Project Manual
DRAFT 10
0%
R ev iew
TOC-1
John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon
TABLE OF CONTENTS
00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
00 70 00 CONDITIONS OF THE CONTRACT SUPPLY CLAUSES
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
GENERAL AND TECHNICAL REQUIREMENTS: SEE PROJECT TABLE OF CONTENTS
ATTACHMENTS
A1: Submittal Register
A2: Transmittal Form ENG Form 4025-R
A3: Construction Sign
A4: Spill Emergency - Initial Report Form
A5: Oil Accountability Form
A6: Adjustable Blade Flow Chart
A7: Fixed Blade Flow Chart
A8: Figure 1, Tables 1-6
A9: Blade Angle Definition
A10: Tables 1-6
A11: Tables 1-5
DRAFT 10
0%
R ev iew
USESE
SEE PROJEE PRO
m ENG Fom ENG F n Signn Sign mergencymergency
AccountAccoun tata
TOC-2
John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon
TABLE OF CONTENTS
A12: Instrument List
A13: Cable and Conduit Removal and Install
A14: Commissioning Plan
A15: Tolerance Sheets
A16: Anchor Detail
A17: Generator Test Report
A18: Project 95 Schedule
A19: Davis Bacon Wage Determination
A20: JDD TMP Operations and Maintenance Manual
A21: Work Over Water
A22: Haz Material Survey Report
A23: OA Work Request Template
A24: John Day Hydropower Unit Asbestos Survey Report
A25: System O&M for the current BLH Units ationt d MainteMaint
Survey Surve
Request quest
Day HydDay H mm
PROJECT TITLE: John Day Dam Turbine Replacement and Generator Rew ind
LOCATION OF PERFORMANCE: John Day Lock and Dam, Rufus, OR 97050
MAGNITUDE OF CONSTRUCTION: Over $500,000,000.
SOCIOECONOMIC: Unrestricted, Full and Open Competition
CAROLYN J RANDOLPH
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Jun-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Oct 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______360 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9127N24R0001 194
DRAFT 10
0%
R ev iew
7050050 wieviOCUMENTSUMENTS
(Inc
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
20B. SIGNATU0B. SIGNAT
ewievieev igive numbe
RevRe o be completebe complete00
FTAND APPROPRAND APPROP
AF
WN INWN IN
DR
F
CODEOD
Rev
R
Section 00 10 00 - Solicitation
PRICE SCHEDULE
1. The price schedule is divided into categories/tables for the following:
Hydraulic Turbine Design (0100s) Prototype Design (0200s) Miscellaneous Equipment, Spare Parts, and Oil Disposal (0300s) Unit AA Prototype Supply and Install (0400s) Unit AB Prototype Supply and Install (0500s) Unit FA Prototype Supply and Install (0600s) Unit AC Prototype Supply and Install (0700s) Unit FB Prototype Supply and Install (0800s) Unit AD Prototype Supply and Install (0900s) Unit FC Prototype Supply and Install (1000s) Unit AE Prototype Supply and Install (1100s) Unit FD Prototype Supply and Install (1200s) Unit AF Prototype Supply and Install (1300s) Unit FE Prototype Supply and Install (1400s) Unit FF Prototype Supply and Install (1500s) Optional Unit AG Prototype Supply and Install (1600s) Optional Unit FG Prototype Supply and Install (1700s) Optional Unit AH Prototype Supply and Install (1800s) Optional Unit FH Prototype Supply and Install (1900s) Optional Unit AI Prototype Supply and Install (2000s) Optional Unit FI Prototype Supply and Install (2100s) Optional Unit AJ Prototype Supply and Install (2200s) Optional Unit FJ Prototype Supply and Install (2300s)
2. The first letter following “Unit” designates the turbine type; ‘A’ identifies adjustable blade and ‘F’ identifies fixed blade. The second letter following the turbine type designator identifies the order of the unit (alphabetical order). For example, Unit AA is the first unit with an adjustable-blade turbine runner.
3. Where variations of an item are priced under one CLIN, the first item (AA) will be awarded as the base requirement. As required based on the final turbine configuration chosen by the Government, subsequent items (optional) will be awarded based upon the outcome of the hydraulic design. No more than one subsequent item (optional) will be awarded for each CLIN and this optional item represents the incremental price difference relative to the first item (AA). All mandatory and optional CLINs will be evaluated during the selection process consistent with the evaluation factor instructions within the solicitation. The solicitation will state, for award purposes, that price will be evaluated based on the total sum anticipated for all base and option CLINs. Evaluation of the option shall not obligate the Government to exercise the option.
4. The price schedule categories provided generally align with the phases of work as defined in Section 01
11.00 00 25 (with some overlapping exceptions).
5. The tables include a column that delineates which CLINs are governed by supply clauses and those that are governed by construction clauses. The Supply clauses defined in this contract apply to the CLINs with an ‘S’ designation in the tables and the Construction clauses apply to the CLINs with a ‘C’ designation in the tables.
00 10 00-3
DRAFT 10
0%
R ev iew tall (1600s)all (1600s) nstall (1700s)nstall (170 nd Install (180nd Install (18 y and Install (and Install ( ply and Instaly and Insta upply and Inspply and In pe Supply andpe Supply a type Supply atype
Unit” designaUnit” design The second lethe second
For exampleFor example ns of an itemns of an item As requiredAs require
l) will bl) will
(op(o
6. Certain CLINs will be adjusted in accordance with Clause 52.216-4 ECONOMIC PRICE ADJUSTMENT
– LABOR AND MATERIAL and WAGE DETERMINATION. CLINs eligible for economic price adjustment are designated in the bases as “Eligible for economic price adjustment” and CLINs affected by wage determination will include “Percent of the CLIN that is labor subject to Davis-Bacon: ___%” in the bases. CLINS eligible for economic price adjustment will be eligible for both supply labor and/or material adjustments.
7. The basis for some CLINs include blanks where the Offeror must provide weights, surface area, and labor and material percentages. All weights signify finished weights in U.S. pounds and must be inclusive of any and all markups. All surface areas signify square footage of finished surfaces. The sum of the percentages provided must be no more than 100%. Some CLINs will be eligible for certain adjustments based on hydraulic design. This will be noted in the bases as “Eligible for material weight adjustment” and/or “Eligible for surface area labor adjustment.” Following acceptance of the final hydraulic design, the contractor shall submit to the contracting officer adjusted weights and surface areas for a contract modification for hydraulic design to be initiated by the government. The adjustments will be made solely to the labor and material percentages provided. These bases will be used to determine/calculate the material weight adjustment and the supply CLIN labor. Descriptions and examples of these two types of adjustments are detailed below.
a. MATERIAL WEIGHT ADJUSTMENT: First, the material price at award, in the year of award dollars, will be determined/calculated. The material weight of some prototype CLINs will be dependent on the outcome of the hydraulic and prototype designs. For these CLINs, if the weight(s) of material(s) (quantities) change(s) as a result of the collaborative hydraulic design process, an adjustment will be made on the material weight(s). These CLINs have been identified as “ELIGIBLE FOR MATERIAL WEIGHT ADJUSTMENT” in the basis. All other CLINs, which do not include this identifier, will not be adjusted for material weight(s) due to the hydraulic design. The basis, specification technical requirements, and Offeror’s proposal define the configuration of the item for material price award.
i. For those CLINs identified as “Eligible for material weight adjustment” in the basis, the stainless-steel price at award (SSAward), carbon steel price at award (CSAward), and Concrete (CAward ) (and/or grout) will be calculated by multiplying the total CLIN price by the percentage of each material in the basis and by the ratio of the final design material weight divided by the awarded design material weight (Equations 1-4).
Equation 1
Equation 2
Equation 3
b. SURFACE AREA LABOR ADJUSTMENT: Certain CLINs are eligible for an adjustment to labor quantity (not labor rates) based on changes in surface area during the iterative design process (this accounts for increases or decreases to manufacturing labor)
00 10 00-4
DRAFT
r grour gr f each matf each m vided by the vided by the
0% materma
HT ADJUSHT ADJU
ll notnot be adjube adju
0%cation techniction techni material pricematerial pric ntified as “Elitified as “E at award (award (SS will bll
Rev iew men ermine/camine/c s of these twothese tw rial price at aprice at weight of somght of som ototype desigototype desig a result of ta result of weigwe
c. TOTAL CLIN ADJUSTMENT: Sum of unadjusted portion, material adjustment and labor adjustment. = (100% )= + + + +
8. This paragraph shows an example of how prices will be adjusted for material and labor. This is an example for CLIN 0401AA Supply Adjustable Five Blade Runner (Base Requirement). This is just an example to illustrate how material weight and supply CLIN labor adjustments will be made.
a. CLIN 0401AA Supply Adjustable Five Blade Runner (Base Requirement)
i. Values at award
1. CLIN 0401AA award price: $10,000,000
2. Pounds of stainless-steel: 300,000
3. Pounds of carbon steel: 200,000
4. Surface area (square feet): 2,000
5. Percent of total CLIN price that is stainless-steel: 25%
6. Percent of total CLIN price that is carbon steel: 10%
7. Percent of total CLIN price that is labor: 50%
ii. Values at NTP of Unit AA supply
1. Pounds of stainless-steel (final design): 285,000
2. Pounds of carbon steel (final design): 220,000
3. Surface area (square feet): 2,250
b. MATERIAL WEIGHT ADJUSTMENT: Adjust for change in weight as this CLIN is eligible for material weight adjustment= $10,000,000 0.25 285,000300,000 = $2,375,000
= $10,000,000 0.10 220,000200,000 = $1,100,000
c. LABOR ADJUSTMENT ON SUPPLY CLINS: Adjust for change in labor as this CLIN is eligible for material weight adjustment
= $10,000,000 0.50 2,2502,000 = $5,625,000
d. TOTAL CLIN ADJUSTMENT: Sum the unadjusted with the adjustments= $10,000,000 (1 0.25 0.1 0 0.5) = $1,500,000= $1,500,000 + $2,375,000 + $1,100,000 + $0 + $5,625,000 = $10,600,000
9. Prototype bid item “Description” column verbs are defined as follows:
Design – Prototype design/engineering including analysis and the preparation of design documentation (reports, drawings, etc.).
Furnish – Design/engineering, manufacturing, procurement, and delivery of components to John Day Powerhouse.
00 10 00-5
DRAFT ntnt$10$10,00000 ,0 == $10$10
BOR BO ADJUADJU
aterial aterial
0%
(finafin l de l (final desig(final desi e feet): 2,250e feet): 2,250
USTMENT: ASTMENT
Rev iewainlessless--steel: steel:
carbon steelcarbon ste t is labor: 50%t is labor: 50% gn)gn
Supply – Manufacturing/procurement and delivery to John Day Powerhouse Install (Installation) – Field work to incorporate new, modified, and/or existing components into the finished generating unit.
Provide – Furnish and install.
Refurbish (Refurbishment) – Rehabilitation of existing components (including incorporation of replacement/modified components) for usage in the rebuilt generating unit.
Replace (Replacement) – Removal of existing component (if require for installation of replacement components) and installation of replacement component.
Hydraulic Turbine Design
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Pre-Iteration Coordination, Design, Analysis, and Performance Model Construction
1 JOB S $________ N/A
Adjustable Blade Iteration 1A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 299.5-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 317-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
Adjustable Blade Iteration 2A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 2A - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 2A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
00 10 00-6
DRAFTJOBJ
AFFT
e ry Design Design ance Model ance Mode (Diamete(Diame tionationa
AFAFAFFFAFF
0% iewv_______ N/AN/AvvvieevReeee
Adjustable Blade Iteration 3A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 1 (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 2 (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 4A Design Work (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 4A - ERDC Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 5A Design Work (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 5A - ERDC Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
Adjustable Blade Final Design Performance Model Testing
1 JOB S $________ N/A
0118 Fixed Blade Iteration 1F Base Design Work 1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Five Blade, 319-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Five Blade, 327-inch Diameter CFD (Optional)
1 JOB S $________ N/A
00 10 00-7
1 1 JOBJOBT
AFFT
RDC C
al Model al Model oordination oordination nal)nal)
AFAFAFTFTFT
AFFT
ble Bladeble Blad gngnD
0%
S S
Rev iewN/AN/A w evReeee
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
0122 Fixed Blade Iteration 2F Base Design Work 1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 2F - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 2F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
0125 Fixed Blade Iteration 3F Base Design Work 1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design CFD With Modified Distributor (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 1 (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 2 (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 4F Design Work (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration
4F - ERDC
Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
00 10 00-8
DRAFTFT
ith ion 2 on 2 nal)nal)
FTFTFT
AFFT
ade Iteraade Iter inainaD
0%
B S S
0%%% iewv______ N/AN/AvvvieevReeee
Fixed Blade Final Design Performance Model Testing
1 JOB S $________ N/A
(Optional)
Supply Set of Model Wicket Gates (Optional)
2 SET S $________ N/A
Hydraulic Design Sub-Total $_____________
Prototype Design
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Discharge Ring Diameter Preliminary Analyses
1 JOB S $________ N/A
Adjustable Blade Runner Prototype Design
1 JOB S $________ N/A
Adjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
1 JOB S $________ N/A
Adjustable Blade Stay Vane Modifications Prototype Design
1 JOB S $________ N/A
Adjustable Blade Wicket Gate Prototype Design
1 JOB S $________ N/A
Adjustable Blade Lower Turbine Shaft and Blade Servomotor Shaft Prototype Design
1 JOB S $________ N/A
(Optional)
Adjustable Blade Replacement Inner Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
0208 Fixed Blade Runner Prototype Design 1 JOB S $________ N/A
Fixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
1 JOB S $________ N/A
(Optional)
Fixed Blade Stay Vane Modifications Prototype Design (Optional)
1 JOB S $________ N/A
00 10 00-9
DRAFT
ft signsign
1 1 JOTT
AFFT
Ae Blade Blade ement Inner ement Inner over ove
DesiDesi
RAAAA
0% %S S $___$%%%%
B S S0011
Rev iew
/A w
____________ N/AN
ie evR
Fixed Blade Wicket Gate Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Replacement Inner Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Modified Outer Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Replacement Outer Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Modified Intermediate Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
0216 Surface Air Coolers Design 1 JOB S $________ N/A
Prototype Stator Bar Design, Manufacture, and Test
1 JOB S $________ N/A
(Optional)
Thrust Bearing Structural Analysis (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Draft Tube Modification Design (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Draft Tube Modification Design (Optional)
1 JOB S $________ N/A
Prototype Design Sub-Total $_____________
Miscellaneous Equipment, Spare Parts, Oil Disposal, and Optional Rewinds
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Design and Supply One Stator Core Including Materials, Accessories, and Factory Testing
1 JOB S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0463 price that is carbon steel: ___%
Percent of the total CLIN 0463 price that is labor: ___%
0302 Mobilization and Demobilization 1 JOB C $________ Percent of the CLIN that is labor subject to Davis-Bacon: ___%
0303 Supply Spare Wicket Gates 1 JOB S $________ Eligible for economic price adjustment.
00 10 00-10
DRAFT JOBJ
FFT
on onal)onal)
1 1 FFFTFTFT
RAAFAAFT 10
0%
S S 0%%%
11101
Rev iewN/AN/A w v______________ N/NvvvievR
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
As shown on proposal drawings:
______ pounds of stainless-steel
_______ square feet of all wetted surfaces
Percent of the total CLIN 0303 price that is stainless-steel steel material: ___%
Percent of the total CLIN 0303 price that is labor: ___%
0304 Supply Generator Spare Parts 1 JOB S $________ N/A
Supply Spare Surface Air Cooler Assemblies
1 JOB S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0305 price that is carbon steel: ___%
Percent of the total CLIN 0305 price that is copper: ___%
Percent of the total CLIN 0305 price that is labor: ___%
Supply Other Required Spare Parts
1 JOB S $________ N/A
(Optional)
Oil Disposal – 4,000 Gallons (Optional)
12 EA C
Unit Price
Total
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
(Optional)
Oil Disposal - 500 Gallons (Optional) 5 EA C
Unit Price
Total
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Miscellaneous Equipment, Spare Parts, and Oil Disposal Sub-Total $_____________
00 10 00-11
DR
osal osal – – onsonsDRAFT
AFT
are are 1AAAFFF
RAF
DR
0%
B SS0
Rev iew en price that e tha material: _aterial:
PercePerc pripvie$________$_______evvvR v RRReR
Unit AA Prototype Supply and Install
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
0401AA
Supply Adjustable Five Blade Runner (Base Requirement)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Fully spherical hub, 309-inch blade tip diameter.
Runner construction method as shown on proposal drawings.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces of the hub and blades
Percent of total CLIN 0401AA price that is stainless-steel material:
Percent of total CLIN 0401AA price that is carbon steel material:
Percent of total CLIN 0401AA price that is labor: ___%
0401AB
(Optional)
Supply Adjustable Six Blade Runner - Incremental Difference Relative to CLIN 0401AA (Optional)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Fully spherical hub, 309-inch blade tip diameter.
Runner construction method as shown on proposal drawings.
00 10 00-12
AFT 10
Rev iew
Rev iew metet propospropo ew
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces of the hub and blades
Percent of the sum of CLINs 0401AA and 0401AB prices that is stainless-steel material:
Percent of the sum of CLINs 0401AA and 0401AB prices that is carbon steel material:
Percent of the sum of CLINs 0401AA and 0401AB prices that is labor: ___%
0402AA
Supply Permanent Discharge Ring Section and Insert for Adjustable Blade Runner (Base Requirement)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Spherical outer blade profile, 309-inch blade tip diameter
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of total CLIN 0402AA price that is stainless-steel material:
Percent of total CLIN 0402AA price that is
00 10 00-13
DRAFT
PermanentPermanent e Ringe Ring
II
0000%
Rev iew
PercePercen
CLICLI
carbon steel material:
Percent of total CLIN 0402AA price that is labor: ___%
0402AB
(Optional)
Supply Embedded Discharge Ring Section and Insert for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0402AA (Optional)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Spherical outer blade profile, 317-inch blade tip diameter
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the sum of CLINs 0402AA and 0402AB prices that is stainless-steel material:
Percent of the sum of CLINs 0402AA and 0402AB prices that is carbon steel material:
Percent of the sum of CLINs 0402AA and 0402AB prices that is labor: ___%
0403AA
Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Adjustable Blade Runner (Base Requirement)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only;
excludes weld filler material.
309-inch blade tip diameter.
______ pounds of concrete and grout
00 10 00-14
DRAFT
AFT 10
0% S S
Rev iew
SpherSphe profileprofil diamdiam
Percent of total CLIN 0403AA price that is concrete and grout material ___(concrete index will be used for economic price adjustment)%
Percent of CLIN 0403AA price that is labor subject to Davis-Bacon: ___%
0403AB
(Optional)
Install Embedded Discharge Ring Section for Adjustable Blade Runner (Excluding Demolition) - Incremental Difference Relative to CLIN 0403AA (Optional)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only;
excludes weld filler material.
317-inch blade tip diameter.
______ pounds of concrete and grout
Percent of the sum of CLINs 0403AA and 0403AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%
Percent of the sum of CLINs 0403AA and 0403AB price that is labor subject to Davis-Bacon:
0404AA
Supply Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner (Base Requirement)
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter.
______ pounds of martensitic stainless steel
00 10 00-15
DRAFT
AFT
DR
0%
C C
Rev iew
Con excluexclu materimater
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of total CLIN 0404AA price that is stainless-steel material:
Percent of total CLIN 0404AA price that is carbon steel material:
Percent of total CLIN 0404AA price that is labor: ___%
0404AB
(Optional)
Supply Embedded Draft Tube Liner Transition Section for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0404AA (Optional)
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
317-inch blade tip diameter.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the sum of CLINs 0404AA and 0404AB prices that is stainless-steel material:
Percent of the sum of CLINs 0404AA and 0404AB prices that is carbon steel material:
Percent of the sum of CLINs 0404AA and
00 10 00-16
DRAFT
tion for tion for
Blade Blade IncrementalIncremental nce Relativnce Relativ 0404A0404A
AFT 10
iew
PercenPerce 040040 lalewviee
RR
0404AB prices that is labor: ___%
0405AA
Modify Existing Draft Tube Liner Without Demolition and Install Permanent Draft Tube Liner Transition Section for Adjustable Blade Runner (Base Requirement)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only;
excludes weld filler material.
309-inch blade tip diameter.
______ pounds of concrete and grout
Percent of total CLIN 0405AA price that is grout material (concrete index will be used for economic price adjustment): ___%
Percent of total CLIN 0405AA price that is labor subject to Davis-Bacon:
0405AB
(Optional)
Install Embedded Draft Tube Liner Transition Section (Excluding Demolition) for Adjustable Blade Runner - Incremental Difference Relative to CLIN 0405AA (Optional)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only;
excludes weld filler material.
317-inch blade tip diameter.
______ pounds of concrete and grout
Percent of the sum of CLINs 0405AA and 0405AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%
Percent of the sum of CLINs 0405AA and 0405AB prices that is labor subject to Davis- Bacon: ___%
(Optional)
Demolition of Discharge Ring and Draft Tube Liner
300 Cubic Yard C
Unit Price
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
00 10 00-17
DRAFT
r ction ction g tion) for tion) for able Bladeable Blad
IncreIncre
AFT 10
0%
Rev iew PercenPerce 0405A0405A mam
Transition – Cubic Yard (Optional)
Total
0407AA
Refurbish Existing Outer Head Cover (Base Requirement)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0407AB
(Optional)
Refurbish and Modify Existing Outer Head Cover - Incremental Difference Relative to CLIN 0407AA (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
309-inch blade tip diameter.
0407AC
(Optional)
Supply Replacement Outer Head Cover - Incremental Difference Relative to CLIN 0407AA (Optional)
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
317-inch blade tip diameter.
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the sum of CLINs 0407AA, 0407AB, and 0407AC prices that is carbon steel material:
Percent of the sum of CLINs 0407AA, 0407AB, and 0407AC prices that is labor: ___%
0408AA
Refurbish Existing Intermediate Head Cover (Base Requirement)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0408AB
(Optional)
Refurbish and Modify Existing Intermediate Head Cover - Incremental Difference Relative to CLIN 0408AA (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
317-inch blade tip diameter.
00 10 00-18
DRAFT
JOB OB
Rev iew weiei
EligiEligibb labolab
0409AA
Refurbish Existing Inner Head Cover (Base Requirement)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0409AB
(Optional)
Supply Replacement Inner Head Cover - Incremental Difference Relative to CLIN 0409AA (Optional)
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
317-inch blade tip diameter.
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the sum of CLINs 0409AA and 0409AB prices that is carbon steel material:
Percent of the sum of CLINs 0409AA and 0409AB prices that is labor: ___%
Supply Stay Vane Modification Components
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Leading and trailing edge extensions or alternate method as shown on proposal drawings
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the total CLIN 0410 price that is carbon steel material: ___%
00 10 00-19
DRAFTTT
Rev iew steelsteel
Percent of the total CLIN 0410 price that is labor:
Refurbish Stay Vanes/Ring Including Installation of Stay Vane Modification Components
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0412 Supply Wicket Gates 1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
Existing wicket gate size and shape.
______ pounds of stainless-steel
_______ square feet of all wetted surfaces
Percent of the total CLIN 0412 price that is stainless-steel steel material: ___%
Percent of the total CLIN 0412 price that is labor:
Supply Wicket Gate Operating Mechanism Bushings and Bearing Plate
1 JOB S $________ N/A
Supply Head Cover and Bottom Ring Facing Plates
1 JOB S $________
Eligible for material weight adjustment
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter.
______ pounds of austenitic stainless steel
_______ square feet of all wetted surfaces
00 10 00-20
DRAFT
AFT
Gate te m Bushings m Bushings aring Platearing Plate
AFAFAFAF
D
Rev iew
Eligg price aprice
ExisExi aa
Percent of the CLIN 0414 price that is stainless-steel material: ___%
Supply Blade Servomotor Shaft and Appurtenances
1 JOB S $________
Eligible for material weight adjustment
Eligible for economic price adjustment.
______ pounds of carbon-steel
Percent of the total CLIN 0415 price that is carbon steel: ___%
Percent of the total CLIN 0415 price that is labor:
Supply Lower Turbine Shaft and Appurtenances
1 JOB S $________
Eligible for material weight adjustment
Eligible for economic price adjustment.
______ pounds of stainless-steel
______ pounds of carbon-steel
Percent of the total CLIN 0416 price that is stainless-steel: ___%
Percent of the total CLIN 0416 price that is carbon steel: ___%
Percent of the total CLIN 0416 price that is labor:
Supply Oil and Water Basin at the Blade Servomotor
1 JOB S $________ N/A
0418 Supply Turbine Shaft Packing Box 1 JOB S $________ N/A
Supply Turbine Guide Bearing Oil Sump
1 JOB S $________ N/A
0420 Supply Complete Set of Stator Bars, 1 JOB S $________ Eligible for economic price adjustment.
00 10 00-21
DRAFT1 T
AFT 10
iew Per 0415 p0415 steel: _steel:
PP
R
RRRevR
Including Supplies and Accessories for a Complete New Winding Including Factory Testing
Percent of the total CLIN 0420 price that is copper:
Percent of the total CLIN 0420 price that is labor:
Remove Existing Stator Winding and Install and Test New Stator Winding
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0422 Supply Surface Air Coolers 1 JOB S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0422 price that is carbon steel: ___%
Percent of the total CLIN 0422 price that is copper:
Percent of the total CLIN 0422 price that is labor:
0423 Install Surface Air Coolers 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Pre-Disassembly Watered Operational Testing
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0425 Generating Unit Disassembly 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Refurbish Existing Turbine Shaft to Become Intermediate Shaft
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0427 Not Used N/A N/A N/A N/A N/A 0428 Not Used N/A N/A N/A N/A N/A
Machine Stay Ring Head Cover Mounting Flange
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0430 Refurbish Bottom Ring 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Refurbish Miscellaneous Wicket Gate Operating Mechanism Components
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
00 10 00-22
DRe e DRAFT 1 1
T
1 FTTT
AFT
xisting xisting haft to haft to A IntermediaIntermediRAAAA D
0JOBOB 000%
JOBB11100010
Rev iew____________
Perr 0422 p0422 steel: _steel:
PP
Line Boring and Installation of Wicket Gate Stem Bushings
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Refurbish Automatic Air Valves and Replace Gate Valves, Scroll Case Drain Valves and Floor Grating, and Draft Tube Drain Valves
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0434 Refurbish Wicket Gate Operating Ring 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0435 Refurbish Wicket Gate Servomotors 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Bore and Hone Wicket Gate Servomotors (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Provide Wicket Gate Servomotor Piston Rings (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Provide Water and Oil Piping Systems and Components
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Provide Electrical Devices, Temperature Indicating Devices, and Wiring/Cable
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Provide High Pressure Oil Injection System Components
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0441 Thrust Bearing Phase 1 Inspections 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Thrust Bearing Phase 2 Inspections (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Thrust Bearing Shoes (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Thrust Bearing Runner and Collar (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Upper Generator Guide Bearing NDT (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Upper Generator Guide Bearing Shoes (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
00 10 00-23
DRBearing PhaBearing PhDRAFT Tn ntsnts
1 TTT
AFT
ng Phase ng Phase onss AFAFAFAF tions tions DR
0%
C C
JOBJOB
000%
Rev iew is lala BaconBacow___________
PercenPerce is lais la
BB
wwwew
$_____$ evRRRRR
Lower Generator Guide Bearing NDT (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Lower Generator Guide Bearing Shoes (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Turbine Guide Bearing NDT (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Turbine Guide Bearing (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0451 Refurbish Oil Head 1 JOB C $________ Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0452 Not Used N/A N/A N/A N/A N/A
Refurbish and Modify Blade Servomotor Oil Pipes
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0454 Not Used N/A N/A N/A N/A N/A
0455 Provide Thrust Bearing Oil Coolers 1 JOB C $________
Eligible for economic price adjustment.
Percent of the total CLIN 0455 price that is carbon steel: ___%
Percent of the total CLIN 0455 price that is copper:
Percent of the total CLIN 0455 price that is labor:
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0456 Refurbish Draft Tube Personnel Entry Door 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Lead Based Paint Removal and Disposal
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0458 Painting 1 JOB C $________ Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0459AA
(Optional)
Draft Tube Floor Fill Modification (Optional)
1 JOB C $________
Eligible for concrete weight adjustment.
Weight adjustment on rebar will not be allowed.
00 10 00-24
DRAFT
1 1
AFT T
D
JOBB10
RevN/AN/A
Rev iew is lala BaconBacowN/AN/Awwwew_____________ PerPewewewew evRRRReR
Based on drawings S-001 and S-002.
______ pounds of concrete
Percent of total CLIN 0459AA price that is concrete material: ___%
Percent of total CLIN 0459AA price that is labor subject to Davis-Bacon:
0459AB
(Optional)
Draft Tube Roof Fill Modification – Incremental Difference Relative to CLIN 0459AA (Optional)
1 JOB C $________
Eligible for concrete weight adjustment.
Weight adjustment on rebar will not be allowed.
Based on drawings S-003 and S-004.
______ pounds of concrete
Percent of the sum of CLINs 0459AA and 0459AB prices that is concrete material: ___%
Percent of the sum of CLINs 0459AA and 0459AB prices that is labor subject to Davis- Bacon: ___%
0460 Inspect, Clean, and Test Stator Core 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Perform Additional Interlaminar Insulation Testing (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Remove Existing Stator Core and Install and Test New Stator Core (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Supply Stator Core Including Materials, Accessories, and Factory Testing (Optional)
1 JOB S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0463 price that is carbon steel: ___%
00 10 00-25
DdditdditDRAFT
AFT
Clean, and Clean, an ator Coreator Cor RA D
0%
C C
Rev iew
Elig weighweig WeighWeig rebreb aa
Percent of the total CLIN 0463 price that is labor:
Clean and Inspect Rotor, Reinsulate Rotor Field Leads, and Test Rotor Field Windings
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Refurbish Rotor Field Pole (Optional) 20 EA C
Unit Price
Total
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Furnish, Install, and Test Surge Arrestors and Refurbish Collector Rings
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Provide Machine Condition Monitoring System Sensors
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Destructively Remove Turbine Shaft-to-Runner Fastener (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0469 Rotor Balancing (Optional) 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0470 Generating Unit Reassembly 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
0471 Generating Unit Commissioning 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
Perform Generator Special Field Test (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Perform Model Validation Testing on Generator (Optional)
1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Provide New Generator Heater Circuits (Optional) 1 JOB C $________
Percent of the CLIN that is labor subject to Davis- Bacon: ___%
(Optional)
Miscellaneous Parts and Materials (Optional)
N/A $ S $100,000 N/A
(Optional)
Miscellaneous Weld Materials (Optional) 300 Lbs S
Unit Price
Total
N/A
(Optional)
Skilled Welding Hire (Optional) 300 Hrs C Unit Price
N/A
00 10 00-26
DRModel Model
DRAFT
1 T
AFT
or
Test Test AFAFAFAF tion Testintion Testin r (Optr (OptDRD
C C %
00JOB JOB 00000010
Rev iew is labla Bacon:Bacon ew______________ PePewewewew
$___$ evR
Total
(Optional)
Skilled Machinist Hire (Optional) 300 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Electrician Hire (Optional) 350 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Painter Hire (Optional) 150 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Millwright / Mechanic Hire (Optional)
1200 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled General Laborer Hire (Optional)
250 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Liquid Penetrant Testing (Optional)
50 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Magnetic Particle Testing (Optional)
50 Hrs C
Unit Price
Total
N/A
(Optional)
Skilled Ultrasonic Testing (Optional) 50 Hrs C
Unit Price
Total
N/A
Unit AA Prototype Supply and Install Sub-Total $_____________
00 10 00-27
250250
AFT
quid uid nt Testing nt Testing nal)nal)
AFAFAFAF
C C
0000000010
Rev ieww ce
TotaTotal l
N/AN/Awww
R ew
UnUn $RRReR
Unit AB Prototype Supply and Install
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
NOTE: To be filled in prior to solicitation. CLINs will match CLINs for Unit AA except CLIN 0472 as generator special field testing is only required on Unit AA.
Unit AB Prototype Supply and Install Sub-Total $_____________
Unit FA Prototype Supply and Install
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
0601AA
Supply Fixed Five Blade Runner (Base Requirement)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter. Runner construction method as shown on proposal drawings.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces of the hub and blades
Percent of total CLIN 0601AA price that is stainless-steel material:
Percent of total CLIN 0601AA price that is carbon steel material:
Percent of total CLIN 0601AA price that is labor: ___%
0601AB
(Optional)
Supply Fixed Six Blade Runner - Incremental Difference
1 JOB S $________
Eligible for material weight adjustment.
00 10 00-28
DRAFT 1 1
AFT 10
0% iew
Re ww
Relative to CLIN
0601AA
(Optional)
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter. Runner construction method as shown on proposal drawings.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces of the hub and blades
Percent of the sum of CLINs 0601AA and 0601AB prices that is stainless-steel material:
Percent of the sum of CLINs 0601AA and 0601AB prices that is carbon steel material:
Percent of the sum of CLINs 0601AA and 0601AB prices that is labor: ___%
0602AA
Supply Permanent Discharge Ring Section for Fixed Blade Runner (Base Requirement)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter.
______ pounds of martensitic stainless steel
00 10 00-29
AFT
D
Rev iew ww
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of total CLIN 0602AA price that is stainless-steel material:
Percent of total CLIN 0602AA price that is carbon steel material:
Percent of total CLIN 0602AA price that is labor: ___%
0602AB
(Optional)
Supply Embedded Discharge Ring Section for Fixed Blade Runner - Incremental Difference Relative to CLIN
0602AA
(Optional)
1 JOB S $________
Eligible for material weight adjustment.
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
327-inch blade tip diameter.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of the sum of CLINs 0602AA and 0602AB prices that is stainless-steel material:
Percent of the sum of CLINs 0602AA and 0602AB prices that is carbon steel material:
Percent of the sum of CLINs 0602AA and
00 10 00-30
DRAFT
ded d ing ng r Fixed r Fixed
Runner Runner -emental emental fference fference ative toative to
AA
Rev iew
Pw vie
0602AB prices that is labor: ___%
0603AA
Modify Existing Discharge Ring Without Demolition and Install Permanent Discharge Ring Section for Fixed Blade Runner (Base Requirement)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only; excludes weld filler material.
309-inch blade tip diameter.
______ pounds of concrete and grout
Percent of total CLIN 0603AA price that is concrete and grout material ___%
Percent of CLIN 0603AA price that is labor subject to Davis- Bacon: ___%
0603AB
(Optional)
Install Embedded Discharge Ring Section (Excluding Demolition) for Fixed Blade Runner - Incremental Difference Relative to CLIN
0603AA
(Optional)
1 JOB C $________
Eligible for material weight adjustment.
Concrete or grout only; excludes weld filler material.
327-inch blade tip diameter.
______ pounds of concrete and grout
Percent of the sum of CLINs 0603AA and 0603AB prices that is concrete and grout material (concrete index will be used for economic price adjustment): ___%
Percent of the sum of CLINs 0603AA and 0603AB price that is labor subject to Davis- Bacon: ___%
0604AA
Supply Permanent Draft Tube Liner Transition Section for Fixed Blade
1 JOB S $________ Eligible for material weight adjustment
00 10 00-31
DRAFd d ng ng ing ing olition) for tion) for xed Blade xed Blade nner nne -menmen
AFT
AFT 10
0%
0%
Rev iew
Runner (Base Requirement)
Eligible for surface area labor adjustment.
Eligible for economic price adjustment.
309-inch blade tip diameter.
______ pounds of martensitic stainless steel
______ pounds of carbon steel
_______ square feet of all wetted surfaces
Percent of total CLIN 0604AA price that is stainless-steel material:
Percent of total CLIN 0604AA price that is carbon steel material:
Percent of total CLIN 0604AA price…