B.08_Amendment_0002_-_FINAL_SPECS.pdf
PDF 145 KB Posted
- Attached to
- The Dalles Intake Gate Gantry Crane
- Solicitation number
- W9127N-19-R-0004
About this file
Amendment 0002. See attachment for details
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_D_-_Small_Business_Subcontracting_Plan_Template.pdf | ||
| B.08_Amendment_0004_-_FINAL.pdf | ||
| Attachment_C_-_Small_Business_Participation_Plan_Template.pdf | ||
| IMG_1173.jpg | JPG image | |
| IMG_1176.jpg | JPG image | |
| IMG_1174.jpg | JPG image | |
| IMG_1175.jpg | JPG image | |
| IMG_1171.jpg | JPG image | |
| IMG_1172.jpg | JPG image | |
| IMG_1170.jpg | JPG image | |
| IMG_1177.jpg | JPG image | |
| IMG_1179.jpg | JPG image | |
| B.08_Amendment_0003_-_FINAL.pdf | ||
| IMG_0338.jpg | JPG image | |
| IMG_0331.jpg | JPG image | |
| IMG_0341.jpg | JPG image | |
| IMG_0335.jpg | JPG image | |
| IMG_0332.jpg | JPG image | |
| Attachment_C_-_Small_Business_Participation_Plan.pdf | ||
| B.07_The_Dalles_Site_Visit_PowerPoint.pptx | PPTX presentation | |
| Final_List.pdf | ||
| B.08_Amendment_0001_Solicitation_-_FINAL.pdf | ||
| B.08_The_Dalles_Intake_Gate_Gantry_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Intake_Gantry_Crane_Contract_Drawings_FINAL.pdf | ||
| B.08_ATTACHMENT_B.docx | DOCX document | |
| B.07_19R4_draft_11082018_FIO_drawings.pdf | ||
| B.08_Attachment_A.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ82551031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0002 is to:
1. Extend the RFP solicitation due date
2. Update the language in Section 01 10 10.00 25, 1.23.2.1 Electrical Power – General
3. Update the language in Section 41 22 13.18 26, 2.1.3 Shore Power
4. Update the language in Section 01 22 00.00 25, 1.4.2 Manufacture and Deliver New 480 Ton Intake Gate Gantry Crane, CLIN 0002
5. Incorporate Clause UAI 5152.232-9000 Payment for Materials Delivered Off-Site
6. Incorporate Attachment C. All other terms and conditions remain unchanged.
The POC is Jason Tanamor, jason.n.tanamor@usace.army.mil, 503-808-4630.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jan-2019
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-19-R-0004
X 9B. DATED (SEE ITEM 11)
11-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jan-2019
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9127N-19-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-Jan-2018 10:00 AM to 19-Feb-2019 10:00 AM.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been added by reference:
UAI 5152.232-9000 PAYMENT FOR MATERIALS DELIVERED OFF-SITE
(MAR 2009)
JAN 2017
(End of Summary of Changes)
The Dalles Intake Gate Gantry Crane
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 16.00 26 REMOVE EXISTING CRANE
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 25 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.00 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
DIVISION 09 - FINISHES
09 97 02.10 26 PAINTING: STEEL STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 32 15.00 26 DIESEL-GENERATOR SET
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.16 26 INTAKE GATE GANTRY CRANE DATA, TESTING AND TRAINING
41 22 13.17 26 INTAKE GATE GANTRY CRANE - MECHANICAL AND STRUCTURAL
41 22 13.18 26 INTAKE GATE GANTRY CRANE - ELECTRICAL
41 22 13.19 26 NEW LIFTING BEAMS
41 22 14.33 26 CRANE RAIL REPLACEMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 10.00 25
CONTRACTOR'S OPERATIONS AND REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 SCHEDULE FOR CONSTRUCTION
1.5 CONSTRAINTS
1.5.1 Emergency Gantry Crane Operation
1.5.2 Four Wire Overhead Conductor System
1.5.3 Erection of New Intake Gate Gantry Crane
1.5.4 Demolition of the Existing 265 Ton Emergency Gantry Crane
1.5.5 Hand Rails
1.5.6 Crane Rail Replacement
1.6 FISH UNIT OUTAGE
1.7 TRANSFORMER OUTAGE
1.8 MAIN UNIT OUTAGE
1.9 EMERGENCY GANTRY CRANE DURING RAIL REPLACEMENT
1.10 EMERGENCY GANTRY CRANE DURING POLE REPLACEMENT
1.11 INCLEMENT WEATHER CONSTRUCTION
1.12 NOTIFICATION OF EQUIPMENT OUTAGE TO BPA
1.13 UTILITY OUTAGE REQUEST AND UTILITY CONNECTION REQUEST
1.14 WORK BY THE GOVERNMENT CONCURRENT WITH CONTRACTOR WORK
1.15 WEEKLY COORDINATION MEETINGS
1.16 CONTRACTOR EMPLOYEES
1.17 PAGERS
1.18 ACCESS AGREEMENTS AND WORK AREAS
1.18.1 Access Agreements
1.18.2 Work Areas
1.18.3 Employee Access and Parking
1.19 SECURITY PROCEDURES
1.19.1 Project Security
1.19.2 Contractor's General Personnel
1.19.3 Verification of Employment Eligibility
1.19.4 Identification of Employees
1.19.5 Non-US Citizens
1.19.6 Safeguarding of Information
1.20 SECURITY TRAINING
1.21 DECK ACCESS RESTRICTIONS
1.22 CONSTRUCTION PROJECT IDENTIFICATION SIGN
1.23 UTILITIES
1.23.1 Sanitary Facilities
1.23.2 Electrical Power
1.23.2.1 General
1.23.2.2 Temporary Electrical Wiring
1.23.3 Telephone
1.23.4 Water
1.24 CONTRACTOR'S EQUIPMENT
1.24.1 Contractor's Planned Equipment Methods
SECTION 01 10 10.00 25 Page 1
1.23 UTILITIES
Provide utilities required for the performance of work under this Contract.
Limited amount of compressed air is available on the intake deck.
1.23.1 Sanitary Facilities
Use of the Project restroom by Contractor personnel will not be permitted.
Provide portable, temporary sanitary facilities in accordance with
EM 385-1-1.
1.23.2 Electrical Power
1.23.2.1 General
Use of existing, available and operable 120V and 480V electrical receptacles is allowed. Take special care not to overload receptacle circuits. Contractor shall be responsible for all accessories, such as extension cords, adapters, and raceways for road crossings. Extension cords shall not be allowed to cross crane rails.
1.23.2.2 Temporary Electrical Wiring
Submit a Temporary Electrical Wiring Plan for temporary electrical wiring.
Install all temporary electrical wiring in accordance with EM 385-1-1 and as approved. All temporary electrical wiring must be removed prior to completion of the Contract. Include load calculations to ensure conduit capacity is not exceeded.
1.23.3 Telephone
Telephone will not be available for Contractor use.
1.23.4 Water
Reasonable amounts of water for domestic use will be made available from existing outlets and supplies. No charge will be made for the water.
1.24 CONTRACTOR'S EQUIPMENT
1.24.1 Contractor's Planned Equipment Methods
Submit proposed methods of transportation and operation of cranes and other heavy equipment including analysis of cranes and equipment traveling over manholes for approval prior to commencement of those operations. Submit certificate showing current inspection of all insulated manlifts or bucket trucks or lifting equipment used on the project prior to use the equipment.
Submit a crane grounding plan that complies with 29 CFR 1926 and EM 385-1-1 for work near overhead transmission lines, to include manlifts. Submittals must include the type, size, loadings of equipment, placement of outriggers, and the proposed transportation routes and work areas to be used on the project. Operation of heavy equipment adjacent to existing structures must be avoided when possible. Testing requirements and operation of cranes and other heavy equipment must be in accordance with EM 385-1-1. All cranes, rigging, lifts, operators, vehicles, and other necessary means to move equipment or items must be Contractor-furnished as required to pursue and complete the work and must comply with EM 385-1-1.
SECTION 01 10 10.00 25 Page 13
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 25
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 UNIT PRICE PAYMENT ITEMS
1.3 JOB PAYMENT ITEMS
1.4 MEASUREMENT AND PAYMENT
1.4.1 Design New 480 Ton Intake Gate Gantry Crane, CLIN 0001
1.4.2 Manufacture and Deliver New 480 Ton Intake Gate Gantry Crane, CLIN 0002
1.4.3 Install and Test New 480 Ton Intake Gate Gantry Crane, CLIN 0003
1.4.4 Remove Existing 265 Ton Emergency Gantry Crane, CLIN 0004
1.4.5 Replace Three Wire Overhead Conductor System With A Four Wire
Overhead Conductor System, CLIN 0005
1.4.6 Replace Existing Intake Hammerhead Crane Main Line Collectors, CLIN 0006
1.4.7 Replace Existing Emergency Gantry Crane Main Line Collectors, CLIN 0007
1.4.8 Replace Crane Rail, CLIN 0008
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 22 00.00 25 Page 1
Government determines that it is complete.
(c) The value of PM No. 3 must be no greater than 35 percent of CLIN 0001, "Design New 480 Ton Intake Gate Gantry Crane."
1.4.2 Manufacture and Deliver New 480 Ton Intake Gate Gantry Crane, CLIN
a. Measurement: Measurement will be made as a job for all costs associated with manufacturing and delivering the new 480 ton intake gate gantry crane.
b. Payment: Progress Payments will be made for purchased and accepted materials required by the technical provisions to manufacture the 480 ton intake gate gantry crane, as well as percentage of completed work as inspected and approved by the COR up to Contract amount under CLIN 0002.
1.4.3 Install and Test New 480 Ton Intake Gate Gantry Crane, CLIN 0003
a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for installing and testing the new 480 ton intake gate gantry crane.
b. Payment: Payment will be made at the Contract amount under CLIN 0003.
1.4.4 Remove Existing 265 Ton Emergency Gantry Crane, CLIN 0004
a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for removing the existing 265 ton emergency gantry crane. This CLIN includes asbestos abatement.
b. Payment: Payment will be made at the Contract amount under CLIN 0004.
1.4.5 Replace Three Wire Overhead Conductor System With A Four Wire Overhead Conductor System, CLIN 0005
a. Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for replacing the three wire overhead conductor system with a four wire overhead conductor system to include, but not limited to: demolition of the existing three wire overhead conductor poles and wires, demolition of the existing intake deck lighting, installation of intake deck lighting and wiring, installation of new four wire overhead conductor poles and wires, and replacing the existing 265 ton emergency gantry crane three wire overhead collectors with four wire overhead collectors.
b. Payment: Payment will be made at the Contract amount under CLIN 0005.
1.4.6 Replace Existing Intake Hammerhead Crane Main Line Collectors, CLIN
a. Measurement: Measurement will be made as a job for providing all labor, equipment, materials, parts, and incidentals for replacing the existing intake hammerhead crane main line collectors.
SECTION 01 22 00.00 25 Page 5
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 22 13.18 26
INTAKE GATE GANTRY CRANE - ELECTRICAL
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 REFERENCES
1.3 SUBMITTALS
1.4 GENERAL REQUIREMENTS
1.5 QUALITY ASSURANCE
1.5.1 General
1.5.2 Electrical Drawing Index
1.5.3 Bill of Electrical Materials
1.5.4 Main One-Line Drawing
1.5.5 Schematic Drawings
1.5.6 PLC Ladder Logic Diagram
1.5.7 Electrical Interconnecting Diagrams
1.5.8 Electrical Installation Drawings
1.5.9 Cable and Conduit Schedule
1.5.10 Cable Carrier Systems Drawings
1.5.11 Final Approved Versions of Contractor Prepared Drawings
1.5.12 Submission of Product Data
1.5.13 Submission of Design Calculations
1.5.14 Submission of Test Results
1.6 SPARE PARTS AND SPECIAL TOOLS
PART 2 PRODUCTS
2.1 CRANE ELECTRIFICATION
2.1.1 General
2.1.2 Diesel Generator Set
2.1.3 Shore Power
2.1.4 Feeder Breaker
2.1.5 Trolley Line Grounding Switch
2.1.6 Four Wire Overhead Conductor System
2.1.7 Main-Line Collectors
2.1.8 Cable Carrier Systems for Power and Control Connections
2.1.9 Accessory Power Cord and Plug
2.2 SYSTEM PROTECTION
2.2.1 General
2.2.2 Generator Circuit Breaker
2.2.3 Manual Transfer Switches
2.2.4 Manual Transfer Switch Position Indication
2.2.5 Main-line Disconnect
2.2.6 Main-line Contactor
2.2.7 Main-line Phase Monitor
2.2.8 Surge Protection
2.2.9 Control Power
2.2.10 Breaker Lockouts
2.3 CONTROL SYSTEMS AND EQUIPMENT
2.3.1 General
2.3.2 Programmable Logic Controller (PLC) and Peripheral Devices
2.3.2.1 PLC General Requirements
SECTION 41 22 13.18 26 Page 1
Design calculations must be approved prior to procurement of associated materials and equipment.
1.5.14 Submission of Test Results
Results of tests performed in accordance with paragraph ELECTRICAL TESTS must be documented and and submitted to the Government within seven working days after completion of the test.
1.6 SPARE PARTS AND SPECIAL TOOLS
Supply spare parts and special tools as outlined in SECTION 41 22 13.16 26
INTAKE GATE GANTRY CRANE DATA, TESTING AND TRAINING.
PART 2 PRODUCTS
2.1 CRANE ELECTRIFICATION
2.1.1 General
Electrical power for the operation of the crane is supplied both by a diesel generator set and shore power. An additional shore power cord will be provided to power electrical accessory power and housekeeping loads.
Provide the diesel engine driven generator set in accordance with SECTION 26 32 15.00 26 DIESEL-GENERATOR SET to provide power to the crane while it is operated without shore power available. Provide new shore power feeder cables as the primary supply of incoming power to the crane's overhead conductors from the new circuit breaker at SQO. Provide Transfer switches to switch power between the generator set and shore power, and preclude those sources from being connected together. Provide accessory power transfer means between the accessory shore power cord and crane power (diesel generator and shore power). Provide all mounting bases, supports, stands, and all additional materials required for proper installation of equipment.
2.1.2 Diesel Generator Set
The generator set will be provided in accordance with SECTION 26 32 15.00 26
DIESEL-GENERATOR SET.
2.1.3 Shore Power
The primary source of power supplied to the crane is comprised of a feeder breaker from SQO located at EL 90, 250 kcmil cable and 3 inch conduit SQO108-q16-K2, which attaches to the overhead conductors at Bay 10 located on the intake deck. The Power Circuit Breaker at SQO is type ABB K-Line Air Circuit Breaker and is to be replaced with a new circuit breaker. Replace cable SQO108-q16-K2 with new cable meeting the requirements of INSULATED WIRE AND CABLE of this SECTION. The new cable must be two sets of compact stranded 250 kcmil AWG per phase minimum and a 2/0 AWG insulated copper ground, to maintain a total voltage drop at the four wire overhead conductor system taps of no more than 4 percent of the nominal system voltage per the requirements of CMAA 70. The existing conduit SQO108-q16-K2 must be reused.
2.1.4 Feeder Breaker
Provide new SQO feeder circuit breaker to replace the existing SQO Intake Cranes Trolley Feeder circuit breaker. The replacement circuit breaker
SECTION 41 22 13.18 26 Page 14
| B.08_Amendment 0002 Solicitation - FINAL |
| PUBLISH |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| 01 10 10.00 25 - CONTRACTOR'S OPERATIONS AND REQUIREMENTS |
| PART 1 GENERAL |
| 1.23 UTILITIES |
| 1.23.1 Sanitary Facilities |
| 1.23.2 Electrical Power |
| 1.23.2.1 General |
| 1.23.2.2 Temporary Electrical Wiring |
| 1.23.3 Telephone |
| 1.23.4 Water |
| 1.24 CONTRACTOR'S EQUIPMENT |
| 1.24.1 Contractor's Planned Equipment Methods |
| 01 22 00.00 25 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 25 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.4 MEASUREMENT AND PAYMENT |
| 1.4.2 Manufacture and Deliver New 480 Ton Intake Gate Gantry Crane, CLIN |
| 1.4.3 Install and Test New 480 Ton Intake Gate Gantry Crane, CLIN 0003 |
| 1.4.4 Remove Existing 265 Ton Emergency Gantry Crane, CLIN 0004 |
| 1.4.5 Replace Three Wire Overhead Conductor System With A Four Wire |
| 1.4.6 Replace Existing Intake Hammerhead Crane Main Line Collectors, CLIN |
| DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT |
| 41 22 13.18 26 - INTAKE GATE GANTRY CRANE - ELECTRICAL |
| 41 22 13.18 26 - INTAKE GATE GANTRY CRANE - ELECTRICAL |
| PART 1 GENERAL |
| 1.5 QUALITY ASSURANCE |
| 1.5.14 Submission of Test Results |
1.6 SPARE PARTS AND SPECIAL TOOLS
| PART 2 PRODUCTS |
| 2.1 CRANE ELECTRIFICATION |
| 2.1.1 General |
| 2.1.2 Diesel Generator Set |
| 2.1.3 Shore Power |
| 2.1.4 Feeder Breaker |
| [2]: [2] |
| Amd0002: AMD #0002 |
File details come from the government source that posted it.