W9127N24R0001 TRGR Draft 95 RFP and Specifications.pdf
PDF 46 MB Posted
- Solicitation number
- W9127N24R0001
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W9127N24R0001
John Day Lock and Dam, Rufus, OR
JOHN DAY DAM TURBINE REPLACEMENT AND
GENERATOR REWIND
Project Manual
PART-1 SPECIFICATIONS
TOC-1
John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon
TABLE OF CONTENTS
00 10 00 SOLICITATION, OFFER, AND AWARD (SF 1442)
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
00 70 00 CONDITIONS OF THE CONTRACT SUPPLY CLAUSES
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
GENERAL AND TECHNICAL REQUIREMENTS: SEE PROJECT TABLE OF CONTENTS
ATTACHMENTS
A1: Submittal Register
A2: Transmittal Form ENG Form 4025-R
A3: Construction Sign
A4: Spill Emergency - Initial Report Form
A5: Oil Accountability Form
A6: Adjustable Blade Flow Chart
A7: Fixed Blade Flow Chart
A8: Figure 1, Tables 1-6
A9: Blade Angle Definition
A10: Tables 1-4
A11: Tables 1-5
TOC-2
John Day Turbine Replacement and Generator Rehabilitation Project, Rufus, Sherman County, Oregon
TABLE OF CONTENTS
A12: Instrument List
A13: Cable and Conduit Removal and Install
A14: Commissioning Plan
A15: Tolerance Sheets
A16: Anchor Detail
A17: Generator Test Report
A18: Schedule
A19: Davis Bacon Wage Determination
95% INDUSTRY REVIEW
PROJECT TITLE: John Day Dam Turbine Replacement and Generator Rew ind
LOCATION OF PERFORMANCE: John Day Lock and Dam, Rufus, OR 97050
MAGNITUDE OF CONSTRUCTION: Over $500,000,000.
SOCIOECONOMIC: Unrestricted, Full and Open Competition
CAROLYN J RANDOLPH
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
05-Jun-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________15 Oct 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______360 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N
PAGE OF PAGES
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W9127N24R0001 1 OF 193
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Table of Contents
TABLE OF CONTENTS
SECTION 00 10 00 ‐ SOLICITATION
PRICE SCHEDULE
SECTION 00 21 00 ‐ INSTRUCTIONS
CONSTRUCTION INSTRUCTIONS TO OFFERORS
PROPOSAL COMMENTS/INQUIRIES
BONDING
BASIS OF AWARD
CLAUSES INCORPORATED BY REFERENCE
52.204‐7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.204‐16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
52.204‐22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)
52.217‐5 EVALUATION OF OPTIONS (JUL 1990)
52.222‐5 CONSTRUCTION WAGE RATE REQUIREMENTS‐‐SECONDARY SITE OF THE WORK (MAY 2014)
52.236‐28 PREPARATION OF PROPOSALS‐‐CONSTRUCTION (OCT 1997)
252.204‐7019 NOTICE OF NIST SP 800‐171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)
252.215‐7008 ONLY ONE OFFER (JUL 2019)
252.215‐7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2018) . 87
252.219‐7000 ADVANCING SMALL BUSINESS GROWTH (SEP 2016)
CLAUSES INCORPORATED BY FULL TEXT
52.215‐1 INSTRUCTIONS TO OFFERORS‐‐COMPETITIVE ACQUISITION (NOV 2021)—ALTERNATE I (OCT 1997)... 87
52.216‐1 TYPE OF CONTRACT (APR 1984)
52.233‐2 SERVICE OF PROTEST (SEP 2006)
52.236‐27 SITE VISIT (CONSTRUCTION) (FEB 1995)
52.252‐1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
RESPONSIBILITY DETERMINATION
SECTION 00 21 16 ‐ INSTRUCTIONS TO PROPOSERS
SUPPLY INSTRUCTIONS TO OFFERORS
CLAUSES INCORPORATED BY REFERENCE
52.204‐7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
52.204‐16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
52.204‐22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)
52.217‐5 EVALUATION OF OPTIONS (JUL 1990)
52.232‐13 NOTICE OF PROGRESS PAYMENTS (APR 1984)
252.204‐7019 NOTICE OF NIST SP 800‐171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)
252.215‐7008 ONLY ONE OFFER (JUL 2019)
252.215‐7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS (JAN 2018) . 93
CLAUSES INCORPORATED BY FULL TEXT
52.233‐2 SERVICE OF PROTEST (SEP 2006)
SECTION 00 45 00 ‐ REPRESENTATIONS AND CERTIFICATIONS
SUPPLY (S) AND CONSTRUCTION (C) REPRESENTATIONS AND CERTIFICATIONS
CLAUSES INCORPORATED BY REFERENCE
252.203‐7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2022) 252.204‐7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS (OCT 2016) .. 94
TOC-1
252.204‐7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES ‐‐
REPRESENTATION (DEC 2019)
252.204‐7017 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR
SERVICES‐‐REPRESENTATION (MAY 2021)
CLAUSES INCORPORATED BY FULL TEXT
52.204‐8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)
52.204‐24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (NOV 2021)
52.204‐26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES‐‐REPRESENTATION (OCT 2020)
52.209‐7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
52.209‐13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS‐‐CERTIFICATION (NOV 2021) 52.229‐11 TAX ON CERTAIN FOREIGN PROCUREMENTS‐‐NOTICE AND REPRESENTATION (JUN 2020)
252.204‐7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2021)
252.225‐7055 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (MAY 2022)
SECTION 00 70 00 ‐ CONDITIONS OF THE CONTRACT SUPPLY CLAUSES
CLAUSES INCORPORATED BY REFERENCE
52.202‐1 DEFINITIONS (JUN 2020)
52.203‐3 GRATUITIES (APR 1984)
52.203‐5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203‐6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
52.203‐7 ANTI‐KICKBACK PROCEDURES (JUN 2020)
52.203‐8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
52.203‐10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
52.203‐13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)
52.203‐17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (JUN 2020)
52.203‐19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
52.204‐4 PRINTED OR COPIED DOUBLE‐SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204‐9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204‐10 REPORTING EXECUTIVE COMPENSATION AND FIRST‐TIER SUBCONTRACT AWARDS (JUN 2020)
52.204‐13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204‐18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204‐21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) 52.204‐23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR
PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)
52.204‐25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (NOV 2021)
52.209‐6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)
52.209‐9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 108 52.209‐10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS. (NOV 2015)
52.210‐1 MARKET RESEARCH (JUN 2020)
52.211‐5 MATERIAL REQUIREMENTS (AUG 2000)
52.211‐17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
TOC-2
52.219‐8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2022)
52.219‐9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)‐‐ALTERNATE II (NOV 2016)
52.219‐16 LIQUIDATED DAMAGES‐SUBCONTRACTING PLAN (SEP 2021)
52.222‐1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222‐3 CONVICT LABOR (JUN 2003)
52.222‐19 CHILD LABOR—COOPERATION WITH AUTHORITIES AND REMEDIES (DEVIATION 2020‐O0019) (JAN
2022)
52.222‐20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT (JUN 2020)
52.222‐21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222‐24 PREAWARD ON‐SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999)
52.222‐26 EQUAL OPPORTUNITY (SEPT 2016)
52.222‐35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
52.222‐36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
52.222‐37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222‐40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
52.222‐50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.222‐54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)
52.222‐62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
52.223‐6 DRUG‐FREE WORKPLACE (MAY 2001)
52.223‐11 OZONE‐DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (JUN 2016)
52.223‐15 ENERGY EFFICIENCY IN ENERGY‐CONSUMING PRODUCTS (MAY 2020)
52.223‐18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)
52.223‐20 AEROSOLS (JUN 2016)
52.223‐21 FOAMS (JUN 2016)
52.225‐13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.227‐1 AUTHORIZATION AND CONSENT (JUN 2020)
52.227‐2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)
52.228‐5 INSURANCE‐‐WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228‐11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021) (DEVIATION 2020‐O0016)
52.228‐12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228‐15 PERFORMANCE AND PAYMENT BONDS‐CONSTRUCTION (JUN 2020) (DEVIATION 2020‐O0016)
52.229‐3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.229‐12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
52.232‐1 PAYMENTS (APR 1984)
52.232‐8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232‐9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)
52.232‐11 EXTRAS (APR 1984)
52.232‐17 INTEREST (MAY 2014)
52.232‐23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232‐25 PROMPT PAYMENT (JAN 2017)
52.232‐33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (OCT 2018) .. 109
52.232‐39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232‐40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV 2021)
52.233‐1 DISPUTES. (MAY 2014) ‐‐ ALTERNATE I (DEC 1991)
52.233‐3 PROTEST AFTER AWARD (AUG. 1996)
52.233‐4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.242‐2 PRODUCTION PROGRESS REPORTS (APR 1991)
TOC-3
52.242‐13 BANKRUPTCY (JUL 1995)
52.242‐15 STOP‐WORK ORDER (AUG 1989)
52.242‐17 GOVERNMENT DELAY OF WORK (APR 1984)
52.243‐1 CHANGES‐‐FIXED‐PRICE (AUG 1987)
52.244‐6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2022)
52.246‐2 INSPECTION OF SUPPLIES‐‐FIXED‐PRICE (AUG 1996)
52.246‐16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
52.247‐34 F.O.B. DESTINATION (NOV 1991)
52.247‐68 REPORT OF SHIPMENT (REPSHIP) (FEB 2006)
52.249‐2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED‐PRICE) (APR 2012)
52.249‐8 DEFAULT (FIXED‐PRICE SUPPLY AND SERVICE) (APR 1984)
52.253‐1 COMPUTER GENERATED FORMS (JAN 1991)
252.201‐7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.203‐7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) 252.203‐7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE‐CONTRACT‐RELATED
FELONIES (DEC 2008)
252.203‐7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.203‐7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
252.203‐7004 DISPLAY OF HOTLINE POSTERS (AUG 2019)
252.204‐7000 DISCLOSURE OF INFORMATION (OCT 2016)
252.204‐7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204‐7004 LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (FEB 2019)
252.204‐7006 BILLING INSTRUCTIONS (OCT 2005)
252.204‐7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEC 2019)
252.204‐7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016)
252.204‐7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT
OR SERVICES (JAN 2021)
252.204‐7020 NIST SP 800‐171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)
252.205‐7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991) 252.209‐7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019)
252.211‐7007 REPORTING OF GOVERNMENT‐FURNISHED PROPERTY (MAR 2022)
252.211‐7008 USE OF GOVERNMENT‐ASSIGNED SERIAL NUMBERS (SEP 2010)
252.223‐7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS‐‐
BASIC (SEP 2014)
252.223‐7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225‐7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM‐‐BASIC (JUN 2022)
252.225‐7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022)
252.225‐7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (MAR 2013)
252.225‐7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)
252.225‐7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JUN 2011)
252.225‐7048 EXPORT‐CONTROLLED ITEMS (JUNE 2013)
252.226‐7001 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN‐OWNED ECONOMIC ENTERPRISES, AND
NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (APR 2019)
252.227‐7000 NON‐ESTOPPEL. (OCT 1966)
252.227‐7013 RIGHTS IN TECHNICAL DATA‐‐NONCOMMERCIAL ITEMS (FEB 2014)
TOC-4
252.227‐7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2011)
252.227‐7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)
252.227‐7030 TECHNICAL DATA‐‐WITHHOLDING OF PAYMENT (MAR 2000)
252.227‐7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA. (APR 2022)
252.232‐7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)
252.232‐7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.243‐7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
252.243‐7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.244‐7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2021)
252.247‐7023 TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)
CLAUSES INCORPORATED BY FULL TEXT
52.232‐16 PROGRESS PAYMENTS (NOV 2021) (DEVIATION 2020‐O0010)
52.248‐1 VALUE ENGINEERING (JUN 2020)
52.252‐2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252‐6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
252.211‐7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)
SECTION 00 72 00 ‐ GENERAL CONDITIONS CONSTRUCTION CLAUSES
CLAUSES INCORPORATED BY REFERENCE
52.202‐1 DEFINITIONS (JUN 2020)
52.203‐3 GRATUITIES (APR 1984)
52.203‐5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203‐6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
52.203‐7 ANTI‐KICKBACK PROCEDURES (JUN 2020)
52.203‐8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY
2014)
52.203‐10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203‐12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (JUN 2020)
52.203‐13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)
52.203‐16 PREVENTING PERSONAL CONFLICTS OF INTEREST (JUN 2020)
52.203‐17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (JUN 2020)
52.203‐19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS
(JAN 2017)
52.204‐2 SECURITY REQUIREMENTS (MAR 2021) ‐ ALTERNATE II (APR 1984)
52.204‐4 PRINTED OR COPIED DOUBLE‐SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204‐9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204‐10 REPORTING EXECUTIVE COMPENSATION AND FIRST‐TIER SUBCONTRACT AWARDS (JUN 2020)
52.204‐13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204‐14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
52.204‐18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204‐19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) 52.204‐21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) 52.204‐23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR
PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)
52.204‐25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT (NOV 2021)
TOC-5
52.209‐6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021)
52.209‐9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) 128 52.209‐10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS. (NOV 2015)
52.210‐1 MARKET RESEARCH (NOV 2021)
52.211‐13 TIME EXTENSIONS (SEP 2000)
52.215‐2 AUDIT AND RECORDS‐‐NEGOTIATION (JUN 2020)
52.215‐3 REQUEST FOR INFORMATION OR SOLICITATION FOR PLANNING PURPOSES (OCT 1997) 52.215‐11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA‐‐MODIFICATIONS (JUN 2020)
52.215‐19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
52.219‐4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT 2022)
52.219‐8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2022)
52.219‐9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2022)‐‐ALTERNATE II (NOV 2016)
52.219‐16 LIQUIDATED DAMAGES‐SUBCONTRACTING PLAN (SEP 2021)
52.219‐28 POST‐AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)
52.222‐1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222‐3 CONVICT LABOR (JUN 2003)
52.222‐4 CONTRACT WORK HOURS AND SAFETY STANDARDS ‐ OVERTIME COMPENSATION (MAY 2018)
52.222‐6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
52.222‐7 WITHHOLDING OF FUNDS (MAY 2014)
52.222‐8 PAYROLLS AND BASIC RECORDS (JUL 2021)
52.222‐9 APPRENTICES AND TRAINEES (JUL 2005)
52.222‐10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222‐11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222‐12 CONTRACT TERMINATION‐‐DEBARMENT (MAY 2014)
52.222‐13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY
2014)
52.222‐14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222‐15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222‐21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222‐26 EQUAL OPPORTUNITY (SEPT 2016)
52.222‐27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)
52.222‐32 CONSTRUCTION WAGE RATE REQUIREMENTS‐‐PRICE ADJUSTMENT (ACTUAL METHOD) (AUG 2018)
52.222‐35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
52.222‐36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
52.222‐37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222‐40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
52.222‐50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.222‐54 EMPLOYMENT ELIGIBILITY VERIFICATION (MAY 2022)
52.222‐55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 (JAN 2022)
52.222‐62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022)
52.223‐2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION
CONTRACTS (SEP 2013)
52.223‐3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)
52.223‐5 POLLUTION PREVENTION AND RIGHT‐TO‐KNOW INFORMATION (MAY 2011)
TOC-6
52.223‐6 DRUG‐FREE WORKPLACE (MAY 2001)
52.223‐11 OZONE‐DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (JUN 2016)
52.223‐12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION EQUIPMENT AND AIR
CONDITIONERS (JUN 2016)
52.223‐15 ENERGY EFFICIENCY IN ENERGY‐CONSUMING PRODUCTS (MAY 2020)
52.223‐17 AFFIRMATIVE PROCUREMENT OF EPA‐DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (AUG 2018)
52.223‐18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020)
52.223‐20 AEROSOLS (JUN 2016)
52.223‐21 FOAMS (JUN 2016)
52.225‐12 NOTICE OF BUY AMERICAN ACT REQUIREMENT‐‐ CONSTRUCTION MATERIALS (MAY 2014) ‐
ALTERNATE I (MAY 2014)
52.225‐13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.227‐1 AUTHORIZATION AND CONSENT (JUN 2020)
52.227‐2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (JUN 2020)
52.227‐4 PATENT INDEMNITY‐‐CONSTRUCTION CONTRACTS (DEC 2007)
52.228‐2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228‐5 INSURANCE‐‐WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228‐11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021) (DEVIATION 2020‐O0016)
52.228‐12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228‐15 PERFORMANCE AND PAYMENT BONDS‐CONSTRUCTION (JUN 2020) (DEVIATION 2020‐O0016)
52.229‐3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.229‐12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
52.232‐5 PAYMENTS UNDER FIXED‐PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232‐17 INTEREST (MAY 2014)
52.232‐23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232‐27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232‐33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (OCT 2018) .. 130
52.232‐39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232‐40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV 2021)
52.233‐1 DISPUTES. (MAY 2014) ‐‐ ALTERNATE I (DEC 1991)
52.233‐3 PROTEST AFTER AWARD (AUG. 1996)
52.233‐4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236‐2 DIFFERING SITE CONDITIONS (APR 1984)
52.236‐3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236‐5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236‐6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236‐7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236‐8 OTHER CONTRACTS (APR 1984)
52.236‐9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
(APR 1984)
52.236‐10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236‐11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236‐12 CLEANING UP (APR 1984)
52.236‐13 ACCIDENT PREVENTION (NOV 1991)
52.236‐14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236‐15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
TOC-7
52.236‐17 LAYOUT OF WORK (APR 1984)
52.236‐21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ‐ ALTERNATE I (APR 1984)
52.236‐26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242‐5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
52.242‐13 BANKRUPTCY (JUL 1995)
52.242‐14 SUSPENSION OF WORK (APR 1984)
52.243‐4 CHANGES (JUN 2007)
52.244‐6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2022)
52.245‐1 GOVERNMENT PROPERTY (SEP 2021)
52.245‐9 USE AND CHARGES (APR 2012)
52.246‐12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.246‐13 INSPECTION‐‐DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)
52.246‐21 WARRANTY OF CONSTRUCTION (MAR 1994)
52.248‐3 VALUE ENGINEERING‐‐CONSTRUCTION (OCT 2020)
52.249‐2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED‐PRICE) (APR 2012) ‐ ALTERNATE I
(SEP 1996)
52.249‐10 DEFAULT (FIXED‐PRICE CONSTRUCTION) (APR 1984)
52.253‐1 COMPUTER GENERATED FORMS (JAN 1991)
252.201‐7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.203‐7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) 252.203‐7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE‐CONTRACT‐RELATED
FELONIES (DEC 2008)
252.203‐7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
252.203‐7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)
252.203‐7004 DISPLAY OF HOTLINE POSTERS (AUG 2019)
252.204‐7000 DISCLOSURE OF INFORMATION (OCT 2016)
252.204‐7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204‐7004 LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (FEB 2019)
252.204‐7006 BILLING INSTRUCTIONS (OCT 2005)
252.204‐7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (DEC 2019)
252.204‐7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (MAY 2016)
252.204‐7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT
OR SERVICES (JAN 2021)
252.204‐7020 NIST SP 800‐171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)
252.205‐7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991) 252.209‐7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2019)
252.211‐7007 REPORTING OF GOVERNMENT‐FURNISHED PROPERTY (AUG 2012)
252.219‐7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) (DEC 2019)
252.223‐7001 HAZARD WARNING LABELS (DEC 1991)
252.223‐7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS‐‐
BASIC (SEP 2014)
252.223‐7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225‐7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)
252.225‐7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JUN 2011)
252.225‐7048 EXPORT‐CONTROLLED ITEMS (JUNE 2013)
TOC-8
252.225‐7056 PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (MAY 2022)
252.227‐7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2011)
252.227‐7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)
252.227‐7030 TECHNICAL DATA‐‐WITHHOLDING OF PAYMENT (MAR 2000)
252.227‐7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
252.227‐7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA. (APR 2022)
252.232‐7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)
252.232‐7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.235‐7003 FREQUENCY AUTHORIZATION (MAR 2014)
252.236‐7000 MODIFICATION PROPOSALS ‐ PRICE BREAKDOWN. (DEC 1991)
252.236‐7002 OBSTRUCTION OF NAVIGABLE WATERWAYS. (DEC 1991)
252.236‐7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION (DEC 1991)
252.243‐7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
252.243‐7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.244‐7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2021)
252.245‐7002 REPORTING LOSS OF GOVERNMENT PROPERTY (JAN 2021)
252.245‐7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)
252.245‐7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)
252.247‐7023 TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)
CLAUSES INCORPORATED BY FULL TEXT
52.211‐10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
52.211‐12 LIQUIDATED DAMAGES‐‐CONSTRUCTION (SEP 2000)
52.216‐4 ECONOMIC PRICE ADJUSTMENT – LABOR AND MATERIAL (JAN 2017) – MODIFIED
ESCALATION OF LABOR RATES
ESCALATION OF MATERIAL COSTS
52.217‐7 OPTION FOR INCREASED QUANTITY‐‐SEPARATELY PRICED LINE ITEM (MAR 1989)
52.222‐23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
52.223‐9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA‐DESIGNATED ITEMS (MAY
2008)
52.225‐11 BUY AMERICAN‐‐CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2022)
52.228‐14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.232‐7 PAYMENTS UNDER TIME‐AND‐MATERIALS AND LABOR‐HOUR CONTRACTS (NOV 2021)
52.236‐1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
52.236‐4 PHYSICAL DATA (APR 1984)
52.252‐2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252‐6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
252.236‐7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
SECTION 00 73 00 ‐ SUPPLEMENTARY CONDITIONS
WAGE DETERMINATION‐CONFLICTING SCHEDULES: OREGON AND WASHINGTON
ARCHITECT‐ENGINEER CLAUSES
CLAUSES INCORPORATED BY REFERENCE
52.232‐10 PAYMENTS UNDER FIXED‐PRICE ARCHITECT‐ENGINEER CONTRACTS (APR 2010)
52.232‐26 PROMPT PAYMENT FOR FIXED‐PRICE ARCHITECT‐ENGINEER CONTRACTS (JAN 2017)
52.236‐23 RESPONSIBILITY OF THE ARCHITECT‐ENGINEER CONTRACTOR (APR 1984)
52.236‐24 WORK OVERSIGHT IN ARCHITECT‐ENGINEER CONTRACTS (APR 1984)
52.236‐25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003)
TOC-9
52.244‐4 SUBCONTRACTORS AND OUTSIDE ASSOCIATES AND CONSULTANTS (ARCHITECT‐ENGINEER SERVICES)
(AUG 1998)
52.248‐2 VALUE ENGINEERING‐‐ARCHITECT‐ENGINEER (MAR 1990)
52.249‐7 TERMINATION (FIXED‐PRICE ARCHITECT‐ENGINEER) (APR 1984)
252.227‐7022 GOVERNMENT RIGHTS (UNLIMITED) (MAR 1979)
252.227‐7024 NOTICE AND APPROVAL OF RESTRICTED DESIGNS (APR 1984)
CLAUSES INCORPORATED BY FULL TEXT
52.243‐1 CHANGES‐‐FIXED‐PRICE (AUG 1987) ‐ ALTERNATE III (APR 1984)
CONTRACT ADMINISTRATION
A. CONTRACTADMINISTRATION
B. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
C. IDENTIFICATION OF EMPLOYEES
D. OTHER WORK
E. SUBMITTING PAY ESTIMATES AND PAYMENTS TO THE CONTRACTOR
F. IMPLEMENTING EQUIPMENT GUARANTEES
G. SAFEGUARDING OF INFORMATION
H. INSURANCE – WORK ON A GOVERNMENT INSTALLATION
I. PUBLIC RELEASE OF INFORMATION
J. CONTRACTOR PERFORMANCE EVALUATIONS
K. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY
(EXECUTIVE ORDER 11246)
BPA FUNDED PROJECT
INCREMENTALLY‐FUNDED CONTRACTS CLAUSE
LIST OF ATTACHMENTS
TOC-10
Section 00 10 00 ‐ Solicitation
PRICE SCHEDULE
Price Schedule
Unrestricted Competition
The magnitude of the project is estimated to be over $500,000,000.
1. The price schedule is divided into categories/tables for the following:
Hydraulic Turbine Design (0100s) Prototype Design (0200s) Miscellaneous Equipment, Spare Parts, and Oil Disposal (0300s) Unit AA Prototype Supply and Install (0400s) Unit AB Prototype Supply and Install (0500s) Unit FA Prototype Supply and Install (0600s) Unit AC Prototype Supply and Install (0700s) Unit FB Prototype Supply and Install (0800s) Unit AD Prototype Supply and Install (0900s) Unit FC Prototype Supply and Install (1000s) Unit AE Prototype Supply and Install (1100s) Unit FD Prototype Supply and Install (1200s) Unit AF Prototype Supply and Install (1300s) Unit FE Prototype Supply and Install (1400s) Unit FF Prototype Supply and Install (1500s) Optional Unit AG Prototype Supply and Install (1600s) Optional Unit FG Prototype Supply and Install (1700s) Optional Unit AH Prototype Supply and Install (1800s) Optional Unit FH Prototype Supply and Install (1900s) Optional Unit AI Prototype Supply and Install (2000s) Optional Unit FI Prototype Supply and Install (2100s) Optional Unit AJ Prototype Supply and Install (2200s) Optional Unit FJ Prototype Supply and Install (2300s)
2. The first letter following “Unit” designates the turbine type; ‘A’ identifies adjustable blade and ‘F’ identifies fixed blade. The second letter following the turbine type designator identifies the order of the unit (alphabetical order). For example, Unit AA is the first unit with an adjustable-blade turbine runner.
3. Where variations of an item are priced under one CLIN, the first item (AA) will be awarded as the base requirement. As required based on the final turbine configuration chosen by the Government, subsequent items (optional) will be awarded based upon the outcome of the hydraulic design. No more than one subsequent item (optional) will be awarded for each CLIN and this optional item represents the incremental price difference relative to the first item (AA). All mandatory and optional CLINs will be evaluated during the selection process consistent with the evaluation factor instructions within the solicitation. The solicitation will state, for award purposes, that price will be evaluated based on the total sum anticipated for all base and option CLINs. Evaluation of the option shall not obligate the Government to exercise the option.
4. The price schedule categories provided generally align with the phases of work as defined in Section 01
11.00 00 25 (with some overlapping exceptions).
00 10 00-3
5. The tables include a column that delineates which CLINs are governed by supply clauses and those that are governed by construction clauses. The Supply clauses defined in this contract apply to the CLINs with an ‘S’ designation in the tables and the Construction clauses apply to the CLINs with a ‘C’ designation in the tables.
6. Certain CLINs will be adjusted in accordance with Clause 52.216-4 ECONOMIC PRICE ADJUSTMENT
– LABOR AND MATERIAL and WAGE DETERMINATION. CLINs eligible for economic price adjustment are designated in the bases as “Eligible for economic price adjustment” and CLINs affected by wage determination will include “Percent of the CLIN that is labor subject to Davis-Bacon: ___%” in the bases.
7. The basis for some CLINs include blanks where the Offeror must provide weights, surface area, and labor and material percentages. All weights signify finished weights in U.S. pounds and must be inclusive of any and all markups. All surface areas signify square footage of finished surfaces. The sum of the percentages provided must be no more than 100%. Some CLINs will be eligible for certain adjustments based on hydraulic design. This will be noted in the bases as “Eligible for material weight adjustment” and/or “Eligible for supply CLIN labor adjustment.” Following acceptance of the final hydraulic design, the contractor shall submit to the contracting officer adjusted weights and surface areas for a contract modification for hydraulic design to be initiated by the government. The adjustments will be made solely to the labor and material percentages provided. These bases will be used to determine/calculate the material weight adjustment and the supply CLIN labor. Descriptions and examples of these two types of adjustments are detailed below.
a. MATERIAL WEIGHT ADJUSTMENT: First, the material price at award, in the year of award dollars, will be determined/calculated. The material weight of some prototype CLINs will be dependent on the outcome of the hydraulic and prototype designs. For these CLINs, if the weight(s) of material(s) (quantities) change(s) as a result of the collaborative hydraulic design process, an adjustment will be made on the material weight(s). These CLINs have been identified as “ELIGIBLE FOR MATERIAL WEIGHT ADJUSTMENT” in the basis. All other CLINs, which do not include this identifier, will not be adjusted for material weight(s) due to the hydraulic design. The basis, specification technical requirements, and Offeror’s proposal define the configuration of the item for material price award.
i. For those CLINs identified as “Eligible for material weight adjustment” in the basis, the stainless-steel price at award (SSAward), carbon steel price at award (CSAward ), copper price at award (CuAward), and Concrete (CAward ) (and/or grout) will be calculated by multiplying the total CLIN price by the percentage of each material in the basis and by the ratio of the final design material weight divided by the awarded design material weight (Equations 1- 4).
𝑆𝑆 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑆𝑡𝑎𝑖𝑛𝑙𝑒𝑠𝑠 𝑆𝑡𝑒𝑒𝑙 ∗
𝑆𝑡𝑎𝑖𝑛𝑙𝑒𝑠𝑠 𝑆𝑡𝑒𝑒𝑙 𝑊𝑒𝑖𝑔ℎ𝑡
𝑆𝑡𝑎𝑖𝑛𝑙𝑒𝑠𝑠 𝑆𝑡𝑒𝑒𝑙 𝑊𝑒𝑖𝑔ℎ𝑡
Equation 1
𝐶𝑆 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑎𝑟𝑏𝑜𝑛 𝑆𝑡𝑒𝑒𝑙 ∗
𝐶𝑎𝑟𝑏𝑜𝑛 𝑆𝑡𝑒𝑒𝑙 𝑊𝑒𝑖𝑔ℎ𝑡
𝐶𝑎𝑟𝑏𝑜𝑛 𝑆𝑡𝑒𝑒𝑙 𝑊𝑒𝑖𝑔ℎ𝑡
Equation 2
𝐶𝑢 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑜𝑝𝑝𝑒𝑟 ∗
𝐶𝑜𝑝𝑝𝑒𝑟 𝑊𝑒𝑖𝑔ℎ𝑡
𝐶𝑜𝑝𝑝𝑒𝑟 𝑊𝑒𝑖𝑔ℎ𝑡
Equation 3
00 10 00-4
𝐶 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑜𝑛𝑐𝑟𝑒𝑡𝑒 ∗
𝐶𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑊𝑒𝑖𝑔ℎ𝑡
𝐶𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑊𝑒𝑖𝑔ℎ𝑡
Equation 4
b. SUPPLY CLIN LABOR ADJUSTMENT: Certain CLINs are eligible for an adjustment to labor quantity (not labor rates) based on changes in surface area during the iterative design process (this accounts for increases or decreases to manufacturing labor)
𝐿𝑎𝑏𝑜𝑟 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐿𝑎𝑏𝑜𝑟 ∗
𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎
𝑆𝑢𝑟𝑓𝑎𝑐𝑒 𝐴𝑟𝑒𝑎
c. TOTAL CLIN ADJUSTMENT: Sum of unadjusted portion, material adjustment and labor adjustment.
𝐶𝐿𝐼𝑁 𝐶𝐿𝐼𝑁 𝑃𝑟𝑖𝑐𝑒 ∗ 100% 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝑆𝑡𝑎𝑖𝑛𝑙𝑒𝑠𝑠 𝑆𝑡𝑒𝑒𝑙
𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑎𝑟𝑏𝑜𝑛 𝑆𝑡𝑒𝑒𝑙 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑜𝑝𝑝𝑒𝑟
𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐶𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑃𝑒𝑟𝑐𝑒𝑛𝑡 𝐿𝑎𝑏𝑜𝑟
𝐶𝐿𝐼𝑁 𝐶𝐿𝐼𝑁 𝑆𝑆 𝐶𝑆 𝐶𝑢 𝐶 𝐿𝑎𝑏𝑜𝑟
8. This paragraph shows an example of how prices will be adjusted for material and labor. This is an example for CLIN 0401AA Supply 299.5-Inch Adjustable Five Blade Runner (Base Requirement). This is just an example to illustrate how economic price adjustments will be made.
a. CLIN 0401AA Supply 299.5-Inch Adjustable Five Blade Runner (Base Requirement)
i. Values at award
1. CLIN 0401AA award price: $10,000,000
2. Pounds of stainless-steel: 300,000
3. Pounds of carbon steel: 200,000
4. Surface area (square feet): 2,000
5. Percent of total CLIN price that is stainless-steel: 25%
6. Percent of total CLIN price that is carbon steel: 10%
7. Percent of total CLIN price that is labor: 50%
ii. Values at NTP of Unit AA supply
1. Pounds of stainless-steel (final design): 285,000
2. Pounds of carbon steel (final design): 220,000
3. Surface area (square feet): 2,250
b. MATERIAL WEIGHT ADJUSTMENT: Adjust for change in weight as this CLIN is eligible for material weight adjustment
𝑆𝑆 $10,000,000 ∗ 0.25 ∗
285,000 300,000
$2,375,000
𝐶𝑆 $10,000,000 ∗ 0.10 ∗
220,000 200,000
$1,100,000
00 10 00-5
c. LABOR ADJUSTMENT ON SUPPLY CLINS: Adjust for change in labor as this CLIN is eligible for material weight adjustment
𝐿𝑎𝑏𝑜𝑟 $10,000,000 ∗ 0.50 ∗ 2,250 2,000
$5,625,000
d. TOTAL CLIN ADJUSTMENT: Sum the unadjusted with the adjustments
𝐶𝐿𝐼𝑁 $10,000,000 ∗ 1 0.25 0.1 0 0 0.5 $1,500,000
𝐶𝐿𝐼𝑁 $1,500,000 $2,375,000 $1,100,000 $0 $0 $5,625,000 $10,600,000
9. Prototype bid item “Description” column verbs are defined as follows:
Design – Prototype design/engineering including analysis and the preparation of design documentation (reports, drawings, etc.).
Furnish – Design/engineering, manufacturing, procurement, and delivery of components to John
Day Powerhouse.
Supply – Manufacturing/procurement and delivery to John Day Powerhouse Install (Installation) – Field work to incorporate new, modified, and/or existing components into the finished generating unit.
Provide – Furnish and install.
Refurbish (Refurbishment) – Rehabilitation of existing components (including incorporation of replacement/modified components) for usage in the rebuilt generating unit.
Replace (Replacement) – Removal of existing component (if require for installation of replacement components) and installation of replacement component.
Hydraulic Turbine Design
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Pre-Iteration Coordination, Design, Analysis, and Performance Model Construction
1 JOB S $________ N/A
Adjustable Blade Iteration 1A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 309-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Five Blade, 317-inch Diameter CFD (Optional)
1 JOB S $________ N/A
00 10 00-6
(Optional)
Adjustable Blade Iteration 1A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
Adjustable Blade Iteration 2A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 2A - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 2A - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
Adjustable Blade Iteration 3A Base Design Work
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 1 (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design CFD With Draft Tube Modification 2 (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 3A - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 4A Design Work (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 4A - ERDC Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Iteration 5A Design Work (Optional)
00 10 00-7
Adjustable Blade Iteration 5A - ERDC Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
Adjustable Blade Final Design Performance Model Testing
1 JOB S $________ N/A
Fixed Blade Iteration 1F Base Design Work
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Five Blade, 319-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Five Blade, 327-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 1F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
Fixed Blade Iteration 2F Base Design Work
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 2F - Preliminary Design Six Blade, TBD-inch Diameter CFD (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 2F - Preliminary Design Performance Model Testing (Diameter TBD) (Optional)
1 JOB S $________ N/A
Fixed Blade Iteration 3F Base Design Work
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design CFD With Modified Distributor (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 1 (Optional)
00 10 00-8
Fixed Blade Iteration 3F - Preliminary Design CFD With Draft Tube Modification 2 (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 3F - Preliminary Design Performance Model Testing With Draft Tube Modification (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration 4F Design Work (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Iteration
4F - ERDC
Observational Model Testing Coordination (Optional)
1 JOB S $________ N/A
Fixed Blade Final Design Performance Model Testing
1 JOB S $________ N/A
(Optional)
Supply Set of Model Wicket Gates (Optional)
2 SET S $________ N/A
Hydraulic Design Sub-Total $_____________
Prototype Design
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Discharge Ring Diameter Preliminary Analyses
1 JOB S $________ N/A
Adjustable Blade Runner Prototype Design
1 JOB S $________ N/A
Adjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
1 JOB S $________ N/A
Adjustable Blade Stay Vane Modifications Prototype Design
1 JOB S $________ N/A
Adjustable Blade Wicket Gate Prototype Design
1 JOB S $________ N/A
Adjustable Blade Lower Turbine Shaft
00 10 00-9 and Blade Servomotor Shaft Prototype Design
(Optional)
Adjustable Blade Replacement Inner Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
Fixed Blade Runner Prototype Design
1 JOB S $________ N/A
Fixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
1 JOB S $________ N/A
(Optional)
Fixed Blade Stay Vane Modifications Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Wicket Gate Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Fixed Blade Replacement Inner Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Modified Outer Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Replacement Outer Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
(Optional)
Modified Intermediate Head Cover Prototype Design (Optional)
1 JOB S $________ N/A
Surface Air Coolers Design
1 JOB S $________ N/A
Prototype Stator Bar Design, Manufacture, and Test
1 JOB S $________ N/A
(Optional)
Thrust Bearing Structural Analysis (Optional)
1 JOB S $________ N/A
(Optional)
Adjustable Blade Draft Tube Modification Design (Optional)
00 10 00-10
Fixed Blade Draft Tube Modification Design (Optional)
1 JOB S $________ N/A
Prototype Design Sub-Total $_____________
Miscellaneous Equipment, Spare Parts, Oil Disposal, and Optional Rewinds
ITEM DESCRIPTION Q U/M CLAUSES AMOUNT BASIS
Design and Supply One Stator Core Including Materials, Accessories, and Factory Testing
1 JOB S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0463 price that is carbon steel: ___%
Percent of the total CLIN 0463 price that is labor: ___%
Mobilization and Demobilization
1 JOB C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Supply Spare Wicket Gates
1 JOB S $________
Eligible for material weight adjustment.
Eligible for supply CLIN labor adjustment.
As shown on proposal drawings:
______ pounds of stainless-steel
_______ square feet of all wetted surfaces
Percent of the total CLIN 0303 price that is stainless-steel steel material: ___%
Percent of the total CLIN 0303 price that is labor: ___%
Supply Generator Spare Parts
1 JOB S $________ N/A
Supply Spare Surface Air Cooler Assemblies
1 JOB S $________
N/A
Supply Other Required Spare Parts
00 10 00-11
Oil Disposal - 8,000 Gallons (Optional)
6 EA C
Unit Price
Total
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
(Optional)
Oil Disposal - 500 Gallons (Optional)
5 EA C
Unit Price
Total
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Mobilization and Demobilization for Rewind Only (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Supply Complete Set of Stator Bars, Including Supplies and Accessories for a Complete New Winding Including Factoring Testing (Optional)
4 EA S $________
Eligible for economic price adjustment.
Percent of the total CLIN 0310 price that is copper: ____%
Remove Existing Stator Winding and Install and Test New Stator Winding (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Supply Surface Air Coolers (Optional)
48 EA S $________ Eligible for economic price adjustment.
Percent of the total CLIN 0312 price that is carbon steel: ___%
Percent of the total CLIN 0312 price that is copper: ___%
Percent of the total CLIN 0312 price that is labor: ___%
Install Surface Air Coolers (Optional)
48 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
00 10 00-12
Pre-Disassembly Watered Operational Testing (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Generating Unit Disassembly (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Provide Water and Oil Piping Systems and Components (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Provide Electrical Devices, Temperature Indicating Devices, and Wiring/Cable (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Provide High Pressure Oil Injection System Components (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Thrust Bearing Phase 1 Inspections (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Thrust Bearing Phase 2 Inspections (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Refurbish Thrust Bearing Shoes (Optional)
48 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Refurbish Thrust Bearing Runner and Collar (Optional)
4 EA C $________
Percent of the CLIN that is labor
00 10 00-13
Upper Generator Guide Bearing NDT (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Refurbish Upper Generator Guide Bearing Shoes (Optional)
48 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Lower Generator Guide Bearing NDT (Optional)
4 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Refurbish Lower Generator Guide Bearing (Optional)
48 EA C $________
Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Turbine Guide Bearing NDT (Optional)
4 EA C $________ Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Refurbish Turbine Guide Bearing (Optional)
4 EA C $________ Percent of the CLIN that is labor subject to Davis-Bacon: ___%
Provide Thrust Bearing Oil Coolers (Optional)
4 EA C $________ Percent of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .