment.

Weight adjustment on rebar will not be allowed.

00 10 00-24

DRAFT

1 1

AFT T

D

JOBB10

RevN/AN/A

Rev iew is lala BaconBacowN/AN/Awwwew_____________ PerPewewewew evRRRReR

Based on drawings S-001 and S-002.

______ pounds of concrete

Percent of total CLIN 0459AA price that is concrete material: ___%

Percent of total CLIN 0459AA price that is labor subject to Davis-Bacon:

0459AB

(Optional)

Draft Tube Roof Fill Modification – Incremental Difference Relative to CLIN 0459AA (Optional)

1 JOB C $________

Eligible for concrete weight adjustment.

Weight adjustment on rebar will not be allowed.

Based on drawings S-003 and S-004.

______ pounds of concrete

Percent of the sum of CLINs 0459AA and 0459AB prices that is concrete material: ___%

Percent of the sum of CLINs 0459AA and 0459AB prices that is labor subject to Davis- Bacon: ___%

0460 Inspect, Clean, and Test Stator Core 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Perform Additional Interlaminar Insulation Testing (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Remove Existing Stator Core and Install and Test New Stator Core (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Supply Stator Core Including Materials, Accessories, and Factory Testing (Optional)

1 JOB S $________

Eligible for economic price adjustment.

Percent of the total CLIN 0463 price that is carbon steel: ___%

00 10 00-25

DdditdditDRAFT

AFT

Clean, and Clean, an ator Coreator Cor RA D

0%

C C

Rev iew

Elig weighweig WeighWeig rebreb aa

Percent of the total CLIN 0463 price that is labor:

Clean and Inspect Rotor, Reinsulate Rotor Field Leads, and Test Rotor Field Windings

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Refurbish Rotor Field Pole (Optional) 20 EA C

Unit Price

Total

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Furnish, Install, and Test Surge Arrestors and Refurbish Collector Rings

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Provide Machine Condition Monitoring System Sensors

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Destructively Remove Turbine Shaft-to-Runner Fastener (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0469 Rotor Balancing (Optional) 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0470 Generating Unit Reassembly 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

0471 Generating Unit Commissioning 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

Perform Generator Special Field Test (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Perform Model Validation Testing on Generator (Optional)

1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Provide New Generator Heater Circuits (Optional) 1 JOB C $________

Percent of the CLIN that is labor subject to Davis- Bacon: ___%

(Optional)

Miscellaneous Parts and Materials (Optional)

N/A $ S $100,000 N/A

(Optional)

Miscellaneous Weld Materials (Optional) 300 Lbs S

Unit Price

Total

N/A

(Optional)

Skilled Welding Hire (Optional) 300 Hrs C Unit Price

N/A

00 10 00-26

DRModel Model

DRAFT

1 T

AFT

or

Test Test AFAFAFAF tion Testintion Testin r (Optr (OptDRD

C C %

00JOB JOB 00000010

Rev iew is labla Bacon:Bacon ew______________ PePewewewew

$___$ evR

Total

(Optional)

Skilled Machinist Hire (Optional) 300 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Electrician Hire (Optional) 350 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Painter Hire (Optional) 150 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Millwright / Mechanic Hire (Optional)

1200 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled General Laborer Hire (Optional)

250 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Liquid Penetrant Testing (Optional)

50 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Magnetic Particle Testing (Optional)

50 Hrs C

Unit Price

Total

N/A

(Optional)

Skilled Ultrasonic Testing (Optional) 50 Hrs C

Unit Price

Total

N/A

Unit AA Prototype Supply and Install Sub-Total $_____________

00 10 00-27

250250

AFT

quid uid nt Testing nt Testing nal)nal)

AFAFAFAF

C C

0000000010

Rev ieww ce

TotaTotal l

N/AN/Awww

R ew

UnUn $RRReR

Unit AB Prototype Supply and Install

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

NOTE: To be filled in prior to solicitation. CLINs will match CLINs for Unit AA except CLIN 0472 as generator special field testing is only required on Unit AA.

Unit AB Prototype Supply and Install Sub-Total $_____________

Unit FA Prototype Supply and Install

ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS

0601AA

Supply Fixed Five Blade Runner (Base Requirement)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces of the hub and blades

Percent of total CLIN 0601AA price that is stainless-steel material:

Percent of total CLIN 0601AA price that is carbon steel material:

Percent of total CLIN 0601AA price that is labor: ___%

0601AB

(Optional)

Supply Fixed Six Blade Runner - Incremental Difference

1 JOB S $________

Eligible for material weight adjustment.

00 10 00-28

DRAFT 1 1

AFT 10

0% iew

Re ww

Relative to CLIN

0601AA

(Optional)

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter. Runner construction method as shown on proposal drawings.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces of the hub and blades

Percent of the sum of CLINs 0601AA and 0601AB prices that is stainless-steel material:

Percent of the sum of CLINs 0601AA and 0601AB prices that is carbon steel material:

Percent of the sum of CLINs 0601AA and 0601AB prices that is labor: ___%

0602AA

Supply Permanent Discharge Ring Section for Fixed Blade Runner (Base Requirement)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter.

______ pounds of martensitic stainless steel

00 10 00-29

AFT

D

Rev iew ww

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of total CLIN 0602AA price that is stainless-steel material:

Percent of total CLIN 0602AA price that is carbon steel material:

Percent of total CLIN 0602AA price that is labor: ___%

0602AB

(Optional)

Supply Embedded Discharge Ring Section for Fixed Blade Runner - Incremental Difference Relative to CLIN

0602AA

(Optional)

1 JOB S $________

Eligible for material weight adjustment.

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

327-inch blade tip diameter.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of the sum of CLINs 0602AA and 0602AB prices that is stainless-steel material:

Percent of the sum of CLINs 0602AA and 0602AB prices that is carbon steel material:

Percent of the sum of CLINs 0602AA and

00 10 00-30

DRAFT

ded d ing ng r Fixed r Fixed

Runner Runner -emental emental fference fference ative toative to

AA

Rev iew

Pw vie

0602AB prices that is labor: ___%

0603AA

Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Fixed Blade Runner (Base Requirement)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only; excludes weld filler material.

309-inch blade tip diameter.

______ pounds of concrete and grout

Percent of total CLIN 0603AA price that is concrete and grout material ___%

Percent of CLIN 0603AA price that is labor subject to Davis- Bacon: ___%

0603AB

(Optional)

Install Embedded Discharge Ring Section (Excluding Demolition) for Fixed Blade Runner - Incremental Difference Relative to CLIN

0603AA

(Optional)

1 JOB C $________

Eligible for material weight adjustment.

Concrete or grout only; excludes weld filler material.

327-inch blade tip diameter.

______ pounds of concrete and grout

Percent of the sum of CLINs 0603AA and 0603AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%

Percent of the sum of CLINs 0603AA and 0603AB price that is labor subject to Davis- Bacon: ___%

0604AA

Supply Permanent Draft Tube Liner Transition Section for Fixed Blade

1 JOB S $________ Eligible for material weight adjustment

00 10 00-31

DRAFd d ng ng ing ing olition) for tion) for xed Blade xed Blade nner nne -menmen

AFT

AFT 10

0%

0%

Rev iew

Runner (Base Requirement)

Eligible for surface area labor adjustment.

Eligible for economic price adjustment.

309-inch blade tip diameter.

______ pounds of martensitic stainless steel

______ pounds of carbon steel

_______ square feet of all wetted surfaces

Percent of total CLIN 0604AA price that is stainless-steel material:

Percent of total CLIN 0604AA price that is carbon steel material:

Percent of total CLIN 0604AA price…