PDF 94 KB Posted
- Attached to
- The Dalles Intake Gate Gantry Crane
- Solicitation number
- W9127N-19-R-0004
About this file
The purpose of this Amendment 0001 is to change the process to receive Offeror proposals from RepliWeb to FBO and CD-ROM. All other terms and conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_D_-_Small_Business_Subcontracting_Plan_Template.pdf | ||
| B.08_Amendment_0004_-_FINAL.pdf | ||
| Attachment_C_-_Small_Business_Participation_Plan_Template.pdf | ||
| IMG_1173.jpg | JPG image | |
| IMG_1176.jpg | JPG image | |
| IMG_1174.jpg | JPG image | |
| IMG_1175.jpg | JPG image | |
| IMG_1171.jpg | JPG image | |
| IMG_1172.jpg | JPG image | |
| IMG_1170.jpg | JPG image | |
| IMG_1177.jpg | JPG image | |
| IMG_1179.jpg | JPG image | |
| B.08_Amendment_0003_-_FINAL.pdf | ||
| IMG_0338.jpg | JPG image | |
| IMG_0331.jpg | JPG image | |
| IMG_0341.jpg | JPG image | |
| IMG_0335.jpg | JPG image | |
| IMG_0332.jpg | JPG image | |
| Attachment_C_-_Small_Business_Participation_Plan.pdf | ||
| B.08_Amendment_0002_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Site_Visit_PowerPoint.pptx | PPTX presentation | |
| Final_List.pdf | ||
| B.08_The_Dalles_Intake_Gate_Gantry_-_FINAL_SPECS.pdf | ||
| B.07_The_Dalles_Intake_Gantry_Crane_Contract_Drawings_FINAL.pdf | ||
| B.08_ATTACHMENT_B.docx | DOCX document | |
| B.07_19R4_draft_11082018_FIO_drawings.pdf | ||
| B.08_Attachment_A.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W66QKZ82551031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0001 is to change the process to receive Offeror proposals from RepliWeb to FBO and CD-ROM. All other terms and conditions remain unchanged. The POC for this action is Jason Tanamor, jason.n.tanamor@usace.army.mil, 503-808-4630.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-19-R-0004
X 9B. DATED (SEE ITEM 11)
11-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Dec-2018
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-19-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
I. INTRODUCTION
Your firm is invited to submit a proposal in response to Request for Proposal (RFP) Number W9127N-19-R-0004 for the project entitled “The Dalles Intake Gate Gantry Crane”. The Government intends to procure this requirement on a competitive basis in accordance with the provisions set forth in FAR Part 15 Contracting by Negotiation, and within this RFP.
The Offeror’s proposal shall be submitted electronically as detailed below. It is the Offeror's responsibility to confirm receipt prior to the proposal submission deadline. If the Offeror does not receive the confirmation, it is the Offeror’s responsibility to follow up to ensure the Government has received the information.
PROPOSAL SUBMITTAL INSTRUCTIONS:
Offeror shall submit its proposal through the FedBizOpps (FBO.gov) system. The requirements and procedures for offer submission are found in the FBO Vendor User Guide located on the FBO webpage at:
https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.
The proposal submittal method used for this solicitation is the electronic response via document upload method.
The electronic proposal shall be Portable Document Format, filename extension: “.pdf” and suitable for viewing in Adobe Reader. Offerors shall bookmark and label each electronic PDF to afford easy identification from the proposal table of contents.
The Offeror’s proposal shall consist of two (2) volumes; Volume I – Technical Proposal and Volume II – Price Proposal. The use of hyperlinks in proposals is prohibited.
Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Propriety information shall be clearly marked.
Offerors should enter a description for every file uploaded. For files over 10 megabytes (MB) the "Large Upload (JAVA)" button must be used. The combined file size limit for upload using "Large Upload (JAVA)" is 100MB.
If needed, the Offeror can break single files over 100MB into smaller files or use the upload utility multiple times if files exceed the 100MB size limit.
Once the Offeror's proposal is submitted, it can be systematically revised prior to the solicitation response deadline. Refer to Paragraph 4.3.2 of the FBO Vendor Guide titled "Reviewing / Editing an Electric Response" for detailed guidance on completing a revision to an electronic proposal submission. Note: the FBO bid response https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf system will send an email to the email address on file for the user confirming the electronic submission.
Note: the Offeror must be logged into the system to be able to submit / revise electronic responses.
For assistance and troubleshooting for the FBO electronic bid response system, contact the Federal Service Desk (FSD.gov). Phone: 866-606-8820 or Web Form (https://gsafsd.service-now.com/fsd-gov/login.do).
Do not assume submission will be instantaneous. File size and number of files to be uploaded will be factors to consider. Offeror/Teammate/Subcontractors should allow adequate time for submission completion because the entire proposal (i.e. Offerors submission and all Teammate/Subcontractor(s) independent submissions) must be received by the due date and time for the proposal to be considered.
To avoid rejection of an offer, the Offeror must make every effort to ensure its electronic submission is virus-free. Proposals, or portions thereof, submitted with the presence of a virus or which are otherwise unreadable will be treated as unreadable pursuant to FAR 15.207(c).
IN ADDITION TO FBO, Offerors are required to mail a CD-ROM to the below POC in case the system is down for maintenance or unavailable.
BY HAND OR COURIER TO:
U.S. ARMY CORPS OF ENGINEERS, NWP
Attention: Jason Tanamor – CECT-NWP-P Block 300 (10th Floor USACE Security Desk) 333 SW First Avenue Portland, Oregon 97204
OR SURFACE MAIL ADDRESS:
U.S. ARMY CORPS OF ENGINEERS, NWP
Attention: Jason Tanamor – CECT-NWP-P P. O. Box 2946 Portland, Oregon 97208-2946
NOTE: If the electronic CD-ROM proposal differs from the FBO submitted proposal, the CD-ROM will take precedence.
OFFEROR SHALL MARK THE OUTSIDE ENVELOPE AS FOLLOWS:
Envelope shall be plainly marked with the following information:
Solicitation No. W9127N-19-R-0004
II. PRE-PROPOSAL CONFERENCE AND SITE VISIT
A site visit will be scheduled as detailed in provision 52.236-27 Alt I.
III. SUBMITTING QUESTIONS
All inquiries regarding this solicitation are to be submitted via ProjNet-Bid℠. Telephone and email inquiries will not be accepted. ProjNet-Bid℠ is a web-based program that allows bidders to post questions regarding the solicitation and to view all questions by other bidders and answers by USACE. ProjNet-Bid℠ can be accessed through ProjNet℠ at https://www.projnet.org/projnet/ To access the ProjNet-Bid℠ website:
1. Click on the Quick Add.
2. Select USACE from the Agency menu.
https://www.projnet.org/projnet/
3. How to retrieve information:
(a) Enter the following information for access:
(1) The Bidder Inquiry Key 9HHJD9-74M3IT
(2) Valid business contact information (e.g. Company name, contact person, business address, phone number and email address). Required for first time users.
(3) Establish secret question and answer which will be used as a password.
(b) For subsequent access use your email address, the Bid Inquiry Key and response to the secret question to access the ProjNet- Bid℠ Module.
4. Submit questions or review questions and answers. (A bidder who submits a question will receive an automated email notification that their question has been received. When an answer is posted to a question, the question and answer is then available for all other bidders to review.)
5. For additional step-by-step on how to gain access, please view Bidder_Inquiry_Instructions.pdf.
6. For questions about the ProjNet-Bid℠, please contact the Call Center help desk toll free at 1-800-428-HELP, which operates from 8AM to 5PM (Central US time zone). ProjNet-Bid℠ questions can also be emailed to the helpdesk at staff@rcesupport.com.
NOTE: No response will be posted to inquiries after the Close of Business on the seventh business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet-Bid℠ prior to bid submission. Nothing in the solicitation is changed unless an amendment is sent out.
IV. GENERAL PROPOSAL REQUIREMENTS
a. Each volume (Volume I-Technical Proposal, and Volume II-Price Proposal) shall be submitted as a separate file in RepliWeb and shall be in PDF format. The printed number of pages (single sided) should not exceed and size limitations detailed elsewhere in this document. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. Revised pages shall be dated.
b. ORGANIZATION – VOLUMES
The following volumes of material shall be submitted:
1. Volume 1: Technical Proposal
2. Volume 2: Price Proposal
c. CONTENT – GENERAL
Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information will be deemed as if no support for that criterion was provided. Offerors submitting proposals should limit submission to data essential for evaluation of proposals so that a minimum of time and money is expended in preparing information required by the RFP. Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
1. Format
Proposals may be in PDF or DOC format but should format to 8 ½ x 11-inch paper, when printed. Any drawings shall be 11x17-inch paper,when printed, can be folded to the same dimensions as the 8 ½ x 11-inch paper. Elaborate artwork, expensive paper and bindings, and expensive/ extensive visual and other presentation aids are not necessary. Each proposal should address the requests for information in the order identified in Section L.
2. Page Numbering
All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer.
3. Page Limits
Volume I Technical Proposal shall not exceed 75 single sided pages, when printed.
mailto:staff@rcesupport.com
4. Signatures
Original signature from the Offeror’s responsible party is required in box 15 of the SF33 submitted with the Price Proposal.
REQUIRED TABS FOR VOLUME 1: TECHNICAL PROPOSAL
Table of Contents Factor 1 – Tab 01: Past Experience Factor 2 – Tab 02: Past Performance Factor 3 – Tab 03: Schedule Factor 4 – Tab 04: Small Business Participation Plan
REQUIRED TABS FOR VOLUME 2: PRICE PROPOSAL
Table of Contents Factor 5 – Price Proposal
Tab 05: SF33, Solicitation, Offer, and Award Tab 06: Price Schedule Tab 07: Small Business Subcontracting Plan (Large Business ONLY) Tab 08: Representations and Certifications
V DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL PROPOSAL
Offerors shall submit the information noted below.
Factor 1 – TAB 01: Past Experience
This project will consist of designing, manufacturing, factory testing, transporting, erecting, and field testing a new 480-ton gantry crane with two trolleys, three 160-ton main hoists, three latching hoists, two maintenance hoists, and one deck-hatch monorail hoist. The three major project phases are: (1) design, (2) manufacture, and (3) installation.
The Offeror shall submit information for up to four projects* best demonstrating the Offeror’s experience performing projects that are similar in size, scope, and complexity to this project, as further described in the RFP specifications.
To be evaluated, each project must have been completed or must be substantially complete** by the Prime or the Prime’s major subcontractor*** within 10 years of the date that proposals are due. In addition, each project must have involved at least one or more of these three major project phases: design, manufacture, or installation of a new crane with a capacity of at least 100 tons. NOTE: Although each project submitted need not demonstrate experience in all three major project phases (design, manufacture, and installation), the Offeror’s Factor 1 proposal in its totality must demonstrate the Offeror has experience in all three major project phases: design, manufacture, and installation.
For each project submitted, the Offeror shall provide an “Offeror Experience Form” using attachment A, or a document addressing all of the information included in the attachment. The Offeror must address all items included. Offerors may include photographs or drawings for each project submission to provide a visual basis for the written description.
*A maximum of four projects will be evaluated. If an Offeror disregards these instructions and submits more than four projects, only the first FOUR projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess the projects against the evaluation criteria described in Section M of the RFP.
**Substantially complete is defined as being 75% complete by the date that proposals are due. If an Offeror submits a project that it represents is “substantially complete,” the Offeror must reasonably explain why the project is considered at least 75% complete. If an Offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.
***Instructions on the use of major subcontractors: Offerors may use the past experience of major subcontractors to demonstrate experience in any of the three major project phases, however a letter of commitment is required in order for that experience to be considered. The letter of commitment must submitted even if the firm is in some way related to a joint venture partner (for example, the subcontractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). If a letter of commitment is not submitted, the experience will not be considered.
Factor 2 – TAB 02: Past Performance
The Offeror shall provide past performance information for each project listed by the Offeror under Factor 1: Past Experience.
Recent and relevant projects are those projects completed or substantially completed* in the past 10 years that are comparable in size, scope, and complexity with this project.
**Substantially complete is defined as being 75% complete by the date that proposals are due.
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation, the standard Past Performance Questionnaire (PPQ) for USACE is Form PPQ-0 (9/30/11) and it is provided as attachment B to this solicitation. PPQ-0 is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its proposal under Factor 1, Past Experience, and for which a completed CPARS evaluation is not available. (Ensure correct phone numbers and email addresses are provided for the client point of contact.)
Do not submit a PPQ when a completed CPARS evaluation is available.
Completed PPQs should be submitted with your proposal if a CPARS evaluation is unavailable. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow- up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Jason Tanamor, via email at jason.n.tanamor@usace.army.mil, prior to proposal closing date.
The Offerors shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an e-mail confirmation upon receipt. If the Offeror does not receive the confirmation, it is their responsibility to follow up to ensure the Government has received the information.
Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors may provide explanation on problems encountered on past projects and the corrective actions taken by the Offeror.
mailto:jason.n.tanamor@usace.army.mil, In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including CPARS, using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), telephone interviews with organizations familiar with the Offeror’s performance, Government personnel with personal knowledge of the Offeror’s performance capability, and any other known sources not provided by the Offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.
Factor 3 – TAB 03: Schedule
The Offeror shall submit a detailed schedule, in Gantt chart format, showing all critical tasks needed to complete the project, duration for each work task, and work task sequencing. The detailed schedule shall include an accompanied narrative explaining the schedule, not to exceed one double-sided page. The Gantt chart shall not include more than 50 tasks. The schedule shall meet the stated schedule requirements specified in FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work.
Factor 4 – TAB 04: SMALL BUSINESS PARTICIPATION PLAN
The purpose of this criterion is to evaluate the amount of work proposed to be performed by small businesses in relation to the total value of the project, as well as the types of work small businesses will be performing and the extent of commitment in using the identified small business firms.
NOTE: Per 13 C.F.R. § 125.3(g)(3), small business Offerors need not submit any information in connection with this factor and shall receive the maximum rating under this evaluation factor.
Submission Requirements:
Other than small business Offerors shall submit the following:
1) Small Business Participation Plan – Complete and submit Attachment C, Small Business Participation Plan (SBPP), to identify the extent to which small businesses will participate in the performance of the proposed acquisition.
A mandatory minimum Total Small Business Participation goal of 10% of the total contract value (through small business participation from small-, small disadvantaged-, HUB Zone-, Service Disabled Vet-, Vet-, or Woman-owned small businesses) is required based on the nature of the work for this project.
2) Small Business Past Performance – Submit past performance information reflecting the Offeror’s small business participation for each project listed by the Offeror under Factor 1, Past Experience. For each project submitted under Factor 1, Past Experience, submit the following:
(a) Name of the project;
(b) Total dollar amount and percentage of the contract value self-performed;
(c) Total dollar amount and percentage of the contract value subcontracted;
(d) Total dollar amount and percentage of the contract value subcontracted to small businesses;
(e) Total dollar amount and percentage of the contract value subcontracted to other than small businesses.
In addition to the above project submission information, the Government reserves the right to review Offerors Individual Subcontract Reports (ISRs) and Summary Subcontract Reports (SSRs) from the Electronic Subcontracting Reporting System (eSRS).
Volume II – Price
The Offeror shall submit their price proposal which consists of:
SF33 (TAB 05)
Price Schedule (TAB 06) Small Business Subcontracting Plan (if applicable) (TAB 07) Representations and Certifications (TAB 08)
The Offeror must provide a complete bid schedule and acknowledge all amendments on the signed SF33.
(End of Summary of Changes)
| II. PRE-PROPOSAL CONFERENCE AND SITE VISIT |
| III. SUBMITTING QUESTIONS |
| IV. GENERAL PROPOSAL REQUIREMENTS |
| V DETAILED CONTENT REQUIREMENTS FOR VOLUME 1: TECHNICAL PROPOSAL |
| Factor 1 – TAB 01: Past Experience |
| Factor 2 – TAB 02: Past Performance |
| Factor 3 – TAB 03: Schedule |
| Factor 4 – TAB 04: SMALL BUSINESS PARTICIPATION PLAN |
| Volume II – Price |
File details come from the government source that posted it.