W9127822R0008 AM02.pdf

PDF 2 MB Posted

Attached to
Building 73 Lab Expansion, Eglin Air Force Base, Florida
Solicitation number
W9127822R0008
Issued by

About this file

This federal contract opportunity solicitation is for the construction of an approximately 7,000 square foot laboratory expansion at Building 73, a cyberspace security test facility at Eglin Air Force Base in Florida. The project involves conventional design and construction methods and will provide a complete and usable SCIF-rated facility in accordance with intelligence community standards. The NAICS code is 236220.

The solicitation will be available exclusively through the SAM.gov website. All prospective contractors and subcontractors must register in SAM.gov before downloading bid documents. Critical path methodology is required. A small business is defined as having average annual receipts less than $39.5 million for the past three years. The solicitation includes bid options that may not be awarded. The request for information process will use the ProjNet system specified in the solicitation.

View the file

Other files

File Type Posted
W9127822R0008 AM07.pdf PDF
W9127822R0008 AM06 DRAWINGS.pdf PDF
W9127822R0008 AM06.pdf PDF
W9127822R0008 AM05.pdf PDF
W9127822R0008 AM04.pdf PDF
W9127822R0008 AM03.pdf PDF
W9127822R0008 AM03 DRAWINGS.pdf PDF
W9127822R0008 AM02 DRAWINGS.pdf PDF
W9127822R0008 AM01.pdf PDF
W9127822R0008 Site Evaluation SIGN IN SHEET.pdf PDF
VOL4.PDF PDF
W9127822R0008 VOL2.pdf PDF
W9127822R0008 VOL5.pdf PDF
W9127822R0008 VOL4.pdf PDF
W9127822R0008 VOL3.pdf PDF
W9127822R0008 VOL1.pdf PDF
W9127822R0008 EM 385-1-1.pdf PDF
W9127822R0008 RTA DRAWINGS.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE 4. REQUISITION/PURCHASE 5. PROJECT NO. (If applicable)

W9127822R0008-0002 20 JAN 2022 MEF22002

6. ISSUED BY CODE 7. ADMINISTERED BY(If other than item 6)

CODE

Corps of Engineers 109 St. Joseph St.

Mobile, AL 36602

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION

NO.

W9127822R0008

9B. DATED (SEE ITEM 11)

17 DEC2021

10A. MODIFICATION OF

CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) The subject solicitation for: BUILDING 73 LAB EXPANSION, EGLIN AIR FORCE BASE, FLORIDA

Is modified in the following: REFER TO THE ENCLOSED SPECIFICATION REVISIONS/REVISED DRAWINGS FOR AMENDMENT

NO. 0002.

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as Heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICE (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of contracting officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

BUILDING 73 LAB EXPANSION W9127822R0008

EGLIN AIR FORCE BASE, FLORIDA MEF22002

SF 30 Page 2 Amendment No. 0002

PART I - REVISIONS MADE BY ADDED AND/OR REPLACEMENT PARAGRAPHS/PAGES/SECTIONS

The items listed below are to be replaced by the corresponding added and/or revised paragraphs/pages or sections. Added and/or revised paragraphs/pages or sections are indicated by a note in bottom right-hand corner of each paragraph or page. Added sections are hereby made a part of the contract and are to be inserted in the specification in the proper numerical/alphabetical sequence.

Within the specifications, deletions from the specifications are indicated by strikethrough, e.g.: deletions are marked with strikethrough and additions to the specifications including revisions/substitutions are indicated in bold, italic and underlined, e.g.: additions are indicated thus.

Corresponding Added or Revised Paragraph SECTION Page, and/or Section

VOLUME 1

Table of Contents Revised Page 3 to add Section 26 08 00

01 00 00 Revised Paragraphs 1.5 and 1.34

01 14 00 Revised Paragraph 1.4.4

01 33 00 Replaced Submittal Register in its entirety

VOLUME 2

Table of Contents Revised Page 3 to add Section 26 08 00

07 92 00 Revised Paragraph 1.2 Added Paragraphs 2.7 and 3.4.8

09 65 00 Revised Paragraph 2.1

VOLUME 3

Table of Contents Revised Page 3 to add Section 26 08 00

26 08 00 Added Section 26 08 00 in its entirety

26 20 00 Revised Paragraph 2.4 Deleted Paragraphs 2.5.1, 2.11.5, 2.12.3.3, 2.22, and 3.1.2

26 24 13 Revised Paragraph 1.4 Deleted Paragraphs 2.5.4 and 3.5.1.7

26 28 01 Revised Paragraph 1.2

26 51 01 Revised Paragraphs 1.2, 1.7.1, 2.5, 3.1.5 and 3.3.1 Deleted Paragraph 2.2.2

27 10 00 Revised Paragraph 1.2

SF 30 Page 3 Amendment No. 0002

28 31 76 Deleted Paragraphs 2.9 and 3.2.5

VOLUME 4

Table of Contents Revised Page 3 to add Section 26 08 00

VOLUME 5

Table of Contents Revised Page 3 to add Section 26 08 00

PART II - NOTE: Revised and added drawings are listed below. These revised and added drawings are to be inserted into the folio in the proper numerical sequence. Drawings that have been revised by this amendment shall be deleted from the folio. All drawings listed below are revised unless indicated otherwise.

Sheet Reference Number Title

USACE COVER

G-002 INDEX OF DRAWINGS

G-004 TEMPORARY ENTRANCE (ADDED)

G-005 TEMPORARY ENTRY AND MANTRAP STRUCTURAL DETAILS (ADDED)

CI001 GENERAL CIVIL NOTES

CD101 OVERALL DEMOLITION PLAN

E-001 ELECTRICAL LEGEND AND GENERAL NOTES

E-201 MEZZANINE LIGHTING PLAN

E-600 PANEL SCHEDULES

E-601 PANEL SCHEDULES

E-606 PANEL SCHEDULES

T-303 TELECOM SINGLE LINE DIAGRAMS

TY001 SECURITY LEGEND AND NOTES

Encl as stated:

Revised pages of the specifications as indicated in Part I.

13 Revised and added drawings as indicated in Part II.

This page was intentionally left blank for duplex printing.

Table of Contents Page 3

REVISED BY AMENDMENT NO. 0002

DIVISION 10 – SPECIALTIES

10 14 02 INTERIOR SIGNAGE

10 26 00 WALL AND DOOR PROTECTION

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 13 - SPECIAL CONSTRUCTION

13 12 20 EXTRUDED ALUMINUM CANOPY SYSTEM

DIVISION 14 - CONVEYING EQUIPMENT

14 25 02 MATERIAL LIFT

DIVISION 21 – FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 36 00.00 40 AIR TERMINAL UNITS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 23 COMPUTER ROOM AIR CONDITIONING UNIT

VOLUME 3 OF 5

DIVISION 25 – INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND

INTEGRATION

DIVISION 26 – ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

Section 01 00 00

REVISED BY AMENDMENT NO. W9127822R0008-0002

01 00 00

1.5 Construction Project Manager

Construction Project Manager shall is not required to be onsite full time and dedicated to only this contract.

1.34 PERMITS AND RESPONSIBILITIES

The Government has obtained the following applicable permits/permit applications related to the design and construction of this project:

a). FDEP 10-2 Stormwater Permit.

b). NPDES Notice of Intent.

c a). Notice of Intent to Use the General Permit for Construction of Water Main Extensions for PWSs, submitted to FDEP.

d). Notification/Application for Constructing a Domestic Wastewater Collection/Transmission System, submitted to FDEP.

e). Joint Application for Individual and Conceptual Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit, submitted to FDEP/Water Management Districts/U.S. Army Corps of Engineers. A permit will not be required for the sanitary sewer system, including the grinder pump station as it meets the exception listed in FAC 62-604600. Furthermore, the project has less than one acre of disturbed soil and will not require an NPDES Notice of Intent Permit. Additionally, the project will qualify for exemption from Environmental Resource Permit (ERP) requirements under FAC Section 373.406(6), F.S., "de minimis" exemption.

The contractor will be required to obtain the as-built certifications for the permits identified above. Accordingly, the contractor will be responsibly responsible for fully coordinating with the Contracting Officer regarding information for as-built

Note: The remainder of the section is unchanged by this amendment.

Section 01 14 00

REVISED BY AMENDMENT NO. W9127822R0008-0002

01 14 00

1.4.4 Occupied and Existing Buildings

The Contractor shall be working in an existing building around existing buildings which are occupied. Do not enter the building without prior approval of the Contracting Officer.

Normal escorted access to the secure facility will be 0700-1500 hrs. with prior coordination (Mon-Fri) unless coordinated 5-working days in advance with the USCOE Site Engineer/Manager to ensure facility owner has manning to support escort activity.

Personnel that have access to the facility will present the USACE rep/COR with identification (Driver Lic.-Real ID-with Star/CAC Card) to log into the facility for designated work under facility escort. All worker identification will be pre-coordinated by USACE rep/COR and documented with rep/COR. No exceptions.

Contractor construct temporary entrance to existing Building 73, and all work for temporary entrance as shown on sheets G-004 and G-005 to be completed and approved by COR before work can begin that will make existing entry door at mantrap (E101) inaccessible to facility users as a facility entrance.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the building during the construction period.

Relocate movable furniture away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in its original locations upon completion of the work. Leave attached equipment in place, and protect it against damage.

Note: The remainder of the section is unchanged by this amendment.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 69 PAGES

Building 73 Lab Expansion, Eglin AFB, FL

01 00 00 SD-01 Preconstruction Submittals

1.9 G ROHazard Analysis

G RORequest for Interruption of Utility

Services

G RORequest for Road Closures

1.20 G ROAF Form 103, Base Civil

Engineering Work Clearance

Request

G RORequest Use of Cranes

1.15 G ROContractor's Area Use Plan

SD-07 Certificates

G ROAsbestos and Lead Based Paint

Certification Letter

SD-11 Closeout Submittals

1.14 G RORedlined As-Built Drawings

1.14 G ROProgress As-Built Building

Information Model (BIM)

1.14 G ROFinal As-Built BIM

1.14 G ROAs-Built Drawings

01 11 00 SD-01 Preconstruction Submittals

Utility Outage Requests

Utility Connection Requests

Borrow Permits

Excavation Permits

Welding Permits

Burning Permits

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

REPLACED BY AMENDMENT NO. W9127822R0008-0002

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 69 PAGES

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 GList of Contact Personnel

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 GAPP - Construction

GDive Operations Plan

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

1.7.3.4 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 69 PAGES

01 35 26 1.12.4Certificate of Compliance

1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet

3.7.3Machinery & Mechanized

Equipment Certification Form

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

GSIOR Letter of Acceptance

GProject Manual

3.1.2Written Practices

3.1.2NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

Steel Truss Plant

Wood Truss Plant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 69 PAGES

01 45 35 AC472 Accreditation

Steel Joist Institute Membership

Certified Plant

2.1Certificate of Compliance

GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

Interim Final Report

3.1.2 GComprehensive Final Report

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.10 G ROSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7 G ROEnvironmental Protection Plan

3.3.1.1 G ROStormwater Pollution Prevention

Plan

3.3.1.2 G ROStormwater Notice of Intent

1.7.9.1 G RODirt and Dust Control Plan

1.6.5 G ROEmployee Training Records

1.6.4Environmental Manager

Qualifications

SD-06 Test Reports

3.8.1.1.2Laboratory Analysis

3.3.1.3Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 69 PAGES

01 57 19 1.10.1 G ROMonthly Solid Waste Disposal

Report

SD-07 Certificates

1.6.5Employee Training Records

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.3.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.3.1.5 G ROStormwater Notice of Termination

3.8.1 G ROWaste Determination

Documentation

3.8.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 G ROAssembled Employee Training

Records

1.10Solid Waste Management Permit

3.8.2.1 GProject Solid Waste Disposal

Documentation Report

3.8.3.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.8.2.1 GSales Documentation

3.8.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 69 PAGES

01 74 19 1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.6 GCommissioning Firm

1.6.1 GLead Commissioning Specialist

1.6.2 GTechnical Commissioning

Specialists

SD-06 Test Reports

3.1.2.1 GInterim Construction Phase

Commissioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 69 PAGES

01 91 00.15 3.1.2.2 GFinal Construction Phase

Commissioning Plan

3.1.4.2 GPre-Functional Checklists

1.7Issues Log

3.2 GCommissioning Report

SD-07 Certificates

1.8 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.5 GTraining Plan

3.1.5 GTraining Attendance Rosters

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 69 PAGES

03 30 00 3.3.8Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

Aggregates

3.12.2.3 GCompressive Strength Tests

Chloride Ion Concentration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 69 PAGES

03 30 00 3.12.2.4Air Content

3.12.2.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 69 PAGES

05 12 00 1.4.3 GDesign Calculations for Steel

Connections

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Structural Steel Fabricator

Quality Certification

1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.7.1.1Certified Welding Inspector

3.7.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 69 PAGES

05 30 00 2.1.4Galvanizing Repair Paint

2.2.15Mechanical Fasteners

2.1.4Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.10Stud Manufacture's Certification

2.2.10Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 69 PAGES

05 40 00 GFraming Components, including specific framing elevations around the exterior of the building of all stud framing, bridging, tracks and connectors. Detail all openings and opening framing requirements.

STC Ceiling Support framing shall also be included

SD-03 Product Data

Studs, STC Ceiling Framing, Joists

2.1 SRecycled Content of Steel

Products

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

05 50 13 SD-02 Shop Drawings

GCover Plates and Frames

2.6 GAngles and Plates

SD-03 Product Data

GCover Plates and Frames

GDownspout Terminations

2.1 GCertificates of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 69 PAGES

05 50 13 GCertified Mill

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.4.4 GHot-Rolled Carbon Steel Sheets

and Strips

GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

GGalvanized Carbon Steel Sheets

2.4.6 GMalleable Iron Castings

GConcrete Inserts

GMasonry Anchorage Devices

2.2.4 GProtective Coating

GSteel Pan Stairs

GSteel Stairs

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 69 PAGES

05 51 00 2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.4.4 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.3 GHot-Rolled Carbon Steel Bars

GCold-Rolled Carbon Steel Sheets

GGalvanized Carbon Steel Sheets

2.4.6 GMalleable Iron Castings

2.2.4 GProtective Coating

GMasonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.3Ship's Ladder

SD-03 Product Data

2.3Ship's Ladder

SD-07 Certificates

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

GFabrication Drawings

3.2 GIron and Steel Hardware

3.2Steel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1Structural-Steel Plates, Shapes, and Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 69 PAGES

05 52 00 2.2.2 GStructural-Steel Tubing

2.2.3Hot-Rolled Carbon Steel Bars

2.2.5Concrete Inserts

2.1.3Protective Coating

GSteel Railings and Handrails

GAluminum Railings and Handrails

GAnchorage and Fastening

Systems

SD-07 Certificates

Welding Procedures

1.3.1Welder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.2.1 GNailing Strips

SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

1.7Preservative Treatment

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 69 PAGES

07 05 23 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

1.6.4 GAir Leakage Test Report

3.5.6 GAir Leakage Test Report

1.6.4 GDiagnostic Test Report

3.6.5 GDiagnostic Test Report

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.1 GBlock or Board Insulation

Vapor Retarder

2.2Pressure Sensitive Tape

1.4Protection Board or Coatings

2.4 GAccessories

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.4.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 69 PAGES

07 21 16 SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

SD-03 Product Data

2.1 GInsulation

Cover Board and Glass Mat

Gypsum Roof Boards; G

Fasteners; G

Sheathing Paper

Moisture Control

SD-06 Test Reports

GFlame Spread Rating

SD-07 Certificates

1.6 GInstaller Qualifications

1.6Certificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.3Fasteners

2.1Insulation

07 27 10.00 10 SD-02 Shop Drawings

2.1 GAir Barrier System Shop

Drawings

SD-03 Product Data

2.1 GAir Barrier System Product Data

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 69 PAGES

07 27 10.00 10 3.1.2 GMock-Up

2.1 GMaterial Samples For Air Barrier

System

SD-05 Design Data

1.8 GDesign Data And Calculations

For The Air Barrier System

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4.3 GMockup

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 69 PAGES

07 27 26 SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.4 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals

1.10.1 GQualification of Manufacturer

1.10.2 GQualification of Installer

1.11 GQuality Control Plan

1.11 GSafety Plan

1.9.1 GFire Prevention Plan

1.9.2 GRespirator Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 69 PAGES

07 27 36 SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.11 GFoam Air Barrier System

SD-03 Product Data

2.1.2 GClosed Cell

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

2.5 GSealants

1.5.2 GSafety Data Sheets

GThermal Barrier Materials

2.1.6 GAccessories

SD-06 Test Reports

1.5.3 GField Peel Adhesion Test

GPrimers

SD-07 Certificates

2.1.2 GClosed cell

SD-08 Manufacturer’s Instructions

1.6.1 GSPF Handling, Storage, and

Spray Procedures

3.2.1 GSubstrate Preparation

1.5.1 GThermal Barrier

2.3 GPrimers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

1.11Core Samples

07 52 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 69 PAGES

07 52 00 1.4.4 GRoof plan

SD-03 Product Data

1.7 GModified Bitumen Sheets

2.2 GModified Bitumen Sheets

1.9Asphalt

2.6 GPrimer

2.7 GModified Bitumen Roof Cement

2.10Pre-Manufactured Accessories

2.9 GFasteners And Plates

1.11 GWarranty

SD-05 Design Data

1.4.3 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.3 GWind Uplift Resistance

SD-08 Manufacturer’s Instructions

3.3.4 GModified Bitumen Membrane

Application

3.3.5 GFlashing

Temperature Limitations for

Asphalt

2.6Primer

Fasteners

SD-11 Closeout Submittals

1.11Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 69 PAGES

07 52 00 3.8Information Card

3.7Instructions To Government

Personnel

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.15 GGutters

3.1.16 GDownspouts

GSplash Pans

3.1.10 GBase Flashing

3.1.11 GCounterflashing

3.1.21 GFlashing at Roof Penetrations

and Equipment Supports

3.1.23 GCopings

3.1.17 GOpen Valley Flashing

3.1.18 GEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.9 GCool Roof

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 69 PAGES

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2Primers

2.3Bond Breakers

2.4Backstops

Expansion Joint (Expanding

Foam System with Silicone Facing)

3.1Field Adhesion

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.5 GFrames

2.5 GFrames

2.3Accessories

2.7Weatherstripping

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 69 PAGES

08 11 13 2.1 GDoors

2.5 GFrames

2.3Accessories

2.7Weatherstripping

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.1.6 GAccessories

SD-04 Samples

2.4 GFinishes

SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

1.3.1 GAcoustical Ratings of Assemblies

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3 GCounterbalancing Mechanism

GManual Door Operators

2.2.4 GElectric Door Operators

2.2.1.3 GBottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.1.8 GOverhead Drum

3.3.2 GHood

2.1.1.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 69 PAGES

08 33 23 SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

GManual Door Operators

2.2.4 GElectric Door Operators

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GElectric Door Operators

SD-10 Operation and Maintenance

Data

3.3.2 GOperation and Maintenance

Manuals

3.3.2 GMaterials

3.3.2 GDevices

3.3.2 GProcedures

3.3.2 GManufacture's Brochures

3.3.2 GParts Lists

SD-11 Closeout Submittals

3.3.1 GWarranty

08 34 73 SD-02 Shop Drawings

2.1 GHollow Metal Sound Retardant

Doors

2.1 GDoor Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 69 PAGES

08 34 73 SD-03 Product Data

2.1 GHollow Metal Sound Retardant

Doors

2.1 GDoor Frames

2.1 GDoor Hardware

2.1 GIntumescent Seals and Gasketing

2.1 GThresholds

2.1 GAstragals

SD-06 Test Reports

2.4.4 GWind Loading Tests

2.4.4 GWater Leakage Tests

2.4.4 GAcoustical Tests

2.4.4 GAir Infiltration Tests

SD-07 Certificates

2.1 GHollow Metal Sound Retardant

Doors

2.1 GDoor Frames

2.1 GDoor Hardware

GIntumescent Seals,Gasketing and

Door Bottoms

2.1 GThresholds

2.1 GAstragals

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

SD-02 Shop Drawings

3.3 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 69 PAGES

08 41 13 2.2 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

3.4.3Deflection

3.4.1Air Infiltration

3.4.4Condensation Resistance and

Thermal Transmittance

3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

SD-11 Closeout Submittals

3.6Manufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.7 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 69 PAGES

08 71 00 SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

Insulating Glass

1.3Glazing Accessories

2.4.3.1Sealants

2.4.4Joint Backer

SD-04 Samples

Insulating Glass

2.4.2Glazing Compound

2.4.6Tape

2.4.6Sealing Tapes

SD-07 Certificates

Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

Monolithic Reflective Glass

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 69 PAGES

08 91 00 SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

09 22 00 SD-02 Shop Drawings

2.1Metal Support Systems

SD-03 Product Data

2.1Metal Support Systems

09 24 23 SD-02 Shop Drawings

3.4Lath

SD-03 Product Data

3.7Proportions and Mixing

Recycled percentage of fly ash in

Portland cement

2.6Recycled Content for steel framing

2.7Recycled Content for metal lath

SD-04 Samples

2.2Colored Stucco Finish Coat

1.3 GSample Panel

09 29 00 SD-03 Product Data

2.1.4Cementitious Backer Units

2.1.2Water-Resistant Gypsum Backing

Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 69 PAGES

09 29 00 2.1.3Glass Mat Covered or Reinforced

Gypsum Sheathing

2.1.3.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.8Accessories

2.1.1Gypsum Board

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

2.1Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2Detail Drawings

SD-03 Product Data

1.4.2Environmental Data

2.1 GTile

2.3 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.4 GTransition Strips

2.3 GGrout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 69 PAGES

09 30 10 SD-07 Certificates

2.1Tile

2.3Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

SD-11 Closeout Submittals

2.1Tile

2.3Adhesives

09 51 00 SD-02 Shop Drawings

1.2 GApproved Detail Drawings

SD-03 Product Data

GAcoustical Ceiling Systems

1.4 GCertification

SD-04 Samples

2.1 GAcoustical Units

2.1.1 GAcoustic Ceiling Tiles

GSuspension System

SD-06 Test Reports

1.2.1 GCeiling Attenuation Class and

Test

SD-07 Certificates

2.1Acoustical Units

2.1.1Acoustic Ceiling Tiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 69 PAGES

09 65 00 SD-02 Shop Drawings

2.9 GResilient Flooring and

Accessories

SD-03 Product Data

2.9 GResilient Flooring and

Accessories

2.5Adhesives

Rubber Flooring Tile

Rubber Tile

2.2Static Dissipative Rubber Tile

Cement-Fiber Board

2.3Wall Base

1.2.3Local/Regional Materials

1.2.1Environmental Data

SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 69 PAGES

09 65 00 2.9 GResilient Flooring and

Accessories

SD-11 Closeout Submittals

Warranty

09 90 00 SD-02 Shop Drawings

3.10 GPiping identification

3.10stencil

SD-03 Product Data

1.4.4Certification

1.9.1Local/Regional Materials

Environmental Data

2.1Materials

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets

Sealant

SD-04 Samples

1.11 GColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions

Application instructions

3.6.2Mixing

1.7.2Manufacturer's Material Safety

Data Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 69 PAGES

09 90 00 SD-10 Operation and Maintenance

Data

2.1 GCoatings:

10 14 02 SD-02 Shop Drawings

1.2 GDetail Drawings

GSign Schedule

SD-03 Product Data

3.1Installation

SD-04 Samples

1.2Interior Signage

SD-10 Operation and Maintenance

Data

3.1Approved Manufacturer's

Instructions

3.1.2Protection and Cleaning

10 26 00 SD-02 Shop Drawings

2.2 GCorner Guards

SD-03 Product Data

2.2 GCorner Guards

SD-04 Samples

2.4 GFinish

SD-06 Test Reports

2.2Corner Guards

SD-07 Certificates

2.2Corner Guards

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .