W9127N24R0001 TRGR Draft 100 Percent Drawings.pdf

PDF 26 MB Posted

Attached to
John Day Dam Turbine Runner Replacement and Generator Rewind Project-100% Review
Solicitation number
W9127N24R0001
Issued by

View the file

Other files

File Type Posted
PLA Request for Input 06 16 2025.docx DOCX document
Draft Turbine Performance 48 13 13.01 26.pdf PDF
PLA Request for Input.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications Specs+A1-A23.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A24.pdf PDF
B.01 7N24R0001 TRGR Draft 100 Percent Specifications A25.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 1 USACE.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 3.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent RFP.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4b.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 5.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4a.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 4.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 1.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 7.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 2.pdf PDF
W9127N24R0001 TRGR Draft 100 Percent Specifications 6.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings.pdf PDF
W9127N24R0001 TRGR Draft 95 RFP and Specifications.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 4 BLH3.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 2 BLH1.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 5 Others.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 3 BLH2.pdf PDF
W9127N24R0001 TRGR Draft 95 Drawings Reference Part 1 USACE.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Portland District q of Engineers

US Army Corps

DATE:

DIRECTOR, HYDROELECTRIC DESIGN CENTER

JORDAN S. FINK, P.E.

EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR

DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE

THE INITIALS OR SIGNATURES AND REGISTRATION

DISTRICT OF THE U.S. ARMY CORPS OF ENGINEERS.

THIS PROJECT WAS DESIGNED BY THE PORTLAND

CHIEF, DESIGN BRANCH

MARK J. SAWKA, P.E.

CHIEF, ENGINEERING & CONSTRUCTION DIVISION

PATRICK L. DUYCK, P.E.

& GENERATOR REWIND

TURBINE REHABILITATION

POWERHOUSE

JOHN DAY LOCK AND DAM

DISTRICT COMMANDER

COLONEL, CORPS OF ENGINEERS

LARRY D. CASWELL

CONTRACT NUMBER: XXXXXXXXXXXXXXXX

JUNE, 2023

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

IC

T

U

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

.S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

V

IC

IN

IT

Y

M A

P

P R

O J E

C T

L O

C A

T

IO

N

G-001

NAVIGATION LOCK

SPILLWAY

KLIC

KIT

AT

CO.

SHERMAN C

O.

COLUM

BI

A

RI

VER

JOHN DAY DAM LANE

U.P.R .R.

B.

N.

R.

R.

(S .P S

FL

O

W

STATE BOUNDARY

POWERHOUSE

JOHN DAY DAM

TURNS AND STEEP GRADES.

OF SPILLWAY HAS TIGHT

ACCESS TO SOUTH END

JOHN DAY DAM ROAD

E

G

O

R

O

N

O

N

T

N

G

H I

S

W A

LOCAL VICINITY MAP

OF NAVIGATION LOCK.

ACCESS TO NORTH SIDE

LOCATION

PROJECT

Portland District qof Engineers

US Army Corps

N

EXI

T 1

INTERSTATE

H W

Y 14

TO

W

ASH

IN

G

TO

N

STATE

PROJECT PHOTO

DISTRICT BOUNDARY MAP

LOCATION

PROJECT

JOHN DAY LOCATION MAP

SCALE: NTS

+0

MILES

0 10 20 30 40 50

INTERSTATE

INTERSTATE

INTERSTATE

W I L

L A

M E

T T

E

COLUMBIA RIVER

R E

V I

R

OREGON

WASHINGTON

LONGVIEW

VANCOUVER

PORTLAND

SALEM

HOOD RIVER

THE DALLES

L O

C K

A N

D D

A M

J O

H N

D A

Y

L O

C K

A N

D D

A M

T H

E D

A L

L E

S

L O

C K

A N

D D

A M

B O

N N

E V

IL

L

E

& GENERATOR REWIND

TURBINE REHABILITATION

POWERHOUSE

COLUMBIA RIVER, OREGON

JOHN DAY LOCK AND DAM

K

S H

ID

E

J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

ISSUE DATE: JUNE 2023

CONTRACT NO.: XXXXXXXXX

SOLICITATION NO.: W9127N23R0003

W

N

R

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

A N

S

F

IN

D

E X

T O

D R

A W

IN

G

S

G-002

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

P

Y L

E

K

S H

ID

E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

J D

P -1

.1

G -0

X X

X .d g n

J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

W

N

R

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

INDEX TO DRAWINGS

FILE NUMBER

NO.

SHEET

TITLE

INDEX TO DRAWINGS

GENERAL

FILE NUMBER

NO.

SHEET

TITLE

MECHANICAL REMOVAL

STRUCTURAL REMOVAL

STRUCTURAL INSTALL

ELECTRICAL REMOVAL

ELECTRICAL INSTALL

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

A N

S

E X

T O

R E

F E

R E

N C

E D

R A

W

IN

G S

G-003

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

P

Y L

E

K

S H

ID

E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

J D

P -1

.1

G -0

X X

X .d g n

S H

E E

T

J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

FILE NUMBER TITLE

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

FILE NUMBER TITLE

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

U.S. ARMY CORPS OF ENGINEERS

BALDWIN - LIMA - HAMILTON

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

A N

S

E E

T

IN

D

E X

T O

R E

F E

R E

N C

E D

R A

W

IN

G S

G-004

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

J

P -1

.1

G -0

X X

X .d g n

P

Y L

E

K

S H

ID

E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

FILE NUMBER

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

FILE NUMBER TITLE

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

CANADIAN GENERAL ELECTRIC

FARVAL CORPORATION

GENERAL ELECTRIC

KINGSBURY INC.

ANDRITZ HYDRO

MACHINERY CONSTRUCTION ENGINEERING

OREGON IRON WORKS

BALDWIN - LIMA - HAMILTON - CONT.

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

A N

S

E E

T

IN

D

E X

T O

R E

F E

R E

N C

E D

R A

W

IN

G S

G-005

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

P -1

.1

G -0

X X

X .d

P

Y L

E

K

S H

ID

E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

FILE NUMBER

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

FILE NUMBER TITLE

REQ'D

AS-BUILT

INDEX TO REFERENCE DRAWINGS

OREGON IRON WORKS - CONT.

ALTMAN BROWNING

DIX CORPORATION

US GOVERNMENT

NOVA GROUP INC.

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

J O

R D

A N

S F

IN

K

P

.E

G-006

K

S H

ID

E

S

IT

E A

C C

E S

S

S H

E E

T

EXISTING ROAD

24FT PAVED (TYP.)

(USACE PROPERTY)

GUARDRAIL TO BE REMOVED.

TWO EXISTING TREES AND

LARGE TRUCK ACCESS.

TURN TO BE WIDENED FOR

B3

SCALE: 1" = 100'

TURN WIDENING

N

C S

E R

G I

NOTES:

TRANSPORTATION AND SITE ACCESS CONTRACT.

1. ALL IMPROVEMENTS SHOWN WILL BE PERFORMED UNDER A SEPARATE JOHN DAY

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

J O

R D

A N

S F

IN

K

P

.E

G-007

K

S H

ID

E

S

IT

E A

C C

E S

S

S H

E E

T

CONTRACTOR PARKING (UNPAVED)

PROPOSED NEW

PUBLIC ACCESS

ROAD 24FT

PAVED (TYP.)

SITE

DIRECTION SIGN

PROPOSED TURBINE

RUNNER DISPLAY

OPTION 2 LOCATION

(BELOW TOWERS)

EXISTING GUARD SHACK

TO REMAIN

WIDENED

MANEUVERING

AREA

EXISTING DOUBLE WIDE TRAILER

TO REMAIN (USACE/PROJECT STAFF)

PROPOSED CONTRACTOR USE

DOUBLE WIDE TRAILERS

200 AMP MAIN BREAKER

APPROX DIMS - 24 X 60FT

PROPOSED CONTRACTOR USE

SINGLE WIDE TRAILERS

APPROX DIMS - 14 X 60FT

REMOVABLE

SPEED BUMPS

EXISTING

SITE ACCESS ROAD

24FT PAVED

REMOVABLE

SPEED BUMPS

STRIPING (TYP.)

BOLLARDS,

BOULDERS,

OR PLANTERS

PROPOSED TURBINE

RUNNER DISPLAY

OPTION 1 LOCATION

(GILES FRENCH PARK)

EXISTING PUBLIC

RESTROOM TO REMAIN

EXISTING

PERIMETER FENCE

TO BE REMOVED

EXISTING BARRIER

AROUND DRAIN FIELD

TO REMAIN

LOW SECURITY

FENCING

SHORT TERM

PARKING

GUARD SHACK

COVERED TRUCK INSPECTION

CHECK POINT

WITH BADGING ACCESS

GATE WITH

REMOVABLE CENTER POST

EXISTING

PERIMETER FENCE

TO REMAIN

EXISTING

PERIMETER FENCE

TO BE REMOVED

PROPOSED

FENCING (TYP.)

BADGING/AMS BUILDING

-20FT X 20FT SHOWN

-10FT TO FENCE

S E

E S

H E

E T

G -0

M A

T C

H L

IN

E

S E

E S

H E

E T

G -0

M A

T C

H L

G-007

EXISTING

PUBLIC PARKING AREA

EXISTING

PUBLIC PARKING AREA

EXISTING

PUBLIC PARKING AREA

EXISTING

PUBLIC PARKING AREA

PROPOSED

SECURITY LIGHT POLE (TYP.)

USACE

FUEL AND OIL

STORAGE

B2

B1

SCALE: 1" = 100'

ACCESS AND LOCATION

N

C S

E R

G I

NOTES:

TRANSPORTATION AND SITE ACCESS CONTRACT.

1. ALL IMPROVEMENTS SHOWN WILL BE PERFORMED UNDER A SEPARATE JOHN DAY

CONTRACTOR

USE A

REA

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

J O

R D

A N

S F

IN

K

P

.E

G-008

K

S H

ID

E

S

IT

E A

C C

E S

S

S H

E E

T

SCALE: 1" = 100'

N

CONTRACTOR PARKING

PROPOSED NEW

PUBLIC ACCESS ROAD

24FT PAVED (TYP.)

SITE

DIRECTION SIGN

REMOVABLE

SPEED BUMPS (TYP.)

EXISTING

SITE ACCESS ROAD

24FT PAVED (TYP.)

BOLLARDS,

BOULDERS,

OR PLANTERS

GUARD SHACK

COVERED TRUCK INSPECTION

CHECK POINT

WITH BADGING ACCESS

GATE WITH

REMOVABLE CENTER POST

SHORT TERM

PARKING

PROPOSED

FENCING (TYP.)

BADGING/AMS BUILDING

-20FT X 20FT SHOWN

-10FT TO FENCE

EXISTING

PUBLIC PARKING

EXISTING

PUBLIC TRAIL

PROPOSED ROAD WIDENING

48FT PAVED FULL WIDTH (TYP.)

PROPOSED

SECURITY LIGHT POLE (TYP.)

B2 E2

ACCESS CONTROL POINT

C S

E R

G I

G-006

NOTES:

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

J O

R D

A N

S F

IN

K

P

.E

G-009

K

S H

ID

E

S

IT

E A

C C

E S

S

S H

E E

T

POWERHOUSE

7 SPACES

14 SPACES

13 SPACES

35 SPACES

+2 ADA

10 SPACES

+2 LOADING

VEHICLE RESISTANT SLIDING GATE

AT ENTRANCE TO POWERHOUSE

PARKING AREA

OPENING WIDTH +/- 15FT

17 SPACES

+2 ADA

S E

E S

H E

E T

G -0

M A

T C

H L

IN

E

S E

E S

H E

E T

G -0

M A

T C

H L

IN

E

B1

SCALE: 1" = 100'

PARKING POWERHOUSE

N

C S

E R

G I

POTENTIAL

AREA

ADDITION

PARKING

NOTES:

CONTRACTOR WORK AREAS

O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

T

432 765 18 17 16

20 19

8 171615 20191811109 141312

40+00

52+61

51+18

12 1

40+20

39+09 18+72

T

52+01 51+58

50+87

211 10 915 14 13 5 4 38 7 6

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

C

S

E R

G I

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

C O

N T

R A

C T

O R

W O

R K

A R

E A

S

G-010

K

S H

ID

E

N

F L

O W

S H

E E

T

J O

R D

A N

S F

IN

K

P

.E

B3

SCALE: NTS

GENERAL PLAN - CONTRACTOR WORK AREAS

6' FORKLIFT CLEARANCE

6' FORKLIFT CLEARANCEEGRESS PATH

PATH

EGRESS

6' FORKLIFT CLEARANCE

SEE NOTE 1

TURBINE RUNNER

REQUIRED FOR

APPROXIMATE SPACE

LIFTING DEVICES

EGRESS PATH

TURBINE ERECTION PAD TURBINE ERECTION PAD

REQUIRED FOR ROTOR

APPROXIMATE SPACE

HATCH

ERECTION

ROTOR

PAD

ERECTION

TURBINE

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 G

-0 X

X X

.d g n

C O

N T

R A

C T

O R

W O

R K

A R

E A

S

G-011

K

S H

ID

E

N

678910

1213141516

HATCH

S H

E E

T

O&M WORKSPACE

ROTOR PEDESTALROTOR PEDESTAL

J O

R D

A N

S F

IN

K

P

.E

NOTES:

LEGEND:

SPACE UNAVAILABLE FOR CONTRACTOR WORK AREA.

C S

E R

G I

MUST BE COORDINATED WITH THE GOVERNMENT.

DIFFERENT LOCATIONS DEPENDING ON MAINTENANCE REQUIREMENTS AND

AVAILABLE FOR JOHN DAY PERSONNEL. THESE AREAS WILL BE LOCATED IN

OF THE SIZE OF THE CONTIGUOUS MAINTENANCE AREAS THAT MUST REMAIN

1. THE O&M WORKSPACE AND LIFTING DEVICE AREAS SHOWN ARE DEMONSTRATIVE

A1

SCALE: 1/16" = 1'-0"

GENERAL PLAN - CONTRACTOR WORK AREAS - SHEET 2

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

G-012

K

S H

ID

E

J O

R D

A N

S F

IN

K

P

.E

A N

D L

E G

E N

D S

AC

SECTION SYMBOLS:

CYLINDER, DOUBLE ACTING

CONTROL, SPRING

CYLINDER, SINGLE ACTING

CONTROL, LEVER

CONTROL, PEDAL

CONTROL, MANUAL

CONTROL, PUSHBUTTON

CONTROL, DETENT

COOLER, LIQUID COOLED

BULKHEAD CONNECTION

PILOT CONTROLLED OPENING

PILOT CONTROLLED CLOSING

CHECK VALVE

CHECK VALVE

CHECK VALVE

SPRING LOADED

CARTRIDGE VALVE

CHECK VALVE

FIXED DISPLACEMENT

AIR COMPRESSOR

ACCUMULATOR

ELECTRICAL SOLENOID

CONTROL,

COOLER

LINE, FLEXIBLE

HEATER

FILTER WITH BYPASS

ELECTRIC LINE

ELECTRIC MOTOR

FILTER OR DIFFUSER

2-WAY, 2-POSITION

DIRECTIONAL CONTROL VALVE

3-WAY, 2-POSITION

DIRECTIONAL CONTROL VALVE

3-WAY, 3-POSITION

DIRECTIONAL CONTROL VALVE

4-WAY, 2-POSITION

DIRECTIONAL CONTROL VALVE

4-WAY, 3-POSITION

DIRECTIONAL CONTROL VALVE

INDICATOR

FILTER WITH PLUGGED

INDICATORS

ELECTRICAL CLOGGING

FILTER WITH VISUAL AND

ADJUSTABLE

FLOW CONTROL VALVE,

ADJUSTABLE WITH BYPASS

FLOW CONTROL VALVE

SHUT-OFF VALVE, NORMALLY OPEN

SHUT-OFF VALVE, NORMALLY CLOSED

SHUTTLE VALVE

QUICK DISCONNECT COUPLING

PROPORTIONAL VALVE

PUMP, VARIABLE DISPLACEMENT

PUMP, FIXED DISPLACEMENT

PUMP, HAND OPERATED

PRESSURE SOURCE

PLUGGED PORT

MEASUREMENT, FLOW

PRESSURE

MEASUREMENT,

TEMPERATURE

MEASUREMENT,

ADJUSTABLE

PRESSURE SWITCH

VALVE ADJUSTABLE

PRESSURE REDUCING

VALVE ADJUSTABLE

PRESSURE RELIEF

SHUT-OFF VALVE, 3-WAY

SNUBBER

FLOAT VALVE

PRESSURE TRANSDUCER

GOVERNOR PRESSURE TANK

GENERAL "REMOVAL" NOTES:

GENERAL "INSTALL" NOTES:

GRAPHIC SYMBOLS LEGEND:

FURNISHED.

IDENTIFIED AS NEW SHALL BE INSTALL CONTRACTOR

FURNISHED EQUIPMENT. ALL OTHER EQUIPMENT

SYMBOL INDICATES ITEMS SUPPLIED AS GOVERNMENT

REPRESENTATIVE TO FACILITATE A BETTER INSTALLATION.

ALLOWED BY THE CONTRACTING OFFICER'S

ROUTING; THEREFORE, SLIGHT MODIFICATION MAY BE

DRAWINGS MAY NOT BE THE MOST PRACTICABLE

6. NEW PRESSURE PIPE ROUTING SHOWN ON THE INSTALL

INFORMATION ON THE INDIVIDUAL DRAWING GOVERNS.

DRAWING AND DIFFERS FROM THIS DRAWING, THE

NUMBERS AND LEGEND APPEAR ON AN INDIVIDUAL

FOR ALL DRAWINGS. HOWEVER, IF SYMBOLS, DEVICE

AND LEGEND SHOWN ON THIS DRAWING ARE APPLICABLE

5. HYDRAULIC SCHEMATIC SYMBOLS, DEVICE NUMBERS

AND/OR MAY NOT BE TO SCALE.

FOLLOWING DRAWINGS ARE OMITTED FOR CLARITY

4. SOME COMPONENTS AND FEATURES ON THE

INDIVIDUAL MECHANICAL DRAWINGS.

NECESSARILY REFERENCED ON THE FOLLOWING

3. ITEMS SHOWN ON THIS DRAWING ARE NOT ALL

SHOW ON SHOP DRAWINGS.

INSTALLATION CONTRACTOR TO FIELD VERIFY AND

2. LOCATION OF EQUIPMENT SHOWN IS APPROXIMATE.

BY RED, HEAVIER WEIGHT LINES OR TEXT, OR AS NOTED.

1. ON ALL M-XXX SHEETS, INSTALLATION WORK IS INDICATED

GREEN, HEAVIER WEIGHT LINES OR TEXT, OR AS NOTED.

1. ON ALL MDXXX SHEETS, REMOVAL WORK IS INDICATED BY

SECTION CALL OUT

DETAIL CALL OUT

ELEVATION CALL OUT

C H

A N

IC

A

L G

E N

E R

A L

N O

T E

S C

S

E R

G I

X

X

X

X

X

X

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

R

T L

A N

D

O R

E G

O N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

K

A

M A

N K

W A

-P O

K U

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

G -0

X X

X .d g n

G-013

J

P A

R K

E R

J O

R D

A N

S F

IN

K

P

.E

A N

D L

E G

E N

D S

E L

E C

T R

IC

A

L G

E N

E R

A L

N O

T E

S

SB1()-e1-SU1()

IF USED

CUBICLE NO.

EQUIPMET

THE UTILIZATION

CIRCUIT NO. TO

DESIGNATION

DESTINATION EQUIP.

u = INSTRUMENTATION t = COMMUNICATION CIRCUIT s = SPARE r = 120 OR 208VAC q = 480VAC h = 120V PREFERRED AC

_/fo-MM = FIBER OPTIC MULTI MODE, _ NUMBER OF FIBER STRANDS

_/fo-SM = FIBER OPTIC SINGLE MODE, _ NUMBER OF FIBER STRANDS f = 250VDC e = 125VDC c = CONTROL

VOLTAGE OR USAGE CODE

CUBICLE NO. IF USED

DESIGNATION

SOURCE EQUIP.

CONTROL DEVICE NUMBER FUNCTIONS

(PLANS, DETAILS, ELEVATIONS)

CONDUIT EXPOSED, CABLE OR BUS

TIME OVERCURRENT RELAY w/VOLTAGE RESTRAINT

PARTIAL SHUTDOWN

CONTROL TRANSFER SWITCH

BKR AUX. (CLOSED WHEN BKR CLOSED)

BKR AUX (CLOSED WHEN BKR OPEN)

OVERVOLTAGE RELAY

UNDERVOLTAGE RELAY

COMPLETE SHUTDOWN

SEMI-COMPLETE SHUTDOWN

ANNUNCIATOR RELAY

SHUTDOWN RELAY

CONTROL SWITCH

REVERSE POWER RELAY

INSTANTANEOUS OVERCURRENT RELAY

TIME OVERCURRENT RELAY

OVERFREQUENCY RELAY

UNDERFREQUENCY RELAY

GENERATOR DIFFERENTIAL RELAY

TRANSFORMER DIFFERENTIAL RELAY

PHASE BALANCE RELAY

LOSS OF EXCITATION RELAY

SYNC CHECK / DEAD BUS RELAY

GROUND TIME OVERCURRENT RELAY

GROUND DETECTOR RELAY

SF6 LOW PRESSURE RELAY

INCOMPLETE SEQUENCE TIMER

BKR AUX (CLOSED WHEN BKR OPENING OR CLOSING)

WIRE CONNECTED

WIRE CROSSING (NOT CONNECTED)

AMMETER

VOLT METER

WATT METER

FREQUENCY METER

SYNCHROSCOPE

SYNCHRONIZING LAMPS

CONDUIT/CABLE (PLANS, DETAILS, ELEVATIONS)

CONDUIT EMBEDDED IN FLOOR, WALL OR UNDERGROUND

CONDUIT TURNED AWAY FROM OBSERVER (PLANS, DETAILS, ELEVATIONS)

CONDUIT TURNED TOWARD OBSERVER (PLANS, DETAILS, ELEVATIONS)

TO CONTROL DEVICE NUMBER

RELAY, FUNCTION ACCORDING

HYDROGEN DENSITY MONITOR

CONDUIT TERMINATION AT CABLE TRAY (PLANS, DETAILS, ELEVATIONS)

5P

52a

52b

81-O

87G

87T

5C

5S

51V

81-U

51G

52ab

H

A

V

W

F

S

L

GRAPHIC SYMBOLS LEGEND (CONT.)

INPUT - SOLID-STATE ELEMENT OR DEVICE

OUTPUT - SOLID-STATE ELEMENT OR DEVICE

K

GRAPHIC SYMBOLS LEGEND

DISCONNECT SWITCH

SWITCHYARD MOTOR OPERATED

115kV SWITCHYARD CIRCUIT BREAKER

EQUIPMENT ENCLOSURE

SURGE ARRESTER

SURGE CAPACITOR

RESISTOR

AIR CIRCUIT BREAKER

RATIO AS SHOWN

CURRENT TRANSFORMERS, NUMBER AND CURRENT

AND VOLTAGES AS SHOWN

POTENTIAL OR CONTROL TRANSFORMERS, NUMBER

CONNECTION TO GROUND BUS

CONTACTS (NORMALLY OPEN)

CONTACTS (NORMALLY CLOSED)

FUSE

TRANSFORMER (CONTROL DIAGRAM)

POWER TRANSFORMER (ONE LINE DIAGRAM)

DISCONNECT SWITCH

TEST BLOCK

AMMETER SWITCH

DISCONNECTING DEVICE, DISCONNECTING CONTACT

VOLTMETER SWITCH

SYNCHRONIZING SWITCH (I=INCOMING, R=RUNNING)

SPARE WIRE(S)

DRAWOUT CIRCUIT BREAKER

RESISTOR OR SHUNT TRIP ELEMENT

DRAWOUT CIRCUIT BREAKER WITH INTERLOCKS

A=AMBER

INDICATING LIGHT: R=RED, G=GREEN, W=WHITE,

DETAILS, ELEVATIONS)

OR TURNED AWAY FROM OBSERVER (PLANS,

NON-SEGREGATED PHASE BUS TURNED TOWARDS

INVERTER OR RECTIFIER

SWITCH

2-POSITION SELECTOR SWITCH OR TRANSFER

DIRECTION OF KEY TRANSFER

BREAKER KEYED INTERLOCK

DEVISE OPEN. (WITH KEY REMOVED)

KEY INTERLOCK USED TO LOCK

DEVISE OPEN. (WITH KEY HELD)

KEY INTERLOCK USED TO LOCK

BREAKER MECHANICAL INTERLOCK

480-120

200:5

VS

SS

I R

AS

TB

SP

OR

M

L-0

L-0

R

WIRE LABEL

AS SHOWN ON DRAWING

WIRE LABEL

TERMINAL BLOCK

TO PANEL

INTERNAL

LEAVES PANEL

REQUIRED WIRE LABELING

CABLE TO PANEL

EXTERNAL

CABLE DESIGNATIONS

ASP1/SJ3/CA-1

ABBREVIATIONS

AIR CIRCUIT BREAKER

ANNUNCIATION

BELL ALARM CONTACT

BENCH BOARD, PANEL NO. _

CIRCUIT BREAKER

CIRCUIT BREAKER

HIGH RESISTANCE GROUNDED NEUTRAL

SYNCHRONIZER, SYNCHRONIZATION

LAMP CUTOUT

GENERATOR PROTECTION RELAY

MULTIFUNCTION PROTECTION RELAY

MAIN INSTRUMENT BOARD, PANEL NO. _

MAIN RELAY BOARD, PANEL NO. _

CONTROL SWITCH

CONTROL SWITCH, CLOSE

CONTROL SWITCH, TRIP

GENERATOR

SWITCHYARD OIL CIRCUIT BREAKER

GOVERNMENT-FURNISHED EQUIPMENT

SYNCHRONIZING SWITCH FOR BREAKER _

BATTERY SWITCHBOARD (EXISTING)

BATTERY SWITCHBOARD NO. 1 (NEW)

BATTERY SWITCHBOARD NO. 2 (NEW)

SWITCHBOARD

SWITCHGEAR

PANEL OR PANELBOARD NO. _

MAIN CONTROL SWITCHBOARD

GRAPHIC SWITCHBOARD

INVERTER

MANUAL BYPASS SWITCH

125VDC BATTERY CHARGER

125VDC BATTERY

125VDC PANELBOARD

120V PREFERRED AC PANELBOARD

FISH UNIT NO. _ GENERATOR SWITCHBOARD

120V PREFERRED AC SWITCHBOARD

PREFERRED AC BYPASS TRANSFORMER

BATTERY MONITOR SYSTEM

480V AC PANELBOARD

120V AC PANELBOARD

(NO. 0 FOR STATION SERVICE)

UNIT NO. _ GENERATOR SWITCHBOARD

TERMINAL CABINET

EXISTING BATTERY SWBD. CONVERTED TO

480V AC SWITCHBOARD

BATTERY DIAGNOSTIC BOX

GROUNDING INSERT

SHIELDED TWISTED PAIR

13.8kV AC SWITCHBOARD

CODE CALL PANEL

TROUBLE CONTACT

(NO. 0 FOR STATION SERVICE)

UNIT NO. _ AUXILIARIES SWITCHBOARD

OPERATE POSITION

BREAKER DRAWOUT

TRUCK OPERATED CONTACT,

TEST POSITION

BREAKER DRAWOUT

TRUCK OPERATED CONTACT,

REMOTE

LOCAL

CIRCUIT

ACB

ANN

BA

BBD_

BKR

CB

CKT

HRGN

SYNC

LCO

TOC-T

GPR

MPR

(TP)

MIB_

MRB_

PNL_

CS

CS-C

CS-T

LOC

REM

SWGR

GEN

TOC-O

OCB

GFE

SS_

SB

SB1

SB2

SWBD

SU_

S_

SC

SG

IV

MBS

BCE

BE

CE

CH

SA_

SH

TH

BM

CQ

CR

SBTC

SJ

SQ

BDB

GI

STP

TC

RC

PMG PERMANENT MAGNET GENERATOR

SSG SPEED SIGNAL GENERATOR

GENERAL "REMOVAL" NOTES:

GENERAL "INSTALL" NOTES:

20 ELECTRICALLY OPERATED VALVE

14 UNDERSPEED DEVICE

80 FLOW SWITCH

71 LEVEL SWITCH

33 POSITION SWITCH

TB TURBINE BEARING

HC HEAD COVER

T TEMPERATURE

HP HIGH LIFT PUMP

(A) LOCATED IN THE ACTUATOR (GOVERNOR) CABINET

WATTHOUR METERWHM

LOCATED IN THE TURBINE PIT AREA

A-C CIRCUIT BREAKER OR MOTOR STARTER

72 DC CIRCUIT BREAKER OR MOTOR STARTER

WIRES INTERNAL TO A PANEL DO NOT INCLUDE THE PANEL IN THE WIRE LABEL.

ARE NOT REQUIRED TO BE LABELED.

SHORT JUMPERS WHERE THE JUMPERS ARE ENTIRELY VISIBLE

(PANEL)DEVICE - NUMBER/SIGNAL NAME -

KEEPING SIGNAL NAME ON THE INSIDE TOWARDS THE DEVICE:

IF LABEL IS ON THE LEFT SIDE OF DEVICE, ORDER IS REVERSED,

- SIGNAL NAME/DEVICE - NUMBER(PANEL)

FORMAT:

JOHN DAY WIRE LABELING

AP TB3-13(S11)

AP AR1-5

AP

AP

(SX)C-8/AP

AP/AR1-5

GREEN, HEAVIER WEIGHT LINES OR TEXT, OR AS NOTED.

1. ON ALL EDXXX SHEETS, REMOVAL WORK IS INDICATED BY

7. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.

TABLE 250-122.

DRAWINGS OR IN THE CONDUIT AND CABLE SCHEDULES, SIZED PER NEC

ALL NEW FEEDERS AND BRANCH CIRCUITS WHETHER OR NOT SHOWN ON THE

CLUTTER FOR CLARITY, BUT ARE REQUIRED AND SHALL BE PROVIDED IN

6. EQUIPMENT GROUNDING CONDUCTORS MAY NOT BE SHOWN TO REDUCE DRAWING

DRAWING, THE INFORMATION ON THE INDIVIDUAL DRAWING SHALL GOVERN.

AND LEGEND APPEAR ON AN INDIVIDUAL DRAWING AND DIFFERS FROM THIS

APPLICABLE FOR ALL DRAWINGS. HOWEVER, IF SYMBOLS, DEVICE NUMBERS

5. SYMBOLS, DEVICE NUMBERS AND LEGEND SHOWN ON THIS DRAWING ARE

IN THE DE-ENERGIZED STATE.

4. CONTROL DIAGRAMS SHOW CONTROL RELAYS AND SWITCHES WITH CONTACTS

ON THE ELECTRICAL CONTRACT DRAWINGS.

3. SOME SYMBOLS AND ABREVIATIONS SHOWN ON THIS LEGEND ARE NOT REFERENCED

OTHERWISE NOTED.

2. CONDUITS AND BOXES ARE DIMENSIONED TO CENTERLINES UNLESS

RED, HEAVIER WEIGHT LINES OR TEXT, OR AS NOTED.

1. ON ALL E-XXX SHEETS, INSTALL WORK IS INDICATED BY

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

43918: INNER OIL HEAD PIPE

43919: INTERMEDIATE OIL HEAD PIPE

43921: OIL HEAD SUPPORT

43922: OIL SUPPLY HEAD

43923: OIL HEAD TOP

43924: OIL HEAD

43925: OUTER OIL HEAD PIPE

43927: OIL HEAD LADDER

43928: OIL HEAD RAILING (NOT SHOWN)

THRUST COLLAR

THRUST BEARING

EXCITER STATOR FRAME

OIL HEAD SUPPORT

& SPIDER

EXCITER ROTOR

GENERATOR SHAFT

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 M

D X

X X

.d g

MD001

R F

IX

E

D B

L A

D E

C O

N V

E R

S

IO

N

D

IS

P O

S A

L O

F O

IL

H

E A

D C

O M

P O

N E

N T

S

K

S H

ID

E

J O

R D

A N

S F

IN

K

P

.E

C S

E R

G I

NOTES:

1. ITEMS IN BOLD/GREEN TO BE REMOVED.

2. PMG WILL BE RETAINED AND ATTACHED TO THE EXCITER SUPPORT BRACKET.

REFERENCES:

ASSEMBLY HYDRAULIC TURBINE DRIVEN GENERATOR757E275

ARRANGEMENT OF OIL HEAD SECTIONAL ELEVATIONBLH-43920-A

A3

OIL HEAD COMPONENTS - REMOVAL

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

.5

.6

.5

.9

583.1

10 11

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

S

E R

G I

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

S -0

X X

X .d g n

D R

A F

T T

U B

E M

O D

IF

IC

A T

IO

N

F

L O

O R

F

IL

L C

O N

C E

P T

J O

R D

A N

S F

IN

K

P

.E

S-001

NOTES:

E C

A R

N

P R

O F

IL

2. CROSS SECTION AND SECTION VIEW CORRELATE WITH DWG NO: JDP-1.1-4-4/5

1. DIMENSIONS ARE IN PROTOTYPE INCHES.

B2

SCALE: 1" = 50'

FLOOR FILL MODIFICATION CONCEPT - PROFILE

AF AF

SECTION AF

BF BF

SECTION BF

CF CF

SECTION CF

DF DF

SECTION DF

EF EF

SECTION EF

FLOOR FILL

29.50

423.88425.27

29.50 41.54

41.54

427.63

426.00

40.35

426.00

426.00

25.53

426.00

25.53

426.09

FFFF

SECTION FF-FF

SCALE: 1/16" = 1'-0"

FLOOR FILL

198.00

781.12

40.35

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"SCALE: 1/16" = 1'-0" SCALE: 1/16" = 1'-0"

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

S

E R

G I

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

S -0

X X

X .d g n

D R

A F

T T

U B

E M

O D

IF

IC

A T

IO

N

F

L O

O R

F

IL

L C

O N

C E

P T

J O

R D

A N

S F

IN

K

P

.E

S-002

NOTES:

E C

A R

N

S E

C T

IO

N

V

IE

W

LEGEND:

E - 650"

D - 570"

C - 440"

B - 310"

A - 180"

FROM THE FRONT EDGE OF THE DRAFT TUBE:

SECTION CUTS ARE TAKEN AT THE FOLLOWING DISTANCES

A1

FLOOR FILL MODIFICATION CONCEPT - SECTION VIEW

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

10 11

652.1

.5

.1

.4

.9

.4

.3

FURNISHED

FILLER IS GOVERNMENT

DRAFT TUBE STOP LOG SLOT

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

S

E R

G I

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

S -0

X X

X .d g n

D R

A F

T T

U B

E M

O D

IF

IC

A T

IO

N

R

O O

F F

IL

L

C O

N C

E P

T

J O

R D

A N

S F

IN

K

P

.E

S-003

NOTES:

E C

A R

N

P R

O F

IL

B2

SCALE: 1" = 50'

ROOF FILL MODIFICATION CONCEPT - PROFILE

AR AR

SECTION AR

BR BR

SECTION BR

CR CR

SECTION CR

DR DR

SECTION DR

ER ER

SECTION ER

458.00 458.00

66.05 66.05

426.00 426.00

52.92 52.92

39.79 39.79

426.00426.00

426.06 411.77

34.4844

425.22

FRFR

SECTION FR-FR

129.00

781.12

13.34 13.34

25.38

25.38

SCALE: 1/16" = 1'-0" SCALE: 1/16" = 1'-0" SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

SCALE: 1/16" = 1'-0"

ROOF FILL

ROOF FILL

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

S

E R

G I

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

S -0

X X

X .d g n

D R

A F

T T

U B

E M

O D

IF

IC

A T

IO

N

R

O O

F F

IL

L

C O

N C

E P

T

J O

R D

A N

S F

IN

K

P

.E

S-004

NOTES:

E C

A R

N

S E

C T

IO

N

V

IE

W

LEGEND:

E - 650"

D - 570"

C - 440"

B - 310"

A - 180"

FROM THE FRONT EDGE OF THE DRAFT TUBE:

SECTION CUTS ARE TAKEN AT THE FOLLOWING DISTANCES

A1

ROOF FILL MODIFICATION CONCEPT - SECTION VIEW

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

M E

U H

L E

C K

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1

S D

X

X X

.d

SD001

O

R D

A N

S F

IN

K

P

.E

S K

IM

LEGEND:

EXTENTS OF DEMOLITION

N C

R E

T E

D E

M O

L

IT

IO

N

L

IM

IT

S

STAY RING JACKS

ERECTION BLOCK

CONCRETE

DENTAL

CONCRETE

STRUCTURAL

MANDOOR

DRAFT TUBE

B2

MAXIMUM EXTENT OF DEMOLITION FOR DISCHARGE RING

REFERENCES:

NOTES:

BY THE GOVERNMENT.

6. DO NOT DAMAGE THE EXISTING EMBEDDED ANCHORS UNLESS APPROVED

5. SEE SPECIFICATIONS SECTION 03 50 00.00 26.

IS TO BE CALCULATED BY DEPTH EMBEDDED INTO STRUCTURAL CONCRETE ONLY.

CONCRETE AND BE EMBEDDED INTO STRUCTURAL CONCRETE. ANCHOR CAPACITY

4. NEW CONCRETE ANCHORS MUST EXTEND THROUGH SECOND STAGE DENTAL

3. CONCRETE DEMOLITION MUST NOT UNDERMINE THE ERECTION BLOCKS.

MODIFICATIONS TO THE DISHARGE RING.

2. LOAD PATH THROUGH STAY RING JACKS MUST REMAIN INTACT DURING

1. NO DEMOLITION PERMITTED BEYOND THE EXTENTS SHOWN.

STAY RING AND PIT LINER

METHOD OF SETTING DISCHARGE RING-BLH 43825-

DETAILS

DISCHARGE RING SECTIONS & WELDINGBLH 43820-B-

DISCHARGE RING SECTIONAL ELEVATIONSBLH 43820-A-

DISCHARGE RING PLANBLH 43820-

EMBEDDED TURBINE PARTS ERECTION DETAILSJDP-1.1-4-4/12

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

R D

A N

S F

IN

K

P

.E

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 E

D X

X X

.d g n

ED201

REFERENCES:

NOTES:

K A

M A

N K

W A

-P O

M O

V A

L

G O

V E

R N

O R

A C

T U

A T

O R

C A

B

IN

E T

P A

N E

L

J

P A

R K

E R

GOVERNOR CABINET OUTLINEJDP-65-558-1

14 15 16

17 18 19

20 21

22 23 24 30

PIPE TRENCH

HINGED PANEL

> CABINET

EL 168.5

(OIL TIGHT)

ACCESS DOOR

24" WIDE

32" HIGH X

DECK DRAIN

1" N.P.T.

PIPING CONNECTION

6"-400# GATE SERVOMOTOR

PIPING CONNECTION

4" BLADE SERVOMOTOR

COVER OPENING 9"X24"

26"X11" COMPARTMENT

TO SUMP TANK

8"-400# CONNECTION

DRAIN

1" DECK COMPARTMENT

DOORS TO TERMINAL

8'-8"

8'-10"

7/8 "

ITEM DESCRIPTION

PARTS LIST

1.

2. SYSTEM PRESSURE GAGE

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

THRUST BEARING TEMPERATURE INDICATOR

TURBINE BEARING TEMPERATURE INDICATOR

THRUST BEARING OIL TEMPERATURE INDICATOR

DUPLEX GEN. AIR BRAKE PRESS. GAGE

GEN. UPPER GUIDE BEARING TEMP. INDICATOR

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

GEN. LOWER GUIDE BEARING TEMP. IND.

TURBINE BEARING OIL TEMP. IND.

SPIRAL CASE PRESSURE GAGE

TURBINE BEARING OIL PRESSURE GAGE

TURBINE BEARING OIL PUMP CONTROL SWITCH

MANUAL GATE LOCK CONTROL SWITCH

THRUST BRG. HIGH PRESS. OIL PUMP CONTR.SWITCH

CABINET LIGHT SWITCH

GENERATOR AIR BRAKE CONTROL SWITCH

AIR BRAKE VALVE

BLADE SERVO DIFFERENTIAL PRESS. GAGE

3.

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

PLAN

LEFT SIDE FRONT SIDE RIGHT SIDE

NOT USED

NOT USED

NOT USED

UPSTREAM

2 3/8"

2'-8"

2'-6"

14"

18"

33 3/8"

17 1/4"

6'-0"

3'-0"

9 3/32 "

TEMPERATURE/PRESSURE INSERTION POINT.

2. REMOVE INDICATORS AND CAPILLARIES BACK TO THERMOWELL OR

1. ITEMS IN BOLD/GREEN TO BE INSTALLED/MODIFIED.

A1

GOVERNOR ACTUATOR CABINET PANEL - REMOVAL

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 E

D X

X X

.d g n

R E

M O

V A

L

S U

C P

O N

E L

IN

E

D

IA

G R

A M

ED601

K

A M

A N

K W

A -P

O K

U

CONTACT

ALARM

20 20 30

30KVA

T R

L

IG

H T

IN

G

T R

A N

S

T R

L

IG

H T

IN

G

T R

A N

S

S U

-s

-T

P

S

U -s

-T

P

S

U -s

-G

S U

-s

-G

15KVA

O

IL

P U

M P

A .C

T

U R

B

IN

E B

R G

50 20 20 50

(TP)

TBA

62G

(A)

(S)

(TP)

TBD

(A)

TBD

11 2

HC

3 52

(TP)

HC

(TP)

HC

HC1

HC2

20 50

GH

50 20

60A

BUS 1 BUS 2

20 30 50 50

(TP)

(G)

HP1

20 20

OL

OL

T

TB

HP2

AQ1

PS

AQ2

PS

LO

AQ3

PS

PS PS

O

IL

P U

M P

D .C

T

U R

B

IN

E B

R G

S U

M P

P U

M P

N O

.1

H E

A D

C O

V E

R

G E

N B

K R

C O

O L

E R

O U

T L

E T

S

S

U -s

S

U -s

/0

S Q

-q

-S

U

S U

M P

P U

M P

N O

.2

H E

A D

C O

V E

R

P U

M P

N O

.1

G O

V E

R N

O R

O

IL

E X

C

IT

A T

IO

N

S U

-q

G E

N H

E A

T E

R S

S P

A R

E S

U -q

S U

-q

H I-

B A

Y L

IG

H

T

IN

G

O U

T L

E T

S

B R

G

O

IL

P U

M P

H

IG

H P

R E

S S

T

H R

U S

T (A)

(GOV. SUMP TANK)

IN

C

P -c

.1

(PRESS TANK)

/2

S

U -f

-T

P

E M

E R

G E

N C

Y L

IG

H

T

IN

G

P U

M P

N O

.2

G O

V E

R N

O R

O

IL

P U

M P

N O

.3

G O

V E

R N

O R

O

IL

125/250V-3P

125V-2P

125/250V-3P

125V-2P

125/250V D-C

NON-AUTO

3P-100A FRAME

/0

S Q

-q

-S

U

C

/0

S U

-f

-S

U

C

/0

S U

-f

-S

U

C

/0

S U

-f

-S

U

C

/0

S U

-f

-S

U

C

/0

S P

-p

-C P

C

/0

C P

-p

-C

P

S

U q

S U

-q

S U

-q

S

U q

S

U

-q

S

U

-q

C

-1

/2

S

U -c

S U

-q

S

U q

S U

-q

S

U -q

S U

-e

-p

T W

O

C -1

/2

C P

-c c

I N

C P

-c

C P

-p

S P

A R

E

S

U -s

S

U -s

S

U -s

S

U

-s

C

/0

C P

-p

-C

P

C

/0

C P

-p

-C

P

S

U -f

-X

J

S P

A R

E

S U

-s

-T

P

/2

S U

-q

/4

125125

ONE-LINE DIAGRAM SU5 & CP5

J O

R D

A N

S F

IN

K

P

.E

REFERENCES:

NOTES:

ONE-LINE DIAGRAM SU5 & CP6JDP-1.1-6-1G21/1

2. ITEMS SHOWN REMOVED FOR UNIT 5 IN THIS DRAWING TYPICAL FOR ALL UNITS.

1. ITEMS IN BOLD/GREEN TO BE REMOVED.

J

P A

R K

E R

A1

ONE-LINE DIAGRAM SU5 & CP5 - REMOVAL

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 E

D X

X X

.d g n

R E

M O

V A

L

C O

N T

R O

L D

IA

G

R A

M S

M A

IN

U

N

IT

A U

X

IL

IA

R

IE

S

ED602

K

A M

A N

K W

A -P

O K

U

SWITCH

SOLENOID

SWITCH

SOLENOID

ANN. HIGH AND LOW

SUMP OIL LEVEL

X

SEE

NOTE 3

CP1-CP8

480 VOLT

SU1

GOVERNOR OIL

SUMP LOW OIL

LOCKOUT & ANN

27BY-4

(SPDD)

4160 VOLT

CP1

(TYPICAL FOR 2 PUMPS)

HC3

STOP-NUT SELSYN

TRANSMITTER

LIMIT SWITCHES

(TP1)

(TP1)

L

R

L

IN

MOTOR

(TP1)

NON-AUTO

L

R

L

R

STOP-NUT

MICRO SW

1SN1

(TP1)

SN SELSYN

TRANSMITTER

R

GATE STOP NUT MOTOR

6B

PC

AQ1

AQ2

OLOL

CG

GF2

GF1

LL96

LL95

L3 L2 L1

C1

C2

C3

BLADE

FREEZE

AQ1

GOVERNOR OIL

PUMP

63Q4

ISW

4160 V

B

C

MAIN

FUSE

GOVERNOR OIL

SHUTDOWN

GOVERNOR OIL

PUMP

GEN START INTERLOCK

GOVERNOR INPUT M5-01

GOVERNOR OIL PUMPS

A

SOLENOID DENERGIZED

WHEN PUMP IS STOPPED.

(SHOWN IN DEENERGIZED POSITION)

UNLOADING

VALVE

GOVERNOR OIL

PUMP DISCHARGE

LOADED

TO SUMP

GOVERNOR OIL

PUMP DISCHARGE

UNLOADED

UNLOADING

VALVE

SOLENOID ENERGIZED WHEN

PUMP IS CALLED TO RUN.

(SHOWN IN ENERGIZED POSITION)

33 SWITCH CONTACT

IS NORMALLY CLOSED

GOVERNOR

OIL

PRESSURE

CLOSE @ 462 PSIG /

OPEN @ 502 PSIG

GOVERNOR OIL PUMP UNLOADING VALVE OPERATION

CLOSE @ 440 PSIG /

OPEN @ 480 PSIG

CLOSE @ 430 PSIG /

OPEN @ 470 PSIG

OPEN @ 530 PSIG /

CLOSE @ 560 PSIG

DETAIL A

SEE DETAIL "A" FOR SOLENOID "20"

AND SWITCH "33" RELATIONSHIP.

GOVERNOR

OIL

PRESSURE

ADJUSTS TIMING

OF OPENING FOR

UNLOADING VALVE

ADJUSTS TIMING

OF CLOSURE FOR

UNLOADING VALVE

VB

VA

GFCT

MP3000

(MP)

HEAD COVER SUMP PUMPS

SU1

X1

CONTACT

NO. 1

LEAD

NO. 2

LEAD

HD COV SUMP PUMP SEL

MAINTAINED

CONTACTS

43HC

(A1)

63Q1

(A1)

63Q3

63Q2

ANN. HIGH AND LOW

ACTUATOR TANK

OIL LEVEL

NO. 1 LEAD

OFF

OFF

X

STOP NUT MOTOR

X

1SN1

CONTACT

1SN2 STOP NUT MOTOR

SPRING RETURN

TO OFF

LOWERRAISE

LOWERRAISE

X

X

X

X

NO. 2 LEAD

X

X

X

TT2B

TT4

G

B

21-2

NF1

PF1

34-2

21-3

34-3

HC2

(TP1)

21 21

13 5 5

71Q1

71Q4

71Q3

71Q2

515 540

OFFON

AP 16I07

AP

LAG 2

LAG 1

LEAD

B

41 41

AP

NN

AP

PP

AP

P N1

71LO

(T-12)AP

N

22 12

16106

23 20

125-250 VDC

1 2

OL

SN2

SN5SN6

SN3

SN7 SN8

T2 T3

(TP1)

(TP1)

T1

1SN2(A1)

SN1

T4

S

SN

SN4

SN10

(TP1)

HC1

S T2

T3

SN11

SN3a

OL(TP1)

CLOSED AT NORMAL PRESS.

SCHEMATIC

CPO LOCK-OUT RELAY

GOVERNOR OIL PUMP AND

PUMP #2

PUMP #1

PUMP OPERATION

PRESSURES (PSIG)ANN LOW

ANN HIGH

LOW OIL PRESSURE

OIL PRESSURE

OIL PRESSURE

ANN LOW

ANN HIGH

LO1

LO2

LO3

ANN

AQ3-1

AQ3-9

AQ3-5

AQ3-1

AQ3-9

AQ3-5

AQ2-1

AQ2-9

AQ2-5

AQ2-1

AQ2-9

AQ2-5

AQ1-1

AQ1-8

AQ1-3

AQ1-1

AQ1-8

AQ1-3

16I O7 16I O7

16I O616I O6

71LO CONTACTS

PUMP #2)

(SAME AS

GOP #3

NEUT

CR5

CR5

CR2-3

(3M2)

2M2

CR2-1

TDPU

CR2-2

M12M5Mb

1AQ2 SELCTOR SW

CR2-2

CR2-1

CR2-3

LEAD LAG SS

COIL

DC

COIL

DC

COIL CONTROLLER

CR5

CR5

(AQ3-1)

AQ2-1

PUMP #2)

(SAME AS

GOP #3

NEUT

INTERLOCK

DOOR

MECHANICAL

OPEN

ISOLATION SWITCH

SHOWN WITH

CR1-1

CR1-2

CR1-3

CR5

CR41, R28

AQ1 SS

CR1-1

CR1-2

CR1-3

LOCKOUT

CONTROL CIRCUIT

GOV OIL PUMP

TYPICAL FOR

LOR

01 LOR

01 LOR

01 LOR

CR

TBA TBATBD

CR

TBD

START INTELOCK

GEN AUTO

U N

IT

U T

D O

W N

O

IL

F L

O W

L O

W

OL1

OL1

(DGC)

K10-1 (DGC)

OL2

CR5

IM1 IM2CR5

CR5

CR5

TDPu

24V

TR

AQ1

PUMP

AQ1

LAG 2

LAG 1

LEAD

LEAD LAG S.S.

AQ1-1

AQ1-1

G

P18

E+

E-E+

DP41-63J

E-

R

AQ1-3

71LO

ETM

P7

P6

O

AH

S3 O/L

1P7

1P6

SU1

SU1

52AQ1

AQ1-8

ETM

Ma

M12

MP

MX

86X

M12M7

M

MB

MA

MX

AQ2-1

AQ2-9

(AQ3-9)

2M1 (3M1)

TR

AQ2

PUMP

DP41-63J

P18

E+

10 2

G

R

2P7

AQ2-5

2P6

O

AH

71LO

E-E+

E-

P7

P6

LAG 1

LEAD3

LAG 2

R-28

1-2

ISW

BF66

33 SWITCH CONTACT

OPENS WHEN GOVERNOR

OIL PUMP IS UNLOADED.

T (G1)

GH

1GH

(SU)

GH

GH

G

R

(G1)

GH

GENERATOR HEATER

SU1

(G1)

HP

LL-85

LL-86

K7-2

(DGC)

1HP1

(G1)

HP

(G1)

HP5

HP1

HP3

HP4

(A1)

A

HP2

TBA1

1TBA

(TP1) 2 1

CR

TBATBA

CR

T B

A

T B

A

T B

A 3K21-1

RR110

TBA4

A1X

RR111A1Y

(A1)

1TB

TBA3

(TP1) (A1) (TP1)(A1) (TP1)

GGRR

(TP1)

1TBD

ONREM

TBD4

(TP1)

R

(A1)

R

4.0

GPM

(TP1)

TBD

(TP1) (A1)

GG

T B

D

T B

D

TBD3

TBD7

HP

(G1)

HP

OLOL

(G1)

(G1)

OL

OL

TBD

CR

TBD

TBD

(TP1)

TBA

OL1 OL1

(TP1)

(TP1)

TBA

TBA2

OL2

TBD

TBD

CR

(TP1)

72 TBD8

TBA

TBD

CR

52TBD

CR

N

AC TB OIL PUMP

DC TB OIL PUMP

1HP1

ON REMOTE

OFF

CONTACT

MAINTAINED

CONTACTS

1TBA

THRUST BRG OIL PUMP

X1

REMOTEOFFON

X

1TDB

OFF-CENTRALCONTACT

MAINTAINED

CONTACTS

X1

AUTO

1TB

1HP2 THRUST BRG OIL PUMP

AUTO

OFF-CNTRL

TB OIL PUMPS

X

ON

1HC2

MAINTAINED

CONTACTS

AUTO

1SD

CONTACT

OIL CATCHER PUMP

HD COV SUMP PUMP 2

HD COV SUMP PUMP 1

OFFON

OFF

X

AUTO

GENERATOR HEATER1GH

1HC1

X

OFF

GOV. OIL PUMP NO.3

GOV. OIL PUMP NO.11AQ1

X

ON

OFF

GOV. OIL PUMP NO.2

X

ON

X

MAINTAINED

CONTACTS

AUTO

1AQ3

AUTOCONTACT

1AQ2

HI-PRESS THRUST BRG OIL PUMP

TURBINE BEARING OIL PUMPS

SU1

J O

R D

A N

S F

IN

K

P

.E

REFERENCES:

NOTES:

JDP-1.1-6-1E24/1MAIN UNIT AUXILIARIES GOVERNOR OIL PUMPS / SU1

1SD

(TP1)

(TP1)

OVERLOAD

(TP1)

BUILT-IN

SD

V

A C

C R

NOTE 2

OIL CATCHER PUMP

FOR UNITS RECEIVING FIXED TURBINE BLADES / REPLACED FOR KAPLAN UNITS.

2. OIL CATCHER ELECTRICAL SYSTEM COMPONENTS TO BE REMOVED

1. ITEMS IN BOLD/GREEN TO BE REMOVED/MODIFIED.

D C

P U

M P

S T

A R

T

TBDCR

TBQ 2.0

GPM

T

A P

R

T

A

P C

(TP1)

TBQ 2.3

GPM(TP1)

AQ2 M CONTACTS

63HP

(G1)

650 P.S.I. MIN. SET POINT

J

P A

R K

E R

OL3OL3

G R

OL'S

1HC2

HC1

HIGH WATER

ANN.

43HC

HC1

HC2

1HC1

480V. OUTLET & PLUG

INSTALLED ALL UNITS

30 AMP. 3W 4P

HC2

LAG START

ANN.

LOSS OF

POWER ANN.

VAC

VAC

VAC

VAC

HC3

52HC3 LAG

PUMP #3 START

ANN T20R/T6A

ATB5-14

HAND

TIMER

SET AT

140 SEC

HC3

RSR2

(LAG)

AUTO

HC2

HC3

HC3

A4

A3 A4

A2

LOPA3

HW

2.1

OL2 A1

658 143

2.1

RSR2

3.1

1.1

21 2

OL1

6 8

RSR1

1.3

9 7

1.2

RSR2

5.1

3.2

5.2

CR

G R

OL'S

GR

OL'S

RSR1RSR2

CR

CRLOPHW

OL2

INSTALLED ON UNIT 12 ONLY

HEAD COVER PUMP #3

OL1

480V. OUTLET & PLUG

INSTALLED ALL UNITS

30 AMP. 3W 4P

HC1

SEE DETAIL "A" FOR SOLENOID "20"

AND SWITCH "33" RELATIONSHIP.

A1

MAIN UNIT AUXILIARIES - CONTROL DIAGRAMS - REMOVAL

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

J D

P -1

.1 E

D X

X X

.d g n

R E

M O

V A

L

T U

R B

IN

E

P

IT

S C

H E

M A

T

IC

W

IR

IN

G

D

IA

G R

A M

ED603

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

A

M A

N K

W A

-P O

K U

J

P A

R K

E R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

SOLDER TYPE

R30

R32

43860-P-11

4C #12MI

S

.1

5.1 5.2 5.2

3.2

5.1

.2

.1

.2

.2

SN11

SN10

S N

FLEX. CABLE

U

S N

4C #12MI

S N

S N

S

S N

S N

S N

S N

1.2K

24+

METER SIGNAL +

5.6K

* METER POWER

2C #12MI

2C #12MI

T B

N

E U

B L

U

ULTRA SONIC LEVEL SENSOR SCHEMATIC

O R

N

11 9

LOW ALARM, SET AT 8.5

HIGH ALARM, SET AT 12

TBD4

6C #16AWG

1.2

TBD4

TBD7

TBD5

TBD3

TBD7

6C #16AWG

TBD3

6C #16AWG

TBD5

TBD7

TBA5

TBA2

N

TBA4

TBA3

3 2 4

M

M

M

RED

WHITE

F L

J

4C #12MI

4C #12MI

2C #12MI 2C #12MI

3 O

43866-7

43870-1

43870-3

2C FLEX. CABLE

W

6-#12, 1"

VX

A

43868-45

7C-#12MI

43866-9

43868-46

D E

4C #12MI

2C #12MI

4C #12MI

S2

S1

4C #12MI

C

43885-9 43885-8

I

43885-1 & 2

B

STATION. DWG.43884B

HD SUMP PUMPS CONTROL

DWG 43884A

TERMINAL CABINET

CONTACTS

MAINTAINED

CONTACTS

MAINTAINED

43860-M-9

ENCLOSED-REVERSING

SINGLE PHASE-TOTALLY

120VOLT A-C-60 CYCLE-

SM STOP-NUT MOTOR

2C #12MI

TO D-C MOTOR

TRIP

86GT

125V-D.C.

CONTACTS 10AMPS @

FLOW OF 2.3 G.P.M

TO CLOSE AT & ABOVE

SPDT SWITCHES. CONTACTS

FLOW SWITCH WITH 2

AUTO. STARTING INTERLOCK

PLATE AREA

LIGHTS IN TOP

43885-10

OUTLET

CONVENIENCE

ALARM

43885-3

M.G. BEARING

TEMP RELAY FOR

AP16/AR1-5/RED

WHT

T9D/AR1-6

T9/AR2-6

GRN59

TB-44/AP16

T9D/ATB3-14/BLU(S*1)

BLU/BLK/T9D

(S*1)ATB3-13/AP

BLU/T9

20MA=18.5"

4MA= 0"

LEVEL SENSOR

ULTRA SONIC

OR LOW ALARM TEST SIGNAL

SIGNAL AND INJECTS A 4ma

*PB2INTERUPTS THE SUMP

BUTTONS

LEVEL TEST

T.B.G. OIL

ON INCREASING FLOW AT 7 G.P.M.

FLOW AT 5 G.P.M AND RESET

CLOSE ON DECREASING

WATER FLOW SW. TO

BEARING OIL COOLING

PUMP BAY-43866-11

IN PIT LINER

RECEIVER LOCATED

OIL SUMP LEVEL GAUGE

CONTACT 13AMP @ 125V A-C

OF OIL CATCHER PUMP

SW FOR AUTO CONTROL

OIL CATCHER DRAIN FLOAT

HIGH PB

LIMIT

LOWER

43860-M-10

LIMIT SWITCH

SELSYN TRANS

LIMIT

RAISE

LOW PB

AP

3 #12

SU

125V-D.C.

ON SM LOCK CYL, 2.5AMPS

LOCK LIMIT SW. LOCATED

SERVOMOTOR GATE

18GM75-E01-VIS

PEPPREL & FUCHS

LEVEL SENSOR

ULTRA SONIC

4-20MA

CONTACTS 10AMPS @ 125V-D.C.

FLOW RISES ABOVE 4.5 G.P.M

4.0 G.P.M AND TO OPEN WHEN

WHEN FLOW DROP 5 BELOW

SWITCHES. CIRCUITS TO CLOSE

FLOW SWITCH WITH 2 SPDT

BY OTHERS.

FURNISHED & INSTALLED

STOP NUT SELSYN

3C #12MI.

TO A-C MOTOR

43864-2

3 PHASE (TOTALLY ENCLOSED)

440VOLT A-C 60 CYCLE

HD COV. SUMP PUMP MOTOR

ENCLOSED.

SINGLE PHASE TOTALLY

115VOLT A-C-60 CYCLE

OIL LEAKAGE & DRAIN

CATCHER RETURN OF

A-C MOTOR FOR OIL

43864-1.

(TOTALLY ENCLOSED)

3-PHASE

440VOLT A-C 60 CYCLE

HD COV. SUMP PUMP MOTOR

ANNUNCIATION.

CONTACTS FOR HIGH WATER

WITH ADJ. 5AMP 125 D-C

SUMP PUMP #3 FLOAT SW

3 #12

"4

3SU__

ALARM.

OF SECOND SUMP PUMP AND

CONTACTS FOR AUTO CONTROL

WITH ADJ. 5AMP 125VOLT D-C

SUMP PUMP #2 FLOAT SW

ALARM.

OF ONE SUMP PUMP AND

CONTACTS FOR AUTO CONTROL

WITH ADJ. 5AMP 125VOLT D-C

SUMP PUMP #1 FLOAT SW

24-

R-30

ML

5-

NEUT

2 1

B L

K

B R

N

B L

K

B L

U

BLK

BLK

WHT

GRN

AP/AR1-5/RED

T.P. TERMINAL CABINET

B L

U

Sx1-ATB

Sx1-ATB

O R

N

A P

/A R

-5

[A P

/T B

-5

M U

[T

/T B

-5

M U

T9/AR2-6

T9D/AR1-6/BLK

T

/T B

-4

A P

/T B

-4

/R E

D

A P

/A R

-5

[T

D /T

B -5

M

U

T

D /T

B -6

/B

L K

WHITE

TBA-2

a3 a2 a4 a1

A11

C16

C11

B11

B16

A16

T10B

AP

PC1 46

T9

T10A

APR9

TBA-5

TBA-4

TBA-3 12

T10A

APR

PC1

X

X

X

X

X

X

X

1HC2

1HC1 43HC

X

X

ONCONTACT AUTO

HD COV. SUMP PUMP ????

AUTO

X

CONTACT

OFF

HD COV. SUMP PUMP 1

OFF

ON

HD COV. SUMP PUMP 2

NC1

T6R

AP1

R-14 a5

N

74R a6

AP1 23

T-13

O

N

TBD-3

O

O

O

APR

T-9

S P a a

S a

S2 a

4C #12MI

QP

2C #12MI

R

98 1110743 65 12

1413 1615

N

7C #12MI

1 1

RED

3C-#16AWG

A1 a3

A2 1S2S1

97 a4

G

2C #12MI

K

43864-2

43864-2 43864-1

M

Z

3C-#12MI

M

T

2C-#12MI3C-#12MI

S Y

7C-#12MI

2SP

1HC2

3.2

3.1

43HC

AR2

AR1

65 65

1HC1

3.1

N E

U

T B

M E

T E

R

H I

4C #12MI

T B

M E

T E

R

L O

16 ONLY

MAIN UNIT

OIL SUMP FLOAT

TURBINE BEARING

3 #12

CQHC; 3/4

LEAD

N -1

LEAD

N -2

N 1 LEAD N 2 LEAD

3 #12

SU_9,3 3/4"

43860E-13

1/2 AMP-125V-D-C

10AMPS. @ 125V-AC OR

IN CYL, HEAD CONTACTS

DRDT LIMIT SWITCH

SM POSITIONING NOT

11-#12, 1 1/2"

CONTACTS 10AMPS @ 125V-DC

APPROXIMATELY 2.3 G.P.M

CIRCUIT WHEN FLOW RISES TO

BELOW 2GPM AND OPEN A

A CIRCUIT WHEN FLOW DROPS

SWITCHES BOTH TO CLOSE

SWITCH WITH 2 SPDT

ALARM & SHUTDOWN FLOW

BEARING.

LOCATED IN TURBINE

TEMP- DETECTORS

BEARING RESISTANCE

3C #16AWG

-43885-6 & 7

SOLDER TYPE.

BRG. HOUSING,

BOARD LOC, ON

TERM. BOX &

WHT

GRN

TB-52/AP16

8321 4 765

6 58 7 2 14 3

OR HI ALARM TEST SIGNAL

SIGNAL AND INJECTS A 20ma

*PB1INTERUPTS THE SUMP

4ma=0 20ma=18.5

0=EMPTY 18.5 IS FULL

INCHES OF OIL

METER DISPLAYS

J O

R D

A N

S F

IN

K

P

.E

REFERENCES:

NOTES:

SCHEMATIC WIRING DIAGRAM TURBINE PITJDP-62-149-116

STARTER

A-C TURB BRG. OIL PUMP

STARTER

D-C TURB BRG. OIL PUMP

STATION

PUMP CONTROL

OIL CATCHER

JUNCTION BOX

HD COV. SUMP PUMP #1 STARTER HD COV. SUMP PUMP #2 STARTER

1. ITEMS IN BOLD/GREEN TO BE REMOVED/MODIFIED.

AR2

AR1

A1

SCHEMATIC WIRING DIAGRAM TURBINE PIT- REMOVAL

C/N #23

SCALE: 3/4"=1'-0"

MOUNTING OF LIGHT SWITCH

SECTION SHOWING

SCALE: 3/4"=1'-0"

MOUNTING OF CONVENIENCE OUTLET

SECTION SHOWING

8 UNITS FOR JOHN DAY LOCK & DAM.

THIS SECTION APPLIES ONLY TO

THIS SECTION APPLIES ONLY

GRANITE LOCK & DAM.

MONUMENTAL, & LOWER

UNITS ON LITTLE GOOSE, LOWER

TO 8 UNITS ON JOHN DAY & ALL

REFERENCES:

NOTES:

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

W

N

R

P A

R K

E R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 E

D X

X X

.d g n

R E

M O

V A

L

E L

E C

T R

IC

A

L S

Y S

T E

M S

E C

T

IO

N S

S H

T U

R B

IN

E

P

IT

ED604

K A

M A

N K

W A

-P O

K U

J O

R D

A N

S F

IN

K

P

.E

TURBINE PIT ELECTRICAL SYSTEMS SECTIONSBLH43885-A

SCALE: 3"=1'-0"

TERMINAL BOX & BOARD

DETAIL OF TEMPERATURE DETECTOR

1. ITEMS IN BOLD/GREEN TO BE REMOVED/MODIFIED.

3 RELAY & BULB

J

J

K

L

K L

TO TERMINAL CABINET

DWG 43838

OUTER HEAD COVER

COVER DWG 43841

INTERMEDIATE HEAD

DWG 43848

GUIDE BEARING HOUSING

DWG 43850

MAIN GUIDE BEARING

DWG 43838

OUTER HEAD COVER

DWG 43844

INNER HEAD COVER

S

N

ZY

I

P

Q

R

T

Z

Y

T

TO SUMP PUMP #1 FLOAT

SWITCH. DWG 43864.

I

FIELD NOTE: 33 39

1/4-20 UNC-2 TAP-3/4 DEEP IN INTER HEAD COVER-4 HOLES

T

N

P

S

STUFFING BOX FURNISHED WITH

CONDULET MTG PLATE PC 43 TO INNER HD COVER.

SHOW IN SEC "WW-W-W", FIELD WELD

ALTERNATE LOCATION FOR CONDULET PC 41

COVER DWG 43841

INTERMEDIATE HEAD

SHOWN IN SECTION "D-D"

#3 FLOAT SWITCH

DWG 43864

TEMP DETECTOR

DWG 43864

#1 FLOAT SWITCH

SUMP PUMP

SEE SECTION "V-V"

SENDER

TO OIL LEVEL GAUGE

SEE SECTION "W-W"

LEVEL ALARM

SUMP LOW OIL

SUMP PUMP

RELAY.

STUFFING BOX FURNISHED WITH

TUBING

3/16 DIA COPPER

OIL SUMP DWG 43847

DWG 43864

HC SUMP PUMP

COVER DWG 43841

INTERMEDIATE HEAD

DWG 43848

GUIDE BEARING HOUSING

DWG 43848

OUTER HEAD COVER

PC 8 AS TEMPLATE.

LOCATE IO SUIT & USE

DO NOT DRILL THRU

COVER DWG 43841

INTERMEDIATE HEAD

DWG 43838

OUTER HEAD COVER

DWG 43864

HC SUMP PUMP

DWG 43850

MAIN GUIDE BEARING

APPROXIMATE

BOARD.

TERMINAL BOX & TERMINAL

TEMPERATURE DETECTOR

SEE ENLARGED DETAIL OF

SHOWN IN SECTION "E-E"

THESE THREE LINES ARE

COVER DWG 43841

INTERMEDIATE HEAD

THESE TWO LINES ARE

DWG 43838

COVER

OUTER HEAD

DWG 43848

GUIDE BEARING HOUSING

DWG 43884-A

TERMINAL CAB

TO TERMINAL CABINET

DWG 43864

#2 FLOAT SWITCH

SUMP PUMP

STATION DWG 43884-B

HEAD COVER SUMP PUMP CONTROL

TOP PLATE LIGHT

FIELD NOTE: 37

IN PIT LINER.

STRAPS EXCEPT THOSE

TYPICAL FOR ALL CABLE

#10-24 SELF TAPPING SCREW.

.177 HOLE-1/2 DEEP FOR

32 38FIELD NOTE

TEMPLATE.

RIB USE RELAY AS

IN BEARING HOUSING

3/8 DRILL-THRU-2 HOLES

DWG 43841

INTERMEDIATE HEAD COVER

FIELD NOTE: 33 39

PC 9 AS TEMPLATE.

LOCATE TO SUIT & USE

DO NOT DRILL THRU

IN INTER HD COVER

1/4-20 UNC-2 TAP-3/4 DEEP

FIELD NOTE: 33 39

1/4-20 UNC-2 TAP-3/4 DEEP IN

INTER HD COVER

DO NOT DRILL THRU

LOCATE TO SUIT & USE

PC 10 AS TEMPLATE.

INTERMEDIATE HEAD

COVER DWG 43841

MIN OIL LEVEL

MAX OIL LEVEL MAX OIL LEVEL

MIN OIL LEVEL

USE SEALANT AT

GASKET IN FINAL

ASSEMBLY IN FIELD.

X

X

18 1/2

15 5/8

90 GALS

L

USE SEALANT AT

GASKET IN FINAL

ASSEMBLY IN FIELD.

QUICK DISCONNECT PLUG & #16-2C

CABLE, TYPE S O-NEOPRENE COVERED,

FURNISHED WITH QUALITROL GAUGE PC 4.

L

42 41

35 36 40

2-8

34 36

2-8

LOCATE & WELD IN FIELD TO TOP

PLATE OF OIL RESER, TO SUIT.

DETERMINED BY

ROCHESTER MFG CO INC

10 GALS

FIELD NOTE:

HO TRERICE CO

DETERMINED BY

DIMENSIONS "X" TO BE

10 GALS

18 1/2

15 5/8

90 GALS140°

X X

140°

8 1/2

3 4

7 1/4

1 1/2

3/4

1 1/2

1/2

3/4 3/4

1 3/8 1/2

LOCATE AS SHOWN.

#7 DRILL-THRU BOX-4 HOLES

FIELD NOTE:

4WITH NUT.

GRIND SCREW FLUSH

LOCATE AS SHOWN

#7 DRILL-THRU BOX-2 HOLES

43848-

"QUALITROL" OIL LEVEL GAUGE CABLE GRIP

1/2 PORTABLE 1/2 CONDULET

TEMPLATE.

USING CONDULET PC 41 AS

4 HOLES IN MTG PLATE TO SUIT,

DRILL, 177 HOLE-#16 DRILL-

1/4X5X5 STEEL MTG PLATE

DIMENSIONS "X" TO BE

AS SHOWN.

LOCATE BOX APPROX

LOCATE FROM BOX.

4-HOLES

#7 DRILL-THRU 43848-

FIELD NOTE:

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11 12 13

H

J

SHEET ID

F

IL

E N

A M

E

D R

A W

IN

G

N O

B C

O E

S

J U

N E

E1

ED603

E2

ED603

C10

ED603

C11

ED603

C11

ED603

B9

ED603

C9

ED603

B9

ED603

B9

ED603

C10

ED603

C9

ED603

G3

SCALE: 3" = 1'-0"

SECTION

ED606

E3

G6

SCALE: 3" = 1'-0"

SECTION

ED606

D4

E2

SCALE: 1" = 1'-0"

DETAIL

E1

SCALE: 1" = 1'-0"

SECTION

D6

SCALE: 3" = 1'-0"

SECTION

ED606

D4

C9

SCALE: 6" = 1'-0"

SECTION

C10

SCALE: 6" = 1'-0"

SECTION

C11

SCALE: 6" = 1'-0"

SECTION

B9

SCALE: 6" = 1'-0"

SECTION

A2

SCALE: 1/2" = 1'-0"

SECTION

ED606

G6

A6

SCALE: 1/2" = 1'-0"

SECTION

ED606

A5

E3

SCALE: 1/2" = 1'-0"

SECTION

ED606

G2

E6

SCALE: 1/2" = 1'-0"

SECTION

ED606

D6

E9

SCALE: 1/2" = 1'-0"

SECTION

ED606

A5

SCALE: 3"=1'-0"

OF CONDULET PC11.

ENLARGED VIEW OF MOUNTING

®of Engineers

US Army Corps

D R

A W

IN

G

N O

F

IL

E N

A M

E

JO

H

N D

A Y

L O

C K

A N

D D

A M

P O

R T

L A

N D

O

R E

G O

N

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

P O

R T

L A

N D

O

R E

G O

N

P O

R T

L A

N D

D

IS

T R

R B

IN

E

R E

H A

B

G E

N E

R A

T O

R R

E W

IN

D

P O

W E

R H

O U

S E

C O

L U

M B

IA

R

IV

E

R

J

P A

R K

E R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

A N

S I

F

G P

Y L

E

J D

P -1

.1 E

D X

X X

.d g n

R E

M O

V A

L

E L

E C

T R

IC

A

L S

Y S

T E

M S

E C

T

IO

N S

S H

T U

R B

IN

E

P

IT

ED605

K A

M A

N K

W A

-P O

K U

J O

R D

A N

S F

IN

K

P

.E

REFERENCES:

NOTES:

TURBINE PIT ELECTRICAL SYSTEM SECTIONAL ELEVATION43885-B

1. ITEMS IN BOLD/GREEN TO BE REMOVED/MODIFIED.

W

N

R

33 39

PIT LINER WALL

5X5X1/4 PLATE

1/4-20 UNC-2 TAP THRU PC15.

5/16 DRILL-THRU-BACK OF BOX, PC11-2 HOLES

FIELD NOTE:-

TO PIT LINER WALL.

TACK WELD-BOTH ENDS

FIELD NOTE:-

4 5/16

2 5/16

4 5/8

3/4 3/4

Z

T

17 31

23 30

2922 3023

2518 2518

L K

M N

S

Y

T

Z

J

I

E D

J

E

D

J

IH

K M

L

K

N S

Y

FCBA

H

G

A B

H-2

H-1

K

F

G

C

O

TERMINAL CABINET

43884-A

6#12

1" 1 1/2"

11#12 4#12MI

4#12MI

FIELD NOTE:-

48 NTS

13 NTS

THIS AREA TO BE USED TO

RUN CABLES AROUND

PIT LINER AS SHOWN

THIS AREA TO BE USED TO

RUN CABLES AROUND

PIT LINER AS SHOWN

BAY PANEL. DWG 43866-A

INSTRUMENT PIPING-PUMP

BRG LUBE-WATER-GAUGE &

OIL PUMP

A-C TURBING BRG

OIL PUMP

D-C TURBINE BRG

3#12

SU-q14, 3/4"

TOP OF TURBINE PIT WALKWAY

PLATES TO SUIT CABLES

BURN HOLES IN FLOOR

FLOW SWITCH

AUTO-STARTING INTERLOCK

FLOW SWITCH.

ALARM & SHUTDOWN

BOTTOM OF PIT LINER

3#12

SU -q7, 3/4"

INDICATOR LIGHT

A-C PUMP SIGHT FLOW

INDICATOR LIGHT

D-C PUMP SIGHT FLOW

3#12

SU -q3, 3/4

3#12

SU --3/4

FLOW SWITCH

D-C PUMP START-UP

RECEIVER GAUGE

OIL SUMP OIL LEVEL

FLOW GAUGE

BRG OIL COOLING WATER

CONDULET.

FOR MOUNTING OF

SEE ENLARGED VIEW

LIGHT SWITCHES

SIGHT FLOW INDICATOR

HEAD COVER SUMP PUMP #1 STARTER

#2 STARTER.

HEAD COVER SUMP PUMP

PUMP STARTER

D-C TURBINE BRG OIL

PUMP STARTER

A-C TURBINE BRG OIL

TO JUNCTION BOX.

FLEXIBLE CONDUIT FROM GAUGE

4 FT LEADS WITH GAUGE.

STATION.

OIL CATCHER & DRAIN CONTROL

& 43870.

SHAFT & GENERATOR SHAFT COUPLING. REFER TO DWG 43935

FLOAT SWITCH MOUNTED ON OIL CATCHER AT TURBINE INTERMEDIATE

LOCAL JUNCTION BOX IN VICINITY OF SERVOMOTOR BLADE PUMP &

TO SHAFT STATIONARY NUT GUARD HANGER DWG 43938, THEN TO

SUPPORTS, THEN CROSS UNDER GENERATOR PLATFORM SUPPORT

THIS LEAD ROUTED UP PIT LINER WALL TO GENERATOR PLATFORM

1/8

37 16

FIELD NOTE:

TO PIT LINER IN

FIELD. TYPICAL

FOR ALL BARS.

TYPICAL

TEMPLATE.

USE CABLE STRAPS AS

TYPICAL FOR ALL 3/8 BARS

LOCATE AS SHOWN

0.177 HOLES-THRU

PIT LINER

STRAPS IN PIT LINER

TYP FOR ALL CABLE

#10-24 SELF TAPPING SCREW

0.177 HOLE-THRU 3/8 BARS

1 3/4 3 1/4

4 1/2 5 1/2

3 1/4

4 1/8 3 3/4

1/2

5/8

5/8

3/…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .