This amendment modifies solicitation W9127N23R0010 to update specifications and drawings in response to bidder inquiries for the Bonneville Powerhouse 1 Main Unit Breaker (MUB) Replacement opportunity issued by the Department of the Army Corps of Engineers Engineering District Portland. Key changes include revising foundation design requirements in specification 26 13 13.00 26, reducing schedule preparation requirements in specification 01 32 01.00 25, modifying submittal procedures in specification 01 33 00 to accept electronic submissions and remove field test report requirements, and updating various drawings to change CT specifications and disconnect switch orientation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0002 is to update Specifications and Draw ings in response to Bidder Inquiries. See "Summary of Changes" for details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N23R0010
X 9B. DATED (SEE ITEM 11)
25-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Sep-2023
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N23R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002 CHANGES
The following is a summary of changes made to the Specifications and Drawings. The Amendment 0002 Attachements are posted on SAM.gov and include “Technical Sections_Amd 0002,” “Drawings_Amd 0002,” and “J1-Submittal Register Amd 0002.”
1. Spec 26 13 13.00 26 was updated as follows:
Paragraph 2.3.11.1 was revised to include the following foundation design requirements: “All foundations must be suitable for the dynamic switching forces of the circuit breaker and the specified seismic forces. Design in accordance with the applicable provisions in Section 13.3 of ASCE 7 using a spectral acceleration SDS = 0.507, IP = 1.50, and z/h=1.”
2. Spec 01 32 01.00 25 Project Schedule.
Reduced the requirements for schedule preparation.
3. Spec 01 33 00 Submittal Procedures Removed the requirement for all submittals to be hard copy.
Reduced the requirement for electronic submission of submittals.
Remove the “Field Test Reports” paragraph at 1.13.
4. Drawing E-101A Removed elevation references to E-204A.
5. Drawing E-603 The CT’s between breaker 1XJ1 and Unit 1 were changed from 4000:5 to 3000:5.
6. Drawing E-603A The CT’s on the delta bus side, between breaker 1XJ2.2 and disconnect 1ZJ2.2D were changed from 3000:5 to 4000:5 and the function title of the CT’s was changed from “TO GENERATOR DIFFERENTIAL RELAY” to “TO SOUTH TRANSFER BUS DIFFERENTIAL RELAY”.
7. Drawing E-607A Orientation of disconnect switch 1ZJ9.2D moved to opposite side of breaker 1XJ9.2.
(End of Summary of Changes)