Revised Attachment 7 - Seed Project Requirements.pdf

PDF 153 KB Posted

Attached to
Solicitation for W9126G25RA043 with Amendments Federal contract opportunity
Solicitation number
W9126G25RA043
Issued by
Department of the Army Corps of Engineers Engineering District Fort Worth

About this file

This Request for Proposal (RFP) W9126G15RA043 outlines two construction contract line items (CLINs) for projects in Lewisville, Texas. CLIN 0001 involves a 30-day parking lot and flagpole lighting replacement at the Lewisville Project Office. CLIN 0002 is an optional project at Hickory Creek Park, involving a 120-day construction of a Recreational Vehicle (RV) Dump Station with holding tank, aeration treatment, and spray field. The project schedule includes 30 days for design and permitting, 60 days for construction, and 30 days for commissioning and final inspection. The Notice to Proceed (NTP) will be issued within 15 calendar days after task order award, contingent upon receipt of bonds, a quality control plan, and a schedule of values. Contractors must submit a performance and payment bond for 100% of the task order price and provide a detailed price schedule using the government's provided template.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP: Revised: W9126G15RA043

ATTACHMENT 7

Seed Project Requirements

CLIN 0001 - Parking Lot and Flagpole Lighting Replacement Location: Lewisville Project OƯice, Lewisville, Texas

Performance Period: 30 calendar days from Notice to Proceed.

OPTION CLIN 0002: Hickory Creek Park Recreational Vehicle (RV) Dump Station with Holding Tank, Aeration Treatment, and Spray Field Location: Lewisville Lake, Hickory Creek Park, Hickory Creek, Texas

Performance Period: 120 calendar days from Notice to Proceed. Schedule shall include and is concurrent with CLIN 0001:

30 days – Design and Permitting

60 days – Construction

30 days – Commissioning and Final Inspection

NOTICE TO PROCEED (NTP): NTP to be issued within 15 calendar days after award of the task order and upon receipt and approval of bonds, the contractor’s site-specific Quality Control Plan, and a Schedule of Values.

WORKING HOURS: Business operating hours of the lake oƯice.

SITE SUPERINTDENT/QUALITY CONTROL: Duties for quality control may be performed by the Site Superintendent for this project. The site superintendent must still complete the job duties of quality control as specified at 01 45 00.00 10 or contained elsewhere in Div 01 of the specification.

BONDS: The successful oƯeror will be required to submit a performance and payment bond in the amount of 100% of the task order price within ten (10) calendar days after task order award. Bid Guarantee is required as per Request for Proposal to cover both CLINS.

CONFLICT OF INTEREST: Identify any conflict of interest or appearance issues which may be a potential Organizational Conflict of Interest (OCI) in accordance with FAR 9.5, as supplemented, and any basic contract clause(s) that govern the Indefinite Delivery/Indefinite Quantity (ID/IQ). Contractors are responsible for immediately notifying the Contracting OƯicer should any potential conflict of interest arise at any time prior to and/or after contract award.

PRICE SCHEDULE: Price proposal shall consist of completing the Government provided price schedule (Request for Proposal Attachment 4). In addition, the contractors shall provide a Schedule of Values (SoV) along with their price proposal. The SoV shall be broken down per the current MasterSpec format: by Division, and subsequently, by Section. Each Section Item shall include the Section Number, Section Title, and Scheduled Value. The Design eƯort shall be a separate item of its own. (The Schedule of Values is for informational use only in the event negotiations become required and will not be included in the awarded task order).

File details come from the government source that posted it. Updated .