W9127822R0008 AM02 DRAWINGS.pdf
PDF 2 MB Posted
- Solicitation number
- W9127822R0008
About this file
This federal solicitation is for the construction of an approximately 7,000 square foot extension to Building 73 at Eglin Air Force Base in Florida. The project involves constructing a concrete foundation, split-faced concrete block structure over a steel frame, and a sloped standing seam metal roof to accommodate the ongoing cyberspace security testing mission. Approximately 95% of the facility must meet ICD 705-1 physical and technical security standards for a sensitive compartmented information facility (SCIF). The work also includes all necessary support facilities to provide a complete and usable facility. The North American Industry Classification System code listed is 236220.
The solicitation notes that plans and specifications will only be available via SAM.gov. All prospective contractors and subcontractors must be registered in SAM.gov in order to download solicitation documents. A critical path method is required and small businesses are defined as averaging less than $39.5 million in annual receipts over the past three years. The request for information process will occur through ProjNet and responses may not be provided for all questions, particularly late in the advertisement period.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers®
MOBILE DISTRICT
109 SAINT JOSEPH STREET
MOBILE, AL 36602
BUILDING 73 LAB EXPANSION
DECEMBER 20 1
22002 22R 8
AMENDMENT NO. 0001
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
AMENDMENT 0002
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
G-002FTFA20DR04
IN
D
E X
O F
D R
A W
IN
G
S
M F
O X
C
M O
X L
E Y
B T
A
B
M A
G G
IO
R
E
O C
T O
B E
R
M E
F
G
.D W
G
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
MECHANICAL
M-001 HVAC LEGENDS, NOTES & ABBREVIATION
M-101 HVAC GROUND FLOOR PLAN
M-102 HVAC MEZZANINE FLOOR PLAN
M-301 HVAC SECTIONS-1
M-302 HVAC SECTIONS-2
M-401 HVAC ENLARGED FLOOR PLANS
M-402 HVAC ENLARGED MEZZANINE FLOOR PLANS
M-501 HVAC DETAILS-1
M-502 HVAC DETAILS-2
M-503 HVAC DETAILS-3
M-601 HVAC SCHEDULES-1
M-701 HVAC CONTROLS-1
M-702 HVAC CONTROLS-2
M-703 HVAC CONTROLS 3
ELECTRICAL
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
E-002 LIGHTING FIXTURES AND SCHEDULES
E-003 LIGHTING SCHEDULES
E-004 480V POWER RISER DIAGRAM
E-005 208V POWER RISER DIAGRAM
E-006 NEW WORK ELECTRICAL SITE PLAN
E-007 ELECTRICAL DETAILS
E-100 ELECTRICAL DEMOLITION PLAN
E-101 GROUND FLOOR POWER PLAN
E-102 MEZZANINE AND TOWER POWER PLAN
E-103 MECHANICAL POWER PLAN
E-200 GROUND FLOOR LIGHTING PLAN
E-201 MEZZANINE LIGHTING PLAN
E-300 NEW WORK LIGHTNING PROTECTION PLAN
E-301 LIGHTNING PROTECTION DETAILS
E-600 PANEL SCHEDULES
E-601 PANEL SCHEDULES
E-602 PANEL SCHEDULES
E-603 PANEL SCHEDULES
E-604 PANEL SCHEDULES
E-605 PANEL SCHEDULES
E-606 PANEL SCHEDULES
TELECOMMUNICATIONS
T-001 TELECOM LEGEND
T-002 TELECOM NOTES
T-100 TELECOM DEMOLITION PLAN
T-111 TELECOM GROUND FLOOR PLAN
T-112 TELECOM GROUND FLOOR BELOW CEILING PATHWAYS PLAN
T-113 TELECOM GROUND FLOOR ABOVE CEILING PATHWAYS PLAN
T-121 TELECOM MEZZANINE FLOOR PLAN
T-122 TELECOM MEZZANINE AND ROOF PATHWAY PLANS
T-201 TELECOM FACEPLATE DETAILS
T-202 TELECOM DETAILS
T-301 TELECOM SINGLE LINE DIAGRAMS
T-302 TELECOM SINGLE LINE DIAGRAMS
T-303 TELECOM SINGLE LINE DIAGRAMS
T-401 TELECOM ENLARGED PLANS
T-501 EXISTING RACK ELEVATIONS
T-502 NEW WORK RACK ELEVATIONS
TY001 SECURITY LEGEND AND NOTES
TY111 SECURITY GROUND FLOOR PLAN
TY121 SECURITY MEZZANINE AND ROOF FLOOR PLAN
TY201 SECURITY DETAILS
TY202 SECURITY DOOR DETAILS
TY301 SECURITY SINGLE LINE DIAGRAMS
TY302 SECURITY SINGLE LINE DIAGRAMS
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
ARCHITECTURAL
A-001 LEGENDS, NOTES, AND ABBREVIATIONS
A-002 WALL TYPES
A-101 FLOOR PLAN
A-102 DIMENSION FLOOR PLAN
A-103 MEZZANINE FLOOR PLAN
A-104 MEZZANINE FLOOR DIMENSION PLAN
A-140 ROOF PLAN & TOWER PLANS
A-141 ROOF DETAILS
A-142 ROOF DETAILS
A-143 ROOF DETAILS
A-144 ROOF DETAILS
A-145 ROOF DETAILS
A-150 REFLECTED CEILING PLAN
A-151 SECURITY/STC 50 GYPSUM WALLBOARD REFLECTED CEILING PLAN
A-201 EXTERIOR ELEVATIONS
A-202 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 WALL SECTIONS
A-320 TYPICAL SECURITY/STC ASSEMBLY SEALING DETAILS
A-401 ENLARGED RESTROOM PLAN, ELEVATION, AND DETAILS
A-402 ENLARGED STAIR PLANS, SECTIONS, AND DETAILS
A-403 ENLARGED STAIR PLANS, SECTIONS, AND DETAILS
A-404 ENLARGED RAMP PLANS, SECTIONS, AND DETAILS
A-405 ENLARGED MATERIAL LIFT PLAN AND SECTIONS
A-501 PLAN DETAILS
A-510 FLOOR & CEILING ASSEMBLY DETAILS
A-511 STC/SECURITY DETAILS & CEILING DETAILS
A-601 DOOR SCHEDULE, DOOR AND FRAME ELEVATIONS
A-602 EXTERIOR DOOR DETAILS
A-603 INTERIOR DOOR DETAILS
A-610 LOUVER ELEVATIONS
A-611 LOUVER DETAILS
INTERIOR
I-101 FINISH PLAN
I-102 MEZZANINE FINISH PLAN
I-103 FURNITURE PLAN
I-104 MEZZANINE FURNITURE PLAN
I-105 SIGNAGE AND CORNER GUARD PLAN
I-106 MEZZANINE SIGNAGE AND CORNER GUARD PLAN
I-601 FINISH SCHEDULE, NOTES, AND DETAILS
I-602 SIGNAGE SCHEDULE AND DETAILS
FIRE PROTECTION
FL001 CODE SUMMARY
FL101 FLOOR PLAN - LIFE SAFETY
FL102 MEZZANINE - LIFE SAFETY
FD101 FLOOR PLAN - FIRE ALARM DEMO
FA101 FLOOR PLAN - FIRE ALARM
FA102 MEZZANINE - FIRE ALARM
FA501 DETAILS - FIRE ALARM
FX101 FLOOR PLAN - FIRE PROTECTION
FX102 MEZZANINE - FIRE PROTECTION
FX501 DETAILS - FIRE PROTECTION
PLUMBING
P-001 PLUMBING LEGENDS, NOTES & ABBREVIATION
P-101 GROUND FLOOR PLAN - PLUMBING BELOW SLAB
P-102 GROUND FLOOR PLAN - PLUMBING ABOVE SLAB
P-501 PLUMBING DETALS-1
P-502 PLUMBING DETAILS-2
P-601 PLUMBING SCHEDULES-1
P-901 PLUMBING WASTE RISER DIAGRAM
P-902 PLUMBING DOMESTIC WATER RISER DIAGRAM
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
GENERAL
G-001 TITLE SHEET
G-002 INDEX OF DRAWINGS
G-003 SECURE AREA AND STC CONSTRUCTION NOTES
G-004 TEMPORARY ENTRANCE
G-005 TEMPORARY ENTRY AND MANTRAP STRUCTURAL DETAILS
GC003 SITE LOCATION, ACCESS, AND SAFETY PLAN
GC004 SITE USE AND WORK RESTRICTION PLAN
G-110 AIR BARRIER FLOOR PLAN
G-111 AIR BARRIER SECTION DRAWINGS
CIVIL
V-101 SURVEY AND SURVEY CONTROL PLAN
V-102 SURVEY AND SURVEY CONTROL PLAN
CI001 GENERAL CIVIL NOTES
CI002 ABBREVIATIONS AND LEGEND
CD101 OVERALL DEMOLITION PLAN
CS101 SITE PLAN/GEOMETRIC LAYOUT
CS111 JOINT LAYOUT PLAN
CS501 PAVING DETAILS
CS502 PAVING DETAILS
CS503 FENCE DETAILS
CG101 GRADING & DRAINAGE PLAN
CE100 OVERALL EROSION AND SEDIMENT CONTROL PLANS
CU101 UTILITY PLAN
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
CATHODIC
X-101 CATHODIC LAYOUT
X-102 CATHODIC PROTECTION DETAILS
X-103 CATHODIC PROTECTION DETAILS
X-104 CATHODIC PROTECTION DETAILS
X-105 CATHODIC PROTECTION DETAILS
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES CONT. & WIND LOAD CRITERIA
S-101 FOUNDATION PLAN
S-102 SLAB-ON-GRADE PLAN
S-110 MEZZANINE AND WIND BEAM FRAMING PLAN
S-120 ROOF FRAMING PLAN
S-130 TOWER FRAMING PLAN
S-140 EXISTING BUILDING EXIT STAIR FRAMING
S-201 WALL FRAMING ELEVATIONS
S-202 WALL FRAMING ELEVATION
S-410 FOUNDATION SECTIONS AND DETAILS
S-411 FOUNDATION SECTIONS AND DETAILS
S-420 MEZZANINE FRAMING SECTIONS AND DETAILS
S-421 EXTERIOR STAIR SECTIONS AND DETAILS
S-430 ROOF FRAMING SECTIONS AND DETAILS
S-431 ROOF FRAMING SECTIONS AND DETAILS
S-432 TOWER STAIR FRAMING SECTIONS AND DETAILS
S-501 TYPICAL FOUNDATION AND SLAB DETAILS
S-502 TYPICAL STEEL DETAILS
S-503 TYPICAL STEEL DETAILS
S-504 BRACED FRAME DETAILS
DEMOLITION
AD101 DEMOLITION FLOOR PLAN & HANGER 71 STAIR MODIFICATION
AD102 ROOF DEMOLITION PLAN
A
M E
N D
M E
N T
J A
N
A
D D
E D
S H
E E
T S
LAB 1
E111
LAB 2
E110
CORR.
E103
TLT
E108
LAB 4
E107
LAB 3
E106
CONF.
E105
MANTRAP
E101
ADMIN. SECURITY
E102
COMM.
E104
MECH
E109
E E
EE
E
E
E
E
E
E
E
E
G-004
UP
______1
G-005
______2
G-005
______3
G-005
TEMPORARY ENTRANCE, VESTIBULE,
RAMP, & RAILINGS
UP
UP
EXISTING FACILITY ENTRANCE
UP
EXISTING FACILITY
SECURE AREA BOUNDARY
1' -6
TO FACE OF EXISTING
1. ALL WORK FOR TEMPORARY ENTRANCE AS SHOWN ON SHEETS G-004 AND
G-005 TO BE COMPLETED BEFORE WORK CAN BEGIN THAT WILL MAKE
EXISTING ENTRY DOOR AT MANTRAP (E101) INACCESSIBLE TO FACILITY
USERS AS A FACILITY ENTRANCE.
2. AFTER FACILITY ADDITION IS COMPLETE AND USABLE, REMOVE
TEMPORARY PARTITION, DOOR, AND FRAME FROM CORRIDOR E103; AND
REMOVE TEMPORARY VESTIBULE LANDING, RAMP, RAILINGS, AND
ASSOCIATED TEMPORARY LIGHT AND RECEPTACLE.
3. PROVIDE 26 GA GALVANIZED 5V CRIMP ROOF PANELS (24" COVERAGE)
OVER SELF-ADHERED ROOF UNDERLAYMENT AT TEMPORARY
VESTIBULE/MANTRAP. ANCHOR ROOF PANELS TO P.T. PLYWOOD WITH #
9-15x1 1/2" SCREWS WITH SEALING WASHER AT 12" O.C. PROVIDE 26 GA
GALVANIZED EDGE METAL FLASHING, AND PROVIDE 26 GA GALVANIZED
METAL COUNTERFLASHING WITH CONTINUOUS SEALANT AT RAKE EDGE
AGAINST EXISTING BUILDING.
4. REFER TO THE "E" SHEETS FOR ADDITIONAL ELECTRICAL DETAILS AND
NOTES.
5. REFER TO THE "TY" SHEETS FOR ADDITIONAL SECURITY DETAILS AND
NOTES.
6. SEE 01 14 00, WORK RESTRICTIONS, FOR ADDITIONAL INFORMATION.
7. PAINT ALL EXPOSED SURFACES OF TEMPORARY VESTIBULE/MANTRAP
WALLS AND EXPOSED ROOF JOIST & UNDERSIDE OF ROOF PANELS. ONLY
PAINT P.T. PLYWOOD AND ROOF JOISTS WHEN DRY. DO NOT PAINT P.T.
RAMP & GUARDRAILS.
GENERAL NOTES
GRAPHIC LEGEND
EXISTING WALL
EXISTING ROOM NAME / NUMBER
DESIGNATION
DEAD-END CORRIDOR/TRAVEL
DISTANCE TO EXIT CREATED BY
TEMPORARY PARTITION
NEW WALL CONSTRUCTION
EXISTING FACILITY SECURE AREA LIMITS
ROOM NAME
101A
EXISTING DOOR TO REMAIN E
KEYNOTES
REMOVE EXISTING DOOR AND HARDWARE. EXISTING FRAME TO
REMAIN; MODIFY EXISTING FRAME TO ACCEPT NEW DOOR. PROVIDE
NEW HOLLOW METAL STC 53 DOOR WITH FF-L-2890C TYPE IV HIGH
SECURITY ELECTRIC LOCK WITH INTEGRATED COMBINATION SPIN
DIAL. PAINT NEW DOOR.
INSTALL RECEPTACLE 84" AFF. INSTALL AND CONNECT 2#12 AND 1#12
GROUND IN 1/2" CONDUIT TO THE EXISTING E103 CORR HALLWAY
RECEPTACLE CIRCUIT. EXISTING RECEPTACLE CIRCUIT IS LOCATED
APPROXIMATELY 25' AWAY.
(ABOVE) SURFACE MOUNT LIGHT FIXTURE TYPE 'LSE'. INSTALL AND
CONNECT 2#12 AND 1#12 GROUND IN 1/2" CONDUIT TO THE EXISTING
HALLWAY LIGHTING CIRCUIT. TAP CIRCUIT AHEAD OF THE LOCAL
SWITCH. LIGHT FIXTURE SHALL BE 24/7 ALWAYS 'ON' WITH
EMERGENCY BATTERY BACKUP.
8 GOVERNMENT WILL INSTALL TEMPORARY WHITE NOISE SPEAKER AND
CONNECTION.
9 INSTALL TEMPORARY 3/4" CONDUIT AND PULLSTRING TO CCTV
CABINET IN ROOM E102.
10 INSTALL 3/4" CONDUIT AND PULLSTRING TO EXISTING ACS PANEL IN
CORR. E103.
REMOVE EXISTING GUARDRAIL, STORE, AND REINSTALL AFTER
TEMPORARY VESTIBULE, LANDING, AND RAMP IS REMOVED.
INSTALL FIXTURE TYPE 'X'. INSTALL 2#12 AND 1#12 GROUND IN 1/2"
CONDUIT TO THE EXISTING CORRIDOR LIGHTING CIRCUIT. CONNECT
TO CIRCUIT AHEAD OF THE LOCAL SWITCH.
TEMPORARY METAL STUD AND GYPSUM BOARD PARTITION, EXTEND
FROM TOP OF EXISTING ACCESS FLOOR TO BOTTOM OF EXISTING
CEILING. PROVIDE TEMPORARY HOLLOW METAL DOOR & FRAME WITH
LEVER HANDLE PASSAGE LOCKSET.
TEMPORARY DEAD-END CORRIDOR/TRAVEL DISTANCE TO EXIT AS
SHOWN BY DASHED LINE IS NOT TO EXCEED 50'. ACTUAL DISTANCE
SHOWN IS 48'.
TEMPORARY HOLLOW METAL DOOR AND FRAME W/ LEVER HANDLE
PASSAGE LOCKSET.
P.T. WOOD RAILINGS, SEE G-005.12
P.T. WOOD RAMP AND LANDING, SEE G-005.13
P.T. WOOD STUD WALLS AND P.T. PLYWOOD SHEATHING, SEE G-005.14
EXISTING CONCRETE STAIRS BELOW.15
S
CRK
C A
M
UP
______1
G-005
______2
G-005
______3
G-005
RAMP (1:12)
TEMPORARY
VESTIBULE/
MANTRAP
7'-10 1/2" 27'-0" +/-
TO FACE OF EXISTING
6' -1
A
SHEET
IDENTIFICATION
US Army Corps of
Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
AMENDMENT 0002
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
G-004FTFA20DR04
T E
M P
O R
A R
Y E
N T
R A
N C
E
M F
O X
C
M O
X L
E Y
B T
A
B
M A
G G
IO
R
E
O C
T O
B E
R
M E
F
G
.D W
G
PLAN
NORTH
TRUE
NORTH 1/8" = 1'-0"G-004
1 B73 TEMPORARY ENTRANCE PLAN
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
PLAN
NORTH
TRUE
NORTH 1/4" = 1'-0"G-004
2 ENLARGED TEMPORARY ENTRANCE PLAN
SCALE: 1/4" = 1'-0"
0 2' 4' 8' 1
T
E M
P O
R A
R Y
E N
T R
A N
C E
S
H E
E T
A D
D E
D
A M
E N
D M
E N
T
J A
N
SLAB-ON-GRADE - HIGH
1' - 4"
2" / 1' - 0"
6"
6"
/2
F
IE
L D
V E
R
IF
Y
P.T. 2x6 @ 1'-0" O.C. WALL W/
P.T. 1/2" PLYWOOD SHEATHING
EACH FACE NAILED WITH 10dx2 1/2" RING-SHANK
NAILS AT 4" O.C. AT PANEL EDGES AND 6"
O.C. IN THE FIELD OF THE PANELS.
P.T. 2x6 BOTTOM PLATE WITH 1/2"x6" GALV. HILTI KWIK HUS-EZ OR EQUIV.
ANCHORS AT 2'-0" O.C. MAX SPACING
AND WITHIN 6" OF ALL WALL CORNERS
AND OPENING JAMBS.
P.T. 2x6 RAFTERS AT 2'-0" O.C.
MAX SPACING
1/2" PLYWOOD ROOF DECK
NAILED TO ROOF WITH GALV.
10dx2 1/2" RING-SHANK NAILS AT
4" O.C. AT PANEL EDGES AND 6" O.C.
IN THE FIELD OF THE PANELS.
P.T. 2x6 FASCIA;
CONT., TYPICAL
P.T. (2) 2x6 TOP PLATES
SIMPSON H2.5A EACH END
FILL ALL HOLES W/10dx1 1/2"
GALV. NAILS.
G-005
P.T. 1/2" PLYWOOD
SOFFIT; MATCH ROOF
ATTACHMENT.
EXISTING CONCRETE
LANDING/STAIRS TO REMAIN
EXISTING CONCRETE
SLAB TO REMAIN
PROVIDE SIMPSON HTT4 OR EQUIV. HOLD DOWN
ANCHORS IN (4) SHEARWALL CORNERS TO A
DOUBLE STUD PACK W/(1) 5/8"x6 1/2" GALV. HILTI
KWIK HUS-EZ OR EQUIV. ANCHOR INTO SLAB. FILL
ALL HOLES W/FASTENERS AS REQ'D BY MFR.
P.T. 2x6 BOTTOM PLATE WITH 1/2"x6" GALV. HILTI KWIK HUS-EZ OR EQUIV.
ANCHORS AT 2'-0" O.C. MAX SPACING
AND WITHIN 6" OF ALL WALL CORNERS
AND OPENING JAMBS.
2x4 DIAGONAL BRACING @ 4'-0" O.C.
MAX SPACING WITH (4) 0.131"x3 1/4" NAILS
EACH END; TYPICAL ALONG RAMP.
P.T. 2x6@1'-0" O.C. MAX SPACING
V A
R
IE
S ; S
E E
P
LA
N
P.T. 2x6 @ 1'-0" O.C. KNEE-WALL W/
P.T. 1/2" PLYWOOD SHEATHING
OUTSIDE FACE NAILED WITH 10dx2 1/2" RING-SHANK
NAILS AT 4" O.C. AT PANEL EDGES AND 6"
O.C. IN THE FIELD OF THE PANELS.
P.T. 2x6@2'-0" O.C. RAILING
POSTS ANCHORED TO
STRINGERS W/(8) 0.131"x3 1/4"
NAILS; TYPICAL.
P.T. 2x8; CONT.
2x4 CONT. NAIL TO EACH VERT. W/(2) 0.131"x3 1/4" GALV. NAILS
SIMPSON H2.5A AT EACH VERT.
POST ANCHORED TO BOTTOM PLATE.
FILL ALL HOLES W/GALV. 10dx1 1/2"
1' -4
1/ 2"
1' -5
/2
3' -6
EXTEND ALTERNATE TAILS
FOR CONNECTION.
SIMPSON H2.5A EACH END
FILL ALL HOLES W/10dx1 1/2"
GALV. NAILS.
MATCH OUTSIDE OF EXISTING CONC. STAIR/LANDING BEYOND
+/- 6'-0"
G-005
P.T. APA SPAN RATED 3/4" TONGUE AND
GROOVE DECKING
2'-6"
ADD (2) 2x4 KICKERS @ 4'-0" O.C.
WHERE RAMP HEIGHT IS LESS THAN
12"
2x4 FLATWISE W/(2) GALV.
1/2"x6" HILTI KWIK HUS-EZ
OR EQUIV. ANCHORS AT ENDS;
TYP. WHERE KICKERS REQ'D
(3) 0.131"x3 1/4" GALV. NAILS;
TYPICAL EACH KICKER
(2) SIMPSON A35, ONE EACH SIDE TO
TOP OF FLATWISE 2x4 WITH (8) 1 1/2"
SIMPSON SDS SCREWS; TYP. @ KICKERS
EXISTING CONCRETE
SLAB TO REMAIN
SLAB-ON-GRADE - HIGH
1' - 4"
G-005
G-005
6"
P.T. 2x6 @ 1'-0" O.C. WALL W/
P.T. 1/2" PLYWOOD SHEATHING
EACH FACE NAILED WITH 10dx2 1/2" RING-SHANK
NAILS AT 4" O.C. AT PANEL EDGES AND 6"
O.C. IN THE FIELD OF THE PANELS.
1/2" PLYWOOD ROOF DECK
NAILED TO ROOF WITH GALV.
10dx2 1/2" RING-SHANK NAILS AT
4" O.C. AT PANEL EDGES AND 6" O.C.
IN THE FIELD OF THE PANELS.
P.T. 2x6 FASCIA;
CONT., TYPICAL
P.T. (2) 2x6 TOP PLATES
(3) 2x6 HEADER W/1/2"
PLYWOOD SPACER PLATES;
BEAR ON (1) JACK STUD AND (2)
KING STUDS. STRAP HEADER TO
JACK STUD W/(2) LSTA12 STRAPS;
FILL ALL HOLES.
2x6 OUTRIGGERS @ 2'-0" O.C.
SIMPSON H2.5A EACH END
FILL ALL HOLES W/10dx1 1/2"
GALV. NAILS.
(3) 12d TOENAILS; TYP.
CONT. P.T. 2x6 LEDGER W/ 1/2"x6" GALV. HILTI KWIK HUS-EZ
OR EQUIV. ANCHORS AT 1'-4" O.C.
MAX SPACING AND WITHIN 6" OF
ROOF EDGE; TYPICAL.
JAMB WALL BEYOND
P.T. 3/4" APA SPAN RATED TONGUE AND
GROOVE DECKING NAILED W/
10dx2 1/2" RING SHANK NAILS
AT 4" O.C. AT PANEL EDGES AND 6" O.C.
IN THE FIELD OF THE PANELS.
BRACING SYSTEM FOR
TEMPORARY RAILING;
SEE SECTION ON THIS SHEET
ROTATE AND COPE 2x6 FRAMING
90 DEGREES WHERE LESS THAN
5 1/2" IN HEIGHT BELOW THE PLYWOOD
FLATWISE 2x6 BLOCKING BETWEEN ROTATED 2x6
FRAMING; TAPCON W/(2)
3/16" DIA. TAPCON ANCHORS
EACH END EMBED 2".
1" / 1' - 0"
EXISTING GROUT FILLED
CMU WALL
RIP FINAL 2x6 TO HEIGHT AND
ANCHOR TO FACE OF CONCRETE
STEPS W/1/2"x6" HILTI KWIK HUS-EZ
OR EQUIV. ANCHORS AT 2'-0" MAX SPACING
P.T. 1/2" PLYWOOD
SOFFIT; MATCH ROOF
ATTACHMENT.
A
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
G-005FTFA20DR04
T E
M P
O R
A R
Y E
N T
R Y
A N
D M
A N
T R
A P
S T
R U
C T
U R
A L
D E
T A
IL
S
B J
B
B J
B L
J D
J D
A
O C
T O
B E
R
M E
F
G
.D W
G
3/4" = 1'-0"G-005
1 SECTION THROUGH TEMPORARY MANTRAP
3/4" = 1'-0"G-005
2 SECTION THROUGH RAMP
3/4" = 1'-0"G-005
3 SECTION THROUGH MANTRAP DOOR AND RAMP
GENERAL SHEET NOTES:
1. REFER TO SHEET G-004 FOR ADDITIONAL INFORMATION.
2. ALL TIMBER FRAMING SHOWN SHALL BE PRESSURE TREATED #2
SOUTHERN YELLOW PINE.
3. ALL FASTENERS AND CONNECTORS SHALL BE GALVANIZED OR STAINLESS
STEEL.
4. WHERE FASTENERS ARE NOT SPECIFICALLY NOTED, FOLLOW TABLE
2304.10.1 OF THE 2018 INTERNATIONAL BUILDING CODE.
5. ALL FRAMING SHALL CONFORM TO THE 2018 INTERNATIONAL BUILDING
CODE.
AMENDMENT 0002
0 6" 1' 2'
SCALE 3/4":1'-0"
4'
A
M E
N D
M E
N T
T E
M P
O R
A R
Y E
N T
R A
N C
E
S H
E E
T A
D D
E D
J A
N
CI001FTFA20DR04
G
EN
ER
A
L C
IV
IL
N O
TE
S
C . H
AT
C
H
ER
D . H
U
IS
M
AN
C . M
AS
O
N
A.
M
O R
AL
ES
AM
EN
D M
EN
T
2_
M
EF
2C I0
.D
W G
O
CT
O
C
TO
BE
R
GENERAL CIVIL NOTES
GENERAL:
1. BENCHMARK FOR CONSTRUCTION HAS BEEN PROVIDED ON SHEET V-102.
2. SHOP DRAWINGS OF ALL MATERIALS BEING USED SHALL BE SUBMITTED AS
PER SPECIFICATI0NS (SUBMITTALS).
3. ANY PENALTIES, STOP WORK ORDERS OR ADDITIONAL WORK RESULTING
FROM THE CONTRACTOR BEING IN VIOLATION OF THE REQUIREMENTS
ABOVE, SHALL BE FULLY BORNE BY THE CONTRACTOR.
4. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND TO
MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATION OF THESE
UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR SHALL
EXERCISE CAUTION WHEN CROSSING UNDERGROUND UTILITIES, WHETHER
SHOWN ON THE PLAN OR LOCATED BY THE UTILITY COMPANY. ALL UTILITIES
WHICH INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE
BROUGHT TO THE ATTENTION OF THE COR FIRST.
5. THE SEQUENCE OF CONSTRUCTION SHALL BE SUCH THAT ALL
UNDERGROUND INSTALLATIONS OF EVERY KIND, INCLUDING LANDSCAPE
SPRINKLERS LINES, SHALL BE PLACED BENEATH THE PAVEMENT AND ITS
EDGES PRIOR TO THE CONSTRUCTION OF THE PAVEMENT. THE PAVEMENT
SHALL NOT BE CUT WITHOUT PRIOR APPROVAL OF THE COR.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING ANY
CONSTRUCTION ACTIVITIES FROM TAKING PLACE OUTSIDE OF THE LIMITS OF
CONSTRUCTION SHOWN ON THE PLANS. ANY ON-SITE OR OFFSITE AREAS
DISTURBED BY CONTRACTOR OR SUB CONTRACTOR (EQUIPMENT AND/OR
PERSONNEL VEHICLES) SHALL BE RESTORED TO ORIGINAL CONDITION OR
BETTER.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE EXISTING SITE
CONDITIONS OF SOIL PRIOR TO NOTICE TO PROCEED. CONTRACTOR TO
DETERMINE IF ANY OFF SITE MATERIALS WILL NEED TO BE IMPORTED TO
ACHIEVE THE GRADES SPECIFIED ON THE PLANS.
8. CONTRACTOR TO PERFORM FIRE FLOW TEST ON ALL ADJACENT FIRE
HYDRANTS. FINAL FLOW TESTS AT THE END OF THE PROJECT WILL BE
REQUIRED ON ALL NEW FIRE HYDRANTS INSTALLED.
9. ALL PERMITTING AND REGULATORY COORDINATION MUST BE CONDUCTED
THROUGH THE EGLIN AFB CIVIL ENGINEER WITH THE EXCEPTION OF THE
NPDES CONSTRUCTION PERMIT, WHICH THE CONTRACTOR MUST
COORDINATE DIRECTLY WITH FDEP, SEE EROSION CONTROL NOTE 6, THIS
SHEET, AND SPECIFICATION SECTION 01 00 00. ADDITIONAL SPECIAL
CONTRACT REQUIREMENTS AND 01 57 19 TEMPORARY ENVIRONMENTAL
CONTROLS. THE CONTRACTOR IS NOT TO CONTACT OR COORDINATE ANY
OTHER PERMITTING / REGULATORY ACTIVITY WITHOUT PRIOR APPROVAL BY
EGLIN AFB.
DEMOLITION:
1. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS AND LICENSES FOR
PERFORMING THE DEMOLITION WORK AND SHALL FURNISH A COPY OF SAME
TO THE COR PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL
COMPLY WITH THE REQUIREMENTS OF THE PERMITS.
2. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES OR LOCAL
AUTHORITIES FURNISHING ELECTRICAL, POWER SERVICE SO THEY CAN
REMOVE, RELOCATE, DISCONNECT, CAP OR PLUG THEIR EQUIPMENT IN
ORDER TO FACILITATE DEMOLITION. ALL OTHER UTILITIES (WATER,
TELEPHONE OR SEWER) SHALL BE DISCONNECTED, CAPPED OR PLUGGED BY
THE CONTRACTOR AS DIRECTED BY COR REPRESENTATIVE.
3. THE PAVING MARKED FOR DEMOLITION WHICH INCLUDES ALL ASPHALT,
CONCRETE, BASE, AND RETAINING WALLS (INCLUDING THE FOOTERS) SHALL
BE REMOVED.
4. SAW-CUT A SMOOTH STRAIGHT EDGE ON ANY PAVEMENT PROPOSED FOR
DEMOLITION PRIOR TO ITS REMOVAL. PRIOR TO CONNECTING PROPOSED
PAVEMENT TO EXISTING PAVEMENT, THE CONTRACTOR SHALL ENSURE THAT
THE EDGE OF THE EXISTING PAVEMENT IS STRAIGHT AND UNIFORM PRIOR TO
REPAVING.
5. ALL MATERIAL SUCH AS ASPHALT AND CONCRETE SHALL BE STOCKPILED
AND REUSED ON SITE WHERE PRACTICAL. ALL EXCESS WASTE / RECYCLED
MATERIAL NOT RE-USED SHALL BE PROPERLY DISPOSED OF OFF BASE AT AN
APPROVED FACILITY.
OTHER UTILITY INFORMATION:
1. CONTRACTOR SHALL APPLY FOR AN EGLIN AFB DIG PERMIT BEFORE ANY
EXCAVATION IS BEGUN ON THE PROJECT.
2. LANDSCAPING SHALL NOT BE LOCATED WITHIN 3 FEET OF ANY FIRE HYDRANT
AND/OR FIRE DEPARTMENT CONNECTION.
3. WATER FOR FIRE FIGHTING PURPOSES SHALL BE AVAILABLE PRIOR TO
COMBUSTIBLES BEING BROUGHT ON SITE.
STORM DRAINAGE CONSTRUCTION NOTES:
1. UNLESS OTHERWISE NOTED, ALL STORM STRUCTURES SHALL MEET FDOT
STANDARDS.
2. UNLESS OTHERWISE NOTED ON THE PLANS STORM INLETS, MANHOLES, AND
CATCH BASINS SHALL BE PRE-CAST REINFORCED CONCRETE STRUCTURES
OR APPROPRIATE HDPE STRUCTURES SHALL BE REQUIRED AT EACH CHANGE
OF PIPE SIZE, CHANGE IN PIPE DIRECTION, OR PIPE MATERIAL.
3. ORDER OF CONSTRUCTION ACTIVITIES SHALL BE APPROVED BY COR PRIOR
TO CONSTRUCTION.
EARTHWORK, GRADING, STABILIZATION, PAVING AND DRAINAGE:
1. ALL ORGANIC SOILS BELOW UTILITY TRENCHES, PAVEMENT AND BUILDINGS,
SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIAL AND
COMPACTED TO NO LESS THAN 95% OF THE MODIFIED PROCTOR MAXIMUM
DENSITY (ASTM D-1557).
2. ALL PAVEMENT MARKINGS SHALL BE NON-REFLECTORIZED PAINT UNLESS
OTHER WISE NOTED.
3. THE REINFORCED CONCRETE PIPE SHALL BE CLASS III WITH WALL THICKNESS
"B" CONFORMING TO ASTM C - 76 OR AWWA 302 - 74 AND GASKETS SHALL BE
IN ACCORDANCE WITH ASTM C - 443 OR ASTM D - 412.
4. ALL PIPE CALL OUTS ARE MEASURED CENTER LINE TO CENTER LINE FOR
MANHOLES AND INLETS AND FROM THE END OF THE PIPE FOR MITERED END
SECTIONS.
5. DEWATERING MAY BE REQUIRED. SPECIAL CONDITIONS WILL BE NECESSARY
FOR DEWATERING IF REQUIRED (SEE SPECIFICATIONS).
6. ALL UTILITY PIPES SHALL HAVE 3 FEET MINIMUM COVER UNLESS OTHERWISE
SPECIFIED IN PLANS.
7. PLANS AND SPECIFICATIONS REQUIRE THAT COMPACTED BACKFILL BE
PLACED ALONG SIDE OF AND OVER ALL UTILITIES. TESTING SHALL BE PER
ASUS SPECIFICATIONS AND DETAILS AND CONTRACT SPECIFICATION
SECTION 31 00 00 - EARTHWORK .
8. INSTALL AND MAINTAIN GRASS OR SOD ON EXPOSED SLOPES WITHIN 48
HOURS OF COMPLETED FINAL GRADES, AS NOTED ON PLANS, AND AT ANY
OTHER TIME AS NECESSARY TO PREVENT EROSION, SEDIMENTATION OR
TURBID DISCHARGES TO ANY DOWNSTREAM WATER BODY, WETLAND, OR
OFF-SITE PROPERTY. SODDING ON SLOPES 3:1 AND STEEPER SHALL BE
STAKED.
9. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL
TURBIDITY AND SEDIMENT INCLUDING, BUT NOT LIMITED TO, THE
INSTALLATION OF TURBIDITY BARRIERS AND SILT FENCES AT ALL LOCATIONS
WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE
RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY
AND SEDIMENT BARRIERS MUST BE MAINTAINED AT ALL LOCATIONS UNTIL
CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE
STABILIZED. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR
REMOVING THE BARRIERS. AT NO TIME SHALL THERE BE ANY OFFSITE
DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS IN
CHAPTERS 62-302 AND 62-4, FLORIDA ADMINISTRATIVE CODE.
EROSION CONTROL NOTES:
1. TEMPORARY STABILIZATION IS REQUIRED OF ALL SOIL LEFT BARE. MAXIMUM
TIME FOR BARE SOIL WITHOUT COVER WILL BE 14 DAYS.
2. PERMANENT SOIL STABILIZATION REQUIRED FOR ALL DISTURBED AREAS OF
THE SITE. (NOTE: IT IS NOT ANTICIPATED THAT ANY SLOPES WILL BE
CONSTRUCTED ON THE PROJECT. THE INTENT IS THAT ALL DISTURBED
AREAS SHALL BE REPAIRED WITH SOD).
3. STORMWATER INLETS AND STRUCTURES SHOULD BE PROTECTED FROM SOIL
DEPOSITION FIRST, TO PREVENT SOIL LOSS DURING THE CONSTRUCTION
PROCESS.
4. REQUIRED INSPECTIONS BY CONTRACTOR DURING CONSTRUCTION:
a. ONCE EACH WEEK OR WITHIN 24 HRS OF A STORM EVENT
(GREATER THAN 1/2 IN.) INSPECT ALL CONTROL MEASURES.
b. REPAIR ALL DAMAGED AREAS WITHIN 24 HRS OF DISCOVERY.
c. REMOVE ANY BUILT-UP SEDIMENT AROUND FENCES THAT
REACHES 1/3 OF THE SILT FENCE HEIGHT, REMOVE SEDIMENT
THAT COLLECTS IN DRAINAGE BASINS AND EXFILTRATION
TRENCHES.
d. SILT FENCES SHOULD BE INSPECTED FOR DEPTH OF SEDIMENT
AND TEARS TO INSURE FABRIC HAS NOT PULLED AWAY FROM
POSTS.
e. INSPECT ALL TEMPORARY AND PERMANENT SOIL STABILIZATION
FOR WASHOUTS OR BARE SPOTS.
f. INSPECTION REPORTS MUST BE AVAILABLE FOR INSPECTION AT
ALL TIMES. THE SITE SUPERINTENDENT OR QUALIFIED
STORMWATER INSPECTOR SHALL CONDUCT ALL INSPECTIONS
AND MAINTAIN REPORTS.
g. DATES OF ALL MAJOR GRADING ACTIVITIES MUST BE RECORDED
AND MAINTAINED WITH SITE INSPECTIONS WHEN MAJOR GRADING
HAS CEASED IN ANY AREA, THE DATE MUST ALSO BE RECORDED.
h. INSPECTION AND RECORD KEEPING SHALL BE IN ACCORDANCE
WITH THE PROJECT NPDES PERMIT REQUIRED TO BE OBTAINED
THROUGH FDEP.
5. GOOD HOUSEKEEPING. THE SITE SHOULD BE KEPT IN AN ORDERLY FASHION,
THE CONTRACTOR SHALL INSURE THE FOLLOWING ITEMS ARE ADDRESSED.
a. AN EFFORT TO STORE ONLY WHAT IS NEEDED ON THE SITE.
b. KEEP ALL STORED MATERIALS IN A NEAT AND ORDERLY FASHION
IN THE ORIGINAL CONTAINERS WHEN POSSIBLE.
c. FOLLOW ALL MANUFACTURERS RECOMMENDED PROCEDURES
FOR DISPOSAL OF WASTE MATERIAL.
d. INSPECT DAILY TO ENSURE WASTE MATERIAL IS DISPOSED OF
PROPERLY.
6. THIS PROJECT HAS LESS THAN ONE ACRE OF DISTURBED SOIL AND WILL NOT
REQUIRE AN NPDES PERMIT.
SPILL CONTROL NOTES:
1. IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT
PRACTICES DISCUSSED IN THE PREVIOUS NOTES OF THIS PLAN, THE
FOLLOWING PRACTICES WILL BE FOLLOWED FOR SPILL PREVENTION AND
CLEANUP IAW PROJECT SPECIFICATION SECTION 01 57 19.
a. ALL SPILLS WILL BE REPORTED TO THE AIR FORCE IMMEDIATELY
TO EGLIN AFB ENVIRONMENTAL DEPARTMENT (850.240.1628)
PRIOR TO ANY CLEAN UP, AND IF AN IMMEDIATE EMERGENCY
CALL 911 FIRST. POINT OF CONTACT IS ROBERT (BRUCE)
STIPPICH.
b. ALL SPILL PREVENTION, CONTROL, CLEAN UP AND/OR DISPOSAL
SHALL BE IAW PROJECT SPECIFICATION SECTION
01 57 19.
SURVEY:
1. HORIZONTAL COORDINATES BASED ON FLORIDA STATE PLANE - NORTH ZONE
(NAD83), US SURVEY FEET. SURVEY PERFORMED BY SAM, LLC.
2. ELEVATIONS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88) UNITED STATES COASTAL AND GEODETIC SURVEY (U.S.C. & G.S.),
AS DETERMINED BY SAM, LLC.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL SURVEY AND
PROPERTY MONUMENTS. IF A MONUMENT IS DISTURBED, THE CONTRACTOR
SHALL CONTRACT WITH THE SURVEYOR OF RECORD FOR REINSTALLATION
OF THE MONUMENT.
4. ALL CONSTRUCTION LINES AND GRADES SHALL BE ESTABLISHED AND
MAINTAINED BY THE CONTRACTOR.
OUTAGES:
1. CONTRACTOR SHALL COORDINATE ALL UTILITY OUTAGES A MINIMUM OF 14
WORKING DAYS PRIOR TO THE SCHEDULED EVENT WITH COR
REPRESENTATIVE AND ASUS.
2. TEMPORARY UTILITY TIE-INS: FOR TEMPORARY UTILITY TIE-INS, (I.E.
CONTRACT'S TRAILER) ELECTRICITY AND POTABLE WATER ARE USUALLY
AVAILABLE ON EGLIN AND THE CONTRACTOR MAY TIE INTO THESE. BOTH
TIE-INS MUST MEET CODE REQUIREMENTS, MUST BE METERED WITH
APPROVED REMOTE READABLE METERS, AND THE CONTRACTOR SHALL
PROVIDE ALL MANPOWER/EQUIPMENT FOR THESE TIE-INS. EGLIN WILL ONLY
PERFORM THE FINAL ELECTRICAL TIE-IN TO BASE LINES; ALL OTHER WORK
WILL BE ACCOMPLISHED BY THE CONTRACTOR.
3. CONTRACTOR AWARDED THIS PROJECT IS RESPONSIBLE FOR MONITORING
CONSTRUCTION AND SUBMITTING TO THE DISTRICT/FDEP NOTICE OF
CONSTRUCTION COMMENCEMENT AND AS-BUILT CERTIFICATIONS FOR THE
PROJECT WHEN COMPLETED THE CONTRACTOR SHALL UTILIZE A
PROFESSIONAL ENGINEER TO MONITOR THE CONSTRUCTION ACTIVITIES FOR
THE WATER, SEWER AND STORM WATER IMPROVEMENTS PER THE
CONDITIONS OF THE APPROVED PERMITS. A PROFESSIONAL ENGINEER IS
REQUIRED BY PERMIT CONDITIONS TO SUBMIT THE CONSTRUCTION
COMPLETION PERMITS TO THE PERMITTING AGENCIES
GAS NOTES:
1. OKALOOSA GAS DISTRICT FACILITIES ARE AVAILABLE IN THE AREA ADJACENT
TO THE PROJECT SITE. NO IMPROVEMENTS ARE EXPECTED TO THE NATURAL
GAS INFRASTRUCTURE AS PART OF THE PROJECT.
2. SHORT DURATION OUTAGES WILL BE PERMITTED AND MUST BE APPROVED
BY THE CONTRACTING OFFICER, GAS MAIN SHUTDOWNS/OUTAGES SHALL
LAST NO LONGER THAN 60 MINUTES AND CAN OCCUR NO MORE THAN 2 TIMES
DURING THE CONSTRUCTION PERIOD.
SPECIAL REQUIREMENTS:
1. THIS PROJECT REQUIRES WORK ON THE EXISTING SANITARY SEWER
SYSTEM. THE EXISTING SANITARY SEWER SYSTEM MUST REMAIN IN
OPERATION DURING CONSTRUCTION. SHORT DURATION OUTAGES WILL BE
PERMITTED AND MUST BE APPROVED BY THE CONTRACTING OFFICER.
SANITARY SEWER SHUTDOWNS/OUTAGES SHALL LAST NO LONGER THAN 60
MINUTES, AND CAN OCCUR NO MORE THAN 4 TIMES DURING THE
CONSTRUCTION PERIOD. NO SHUTDOWN/OUTAGES SHALL OCCUR DURING
WET WEATHER EVENTS. THE CONTRACTOR SHALL COORDINATE ALL
SHUTDOWNS/OUTAGES WITH THE USACE AND BASE CIVIL ENGINEERING
OFFICE.
2. WATER AND SEWER, DESIGN AND CONSTRUCTION, SHALL CONFORM WITH
THE REQUIREMENTS SET FORTH BY THE AMERICAN STATES UTILITIES
SERVICES, INC. (ASUS) STANDARD DETAILS AND SPECIFICATIONS INCLUDED
IN CONTRACT DOCUMENTS APPENDIX I FOR REFERENCE TO THE WORK THEY
WILL BE PERFORMING FOR COORDINATION PURPOSES BY THE GENERAL
CONTRACTOR.
3. THE CONTRACTOR SHALL SUBMIT THE TEMPORARY AIRFIELD SECURITY
FENCING AND/OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) TEMPORARY
FENCING LOCATION FOR APPROVAL BY THE BASE ENGINEER AND SECURITY
FORCES PRIOR TO CONSTRUCTION ACTIVITIES COMMENCING AT THE
PROJECT SITE. THE TEMPORARY AIRFIELD SECURITY FENCE SHALL FOLLOW
DESIGN CRITERIA AS STATED ON THE ENGINEERING DESIGN MANUAL, EGLIN
AIR FORCE BASE (AFB) FLORIDA, FEBRUARY 2019 AND UFC 3-260-01,
APPENDIX B SECTION 14. THE TEMPORARY AIRFIELD SECURITY FENCING
SHALL BE INSTALLED BEFORE EXISTING FENCE CAN BE REMOVED.
TEMPORARY FENCE CANNOT BE WITHIN 50 FEET OF REDLINE. TEMPORARY
FENCE SHALL BE 6 FEET HIGH (MINIMUM) CHAIN LINK WITH TOP AND BOTTOM
RAILS AND MESH FABRIC SCREENING. THE TEMPORARY AIRFIELD SECURITY
FENCE SHALL HAVE MOUNTED SIGNS AT 100 FEET ON CENTERS IDENTIFYING
A “CONTROLLED AREA” SIGN LEGEND.
4. CONSTRUCTION ACTIVITIES ON THE AIRFIELD, IN PROXIMITY TO, OR
AFFECTING AIRCRAFT OPERATIONAL AREAS OR NAVIGABLE AIRSPACE, SHALL
BE COORDINATED WITH ALL AIRFIELD USERS BEFORE INITIATING SUCH
ACTIVITIES. IN ADDITION, BASIC RESPONSIBILITIES MUST BE IDENTIFIED AND
ASSIGNED PROCEDURES DEVELOPED AND DISSEMINATED TO INSTRUCT
CONSTRUCTION PERSONNEL IN AIRPORT PROCEDURES AND FOR
MONITORING CONSTRUCTION ACTIVITIES FOR CONFORMANCE WITH SAFETY
REQUIREMENTS. THESE AND OTHER SAFETY CONSIDERATIONS SHALL BE
ADDRESSED IN THE EARLIEST STAGES OF PROJECT FORMULATION AND
INCORPORATED IN THE CONTRACT SPECIFICATIONS, THE WORK ORDER
PROJECT REQUIREMENTS CHECKLIST, AND/OR OTHER PROJECT GUIDANCE
DOCUMENTS DEVELOPED FOR IN-HOUSE. CONSTRUCTION PROJECTS. THE
QUALITY ASSURANCE PERSONNEL, AIRFIELD MANAGER, AND CONTRACT
ADMINISTRATOR SHOULD CLOSELY MONITOR CONSTRUCTION ACTIVITY
THROUGHOUT ITS DURATION TO ENSURE CONTINUAL COMPLIANCE WITH
SAFETY REQUIREMENTS DELINEATED ON THE PROJECT PLANS. THE QUALITY
ASSURANCE PERSONNEL, AIRFIELD MANAGER, AND CONTRACT
ADMINISTRATOR SHOULD CLOSELY MONITOR CONSTRUCTION ACTIVITY
THROUGHOUT ITS DURATION TO ENSURE CONTINUAL COMPLIANCE WITH
SAFETY REQUIREMENTS.
5. EXISTING GOVERNMENT OWNED CONEX TRAILERS TO BE RELOCATED PRIOR
TO CONSTRUCTION WORK COMMENCING.
A
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D
ES
IG
N
ED
B
Y:
BU
LL
O
CK
T
IC
E
AS
SO
CI
AT
ES
E.
C
ER
VA
NT
ES
S
TR
EE
T, S
UI
TE
B
PE
NS
AC
O
LA
, F
LO
RI
DA
2 3 4 5
B
C
D
D R
A W
N B
Y:
SB
M
T B
Y:
PL
O
T
SC
A
LE
SI
ZE
C K
D B
Y:
PL
O
T D
A
TE
D A
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
PR
O
JE
C
T N
U M
B
ER
FI
LE
N A
M E:
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
A
PP
R
1:
x
M O
B
IL
E D
IS
TR
IC
T
M O
B
IL
E, A
LA
B
A M
A
M
EF
EG
LI
N
AI
R
FO
RC
E
BA
SE
, F
LO
RI
DA
BU
IL
DI
NG
LA
B
EX
PA
NS
IO
N
V:
\2
6\ ac tiv e\
0\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
Am en dm en t 0
_M
EF
2C I0
.d w g
/0 1/
:0
PM B
y:
M or al es
, A rle ne
AMENDMENT 0002
AM
EN
DM
EN
T
ER
OS
IO
N
CO
NT
RO
L N
OT
ES
AN
D
6 R
EV
IS
ED
JA
N
CS
M
M
EF
2C I0
.D
W
SS
x
SS
x
W x
W x
W x
W x
W x
W x
W x
Wx Wx
W x
W x
W x
W x
W x
W x
W x
W x
W x
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
E x
E x
E x
E x
E x
E x
E x
STEPS
RAMP
BUILDING 73
1 STORY BLOCK
F.F.E.=57.30'
BUILDING 71
2 STORY BLOCK
F.F.E.=56.06'
BUILDING 71
2 STORY BLOCK
F.F.E.=56.06'
E x
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex Ex
Ex Ex
COMM
Ex Ex
E x
E x
Ex
Wx Wx Wx Wx
CO
M
M
CO
M
M
C O
M M
CO
M
M
C O
M M
C O
M M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
E x
Ex
ExExEx
Ex Ex
Ex Ex
Ex Ex
Ex Ex
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
Ex Ex
Ex Ex
Ex Ex
E x
E x
E x
E x
Wx Wx Wx Wx Wx Wx Wx Wx Wx
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
ExExExExExExExExExExExExE x
E x
E x
E x
E x
E x
E x
E x
E x
E x
Ex Ex
E x
E x
E x
E x
E x
E x
Ex Ex
Ex Ex
Ex Ex E x
Ex Ex Ex Ex Ex
Ex
E x
E x
E x E x
E x
E x
E x
E x
E x
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
W x
Wx Wx Wx
G
G
G G
G
G
SDx SDx
Ex
Ex
E x
E x
SD x
SD x
SD x
SD x
Wx Wx Wx Wx
W x
W x
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
METAL DECK
WOOD DECK
WOOD DECK
METAL DECK
DECK OVERHANG
1 S
TO
RY
M
ET
AL
F.
F.
E.
=0
.00
2 S
TO
RY
M
ET
AL
F.
F.
E.
=0
.00
6"
CATV LINE
WALL
x
SD
x
E x
E x
E x
E x
E x
E x
ExEx
CO
M
M
COMM
BUILDING 85
2 STORY BRICK
F.F.E.=57.80'
AC
AC
BUILDING 78
1 STORY BRICK
F.F.E.=56.80'
WALKWAY
OVERHANG
CONEX
CONEX
CONEX
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
0 20' 40'
N
48 HOURS BEFORE DIGGING
1-800-432-4770
SUNSHINE STATE ONE CALL CENTER
CALL 811
TOLL FREE
OR
Know what's below.
Call before you dig.
CD101FTFA20DR04
O
VE
R A
LL
D
EM
O
LI
TI
O N
P
LA
N
C . H
AT
C
H
ER
D . H
U
IS
M
AN
C . M
AS
O
N
A.
M
O R
AL
ES
AM
EN
D M
EN
T
2_
M
EF
2C D
1.
D W
G
O
CT
O
C
TO
BE
R
EXISTING PARKING LOT
SOD REMOVAL
DEMOLITION LEGEND
CONCRETE REMOVAL
STRUCTURE AND PAVEMENT
DEMOLITION
STRUCTURE(S) TO BE REMOVED BY GOVERNMENT PRIOR TO
CONTRACTOR COMMENCING WORK
UTILITY DEMOLITION
DEMOLITION NOTES
1. FOR EXISTING CONDITIONS LEGEND REFER TO SHEET V-101 AND V-102.
2. FOR PROPOSED WORK LEGEND REFER TO SHEET CI002.
3. REFER TO GC004 FOR PROPOSED FOREIGN OBJECT DEBRIS (FOD) AND
CONSTRUCTION FENCE LOCATIONS.
4. DOUBLE SAW CUT METHOD SHALL BE NECESSARY TO PREVENT
BINDING OF SAWING BLADE.
5. PCC DEMOLITION SHALL EXTEND TO THE NEAREST JOINT BASED ON
THE CONCRETE REMOVAL LIMITS.
6. CONTRACTOR SHALL COORDINATE UTILITY DEMOLITION WITH
CONTRACTING OFFICER. VERIFY ALL UTILITIES NOTED FOR
DEMOLITION HAVE BEEN SHUT OFF AND ABANDONED PRIOR TO ANY
WORK.
7. CONTRACTOR SHALL FIELD VERIFY ALL UTILITIES PRIOR TO BEGINNING
CONSTRUCTION ACTIVITIES. COORDINATE WITH CONTRACTING
OFFICER AND NOTIFY IMMEDIATELY OF ANY DISCREPANCY WITH
UTILITY LOCATIONS. EACH CONTRACTOR IS RESPONSIBLE FOR ANY
AND ALL DAMAGE TO UTILITIES CAUSED BY THEIR CONSTRUCTION
ACTIVITIES.
8. CONTRACTOR SHALL PROVIDE A TEMPORARY TRAFFIC CONTROL PLAN
FOR APPROVAL BY CONTRACTING OFFICER AND BASE ENGINEER
PRIOR TO STARTING CONSTRUCTION ACTIVITIES. TEMPORARY TRAFFIC
CONTROL PLAN SHALL COMPLY WITH FDOT MAINTENANCE AND
TRAFFIC DESIGN REQUIREMENTS, SPECIFICATIONS, AND 600 SERIES
INDEXES LATEST EDITION.
9. CONTRACTOR SHALL PERFORM AIRFIELD DEMOLITION AS NECESSARY
AT THE LOCATION OF AN EXISTING CONCRETE JOINT.
CONEX TRAILERS, TYP. 6
(ANTICIPATED LOCATIONS AT
TIME OF PROJECT)
PAVEMENT MARKING REMOVAL
PROTECT EXISTING 10"
WATER LINE
PROTECT EXISTING
BURIED ELECTRIC LINE PROTECT EXISTING BURIED
ELECTRIC AND COMM LINES
PROTECT EXISTING BURIED
ELECTRIC AND COMM LINES
PROTECT EXISTING
BURIED ELECTRIC
AND COMM LINES
PROTECT EXISTING
BURIED ELECTRIC LINE
PROTECT EXISTING WATER LINE
PROTECT EXISTING
COMM LINES
PROTECT EXISTING GAS LINE
1 OVERALL DEMOLITION PLAN
1" = 20'
A
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D
ES
IG
N
ED
B
Y:
BU
LL
O
CK
T
IC
E
AS
SO
CI
AT
ES
E.
C
ER
VA
NT
ES
S
TR
EE
T, S
UI
TE
B
PE
NS
AC
O
LA
, F
LO
RI
DA
2 3 4 5
B
C
D
D R
A W
N B
Y:
SB
M
T B
Y:
PL
O
T
SC
A
LE
SI
ZE
C K
D B
Y:
PL
O
T D
A
TE
D A
TE
SO
LI
C
IT
A
TI
O N
N O
C O
N
TR
A C
T N
O
PR
O
JE
C
T N
U M
B
ER
FI
LE
N A
M E:
M A
R K
D
ES
C R
IP
TI
O N
D A
TE
A
PP
R
1:
x
M O
B
IL
E D
IS
TR
IC
T
M O
B
IL
E, A
LA
B
A M
A
M
EF
EG
LI
N
AI
R
FO
RC
E
BA
SE
, F
LO
RI
DA
BU
IL
DI
NG
LA
B
EX
PA
NS
IO
N
V:
\2
6\ ac tiv e\
0\ ci vil
\d ra w in g\
_d sg n\ sh ee t_ file s\
Am en dm en t 0
_M
EF
2C D1
.d w g
/0 1/
:0
PM B
y:
M or al es
, A rle ne
EXISTING GOVERNMENT
OWNED CONEX TRAILERS
TO BE RELOCATED PRIOR
TO CONSTRUCTION WORK
COMMENCING (NIC)
PROTECT EXISTING
CONCRETE
REMOVE CONCRETE TO THE
NEAREST JOINT AS SHOWN.
CONTRACTOR TO VERIFY
LOCATION. IF SAW CUTTING
IS NECESSARY, USE DOUBLE
SAW CUT METHOD PER
UFC 3-260-02 & UFC 3-270-01.
DEMO EXISTING STAIRS AND FOUNDATION,
SEE ARCHITECTURAL & STRUCTURAL
DRAWINGS FOR ADDITIONAL INFORMATION
DEMO EXISTING BOLLARDS
B-1
B-2
REMOVE STEEL PLATING TO NEAREST JOINT AND FILL UNDERGROUND
VAULT WITH COMPACTED SAND AND AGGREGATE BASE COURSE TO
SUPPORT NEW CONCRETE PAVEMENT. CONSTRUCT CONCRETE
PARTITION AT REMOVAL LIMIT TO CLOSE VAULT.
STEEL COVER REMOVAL
EXISTING UNDERGROUND VAULT
WITH STEEL PLATE COVERS
PROTECT EXISTING
FIRE HYDRANT
REMOVE ABANDONED
ELECTRIC MANHOLE
AND FILL WITH
COMPACTED SUITABLE
BACKFILL
E
AM
EN
DM
EN
T
EX
. E
LE
CT
RI
CA
L M
H
RE
MO
VA
L N
OT
E
AD
DE
D
JA
N
CS
M
AMENDMENT 0002
M
EF
2C D
1.
D W
IIIL
IIIIL
ELECTRICAL LEGEND
RUN CONCEALED UNDER FLOOR
RUN SURFACE MOUNTED UNLESS NOTED OTHERWISE
LIQUID-TIGHT FLEXIBLE CONDUIT CONNECTION
PANELS AND POWER
Y INDICATES # OF POLES, AND Z INDICATES NEMA RATING
NON-FUSIBLE DISCONNECT SWITCH; XX/YY/ZZ WHERE X INDICATES AMPERAGE,
NEMA 5-20R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE; PROVIDE WEATHERPROOF
BOX FOR RECEPTACLE
NEMA 5-20R. MOUNT 6" ABOVE COUNTER
NEMA 5-20R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE
BRANCH CIRCUITING
WALL SWITCHES (UNLESS OTHERWISE NOTED, MOUNT 48" A.F.F.)
A.C. TYPE, SINGLE POLE, 20 AMP, 120/277 VOLT
A.C. TYPE, 3-WAY, 20 AMP, 120/277 VOLT
WALL MOUNTED EXIT LIGHT
A.C. TYPE, 4-WAY, 20 AMP, 120/277 VOLT
JUNCTION BOX WITH BLANK SCREW COVER AND FLEXIBLE CONDUIT CONNECTION
DUPLEX RECEPTACLE - 20 AMP, 125 VOLT, GFCI, 2 POLE, 3 WIRE GROUNDED TYPE,
DUPLEX RECEPTACLE - 20 AMP, 125 VOLT, GFCI, 2 POLE, 3 WIRE GROUNDED TYPE,
4$
3$
J
G
G
CEILING OUTLETS
JUNCTION BOX
WALL OUTLETS
NEMA 5-20R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE
CEILING RECESSED MOUNTED DOWNLIGHT FIXTURE
DUPLEX RECEPTACLE - 20 AMP, 125 VOLT, GFCI, 2 POLE, 3 WIRE GROUNDED TYPE,
RECESSED 2' X 4' LED FIXTURE
DUPLEX RECEPTACLE - 20 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
CEILING SURFACE MOUNTED EXIT LIGHT; PROVIDE DIRECTION ARROW AS INDICATED
WP
J
MISCELLANEOUS
WEATHERPROOF
UNLESS NOTED OTHERWISE
ABOVE FINISH FLOOR
WP
U.N.O.
A.F.F.
RECESSED 2' X 2' LED FIXTURE
GROUND FAULT CIRCUIT INTERRUPTERG
ELECTRICAL PANELBOARD
NEMA 5-20R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE
QUADRAPLEX RECEPTACLE - 20 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
NEMA 5-20R. MOUNT 72" A.F.F. TO C/L ADJACENT TO TELEVISION OUTLET
DUPLEX RECEPTACLE - 20 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
SURFACE OR PENDANT MOUNTED 1' X 4' LED FIXTURE
DRY TYPE TRANSFORMER
RECEPTACLE - 200 AMP, 600 VOLT, 4 POLE, 5 WIRE GROUNDED TYPE BASIS OF DESIGN HUBBELL HBL5200RS1W COORIDNATE FINAL RECEPTACLE WITH GOVERNMENT REPRESENTATIVE PRIOR TO ORDERING MATERIALS.
NUMERALS INDICATE PANEL AND CIRCUIT NUMBER.
HOMERUN TO PANEL. ANY CIRCUIT WITHOUT FURTHER IDENTIFICATION INDICATES
2 #12, 1 #12 GROUND - 1/2" C; 3 #12, 1 #12 GROUND - 1/2" C;LA-1
4 #12, 1 #12 GROUND - 1/2" C; ETC. AS PER NEC. LETTERS AND
P SIDE WALL MOUNTED PHOTOCELL 120 VOLT
ROTATING BEACON TYPE BLUE LIGHT; STROBE TYPES ARE NOT ACCEPTABLE
MOTOR RATED TOGGLE SWITCH, 30 AMP, 120/277 VOLTM$
SWITCH TYPE INFRARED OCCUPANCY SENSORR$
NEMA 5-20R. MOUNT 18" BELOW FINISHED CEILING TO C/L FOR WALL MOUNTED CLOCK.
SIMPLEX RECEPTACLE - 20 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
WALL MOUNTED LED LIGHTING FIXTURE
CONDUIT GND GROUNDC
GROUNDGND
RECESSED 2' X 4' LED FIXTURE WITH EMERGENCY DRIVER
SURFACE OR PENDANT MOUNTED 1' X 4' LED FIXTURE WITH EMERGENCY DRIVER
RECESSED 2' X 2' LED FIXTURE WITH EMERGENCY DRIVER
360 DEGREE CEILING MOUNTED OCCUPANCY SENSOR WITH POWER PACK RELAY;
DUAL TECHNOLOGY
LOW VOLTAGE SWITCH WITH ON/OFF/50% PRESET BUTTONSLV$
T
BL
OS
2' LONG X 4" TALL X 1/4" THICK CONTINUOUS GROUND BUSBAR. INSTALL #3/0
BONDING CONDUCTOR TO MAIN SYSTEM GROUND BAR.
C
RECEPTACLE - 100 AMP, 600 VOLT, 3 POLE, 4 WIRE GROUNDED TYPE. COORDINATE EXACT
OUTLET TYPE WITH GOVERNMENT REPRESENTATIVE PRIOR TO ORDERING MATERIALS.
RECEPTACLE - 30 AMP, 250 VOLT, 3 POLE, 4 WIRE GROUNDED TYPE. COORDINATE EXACT
OUTLET TYPE WITH GOVERNMENT REPRESENTATIVE PRIOR TO ORDERING MATERIALS.
WALL MOUNTED ROTATING BEACON TYPE BLUE LIGHT; STROBE TYPES ARE NOT ACCEPTABLE'BL'
BLUE LIGHTS SWITCHBL$
DIMMING LIGHT SWITCHD$
WALL MOUNTED OCCUPANCY SENSOR; DUAL TECHNOLOGYOS$
NEMA L5-30R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE
SIMPLEX RECEPTACLE - 30 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
NEMA L6-30R. MOUNT 18" A.F.F. UNLESS NOTED OTHERWISE
SIMPLEX RECEPTACLE - 30 AMP, 125 VOLT, 2 POLE, 3 WIRE GROUNDED TYPE,
A
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
AMENDMENT 0002
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
E-001FTFA20DR04
E L
E C
T R
IC
A
L L
E G
E N
D A
N D
G E
N E
R A
L N
O T
E S
D
C O
L E
M A
N
D
C O
L E
M A
N D
B
A G
W E
L L
B T
A
O C
T O
B E
R
1. ALL PANELBOARDS, BACKBOARDS, TERMINAL CABINETS, DISCONNECTS, ETC SHALL HAVE CUSTOM ENGRAVED NAMEPLATE MECHANICALLY AFFIXED IDENTIFYING SYSTEM.
2. GENERAL CONTRACTOR SHALL FIELD-VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK, AND SHALL IMMEDIATELY NOTIFY THE GOVERNMENT OF ANY
DISCREPANCIES. FAILURE TO DO SO INDICATES THAT THE CONTRACTOR ACCEPTS THE CONDITIONS AS THEY EXIST, AND SHALL PERFORM THE WORK REQUIRED AS SHOWN AND
SPECIFIED.
3. THE ELECTRICAL CONTRACTOR SHALL OBTAIN AND REVIEW THE MECHANICAL AND SPECIAL EQUIPMENT SUBMITTALS PRIOR TO SUBMITTING THE ELECTRICAL SUBMITTALS. ANY ELECTRICAL EQUIPMENT, CONDUIT, AND WIRE SIZE CHANGES RESULTING FROM THIS REVIEW SHALL ALSO BE SUBMITTED FOR APPROVAL.
4. FURNISH ALL EQUIPMENT AND LABOR, PERFORM ALL LABOR WITH SUPERVISION, BEAR ALL EXPENSES, AS NECESSARY FOR THE SATISFACTORY COMPLETION OF ALL WORK READY
FOR OPERATION.
5. COMPLY WITH ALL CODES, LAWS, AND ORDINANCES APPLICABLE TO ELECTRICAL WORK, THE NATIONAL ELECTRIC CODE, NFPA, AND UFC PUBLICATIONS. OBTAIN ALL PERMITS
REQUIRED BY THE GOVERNMENT.
6. THE GENERAL CONTRACTOR SHALL NOTIFY THE GOVERNMENT IMMEDIATELY OF ANY CONFLICTS/DISCREPANCIES BETWEEN DISCIPLINES BEFORE ORDERING
EQUIPMENT/MATERIALS.
7. ALL CONDUCTORS INDICATED ON PLAN SHALL BE COPPER.
8. ALL ELECTRICAL WORK AND MATERIALS USED IN THIS PROJECT SHALL BE NEW, UNDERWRITERS' LABORATORIES (UL) LISTED AND LABELED, AND SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR UNLESS NOTED OTHERWISE.
9. CONDUIT ROUTINGS AND DEVICE/EQUIPMENT LOCATIONS SHOWN ARE DIAGRAMMATIC ONLY, CONTRACTOR SHALL FIELD ROUTE AND LOCATE AS REQUIRED. CONDUIT ROUTINGS
SHALL BE PARALLEL OR PERPENDICULAR TO BUILDING LINES.
10. THE CONDUIT SYSTEMS UTILIZED SHALL BE AS FOLLOWS:
A. BELOW GRADE - PVC SCHEDULE 40.
B. TRANSITIONS FROM BELOW GRADE (WHICH SHALL INCLUDE A 'RSC' FACTORY 90 DEGREE ELBOW) TO ABOVE GRADE AND/OR THRU SLAB - RIGID GALVANIZED STEEL (RGS).
C. INTERIOR OF BUILDING CONDUITS - ELECTRIC METALLIC TUBING (EMT) UNLESS NOTED OTHERWISE.
D. EXTERIOR OF BUILDING EXPOSED ABOVE FINISHED GRADE - RIGID STEEL CONDUIT (RSC) UNLESS NOTED OTHERWISE.
E. FINAL 36" OF CONDUIT CONNECTED TO MOTORS AND DRY TYPE TRANSFORMERS - LIQUID TIGHT FLEXIBLE CONDUIT (LFMC).
11. ALL NEW CONDUITS RUN UNDERGROUND SHALL HAVE A MINIMUM BURIAL DEPTH OF 36" UNLESS NOTED OTHERWISE.
12. NEW CONDUITS LEAVING OR ENTERING BUILDING SHALL BE SEALED PER NEC TO PREVENT ENTRANCE OF MOISTURE.
13. PAINT ALL NEW EXPOSED SURFACE RUN CONDUITS TO MATCH COLOR OF SURFACE UPON WHICH THEY ARE PLACED.
14. PROVIDE A NEW TYPED PANELBOARD DIRECTORY FOR ALL NEW ELECTRICAL PANELBOARDS. MOUNT IN HOLDER BEHIND A TRANSPARENT PROTECTIVE COVERING. PANELBOARD
DIRECTORIES SHALL INDICATE SOURCE OF FEEDER TO PANELBOARD (IE PANEL 'DP' FED FROM PANEL 'MDP'). HANDWRITTEN PANELBOARD DIRECTORIES IS UNACCEPTABLE. MARK
ALL RECEPTACLES, LIGHTS, AND EMERGENCY EQUIPMENT WITH PANEL AND BREAKER #.
15. COORDINATE LOCATIONS OF ALL NEW ELECTRCAL EQUIPMENT, DEVICES, OUTLETS, FIXTURES, ETC. WITH ARCHITECTURAL PLANS, ELEVATIONS AND REFLECTIVE CEILING PLANS
PRIOR TO ROUGH-IN WORK.
16. WHERE CONFLICTS OCCUR ON ELECTRICAL DRAWINGS BETWEEN DRAWINGS, SPECIFICATIONS AND CODES, THE MOST STRINGENT REQUIREMENT THAT APPLIES SHALL BE ADHERED
TO.
17. ELECTRICAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING ANY WORK AND SHALL IMMEDIATELY NOTIFY THE GOVERNMENT INSPECTOR OF ANY DISCREPANCIES. FAILURE TO DO SO INDICATES THAT THE CONTRACTOR ACCEPTS THE CONDITIONS AS THEY EXIST AND SHALL PERFORM THE WORK AS SHOWN AND SPECIFIED.
18. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO INSTALLATION. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR EXACT LOCATION AND SIZE OF
EQUIPMENT WHICH ARE PROVIDED BY OTHERS AND CONNECTED BY ELECTRICAL.
19. PROVIDE A 6'-0" MAXIMUM FLEXIBLE CONNECTION FROM EACH RECESSED LIGHTING FIXTURE TO NEW OUTLET BOX ABOVE CEILING.
20. ALL NEW OUTLET BOXES FOR MOUNTING LIGHTING FIXTURES SHALL BE MINIMUM 4" SQUARE OR OCTAGONAL X 1 1/2" DEEP UNO.
21. BUSBARS ARE TO BE PROVIDED FOR ALL POLES INDICATED ON PANEL SCHEDULE, REGARDLESS OF WHETHER POLES ARE SHOWN WITH CIRCUIT BREAKERS OR 'SPACE ONLY'.
22. ALL NEW PANELBOARDS AND SAFETY SWITCH DISCONNECTS SHALL BE FURNISHED WITH LAMINATED PLASTIC NAMEPLATES. NAMEPLATES SHALL BE MELAMINE PLASITC .125" THICK, WHITE WITH BLACK CENTER CORE. SURFACE SHALL BE MATTE FINISHED. CORNERS SHALL BE SQUARE. ACCURATELY ALIGN LETTERING AND ENGRAVE INTO THE CORE. MINIMUM SIZE OF NAMEPLATES SHALL BE 1" X 2 1/2". LETTERING SHALL BE A MINIMUM OF .25" HIGH, NORMAL BLOCK STYLE. FASTEN NAMEPLATES WITH A MINIMUM OF TWO SHEET METAL
SCREWS OR TWO RIVETS, PER NAMEPLATE.
23. WORKING SPACE OF 36" FOR 208/120 VOLT SYSTEMS SHALL BE MAINTAINED IN FRONT OF ALL ELECTRICAL PANELS AND DEVICES.
24. SAFETY SWITCH DISCONNECTS SHALL BE MOUNTED AT 48" AFF TO CENTER AND SHALL HAVE 3'-0" MIN. OF WORKING SPACE IN FRONT OF DISCONNECT; COORDINATE WITH
MECHANICAL CONTRACTOR AND EQUIPMENT LOCATIONS.
25. FINAL CONDUIT CONNECTIONS TO HEAT PUMPS, AIR HANDLERS, EXHAUST FANS, AND ELECTRIC WATER HEATERS SHALL BE LIQUID TIGHT FLEXIBLE METAL.
26. ALL NEW PANELBOARDS, MAIN BREAKER WHERE STIPULATED, SHALL NOT BE ALLOWED IN BRANCH BREAKER SPACES. MAIN BREAKER ONLY WILL ONLY BE PERMITTED ABOVE OR
BELOW THE BRANCH BREAKER AREA.
27. ALL DEVICE COLORS SHALL BE SELECTED BY THE USER AND GOVERNMENT PRIOR TO ORDERING MATERIALS.
28. USE OF SERIES RATED CIRCUIT BREAKERS IS NOT ALLOWED.
29. USE OF PLUG-IN BREAKERS IS NOT ALLOWED.
30. ALL NEW PANELBOARDS SHALL BE FURNISHED WITH DOOR-IN-DOOR OR HINGED FRONT COVER TYPE CONSTRUCTION.
31. FURNISH 1/4" NYLON PULL ROPE IN ALL EMPTY CONDUITS FOR PULLING OF CONDUCTORS/CABLES.
32. PROVIDE RIGID PLASTIC INSULATED BUSHING ON END OF ALL TELECOMMUNICATIONS AND LOW VOLTAGE CONDUIT STUBS.
33. NEW WALL OUTLETS SHALL NOT BE INSTALLED BACK TO BACK.
34. INSTALLATION SHALL ADHERE TO ICD/ICS 705.
35. ALL EQUIPMENT SHALL BE RATED FOR THE ENVIRONMENT FOR WHICH IT IS INSTALLED.
ELECTRICAL PRIMARY NOTE:
ALL PRIMARY DISTRIBUTION WORK AND MATERIALS INCLUDING PRIMARY CONDUITS, CONDUCTORS, PAD MOUNTED TRANSFORMER SHALL BE PROVIDED BY CHELCO. CHELCO'S EGLIN AFB CONSTRUCTION STANDARDS ARE INCLUDED IN CONTRACT DOCUMENTS AND SPECIFCATIONS APPENDICES FOR REFERENCE TO THE WORK THEY WILL BE PERFORMING FOR COORDINATION PURPOSES BY THE
GENERAL CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR HIRING CHELCO.
ELECTRICAL NOTES:
M E
F
E
.D W
G
STC PENETRATION NOTES:
ALL BUILDING CONDUITS, PIPING, DUCTWORK, ETC. SHALL BE INSTALLED BELOW THE STC
RATED CEILING ASSEMBLY, UNLESS NOTED OTHERWISE
GYPSUM CEILING SUPPORT FRAMING SHALL NOT BE USED TO SUPPORT OTHER ITEMS.
UNISTRUT SYSTEM SHALL BE CONNECTED TO THE BUILDING STRUCTURAL ELEMENTS.
CONTRACTOR SHALL COORDINATE INSTALLATION SEQUENCE OF VARIOUS SYSTEMS WITH
EACH TRADE.
ALL PENETRATIONS THROUGH THE GYPSUM WALLBOARD CEILING PORTION OF THE STC
CEILING ASSEMBLY SHALL BE COMPLETELY SEALED WITH ACCOUSTICAL SEALANT.
A
M E
N D
M E
N T
U
P D
A T
E D
P E
R R
F
IS
J A
N
DN
A B B.2 B.8 C C.6 D E F G
1.6
2.4
E.2 F.4
2.8
3.4
3.6
1.4
C.2
TOWER EQUIPMENT
HL -2
TRP
'LS'
'LSE' 'LS'
'LS'
'LSE'
'LS'
'HB' 'HBE'
'HB''HBE'
'HB' 'HBE'
'HBE'
'HB'
'HBE'
'HB'
'HBE'
'HB'
'HB'
'HBE'
'FL'
'FL'
'FL'
'SLE'
'SLE'
HL -5 1
'LSE'
'LS'
'WB' 'WB'
HL -6
$3 $
MEZZANINE
B L
BL
'X'
'X'
'VPE'
EXISTING FACILITY
/2
'WB'
A
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
E-201FTFA20DR04
M E
Z Z
A N
IN
E
L
IG
H T
IN
G
P L
A N
D
C O
L E
M A
N
D
C O
L E
M A
N D
B
A G
W E
L L
B T
A
O C
T O
B E
R
PLAN
NORTH
TRUE
NORTH 1/8" = 1'-0"E-201
1 MEZZANINE LEVEL LIGHTING PLAN
KEYNOTES:
2#10,1#10 GND IN 1/2"C
2#10,1#10GND IN 1/2"C TO
SWITCH IN LAB 6 ON GROUND FLOOR
MOUNT FIXTURE 12" BELOW LOUVER
MOUNT FIXTURE 7' 6" ABOVE EXTERIOR STAIR.
MOUNT FIXTURE 6' ABOVE EXTERIOR STAIR.
MOUNT FIXTURE ALONG FACE OF STAIR LANDING.
MOUNT FIXTURE 20' ABOVE FINISHED FLOOR.
2#12,1#12 GND IN 1/2"C TO SWITCH AT GROUND FLOOR OF LIFT.
COORDINATE EXACT LOCATION WITH ELEVATOR MANUFACTURER.
COORDINATE EXACT LOCATION OF LIGHT WITH ELEVATOR MANUFACTURER.
2#12,1#12 GND IN 1/2"C TO 'WB' FIXTURE ABOVE EXTERIOR STAIR.
DEVICE INSTALLATION NOTE:
ALL DEVICES AND PATHWAYS SHALL BE INSTALLED EXPOSED ON SECURITY WALLS.
REFER TO ARCH FOR SECURE AREA BOUNDARY PERIMETERS THROUGHOUT THE FACILITY.
M E
F
E
.D W
G
0'8' 8' 16
SCALE: 1/8"=1'-0"
PLAN
NORTH
TRUE
NORTH 1/8" = 1'-0"E-201
2 TOWER LIGHTING PLAN
PENETRATION NOTE:
ANY PENETRATIONS INTO SECURE AREA 'B' OR PERIMETER OF THE SECURE AREA 'A'
SHALL BE WITH DIELECTRIC BREAK AND SHALL BE ICD 705 COMPLIANT.
CONDUITS SHALL NOT PASS THROUGH LAB 10 TO SERVE OTHER SPACES. EACH CONDUIT
SHALL BE MARKED AS TO WHAT IT IS WHEN PENETRATING PERIMETER STC SECURITY
WALLS AND THE MAIN PERIMETER WALL. MARKINGS SHALL BE MADE USING COLOR
CODING AND PERMANENT MARKER.
A
M E
N D
M E
N T
U
P D
A T
E D
P E
R R
F
IS
J A
N
AMENDMENT 0002
SHEET
IDENTIFICATION
US Army Corps of Engineers ® Mobile District
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
D E
S
IG
N E
D B
Y
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S E
C
E R
V A
N T
E S
S T
R E
E T
P E
N S
A C
O L
A F
L O
R
ID
A
2 3 4 5
B
C
D
D R
A W
N B
Y
S B
M T
B Y
P L
O T
S C
A L
E
S
IZ
E
C K
D B
Y
P L
O T
D A
T E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
P R
O J
E C
T N
U M
B E
R
F
IL
E N
A M
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
:1 x
M O
B
IL
E D
IS
T
R
IC
T M
O B
IL
E
A
L A
B A
M A
O C
T
M
E F
E G
L
IN
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A B
U
IL
D
IN
G
L
A B
E X
P A
N S
IO
N
E-600FTFA20DR04
P A
N E
L S
C H
E D
U L
E S
D
C O
L E
M A
N
D
C O
L E
M A
N D
B
A G
W E
L L
B T
A
O C
T O
B E
R
Notes:
Total Est. Demand Current: 362 A
Total Conn. Current: 363 A
Lighting 3888 VA 100.00% 3888 VA Total Est. Demand: 301166 VA
Power 297042 VA 100.00% 297042 VA Total Conn. Load: 301441 VA
Other 550 VA 50.00% 275 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 368.64 A 360.44 A 359.42 A
Total Load: 102.08 kVA 99.8 kVA 99.56 kVA
41 1.14... 0 kVA 42
39 1.35... 0 kVA 40
PANEL HL 100 A 3
1.97... 0 kVA
3 30 A SURGE SUPPRESSOR
35 24.17... 0 kVA 36
33 24.17... 0 kVA 34
PANEL EQ 200 A 3
25.83... 0 kVA
3 400 A EXISTING MAIN PANEL
29 Space -- -- 0 kVA 0 kVA -- -- Space 30
27 Space -- -- 0 kVA 0 kVA -- -- Space 28
25 Space -- -- 0 kVA 0 kVA -- -- Space 26
23 Space -- -- 0 kVA 0 kVA -- -- Space 24
21 Space -- -- 0 kVA 0 kVA -- -- Space 22
19 Space -- -- 0 kVA 0 kVA -- -- Space 20
17 Space -- -- 0 kVA 0 kVA -- -- Space 18
15 Space -- -- 0 kVA 0 kVA -- -- Space 16
13 Space -- -- 0 kVA 0 kVA -- -- Space 14
11 9.7 kVA 26.98... 12
9 9.7 kVA 26.98... 10
AHU-1 40 A 3
9.7 kVA 26.98...
3 110 A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .