B.08_Amendment_0004_-_FINAL.pdf
PDF 169 KB Posted
- Attached to
- The Dalles Intake Gate Gantry Crane
- Solicitation number
- W9127N-19-R-0004
About this file
Not Listed
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_D_-_Small_Business_Subcontracting_Plan_Template.pdf | ||
| Attachment_C_-_Small_Business_Participation_Plan_Template.pdf | ||
| IMG_1173.jpg | JPG image | |
| IMG_1176.jpg | JPG image | |
| IMG_1174.jpg | JPG image | |
| IMG_1175.jpg | JPG image | |
| IMG_1171.jpg | JPG image | |
| IMG_1172.jpg | JPG image | |
| IMG_1170.jpg | JPG image | |
| IMG_1177.jpg | JPG image | |
| IMG_1179.jpg | JPG image | |
| B.08_Amendment_0003_-_FINAL.pdf | ||
| IMG_0338.jpg | JPG image | |
| IMG_0331.jpg | JPG image | |
| IMG_0341.jpg | JPG image | |
| IMG_0335.jpg | JPG image | |
| IMG_0332.jpg | JPG image | |
| Attachment_C_-_Small_Business_Participation_Plan.pdf | ||
| B.08_Amendment_0002_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Site_Visit_PowerPoint.pptx | PPTX presentation | |
| Final_List.pdf | ||
| B.08_Amendment_0001_Solicitation_-_FINAL.pdf | ||
| B.08_The_Dalles_Intake_Gate_Gantry_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Intake_Gantry_Crane_Contract_Drawings_FINAL.pdf | ||
| B.08_ATTACHMENT_B.docx | DOCX document | |
| B.07_19R4_draft_11082018_FIO_drawings.pdf | ||
| B.08_Attachment_A.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ82551031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0004 is to:
1. Incorporate Attachment C – Small Business Participation Plan Template
2. Incorporate Attachment D – Small Business Subcontracting Plan Template
3. Update Section 41 22 13.18 26, Para 2.17.1
Note: Other than small business Offerors shall submit a Small Business Participation Plan. Reference Factor 4 in the RFP. All other terms and conditions remain unchanged. The POC is Jason Tanamor, jason.n.tanamor@usace.army.mil, 503-808-4630.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-19-R-0004
X 9B. DATED (SEE ITEM 11)
11-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2019
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-19-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The Dalles Intake Gate Gantry Crane
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 16.00 26 REMOVE EXISTING CRANE
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 25 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.00 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
DIVISION 09 - FINISHES
09 97 02.10 26 PAINTING: STEEL STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 32 15.00 26 DIESEL-GENERATOR SET
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.16 26 INTAKE GATE GANTRY CRANE DATA, TESTING AND TRAINING
41 22 13.17 26 INTAKE GATE GANTRY CRANE - MECHANICAL AND STRUCTURAL
41 22 13.18 26 INTAKE GATE GANTRY CRANE - ELECTRICAL
41 22 13.19 26 NEW LIFTING BEAMS
41 22 14.33 26 CRANE RAIL REPLACEMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 22 13.18 26
INTAKE GATE GANTRY CRANE - ELECTRICAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.5 QUALITY ASSURANCE
1.5.1 General
1.5.2 Electrical Drawing Index
1.5.3 Bill of Electrical Materials
1.5.4 Main One-Line Drawing
1.5.5 Schematic Drawings
1.5.6 PLC Ladder Logic Diagram
1.5.7 Electrical Interconnecting Diagrams
1.5.8 Electrical Installation Drawings
1.5.9 Cable and Conduit Schedule
1.5.10 Cable Carrier Systems Drawings
1.5.11 Final Approved Versions of Contractor Prepared Drawings
1.5.12 Submission of Product Data
1.5.13 Submission of Design Calculations
1.5.14 Submission of Test Results
1.6 SPARE PARTS AND SPECIAL TOOLS
PART 2 PRODUCTS
2.1 CRANE ELECTRIFICATION
2.1.1 General
2.1.2 Diesel Generator Set
2.1.3 Shore Power
2.1.4 Feeder Breaker
2.1.5 Trolley Line Grounding Switch
2.1.6 Four Wire Overhead Conductor System
2.1.7 Main-Line Collectors
2.1.8 Cable Carrier Systems for Power and Control Connections
2.1.9 Accessory Power Cord and Plug
2.2 SYSTEM PROTECTION
2.2.1 General
2.2.2 Generator Circuit Breaker
2.2.3 Manual Transfer Switches
2.2.4 Manual Transfer Switch Position Indication
2.2.5 Main-line Disconnect
2.2.6 Main-line Contactor
2.2.7 Main-line Phase Monitor
2.2.8 Surge Protection
2.2.9 Control Power
2.2.10 Breaker Lockouts
2.3 CONTROL SYSTEMS AND EQUIPMENT
2.3.1 General
2.3.2 Programmable Logic Controller (PLC) and Peripheral Devices
2.3.2.1 PLC General Requirements
SECTION 41 22 13.18 26 Page 1
2.3.2.2 PLC Modules
2.3.2.3 PLC Wiring Connections
2.3.3 Interfacing Data Port
2.3.4 Human Machine Interface (HMI)
2.3.5 Variable Frequency Drives (VFDs)
2.3.5.1 General
2.3.5.2 Main Hoist Backup VFDs
2.3.5.3 VFD Operating Features
2.3.5.4 Drive Isolation Transformers for VFDs
2.3.5.5 Line and Load Reactors for VFDs
2.3.5.6 Dynamic Braking for VFDs
2.3.6 Elapsed Time Meter
2.3.7 Hoist and Travel Operating Features
2.3.7.1 Hoisting and Lowering
2.3.7.2 Hoisting and Lowering Performances
2.3.7.3 Tandem Main Hoisting and Lowering Performances
2.3.7.4 Gantry Travel and Trolley Travel
2.3.7.5 Travel Performances
2.3.7.6 Tandem Trolley Travel Performance
2.3.7.7 Positioning Accuracy
2.3.7.8 Lifting Beam Latching Hoists
2.3.8 Limit Switches
2.3.9 Gate Alignment Indication
2.3.9.1 Proximity switch
2.3.10 Trolley Motion - Gate Alignment Indication
2.3.10.1 Proximity switch
2.4 OPERATOR CONTROL STATION
2.4.1 General
2.4.2 Operator Control Station Console and Chair
2.4.3 Operator Control Station Apparatus
2.4.4 Operator Control Station Apparatus Performances
2.4.5 Shop Inspection and Testing
2.5 PENDANT PUSHBUTTON CONTROLLER
2.6 MAINTENANCE HOIST (UNDERHUNG MONORAIL)
2.7 DECK HATCH HOIST (UNDERHUNG MONORAIL)
2.8 REMOTE (RADIO) CONTROL SYSTEM
2.8.1 General
2.8.2 Transmitter
2.8.3 Transmitter Frequency Allocation
2.9 LOCATION OF CONTROLS AND CONTROL EQUIPMENT
2.10 LOAD CELLS AND INDICATION
2.11 WIND SPEED MONITOR
2.12 WARNING SIGNALS
2.12.1 Travel Warning Bell
2.12.2 Horn
2.12.3 Crane Operation Warning Lights
2.12.4 Traffic Lights
2.13 MOTORS
2.13.1 General
2.13.2 Motor Size, Speed, and Time Ratings
2.13.3 Motor Winding Heaters
2.13.4 Motor Encoders
2.14 HOLDING BRAKES
2.14.1 Brake Type
2.14.2 Brake Release
2.14.3 Brake Mechanical Construction
2.14.4 Brake Torque Rating, Duty, and Adjustment
2.15 GANTRY STORM BRAKES
2.16 POWER, HEATING, LIGHTING AND CONVENIENCE OUTLET SYSTEMS
SECTION 41 22 13.18 26 Page 2
2.16.1 Utility Transformer
2.16.2 Power and Lighting Panelboards
2.16.3 Molded Case Circuit Breakers
2.16.4 Lighting
2.16.4.1 General
2.16.4.2 Working Area Floodlights
2.16.4.3 Intake Deck Floodlights (Street lights)
2.16.4.4 Walkways and Machinery Housing Lights
2.16.4.5 Cab and Trolley Machinery House Lights
2.16.4.6 Light Switches
2.16.5 Convenience Outlets
2.16.6 Power Outlet
2.17 CONDUIT AND WIREWAYS
2.17.1 Conduit
2.17.2 Conduit Fittings
2.17.3 Outlet, Junction, and Pull Boxes and Cover Plates for Conduit
2.17.4 Wireways
2.18 INSULATED WIRE AND CABLE
2.18.1 General
2.18.2 Material
2.18.3 Insulation
2.18.4 Jackets
2.18.5 Size
2.18.6 Stranding
2.18.7 Special Wire and Cable Requirements
2.18.7.1 Control Panel Wiring
2.18.7.2 Instrumentation Cable
2.18.7.3 Wire Near Resistors
2.18.7.4 Cable Carrier System Cable
2.18.8 Flame Tests
2.18.9 Wire Markers
2.18.10 Wire and Cable Connectors
2.19 TERMINAL BLOCKS
2.20 CABINETS AND ENCLOSURES
2.20.1 General
2.20.2 Working Clearances
2.20.3 Control Cabinets
2.20.4 Control Cabinet Heaters
2.20.5 Control Cabinet Cooling
2.20.6 Brake Enclosing Case
2.20.7 Brake Enclosure Heaters
2.21 AIR CONDITIONING EQUIPMENT
2.22 RADIANT HEATER
2.23 GEARBOX HEATERS
2.24 SLACK WIRE ROPE DETECTION SYSTEM
2.25 TROLLEY MACHINERY HOUSING VENTILATION
2.25.1 Fan Motors
2.25.2 Damper Actuator (Louver)
2.25.3 Controls
PART 3 EXECUTION
3.1 EQUIPMENT INSTALLATION
3.1.1 Sequencing of Crane Power Supply Work
3.1.2 Conduit
3.1.3 Wire and Cable
3.1.3.1 General
3.1.3.2 Cable Carrier System Terminations
3.1.3.3 Wire and Cable Markers
SECTION 41 22 13.18 26 Page 3
3.1.4 Connecting to Shore Power
3.1.5 Main-Line Collector System
3.2 ELECTRICAL TESTS
3.2.1 General
3.2.2 Motor Factory Testing
3.2.3 Holding Brakes Factory Testing
3.2.4 Control System and Equipment Factory Testing
3.2.5 Wiring Field Testing
3.2.6 Crane Acceptance Testing
3.2.7 Arc Flash Analysis
3.3 FIELD TRAINING
3.4 OPERATION AND MAINTENANCE DATA
-- End of Section Table of Contents --
SECTION 41 22 13.18 26 Page 4
b. Two duplex outlets in the electrical cab, external to the control panels.
c. Duplex outlets are to be located inside the control panels as recommended by the manufacturer.
d. Two duplex outlets in each trolley house, on opposite sides.
e. Two duplex outlets, located on both sides of the upstream side of the Sill, at deck-level, approximately 3 to 5 feet above the roadway.
2.16.6 Power Outlet
Two power outlets must be provided and connected to 480-volt welding outlet circuits in the 480 VAC panelboard, Meltric DSN30 Part# 63-34043, 3P+G, rated 30A, 480VAC with Meltric nylon 30 degree angle Part# 61-3A027, or approved equivalent. One power outlet is to be installed at deck-level, approximately 3 to 5 feet above the roadway. One outlet is to be installed on the trolley upstream walkway, centered on Hoist #2 (middle hoist).
2.17 CONDUIT AND WIREWAYS
2.17.1 Conduit
Minimum conduit size is to be 3/4 inch. All conduit must be Rigid steel conduit (RMC) and must conform to NEMA C80.1 and UL 6 and be hot-dip galvanized on inside and outside surfaces. Flexible conduit must conform to UL 1 and UL 360 and have a hot-dip galvanized steel core, copper ground wire, and a liquid tight waterproof extruded polyvinyl chloride cover.
Flexible conduit is only to be used on connections to vibrating or moving equipment such as motors, brakes, actuators, and limit switches; or when transitioning between two moving structural members. The maximum length of flexible conduit allowed for use is 36 inches. Flexible conduit may be 1/2 inch only when connected to equipment with factory threaded 1/2 inch entries.
2.17.2 Conduit Fittings
Fittings for rigid conduit must be threaded. Fittings for rigid and flexible conduit must conform to NEMA FB 1, UL 467, and UL 514B. Fittings must be galvanized cast or malleable iron or cast brass.
2.17.3 Outlet, Junction, and Pull Boxes and Cover Plates for Conduit
Junction boxes and cover plates for conduit must be galvanized cast or malleable iron, or cast brass, and conform to UL 514B. All cast boxes are to be supplied with integral-cast or factory-brazed hubs and be factory threaded. Sheet metal pull boxes and covers must conform to NEMA OS 1, UL 514A, UL 514B, and SECTION 26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS paragraph CABINETS AND ENCLOSURES.
2.17.4 Wireways
If used, wireways must be Listed to UL 870. Wireways and all fittings and connectors must be made of sheet metal. Covers and bodies of wireways must have minimum thickness equal to 18 gauge steel. Seams are to be continuously welded and ground smooth, with no screws or bolts protruding into the inside of the wireway. All edges and corners are to be rounded and smooth. All covers and connectors including elbows, tees, crosses, SECTION 41 22 13.18 26 Page 46
| B.08_Amendment 0004 |
| Technical_Sections |
| PROJECT TABLE OF CONTENTS |
| DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT |
| 41 22 13.18 26 - INTAKE GATE GANTRY CRANE - ELECTRICAL |
| 41 22 13.18 26 - INTAKE GATE GANTRY CRANE - ELECTRICAL |
| PART 2 PRODUCTS |
| 2.16 POWER, HEATING, LIGHTING AND CONVENIENCE OUTLET SYSTEMS |
| 2.16.6 Power Outlet |
| 2.17 CONDUIT AND WIREWAYS |
| 2.17.1 Conduit |
| 2.17.2 Conduit Fittings |
| 2.17.3 Outlet, Junction, and Pull Boxes and Cover Plates for Conduit |
| 2.17.4 Wireways |
| [4]: [4] |
| Amd0004: AMD #0004 |
File details come from the government source that posted it.