Amendment_3.pdf
PDF 3 MB Posted
- Attached to
- Fort Hood 69th ADA SSA Warehouse Federal contract opportunity
- Solicitation number
- W9126G19B0029
About this file
This document package includes specifications and drawings for wire mesh partitions and electrical and telecommunications systems for a federal supply support activity warehouse project at Fort Hood, Texas. The solicitation number is W9126G19B0029 and was issued by the U.S. Army Corps of Engineers Engineering District Fort Worth. The specifications cover requirements for wire mesh partitions including normal and heavy duty configurations, doors, locks and fabrication. The electrical drawings show power, lighting and low voltage plans for areas A, B and C including panel schedules and riser diagrams. The telecommunications drawings depict cable tray, conduit and outlet locations for voice and data cabling in areas B and C.
The specifications include sustainability criteria for recycled steel content in partitions. Electrical specifications cover occupancy sensors, receptacles, lighting controls and digital metering. Revisions to specifications, drawings and key notes are denoted in amendment 0003. The bid receipt date was 19 September 2019 with bid opening on the same date at a later time. This package provides the technical requirements for a federal supply support activity warehouse project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C1_Bid_Abstract_19B0029.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| G2_W9126G19B0029.pdf | ||
| A1.2_Drawings_Part1.pdf | ||
| A1.2_Drawings_Part4.pdf | ||
| A1.2_Drawings_Part10.pdf | ||
| A1.2_Drawings_Part8.pdf | ||
| A1.2_Drawings_Part9.pdf | ||
| A1.2_Drawings_Part5.pdf | ||
| A1.2_Drawings_Part2.pdf | ||
| A1.2_Drawings_Part3.pdf | ||
| A1.2_Drawings_Part6.pdf | ||
| A1.2_Drawings_Part7.pdf | ||
| G2.20_W9126G19B0029.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Solicitation for the 69th Supply Support Activity (SSA) Warehouse at Fort Hood, Texas, is amended as follows:
See SF30 Continuation Sheet(s)
NOTE: Bid Receipt date is 19 September 2019, 10:00 a.m., CT, as previously announced. Bid Opening date is 19 September 2019 at 4:30 p.m. CT, as previously announced.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W9126G19B0029
X 9B. DATED (SEE ITEM 11)
20-Aug-2019
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2019
CODE
US ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR ST, ROOM 2A19
P.O. BOX 17300
FORT WORTH TX 76102-0300
W9126G 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W9126G19B0029
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SOLICITATION W9126G19B0029
CHANGES TO THE SPECIFICATIONS
1. Replacement Sections: Replace the following section with the accompanying new section of the same number and title bearing the notation W9126G19B0029 AMENDMENT 0003.
10 22 13 WIRE MESH PARTITIONS
CHANGES TO THE DRAWINGS
2. Replacement Drawings: Replace the drawings listed below with the attached new drawings(s) of the same number, each page bearing the notation W9126G19B0029 AMENDMENT 0003.
EP102 POWER PLAN AREA B
EP601 POWER RISER DIAGRAM AREA B
EP602 POWER RISER DIAGRAM AREA A
EP603 POWER RISER DIAGRAM AREA C
ET102 TELECOMMUNICATION PLAN AREA B
ET103 TELECOMMUNICATION PLAN AREA C
NOTE: This amendment is only addressing the responses to Bidder Inquiries number 8184768 and 8186800.
End of Summary of Changes
69th SSA Complex FH69SSA
SECTION 10 22 13
WIRE MESH PARTITIONS
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Wire Mesh Partitions
Show layout, details, materials, dimensions, finishes, and all information necessary for fabrication and installation.
SD-03 Product Data
Wire Mesh Partitions
Submit for each type of partition, door, and window.
SD-11 Closeout Submittals
Recycled Content for Metal Post and Framing Materials ; S
Recycled Content for Wire Materials ; S
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials in manufacturer's original, unopened containers or packaging with labels intact and legible. Deliver, store, and handle materials so as to prevent damage. Replace damaged or defective materials with new.
SECTION 10 22 13 Page 1
W9126G19B0029 AMENDMENT 0003
1.4 DESCRIPTION OF WORK
Wire mesh partitions must be all wire type, heavy duty for extra heavy industrial use. Provide partitions complete with fasteners, capping bars, adjustable floor sockets, bracing, doors, hardware, and other items necessary for a complete, useable, and rigid installation.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
2.1.1 Recycled Content for Steel Materials
Recycled content is identified for some products in this section; provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT. Other products listed in this section may be available with recycled content; identify those products that meet project requirements for recycled content, and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.
2.2 MATERIALS
Metal post and framing materials listed below must contain a minimum of 15 percent post-consumer recycled content and wire materials must contain a minimum of 50 percent post-industrial recycled content. Provide data identifying percentage of recycled content for metal post and framing materials . Also provide data identifying percentage of recycled content for wire materials .
2.2.1 Steel Shapes, Plates, and Bars
ASTM A36/A36M.
2.2.2 Cold-Formed Steel
AISI SG03-3 .
2.2.3 Wire Mesh
Carbon steel wire, woven diamond mesh, intermediate crimped.
2.2.4 Floor Sockets
Cast or forged steel or ductile iron, adjustable, approximately 2-1/2 inches high.
2.3 NORMAL DUTY PARTITIONS
These partitions are located at Customer Issue Bay and Turn In Bay as indicated on the drawings.
2.3.1 Wire Mesh
(AM# 3) 10 14 gage wire, 2 inch mesh (/AM# 3) .
SECTION 10 22 13 Page 2
2.3.2 Vertical Frames
1-1/4 by 5/8 inch cold-rolled C section channels or 1-1/4 by 5/8 by 1/8 inch channels. Provide only c channels where frame are installed toe to toe without posts.
2.3.3 Horizontal Frames
1 by 5/8 inch channels
2.3.4 Center Reinforcing Bar
One 1 by 1/2 by 1/8 inch channel with all wires woven through, or two 1 by 3/8 by 1/8 inch channels bolted together with mesh in between.
2.3.5 Capping Bar
2-1/4 by one by 1/8 inch channel or 2 by 1/4 inch flat bar.
2.3.6 Corner Posts
Structural steel angles, 1-1/4 by 1-1/4 by 1/8 inch.
2.3.7 Line Posts
Unless otherwise indicated, provide partitions with flat bar line posts bolted between vertical frame channels. Sizes of posts must be as follows:
Partition Height Size of Posts
12 feet to 14 feet 1-3/4 by 5/16 inch or 2 by 1/4 inch
2.3.8 Hinged Doors
Frames must be 1-1/4 by 1/2 by 1/8 inch channels with 1-1/4 by 1/8 inch flat bar cover on top and bottom rails and on hinge stile and a 1-3/8 by 3/4 by 1/8 inch angle riveted to the lock stile. Provide 1 1/2 pairs of regular weight, wrought steel, non-removable pin, butt hinges riveted or welded to the door and the door opening frame for each door.
2.3.9 Sheet Metal Base
Hot- or cold-rolled sheet steel, not lighter than 16 gage.
2.4 HEAVY DUTY PARTITIONS
2.4.1 Wire Mesh
10 gage wire, 1-1/2 inch mesh.
2.4.2 Panel Frames
1-1/2 by 3/4 by 1/8 inch steel channels.
SECTION 10 22 13 Page 3
2.4.3 Center Reinforcing Bar
One 1-1/2 by 3/4 by 1/8 inch channel with all wires woven through, or two 1-1/4 by 3/8 by 1/8 inch channels bolted together with mesh in between.
2.4.4 Capping Bar
Structural steel channel, 3 inch by 4.1 pounds .
2.4.5 Corner Posts
Structural steel angles, 1-3/4 by 1-3/4 by 1/8 inch .
2.4.6 Line Posts
Unless otherwise indicated, provide partitions with flat bar line posts bolted between vertical frame channels. Sizes of posts must be as follows:
Partition Height Size of Posts
7 feet to 12 feet 2-1/2 by 5/16 inch
12 feet to 16 feet 3 by 5/16 inch or 2-1/2 by 3/8 inch
16 feet to 20 feet 3-1/2 by 5/16 inch
2.4.7 Hinged Doors
Frames must be 1-1/2 by 3/4 by 1/8 inch channels with 1-1/2 by 1/8 inch flat bar cover on top and bottom rails and on hinge stile and a 1-5/8 by 7/8 by 1/8 inch angle riveted to the lock stile. Provide 1-1/2 pairs of heavyweight, wrought steel, non-removable pin, butt hinges riveted or welded to the door and the door opening frame for each door.
2.5 DOOR OPENING FRAMES
Provide frames the same size and shape as the vertical frames for the mesh panels.
2.6 LOCKS
Provide each door with a mortise type lock with a six-pin tumbler lock cylinder on the outside and a recessed knob on the inside.
2.7 FABRICATION
2.7.1 Standard Panels
Wire must be woven into diamond mesh, intermediate crimped, and securely clinched to frames. Joints must be mortised and tenoned. Wire must be continuous at center reinforcing bars, either woven through a single channel or bolted between two channels. Panel vertical frames must have 1/4 inch bolt holes 12 inches o.c. for normal duty partitions 3/8 inch bolt holes 18 inches o.c. for heavy duty partitions.
2.7.2 Sheet Metal Base Panels
Upper portion must be as specified for standard panels, except that the
SECTION 10 22 13 Page 4 wire must be clinched into the center reinforcing bar. Form sheet steel to fit between the panel frames and securely bolt to the frames.
2.7.3 Doors
Construction must be similar to that specified for panels. Wire mesh must be the same as that used in the adjacent partition panels.
2.7.4 Finish
Thoroughly clean ferrous metal, treat with phosphate, and paint with gray enamel in the shop.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Wire Mesh Partitions
Install plumb, level, and true to line, within a tolerance of 1/8 inch in 10 feet or the height or run of the partition, if less than 10 feet .
Anchor floor sockets to the floor with expansion bolts. Bolt vertical frames and posts together with 3/8 inch bolts 18 inches o.c. for heavy duty partitions. Secure top frames to a continuous capping bar with 1/4 inch diameter U bolts not more than 28 inches o.c.
3.1.2 Doors
Install in accordance with the manufacturers' recommendations. Adjust as required so that doors and hardware operate freely and properly.
3.1.3 Bracing
Brace free standing partitions more than 20 feet in length, at intervals not greater than 20 feet with a steel channel brace connected to the capping bar and anchored to the building wall or framing member.
3.1.4 Touch-Up
Clean and paint scratches, abrasions, and other damage to shop painted surfaces to match the shop-applied finish.
Repair minor surface rust areas. Clean and prime with rust inhibitive primer paint. Apply final paint to match shop-applied finishes.
-- End of Section --
SECTION 10 22 13 Page 5
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H
T X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
N
NORTH
TRUE
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
L1B
L2B L2C
L1C
T1CT1B
MDP
GFCI
ACAC
EWC
LDP-B
LDP-C
WPWP
GFCI
TV
J
GFCI
C O
R R
ID
O
R
RECEIVING / ISSUE BAY
STOCK CONTROL OFFICE
OFFICE SUPPORT
CONFERENCE ROOM
A
C O
R R
ID
O
R B
CONTCTR
LIGHTING
VESTIBULE
ROOM
TELECOMM
CLOSET
JANITOR'S
WOMEN
RESTROOM
ROOM
ELECTRICAL
MEN
RESTROOM
WP
L
L
L
L
L
L
L
L
H1B H1C
L L
L
L
L
TV
ILON
L3B
L2B-25
EF-1B
L2B-27 L2B-29
GFCI GFCI
L4B-22
L4B-22
L4B-24
WP
L4B-24
L4B-30
L4B-30
L4B-30
L4B-20
L4B-20
L4B-20
L3B-4 L3B-4
L3B-17 L3B-4
L3B-15
L3B-16 L3B-16
L3B-16
L4B-22 L4B-22
L4B-20L4B-24
WP
L4B-30
L2C-1
L4B-22 L2B-1
WP
H1B-19,21,23
H1B-20,22,24
L2B-6 L2B-6
L2B-1
L2B-6
L2B-1
L
L2B-15
L2B-15
L2B-12
L2B-17
L2B-17 L2B-17
L2B-21
L2B-19
L2B-19
L2B-21
L2B-21L2B-19
L2B-19
TV
L2B-21
L2B-14 L2B-14
L2B-10L2B-16L2B-16
L2B-16
L2B-7
L2B-7
L2B-7
L2B-11
L2B-11
L2B-11
L2B-11
L2B-9
L2B-3 L2B-3
L2B-3
L2B-3
L2B-3
L2B-8
L2B-18
L2B-18
L2B-13
L2B-13
L2B-18
L2B-18
L2B-13
L2B-13
L2B-23
L2B-23 L2B-23
L2B-23
L2B-2
L2B-2
L2B-2
L2B-2
L2B-4
L2B-7
L3B-2
L3B-7,9
L3B-8,10
J
J
WH
L2B-25
WATTNODE
T
B L
B
CHARGING STATION
& FORKLIFT
MAINTENANCE SHOP
FIRE / RISER PUMP
MECHANICAL
CORRIDOR B
CLS OFFICE
CUSTOMER ISSUE BAY
TURN IN BAY
STORAGE WAREHOUSE
SECURE STORAGE
CUSTOMER SERVICE AREA
4' AFF.
EIA709 ROUTER
LOYTEC L-IP
EP102
0 824 168
" = 1'-0"8
1SCALE:
POWER PLAN - AREA B
EP102 SCALE: 1/8" = 1'-0"
F O
R M
A T
C H
L
IN
E
R E
E
P
F O
R M
A T
C H
L
IN
E
R E
E
P
A R
E
P O
W E
R P
L A
N
Fort Worth District
CLS OFFICE
CLS OFFICE
CLS OFFICE
CLS OFFICE
GENERAL SHEET NOTES
INACTIVITY.
RECEPTACLES OFF AFTER 15 MINUTES OF
OCCUPANCY SENSOR(S) SHALL TURN
OCCUPANCY SENSOR(S) WITHIN THE ROOM:
DEVICE SHALL BE CONTROLLED BY
"L" NEXT TO RECEPTACLE INDICATES THE 5.
PENETRATED THE WALL.
OR GREATER VALUE THAN THE FIRE RATING OF
STOP ASSEMBLIES WITH RATINGS OF EQUAL
SHALL BE FIRE STOPPED WITH UL TESTED FIRE
PENETRATIONS THROUGH FIRE RATED WALLS
ALL WALL PENETRATIONS SHALL BE SEALED. 4.
LOCATIONS.
LOCATIONS OF VOICE/DATA AND CATV OUTLET
SEE TELECOMMUNICATIONS PLANS FOR
EACH DESK AND TO CATV OUTLETS ON WALLS.
POSSIBLE TO VOICE/DATA JACK OUTLET AT
INSTALL POWER RECEPTACLES AS CLOSE AS 3.
STRUCTURAL PLANS.
COORDINATE ALL FLOOR PENETRATIONS WITH 2.
SEE SHEET E-001.
FOR ELECTRICAL LEGEND AND ABBREVIATIONS 1.
KEY NOTES:
a
X J
X J a
X J
X J a a a
- INSIDE LIGHT TURNS RED
- OUTSIDE LIGHT TURNS GREEN
DOOR CLOSES
- INSIDE LIGHT TURNS GREEN
- OUTSIDE LIGHT TURNS RED
DOOR OPENS
OPERATIONS SHALL BE AS FOLLOWS:
WITH 180 DEGREE VISIIBILITY. GENERAL
INTEGRATED CONTROL CIRCUITRY. LED LIGHTS
LED UNIT. INTERIOR CONTROL PANEL WITH
SYSTEM. INTERIOR AND EXTERIOR GREEN/RED
FULLY-AUTOMATED DOCK COMMUNICATION 7
OCCUPANCY CONTROLLED TYPE.
RECEPTACLE FOR EACH WORKSTATION AS
FURNITURE. PROVIDE 50% OF THE
EXACT LOATION OF THE MODULAR SYSTEM
COORDINATE WITH FURNITURE LAYOUT FOR
CONDUCTOR ROLLED UP IN J-BOX.
& 1 NEUTRAL) AND 1 #12 G. LEAVE 12" OF
#12 (1 HOT, 1 SWITCH BY OCCUPANCY SENSOR
POWER FOR MODULAR SYSTEM FURNITURE. 3 6
CHAINLINK WALL.
PROVIDE RECEPTACLE AND CONDUIT FOR 5
CHARGER.
INOPERABILITY DISABLES THE BATTERY
THAT ANY EXHAUST FAN FAULT OR
WITH THE EXHAUST FAN FOR THIS ROOM, SUCH
CHARGING. POWER SHALL BE INTERLOCKED
DISCONNECT FOR FORK LIFT BATTERY 4
CONTROLS.
CONNECT AUTOMATED TOILET FIXTURE
ONE JUNCTION BOX FOR EACH RESTROOM, TO 3
NEMA 6-20
RECEPTACLES IT RACKS. RECEPTACLES TO BE
DEDICATED, 240-V NEMA 6-20, FLOOR MOUNTED 2
LOCATION WITH USER.
FUTURE SECURITY WIRING. COORDINATE FINAL
SURFACE-MOUNTED JUNCTION BOX, FOR 1
a a a
A M
D O
C K
C O
M M
U N
IC
A
T
IO
N S
Y S
T E
M A
D D
E D
/2 a
L4B-26 L4B-26 c c c c A
M
L
O Y
T E
C R
O U
T E
R A
D D
E D
/2
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H T
X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
300A/3P
SPARE
KAIC = 22
NF
60AF
UTILITY
KAIC = 35
500 kVA
TRANSFORMER
UTILITY
SPD
MANUFACTURER
RATED PER
RM 133
RM 133
SPARE
A
/3 P
A
/3 P
A
/3 P
A
/3 P
RM 141
208Y/120V SEC.
480V PRI.
45 kVA
T2B
SPARE
A
/3 P
S P
D SPARE
480/277V
H1B
RM 133
RM 137
LAN/IT
208Y/120V
L3B
208Y/120V
L2B
RM 133
208Y/120V
L1B
RM 133
208Y/120V
L4B
RM 141
DISTRIBUTION PANEL WITH FULL NEUTRAL & GROUND BUSES
LDPB, 300A, 208Y/120V, 3 PHASE,
DS-1B
G
N
D M
D M
D M
RM 133
208Y/120V SEC.
480V PRI.
112.5 kVA
T1B
A
/3 P
4 2
7 8 8
3 PHASE, WITH FULL NEUTRAL & GROUND BUSES
BUILDING MAIN DISTRIBUTION PANEL (MDP), 600A, 480/277V,
DOMINION
INSTALLED BY
WATTNODE
INSTALLED BY DOMINION
NEMA 1 ENCLOSURE
FUSED DISCONNECT SWITCH
D M
EP602, 603
CONT. ON SHEETS
TO TMGB
NOTE: REFER TO EG601 FOR WIRE SIZE.
MGB GROUND BUS
ID # FEEDER SCHEDULE
3 #1/0 & 1 #6 GND IN 2" C
2 SETS OF (4 #350 KcMIL IN 4" C) & ONE 4" CONDUIT SPARE
4 #350 KcMIL & 1 #2 GND IN 3" C
4 #4 & 1 #10 GND IN 1-1/2" C
3 #2 & 1 #8 GND IN 1-1/2" C
4 #1/0 & 1 #6 GND IN 2" C
4 #2/0 & 1 #6 GND IN 2" C
4 #1 & 1 #8 GND IN 1-1/2" C
3 #4/0 & 1 #2 GND IN 2-1/2" C
2 22
LINE SIDE OF MAIN DISCONNECT
POINT OF DEMARCATION
RM 133
120V SEC.
277 PRI.
3 kVA
TFA
A
/1 P
SINGLE PHASE
120V
20A
ENCLOSED CB
GENERAL SHEET NOTES
SHEET KEYNOTES
4. CONT. ON SHEETS EP602, 603
SHEET ES101 FOR DETAILS.
CONTRACTOR; SEE ELECTRICAL
LINE SHALL BE INSTALLED BY
3. CONDUIT INSIDE THE BUILDING 5FT
REQUIREMENT
2. SEE SHEET EG601 FOR GROUDING
SPARES REQUIREMENT.
1. SEE PANEL SCHEDULES FOR
01.PAR 9-18.11.1.
PROTECTION SYSTEM PER UFC 3-600-
LOCK-ON CIRCUIT BREAKER FOR FIRE 7.
PAR 3-2.7.d.
RED AND LOCKED PER UFC 3-520-01
CONTROL PANEL. LABELED, PAINTED
CIRCUIT BREAKER FOR FIRE ALARM 6.
CONDUIT INSTALLED BY DOMINION.
CT/PT, ENCLOSURE, WIRING AND 5.
CALCULATION PURPOSES.
DOMINION. 350KCMIL USED FOR
CONDUCTORS INSTALLED BY 4.
LOCATED IN ELECTRICAL ROOM.3.
SYSTEM TO BE DONE BY OTHERS.
ROUTER AND DATA REPORTING
CONNECTION BETWEEN LOYTEC
AND A LOYTEC L-IP EIA709 ROUTER.
AND INSTALL ALL DIGITAL METERS
CONTRACTRACTOR SHALL PROVIDE
LOYTEC L-IP EIA709 ROUTER .
ROUTED FROM ALL METERS TO A
LON CABLE IN 1/2" CONDUIT SHALL BE
METERS. A 2 CONDUCTOR #22 AWG
LONWORKS WNC WATTNODE
ALL DIGITAL METERS SHALL BE 2.
ENCLOSURE.
1. TO BE INSTALLED IN A NEMA 3R
TO CONCRETE ENCASED REBAR
TO EXTERNAL GROUND ROD
TO EXTERNAL GROUND ROD
TO BUILDING STEEL COLUMN
INTERIOR METALLIC PIPE
600A/3P
MAIN
W E
R R
IS
E
R D
IA
G
R A
M
EP601
EP601 N.T.S.
A R
RISER DIAGRAM - AREA B
c c c c A
M
S H
E E
T K
E Y
N O
T E
U P
D A
T E
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H T
X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
DISTRIBUTION PANEL WITH FULL NEUTRAL & GROUND BUSES
LDPA, 300A, 208/120V, 3 PHASE,
300A/3P
SPARE
SPARE
NF
60AF
FROM MDP
RM 118
RM 110
RM 110
A
/3 P
A
/3 P
A
/3 P
A
/3 P
SPARE
SPARE
208Y/120V
L1A
208Y/120V
L2A
208Y/120V
L3A
208Y/120V
L4A
480/277V
H1A
RM 114
LAN/IT
A
/3 P
208Y/120V SEC.
480V PRI.
45 kVA
T2A
RM 110
DS-1A
D M
D M
D M
208Y/120V SEC.
480V PRI.
112.5 kVA
T1A
A
/3 P
9 8
7 8 8
RM 110
KAIC = 22
SHEET EP601
CONT. FROM
RM 133
ID # FEEDER SCHEDULE
3 #1/0 & 1 #6 GND IN 2" C
2 SETS OF (4 #350 KcMIL IN 4" C) & ONE 4" CONDUIT SPARE
4 #350 KcMIL & 1 #2 GND IN 3" C
4 #4 & 1 #10 GND IN 1-1/2" C
3 #2 & 1 #8 GND IN 1-1/2" C
4 #1/0 & 1 #6 GND IN 2" C
4 #2/0 & 1 #6 GND IN 2" C
4 #1 & 1 #8 GND IN 1-1/2" C
3 #4/0 & 1 #2 GND IN 2-1/2" C
2 2 2
GROUDING REQUIREMENT
2. SEE SHEET EG601 FOR
REQUIREMENT.
FOR SPARES
1. SEE PANEL SCHEDULES
SHEET KEYNOTES
GENERAL SHEET NOTES
LOCATED IN ELECTRICAL ROOM.3.
SYSTEM TO BE DONE BY OTHERS.
ROUTER AND DATA REPORTING
CONNECTION BETWEEN LOYTEC
METERS AND A LOYTEC ROUTER.
PROVIDE AND INSTALL ALL DIGITAL
ROUTER . CONTRACTOR SHALL
METERES TO A LOYTEC L-IP EIA709
SHALL BE ROUTED FROM ALL
AWG LON CABLE IN A 1/2" CONDUIT
METERS. A 2 CONDUCTOR #22
LONWORKS WNC WATTNODE
ALL DIGITAL METERS SHALL BE 2.
ENCLOSURE.
1. TO BE INSTALLED IN A NEMA 3R
W E
R R
IS
E
R D
IA
G
R A
M
EP602
EP602 N.T.S.
A R
RISER DIAGRAM - AREA A
Fort Worth District
A M
E
E T
K E
Y N
O T
E
U
P D
A T
E D c c c c
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H T
X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
DISTRIBUTION PANEL WITH FULL NEUTRAL & GROUND BUSES
LDPC, 400A, 208/120V, 3 PHASE,
300A/3P
SPARE
SPARE
NF
60AF
FROM MDP
RM 163
RM 133
RM 133 RM 133
A
/3 P
A
/3 P
A
/3 P
A
/3 P
SHEET EP601
CONT. FROM
SPARE
SPARE
208Y/120V
L1C
208Y/120V
L2C
208Y/120V
L3C
208Y/120V
L4C
480/277V
H1C
RM 160
LAN/IT
A
/3 P
208Y/120V SEC.
480V PRI.
45 kVA
T2C
DS-1C
D M
D M
D M
208Y/120V SEC.
480V PRI.
112.5 kVA
T1C
A
/3 P
4 2
7 8 8
KAIC = 22
RM 133
RM 133
ID # FEEDER SCHEDULE
3 #1/0 & 1 #6 GND IN 2" C
2 SETS OF (4 #350 KcMIL IN 4" C) & ONE 4" CONDUIT SPARE
4 #350 KcMIL & 1 #2 GND IN 3" C
4 #4 & 1 #10 GND IN 1-1/2" C
3 #2 & 1 #8 GND IN 1-1/2" C
4 #1/0 & 1 #6 GND IN 2" C
4 #2/0 & 1 #6 GND IN 2" C
4 #1 & 1 #8 GND IN 1-1/2" C
3 #4/0 & 1 #2 GND IN 2-1/2" C
2 2 2
GROUDING REQUIREMENT
2. SEE SHEET EG601 FOR
REQUIREMENT.
FOR SPARES
1. SEE PANEL SCHEDULES
SHEET KEYNOTES
GENERAL SHEET NOTES
LOCATED IN ELECTRICAL ROOM.3.
SYSTEM TO BE DONE BY OTHERS.
ROUTER AND DATA REPORTING
CONNECTION BETWEEN LOYTEC
AND A LOYTEC ROUTER.
AND INSTALL ALL DIGITAL METERS
CONTRACTOR SHALL PROVIDE
L-IP EIA709 ROUTER .
FROM ALL METERES TO A LOYTEC
CONDUIT SHALL BE ROUTED
AWG LON CABLE IN A 1/2"
METERS. A 2 CONDUCTOR #22
LONWORKS WNC WATTNODE
ALL DIGITAL METERS SHALL BE 2.
ENCLOSURE.
1. TO BE INSTALLED IN A NEMA 3R
EP603 N.T.S.
P O
W E
R R
IS
E
R D
IA
G
R A
M
EP603
RISER DIAGRAM - AREA C
A R
C
A M
E
E T
K E
Y N
O T
E
U
P D
A T
E D c c c
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H
T X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
N
NORTH
TRUE
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
1 1
ET102
SCALE: 1/8" = 1'-0"
F
R M
A T
C H
L
IN
E
R E
E
T
ET102
0 824 168
" = 1'-0"8
1SCALE:
F O
R M
A T
C H
L
IN
E
R E
E
T
T
L E
C O
M M
U N
IC
A
T
IO
N P
L
N
TELECOMMUNICATION PLAN - AREA B
1.
2.
3.
GENERAL SHEET NOTES
WITH STRUCTURAL PLANS.
COORDINATE ALL FLOOR PENETRATIONS
ABBREVIATIONS, SEE SHEET ET001.
FOR TELECOMMUNICATION LEGEND AND
WITH STRUCTURAL PLANS.
COORDINATE ALL FLOOR PENETRATIONS
FOR ADDITIONAL INFORMATION.
SEE RISER DIAGRAM ON SHEET ET601
THE FIRE RATING OF THE WALL.
RATINGS EQUAL TO OR GREATER THAN
TESTED FIRE STOP ASSEMBLIES WITH
RATED WALLS SHALL SEALED WITH UL
SEALED. PENETRATIONS THROUGH FIRE
ALL WALL PENETRATIONS SHALL BE
AND FURNITURE LAYOUT.
DEVICES WITH EQUIPMENT LOCATION
COORDINATE LOCATIONS OF ALL
5.
4.
KEY NOTES
ET101ET102
R E
/2 a a a a
CABLE, WALL-MOUNTED AT 7.5' AFF.
6" LADDER RACK FOR ANTENNA 6
CABLE TRAY.
INTERIOR WALL PENETRATION FOR
REFER TO DETAIL 1 ON AE502 FOR 5
ANTENNA CABLE.
TO INTERIOR LADDER RACK FOR
PIPE WALL PENETRATION ACCESS
REFER TO DETAIL 11 ON AE570 FOR 4
PULLSTRING FOR EACH CONDUIT.
1" C SPARE. PROVIDE A
FOR DATA, 1" C FOR POWER, AND A
PROVIDE A: 1-1/2" C FOR HDMI, 1" C
TVs AND SERVICE MODULE, FOR ROUTING CABLING BETWEEN 3
TRAY. INSTALL 6" ABOVE CEILING.
12" W x 6" D WIRE MESH CABLE 2
INSTALL 6" ABOVE CEILING
6" W x 6" D WIRE MESH CABLE TRAY. 1
A M
H
D M
I C
O N
D U
IT
S
IZ
E c c c c
A M
D
A T
A J
A C
K A
D D
E D c c
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
S Y
M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T
D A
T E
P L
O T
S C
A L
E
F O
R T
H O
O D
T
E X
A S
T H
A
IR
D E
F E
N S
E A
R T
IL
L
E R
Y D
IV
IS
IO
N
P N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T
W O
R T
H
T X
S U
P P
L Y
S U
P P
O R
T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
I s s u e D a te
G C
H O
A T
E
G C
H O
A T
E
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
N
NORTH
TRUE
D B
R O
W N
P
.E
C H
IE
F
E
L E
C T
R
IC
A L
S E
C T
IO
N
D A
R E
N A
B
R O
W N
P
.E
W
G
-1
-B -0
A U
G U
S T
ET103
SCALE: 1/8" = 1'-0"
0 824 168
" = 1'-0"8
1SCALE:
ET103
F O
R M
A T
C H
L
IN
E
R E
E
T
TELECOMMUNICATION PLAN - AREA C
1.
2.
3.
4.
GENERAL SHEET NOTES
WITH STRUCTURAL PLANS.
COORDINATE ALL FLOOR PENETRATIONS
ABBREVIATIONS, SEE SHEET ET001.
FOR TELECOMMUNICATION LEGEND AND
WITH STRUCTURAL PLANS.
COORDINATE ALL FLOOR PENETRATIONS
FOR ADDITIONAL INFORMATION.
SEE RISER DIAGRAM ON SHEET ET601
THE FIRE RATING OF THE WALL.
RATINGS EQUAL TO OR GREATER THAN
TESTED FIRE STOP ASSEMBLIES WITH
RATED WALLS SHALL SEALED WITH UL
SEALED. PENETRATIONS THROUGH FIRE
ALL WALL PENETRATIONS SHALL BE
AND FURNITURE LAYOUT.
DEVICES WITH EQUIPMENT LOCATION
COORDINATE LOCATIONS OF ALL
ET101ET103
5.
C O
R R
ID
O
R
T E
L E
C O
M M
U N
IC
A
T
IO
N P
L A
N
A R
E A
C
Fort Worth District
KEY NOTES
a a a /2 a
CABLE, WALL-MOUNTED AT 7.5' AFF.
6" LADDER RACK FOR ANTENNA 6
CABLE TRAY.
INTERIOR WALL PENETRATION FOR
REFER TO DETAIL 1 ON AE502 FOR 5
ANTENNA CABLE.
TO INTERIOR LADDER RACK FOR
PIPE WALL PENETRATION ACCESS
REFER TO DETAIL 11 ON AE570 FOR 4
PULLSTRING FOR EACH CONDUIT.
1" C SPARE. PROVIDE A
FOR DATA, 1" C FOR POWER, AND A
PROVIDE A: 1-1/2" C FOR HDMI, 1" C
TVs AND SERVICE MODULE, FOR ROUTING CABLING BETWEEN 3
TRAY. INSTALL 6" ABOVE CEILING.
12" W x 6" D WIRE MESH CABLE 2
INSTALL 6" ABOVE CEILING
6" W x 6" D WIRE MESH CABLE TRAY. 1
A M
H
D M
I C
O N
D U
IT
S
IZ
E c c c c
A M
D
A T
A J
A C
K A
D D
E
| AMENDMENT 0003 |
| SUMMARY OF CHANGES |
| 10 22 13 - WIRE MESH PARTITIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| 1.4 DESCRIPTION OF WORK |
| PART 2 PRODUCTS |
| 2.1 PRODUCT SUSTAINABILITY CRITERIA |
| 2.1.1 Recycled Content for Steel Materials |
| 2.2 MATERIALS |
| 2.2.1 Steel Shapes, Plates, and Bars |
| 2.2.2 Cold-Formed Steel |
| 2.2.3 Wire Mesh |
| 2.2.4 Floor Sockets |
| 2.3 NORMAL DUTY PARTITIONS |
| 2.3.1 Wire Mesh |
| 2.3.2 Vertical Frames |
| 2.3.3 Horizontal Frames |
| 2.3.4 Center Reinforcing Bar |
| 2.3.5 Capping Bar |
| 2.3.6 Corner Posts |
| 2.3.7 Line Posts |
| 2.3.8 Hinged Doors |
| 2.3.9 Sheet Metal Base |
| 2.4 HEAVY DUTY PARTITIONS |
| 2.4.1 Wire Mesh |
| 2.4.2 Panel Frames |
| 2.4.3 Center Reinforcing Bar |
| 2.4.4 Capping Bar |
| 2.4.5 Corner Posts |
| 2.4.6 Line Posts |
| 2.4.7 Hinged Doors |
| 2.5 DOOR OPENING FRAMES |
| 2.6 LOCKS |
| 2.7 FABRICATION |
| 2.7.1 Standard Panels |
| 2.7.2 Sheet Metal Base Panels |
| 2.7.3 Doors |
| 2.7.4 Finish |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Wire Mesh Partitions |
| 3.1.2 Doors |
| 3.1.3 Bracing |
| 3.1.4 Touch-Up |
| Drawings |
| EP102AM03 |
| EP601AM03 |
| EP602AM03 |
| EP603AM03 |
| ET102AM03 |
| ET103AM03 |
File details come from the government source that posted it. Updated .