B.08_Amendment_0003_-_FINAL.pdf
PDF 349 KB Posted
- Attached to
- The Dalles Intake Gate Gantry Crane
- Solicitation number
- W9127N-19-R-0004
About this file
The purpose of Amendment 0003 is to: 1. Update Clause 52.228-15 - Performance and Payment Bonds - Construction (Oct 2010) 2. Remove Clause 52.228-1 - Bid Guarantee (Sep 1996) 3. Update Section 41 22 14.33 26, Para 3.10.3, Para 2.4, and Para 3.3.3 All other terms and conditions remain unchanged. The POC is Jason Tanamor, jason.n.tanamor@usace.army.mil, 503-808-4630.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_D_-_Small_Business_Subcontracting_Plan_Template.pdf | ||
| B.08_Amendment_0004_-_FINAL.pdf | ||
| Attachment_C_-_Small_Business_Participation_Plan_Template.pdf | ||
| IMG_1173.jpg | JPG image | |
| IMG_1176.jpg | JPG image | |
| IMG_1174.jpg | JPG image | |
| IMG_1175.jpg | JPG image | |
| IMG_1171.jpg | JPG image | |
| IMG_1172.jpg | JPG image | |
| IMG_1170.jpg | JPG image | |
| IMG_1177.jpg | JPG image | |
| IMG_1179.jpg | JPG image | |
| IMG_0338.jpg | JPG image | |
| IMG_0331.jpg | JPG image | |
| IMG_0341.jpg | JPG image | |
| IMG_0335.jpg | JPG image | |
| IMG_0332.jpg | JPG image | |
| Attachment_C_-_Small_Business_Participation_Plan.pdf | ||
| B.08_Amendment_0002_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Site_Visit_PowerPoint.pptx | PPTX presentation | |
| Final_List.pdf | ||
| B.08_Amendment_0001_Solicitation_-_FINAL.pdf | ||
| B.08_The_Dalles_Intake_Gate_Gantry_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Intake_Gantry_Crane_Contract_Drawings_FINAL.pdf | ||
| B.08_ATTACHMENT_B.docx | DOCX document | |
| B.07_19R4_draft_11082018_FIO_drawings.pdf | ||
| B.08_Attachment_A.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ82551031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0003 is to:
1. Update Clause 52.228-15 – Performance and Payment Bonds – Construction (Oct 2010)
2. Remove Clause 52.228-1 – Bid Guarantee (Sep 1996)
3. Update Section 41 22 14.33 26, Para 3.10.3
4. Update Section 41 22 14.33 26, Para 2.4
5. Update Section 41 22 14.33.26, Para 3.3.3
All other terms and conditions remain unchanged. The POC is Jason Tanamor, jason.n.tanamor@usace.army.mil, 503-808-463.0
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-19-R-0004
X 9B. DATED (SEE ITEM 11)
11-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Feb-2019
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9127N-19-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.228-15
52.228-15 – Performance and Payment Bonds -- Construction (Oct 2010)
(a) Definitions. As used in this clause --
“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds shall be 100 percent of the original contract price for CLINS 0003-0008 and is due within 10 calendar days after receiving the Notice to
Proceed (NTP) for CLINS 0003-0008,
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds shall be 100 percent of the original contract price for CLINS 0003-0008 and is due within 10 calendar days after receiving the Notice to Proceed (NTP) for CLINS 0003-0008.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price for any portion of the construction work is increased. The increase in protection generally will equal 100 percent of the increase in contract price for construction work.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular
570 is published in the Federal Register or may be obtained from the U.S. Department of Treasury, Financial
Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/ .
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
W9127N-19-R-0004
The following have been deleted:
52.228-1
(End of Summary of Changes)
The Dalles Intake Gate Gantry Crane
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 16.00 26 REMOVE EXISTING CRANE
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 25 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS
PROVISIONS
05 50 04.00 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
DIVISION 09 - FINISHES
09 97 02.10 26 PAINTING: STEEL STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 32 15.00 26 DIESEL-GENERATOR SET
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.16 26 INTAKE GATE GANTRY CRANE DATA, TESTING AND TRAINING
41 22 13.17 26 INTAKE GATE GANTRY CRANE - MECHANICAL AND STRUCTURAL
41 22 13.18 26 INTAKE GATE GANTRY CRANE - ELECTRICAL
41 22 13.19 26 NEW LIFTING BEAMS
41 22 14.33 26 CRANE RAIL REPLACEMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 22 14.33 26
CRANE RAIL REPLACEMENT
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 SHOP DRAWINGS
1.6 RAIL REPLACEMENT WORK PLAN
1.7 INITIAL VISUAL INSPECTION AND RAIL ALIGNMENT SURVEY REPORT
PART 2 PRODUCTS
2.1 GANTRY CRANE RAIL MATERIALS
2.1.1 Crane Rail
2.1.1.1 Rail Section Weight and Hardness
2.1.1.2 Metallurgical Composition
2.1.2 Rail Clips and Nuts and Washers
2.1.3 Joint Bars
2.1.4 Crane Rail Joint Bar Bolts, Nuts, and Washers
2.2 FOUNDATION MATERIAL
2.2.1 Base Plate
2.2.2 Non-shrink Grout
2.2.3 Concrete Anchor Bolts
2.2.4 Epoxy Adhesive for Concrete Anchors
2.2.5 Elastomeric Polyurethane Grout
2.2.5.1 Polyurethane Grout
2.2.5.2 Polyurethane Grout Primer
2.3 MONOLITH SEAL MATERIAL
2.3.1 Closed-Cell Backer Rod
2.3.2 Low Pressure Injected Elastomeric Polyurethane
2.3.3 Elastomeric Polyurethane Sealant
2.4 TEMPORARY CRANE STOPS
PART 3 EXECUTION
3.1 WORKMANSHIP
3.2 RAIL REMOVAL
3.2.1 Concrete Removal
3.2.2 Preservation of Existing Anchors
3.2.3 Disposal of Removed Materials
3.3 CONCRETE REPAIR AND ANCHOR INSTALLATION
3.3.1 Concrete Repair and Anchor Location Inspection Report
3.3.2 Spall and Crack Repair
3.3.3 Anchor Installation
3.4 MONOLITH SEAL INSTALLATION
3.4.1 Preparation of Monolith Joints
SECTION 41 22 14.33 26 Page 1
3.4.2 Installing Closed-Cell Backer Rod
3.4.3 Injecting Low Pressure Elastomeric Polyurethane
3.4.4 Installing Elastomeric Polyurethane Sealant
3.4.5 Removing Excess Material and Cleaning
3.4.6 Matching Existing Surrounding Seal On Top of Intake Deck
3.5 CLEANING INSIDE OF EXISTING DRAIN PIPES
3.6 INSTALLATION OF CRANE TRACK AND FITTINGS
3.6.1 Crane Rails
3.6.2 Bolted Rail Joints
3.6.2.1 Joint Bars
3.6.3 Existing Concrete Anchor Bolts
3.6.4 Base Plates
3.6.5 Ground Straps
3.7 NON-SHRINK GROUT PLACEMENT
3.7.1 Preparation
3.7.2 Installation
3.7.2.1 Cold Weather Requirements
3.7.2.2 Cold Weather Requirements
3.8 POLYURETHANE GROUT PLACEMENT
3.8.1 Preparation
3.8.2 Installation
3.9 CLEANUP
3.10 FIELD QUALITY CONTROL
3.10.1 Rail Alignment and Visual Inspection Prior to Grout Placement
3.10.2 Grout Inspection and Grout Testing
3.10.2.1 Grout Inspection
3.10.2.2 Grout Testing
3.10.3 Operational Test Report After Completion of Rail Installation
3.10.4 Completion Alignment Survey and Report
3.10.5 Retesting
-- End of Section Table of Contents --
SECTION 41 22 14.33 26 Page 2
2.2.5.1 Polyurethane Grout
Place elastomeric polyurethane grout as shown on the drawings. Provide polyurethane that is 85 durometer, shore A, two part, air-cured, moisture insensitive, cast-in-place material. A product meeting these requirements is FX-587 Polyurethane grout as manufactured by Fox Industries, 3100 Falls Cliff Road, Baltimore, Maryland 21211, 1-888-760-0369. Other products that comply are BASF Elastocast CUBK 440 polyurethane, or Dural 435 elastomeric polyurethane.
2.2.5.2 Polyurethane Grout Primer
Provide primer as recommended by the manufacturer of the elastomeric polyurethane grout. The bonding agent must be designed to improve the bond between the surrounding concrete and metal surfaces. The primer must be designed to improve the bond of the polyurethane joint seal to the concrete joint faces.
2.3 MONOLITH SEAL MATERIAL
2.3.1 Closed-Cell Backer Rod
Closed-cell backer rod is required to be expandable, closed-cell polyethylene foam designed for use as filler or with cold-applied sealant.
Provide backer rod with diameter sized 2-1/2 x the width of the monolith joint that is used in.
2.3.2 Low Pressure Injected Elastomeric Polyurethane
a. Provide low pressure injectable elastomeric polyurethane that has the following performance properties:
(1) Low viscosity, able to penetrate into cracks >0.2mm in width.
(2) When cured, permanently elastic, inert and chemically-resistant.
(3) Polyurethane injectable resin.
(4) No shrinkage in subsequent dry conditions.
(6) Solvent-free, environmentally friendly.
b. A product meeting these requirement is Sika Injection-201-CE.
2.3.3 Elastomeric Polyurethane Sealant
Provide elastomeric polyurethane sealant meeting ASTM C920 Class 100/50, grade NS. A product meeting these requirement is Sikaflex 2c NS.
2.4 TEMPORARY CRANE STOPS
Provide and install four temporary crane stops, similar to product by ALDON "Crane stop - Bumper Contact; item 4016-08" with cushion slide contact type design features, or approved equal. The crane end trucks and any attached equipment must not be damaged when the crane contacts the temporary end stops. Install the temporary end stops on both rails and both sides of the construction zone units for the duration of the construction. Adjust alignment and placement on the rails such that crane contacts the temporary
SECTION 41 22 14.33 26 Page 9 stops simultaneously. Install the temporary crane stops 71-feet away from the powerhouse monolith adjacent to the construction zone unit. Install per manufacturer's instructions. Submit drawings, product data, and installation/removal procedures for temporary crane stops. If removal is required to access the operating unit bay in which the temporary stops are installed, the Government will perform this removal.
PART 3 EXECUTION
3.1 WORKMANSHIP
Handle fittings, rails, and accessories to avoid kinking or other damage.
Maintain tracks in proper grade, alignment, curvature, and gage.
3.2 RAIL REMOVAL
Complete rail demolition per the requirements of SECTION 03 60 00.01 26, the contract drawings and as specified herein. Remove all existing grout, crane rails, rail clips, anchor bolt nuts, joint bars, joint bar bolts and nuts, and base plates to become property of the contractor. Perform only minimal rail cutting on site; dismantle rail track sections at bolted joints unless the rail segment is longer than 20-feet, or as approved by the COR. The existing crane rails and accessories consist of the following items according to the reference drawings:
a. Crane Rail - 105# Crane Rail
b. Rail Clips - Type 103 clips
c. Concrete anchors - 3/4 diameter with gage of 6 3/4" center to center and a spacing of 30 inches. Concrete anchors remain.
d. Splice Bars - splice bars for 105# crane rail.
e. Base Plates - 1/2" thick by 9" wide, length as shown.
3.2.1 Concrete Removal
a. Follow the requirements of SECTION 03 60 00.01 26 and the following additional requirements.
b. For all concrete removal around the rails, saw cut outline cuts perpendicular to the finished surface of the intake deck and aligned with the sides of the existing rail pockets. Use chipping to remove the remaining concrete. The use of large skid-steer mounted jackhammer for removal of concrete or grout inside grout pocket is not permitted.
Use of handheld jackhammer or chipping tool is recommended. Prior to any concrete demolition beyond the existing rail grout bed, research the area to avoid and identify existing embedded reinforcing, ground wires, conduit, piping and raceways. Do not damage embedded ground wires and conductors. Repair any damaged ground conductor at no additional cost to the Government. Report damaged ground conductors to the GQAR immediately and submit repair procedure for approval.
3.2.2 Preservation of Existing Anchors
Existing concrete anchor bolts are to remain in place undamaged to the maximum extent practicable. Take all measures to preserve the existing concrete anchor bolts and keep their threads undamaged. All existing
SECTION 41 22 14.33 26 Page 10 anchor bolt nuts which also hold the clips to be lubricated prior to loosening nuts and all anchor bolt nuts to be loosened using a calibrated torque-wrench in order to prevent over-torque and bolt breakage. Add additional lubrication if necessary to remove the nuts undamaged.
3.2.3 Disposal of Removed Materials
All existing crane rail and crane rail fitting designated for removal become the property of the Contractor and be removed from the Government property for legal disposal. Title to materials resulting for demolition and items to be removed is vested in the Contractor upon approval by the CO of the Contractor's demolition and removal procedures, and authorization by the Contracting Officer to begin demolition. The Government will not be responsible for the condition, loss of, or damage to such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3 CONCRETE REPAIR AND ANCHOR INSTALLATION
3.3.1 Concrete Repair and Anchor Location Inspection Report
For each Bay, following removal of all grout, concrete, existing rail and track fittings, perform a visual inspection for spalls, cracks, and missing anchors. Mark in a non-permanent method, the surface outlining all spalls to be repaired, cracks to be injection repaired, and locations of new anchors. Perform Concrete Imaging and use results to locate new anchors to miss existing reinforcing bars. Submit New Anchor Bolt placement drawing showing location of broken or missing anchor bolts, location of existing adjacent anchor bolts, and location of new epoxy anchor bolts. Contractor shall perform inspection with Government witness and repair locations must be approved by COR at site during the performance of the inspection.
Provide 5 days written notice of when such inspections are planned to occur.
3.3.2 Spall and Crack Repair
Repair concrete spalls as shown, in the locations approved by the COR, and as per requirements of SECTION 03 60 00.01 26.
3.3.3 Anchor Installation
Install new anchors as shown and as necessary to replace existing anchors which are broken or too damaged for re-use. If any anchor bolt is damaged beyond repair during rail removal, or is missing, provide a pair of substitute anchor bolts as close as practicable to the missing or broken anchor bolt while keeping minimum distance of 4 inches from existing anchor location. Install additional anchors as needed to maintain the recommended manufacturer spacing of 30 inches on center. Assume 10% of all existing anchors require replacement. Prior to installation of new anchor bolt perform concrete imaging as per spec section 03 60 00.01 26. Install new concrete anchor bolts with epoxy adhesive specified herein. Provide drilled hole sizes and epoxy anchor installation method as per manufacture's instruction. Assure anchor holes are clean and dry prior to epoxy installation. Gage and longitudinal spacing to be as indicated on the drawings.
SECTION 41 22 14.33 26 Page 11 observed in the grout bed.
3.8.2 Installation
Ambient air and concrete temperature within the grout bed must be at minimum 50 degrees Fahrenheit and rising at the time of polyurethane grout placement. Follow all manufacturer's recommendations regarding the storage, mixing, pot life, tools and application methods used in applying primer and polyurethane grout. Devise and propose a method as part of the installation plan which will prevent the monolith construction joints from being filled with the polyurethane grout.
3.9 CLEANUP
Upon completion of the work, clear job site of equipment, surplus material, and debris. Dispose of such material off Government property and as required in Section 01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS.
3.10 FIELD QUALITY CONTROL
3.10.1 Rail Alignment and Visual Inspection Prior to Grout Placement
Inspect new rail, rail fittings, mechanical rail splice locations, rail lengths, and construction joint locations by means of a visual survey and identify and correct defects likely to impact satisfactory operation of the cranes prior to operational test and prior to grout placement. Perform an optical survey of alignment, gage, and grade of the new rail to CMAA 70 precision standards. Prepare and submit a visual inspection and the alignment survey report of findings from the visual inspection and the alignment survey. Rail work is performed in segments. Perform and submit the required inspection and survey for each segment prior to grouting that segment. Correct all defects identified prior to grouting at no additional cost to the Government.
3.10.2 Grout Inspection and Grout Testing
3.10.2.1 Grout Inspection
The non-shrink grout bed will be inspected by the GQAR for the proper rate of cure and signs of shrinkage as exhibited by cracking. Remove, waste, and replace any non-shrink grout exhibiting any of these deficiencies prior to final acceptance, at no further cost to the government.
3.10.2.2 Grout Testing
Verify nonmetallic, nonshrink grout strength during placement of grout at daily intervals by molding and testing standard cubes of samples taken at the job site. Take three test cubes each day for grout placed that day.
Mold and cure test specimens in accordance with ASTM C109/C109M. Furnish necessary labor, materials, and facilities for molding the samples and for handling and storing the cubes at the site of the work. Transport cubes to the laboratory not sooner than 24 hours after molding. Test specimens for compressive strength in accordance with ASTM C109/C109M. For evaluation of grout strength, each strength test result shall be the average of the strengths of specimens tested at 3 days.
3.10.3 Operational Test Report After Completion of Rail Installation
Perform the operational test and submit a report after the rail is
SECTION 41 22 14.33 26 Page 15 installed. The operational test for the crane rail consisting of the new intake gate gantry crane with three government furnished intake gates suspended from the hoists traversing the entire length of the new track work. The crane must operate without difficulty, without binding of crane wheel flanges, or without visible rail deflection. Coordinate with GQAR to schedule test. Correct or replace any defective items found during the test and correct the causes of excessive deflection, re-survey and retest, and resubmit the report as directed by the GQAR, at no additional cost to the Government.
3.10.4 Completion Alignment Survey and Report
At completion of crane rail replacement, perform an optical survey of alignment, gage, and grade of the new rail to CMAA 70 precision standards.
Prepare and submit a report of findings after completion of rail installation and at least 30 days prior to completion of contract. Include a detailed chart of measurements taken at each location in the written report.
3.10.5 Retesting
Retest corrected and replaced items and materials at no additional cost to the government.
-- End of Section --
SECTION 41 22 14.33 26 Page 16
| B.08_Amendment 0003 |
| Technical_Sections |
| PROJECT TABLE OF CONTENTS |
| DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT |
| 41 22 14.33 26 - CRANE RAIL REPLACEMENT |
| 41 22 14.33 26 - CRANE RAIL REPLACEMENT |
| PART 2 PRODUCTS |
| 2.2 FOUNDATION MATERIAL |
| 2.2.5 Elastomeric Polyurethane Grout |
| 2.2.5.1 Polyurethane Grout |
| 2.2.5.2 Polyurethane Grout Primer |
| 2.3 MONOLITH SEAL MATERIAL |
| 2.3.1 Closed-Cell Backer Rod |
| 2.3.2 Low Pressure Injected Elastomeric Polyurethane |
| 2.3.3 Elastomeric Polyurethane Sealant |
2.4 TEMPORARY CRANE STOPS
| PART 3 EXECUTION |
| 3.1 WORKMANSHIP |
| 3.2 RAIL REMOVAL |
| 3.2.1 Concrete Removal |
| 3.2.2 Preservation of Existing Anchors |
| 3.2.3 Disposal of Removed Materials |
| 3.3 CONCRETE REPAIR AND ANCHOR INSTALLATION |
| 3.3.1 Concrete Repair and Anchor Location Inspection Report |
| 3.3.2 Spall and Crack Repair |
| 3.3.3 Anchor Installation |
| 3.8 POLYURETHANE GROUT PLACEMENT |
| 3.8.2 Installation |
| 3.9 CLEANUP |
| 3.10 FIELD QUALITY CONTROL |
| 3.10.1 Rail Alignment and Visual Inspection Prior to Grout Placement |
| 3.10.2 Grout Inspection and Grout Testing |
| 3.10.2.1 Grout Inspection |
| 3.10.2.2 Grout Testing |
| 3.10.3 Operational Test Report After Completion of Rail Installation |
| 3.10.4 Completion Alignment Survey and Report |
| 3.10.5 Retesting |
| [3]: [3] |
| Amd0003: AMD #0003 |
File details come from the government source that posted it.