This submittal register amendment document is related to solicitation number W9127N23R0010 for the Bonneville Powerhouse 1 Main Unit Breaker (MUB) Replacement project by the Department of the Army Corps of Engineers Engineering District Portland. The submittal register lists required preconstruction submittals including an initial project schedule, schedule impact analyses, and a submittal register. It also lists required certificates including authorized shop drawing approvers. The document provides a template for tracking submittals, reviews, approvals and due dates to replace the main unit breaker at Bonneville Powerhouse 1.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Bonneville Powerhouse I Main Unit Breaker Replacement
01 32 01.00 25 SD-01 Preconstruction Submittals
1.6.1 GECCCInitial Schedule
1.9Schedule Impact Analysis
01 33 00 SD-01 Preconstruction Submittals
1.5 GSubmittal Register
SD-07 Certificates
1.10.2Authorized Shop Drawing
Approvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
J1-1
AMD #0002