A1.2_Drawings_Part7.pdf
PDF 13 MB Posted
- Attached to
- Fort Hood 69th ADA SSA Warehouse Federal contract opportunity
- Solicitation number
- W9126G19B0029
About this file
This package includes mechanical and plumbing drawings and specifications for a federal supply support activity warehouse renovation project. The project involves renovations and upgrades to the HVAC, plumbing, and fire protection systems. Key project details include installing new packaged air handling units, unit heaters, exhaust fans, and related HVAC equipment. The project also involves upgrades to the domestic water distribution system, sanitary sewer, and plumbing fixtures. The solicitation number is W9126G19B0029 and was issued by the Department of the Army Corps of Engineers Engineering District Fort Worth. The response due date is not stated.
Part 7 of 10
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C1_Bid_Abstract_19B0029.pdf | ||
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| Amendment_1.pdf | ||
| G2_W9126G19B0029.pdf | ||
| A1.2_Drawings_Part1.pdf | ||
| A1.2_Drawings_Part4.pdf | ||
| A1.2_Drawings_Part10.pdf | ||
| A1.2_Drawings_Part8.pdf | ||
| A1.2_Drawings_Part9.pdf | ||
| A1.2_Drawings_Part5.pdf | ||
| A1.2_Drawings_Part2.pdf | ||
| A1.2_Drawings_Part3.pdf | ||
| A1.2_Drawings_Part6.pdf | ||
| G2.20_W9126G19B0029.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M A
T C
H L
IN
E A
R E
A B
R E P -1
R E P -1
M A
T C
H L
IN
E A
R E
A B
3/4" DCW
3/4" DCW
1" DCW
1"NG 1 1/4" NG
1"NG
1 1/4" NG
1 1/2" NG
2" NG
2 1/2" NG
3/4" NFWH 30" AFF, TYP.
1. SEE SHEET P-001 FOR ADDITIONAL INFORMATION.
2. FLOOR PLAN OF AREA A SHOWN AS INDICATED.
1 IRH-UNIT TYP. ROUTE GAS LINE TO UNIT. CONNECTION
TO IRH SHALL BE PER MANUFACTUERS REQUIREMENTS.
GFUH TYP. ROUTE GAS LINE TO UNIT. GAS LINE CONNECTION
SHALL BE PER MANUFACTUERS REQUIREMENTS.
2 1/2" DCW
2 1/2" NG
3/4" NFW 30" AFF, TYP.
1"NG 1"NG
1"NG
1"NG
1"NG
1"NG
2" NG
4" FCO
A B
O V
E S
L A
B
P L
U M
B
IN
G P
L A
N A
R E
A C
P-107
P-107P-104 SCALE: 1/8" = 1’
0 824 168
" = 1’-0"8
1SCALE:
P-401P-107
ABOVE SLAB PIPING
PLUMBING PLAN AREA C
SITE ORIENTATION
RE: CIVIL FOR
NORTH
PLAN
N
P
C
IS
N E
R O
S -C
A M
A C
H O
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
GENERAL NOTES
KEYED NOTES
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
147A
150A
148 147 149
2 4" SS CONTINUES TO BELOW SLAB PIPING.
1. BELOW SLAB PLUMBING FOR AREAS A, B, AND C SHOWN.
4" SS
2" FCO
2" FD
2" FD
2" FCO
2" FD
2" FCO
2" FD
2" FCO
2" SS
4" SS
2" SS
2" SS
4" SS
P-6
4" SS
4" SS4" SS
4" SS
2" SS
2" SS 2" SS
P-6
2" FCO
2" SS
2" SS
2" FCO
2" FD
2" FD
2" FCO
2" FD
2" FCO 2" FCO
2" FD
4" FCO
2" SS
4" SS
4" FCO
2" FD
2" FCO
2" FCO
2" FD
P-6
2" SS
2" SS
2" FCO
2" FD
2" V
2" FCO
2" FD
2" V
4" SS
2" SS
2" V
4" SS
CONTINUES TO
AREA B
FIRE WATER
SUPPLY
1 UP THROUGH PLUMBING CHASE TO
ABOVE GROUND PIPING CONTINUATION.
3 2" VENT FROM BELOW SLAB PIPING.
PIPING IS ROUTED TO WALL CAVITY TO
ROOF TERMINATION.
2. SEE PLUMBING SHEETS P-900 FOR ADDITIONAL
INFORMATION.
2" SS
2" FCO
4" DIAMETER BELOW GROUND
DOMESTIC WATER
SUPPLY
2" SS
2" V
2" V
2" V
2" V
2" V
2" V
2" V
CONTINUES TO
AREA C
3. DISTANCE FROM FIXTURE TRAP TO VENT CONNECTION ON
SS PIPING SHALL BE INACCORDANCE WITH IPC CRITERIA.
IE 4’-10" BELOW SLAB
FINISHED SURFACE
4 4" DOUBLE CLEAN OUT IN YARD.
4" DIA SS PIPING.
6" DIA SS PIPING BEGINS
AT 5’ LINE FROM BUILDING
SCALE: 1/4" = 1’
P-101 P-400
B E
L O
W S
L
B
E N
L A
R G
E D D
E T
A
IL
S
P L
U M
B
IN
G P
L
P-400
SCALE: 1/4" = 1’P-102 P-400
PLUMBING AREA A
ENLARGED BELOW SLAB
PLUMBING AREA B
ENLARGED BELOW SLAB
PLUMBING AREA C
ENLARGED BELOW SLAB
SCALE: 1/4" = 1’P-103 P-400
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
GENERAL NOTES
KEYED NOTES
135 134 133 147A
111 112
104A
113108
147A 168 156 157 158
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
1. ABOVE SLAB PLUMBING FOR AREAS A, B, AND C SHOWN.
1 WALL CLEANOUT OPENING 24" ABOVE FLOOR.
4 LINE SIZED TMV
3 1" DCW TO NFWH.
2 2" VENT FROM BELOW SLAB PIPING.
PIPING IS ROUTED TO WALL CAVITY TO
ROOF TERMINATION.
2. SEE PLUMBING SHEETS P-901 AND 902 FOR ADDITIONAL
INFORMATION.
3. ROUTE ALL PIPING HIGH ABOVE FINISHED FLOOR
TO AVOID ELECTRICAL AND MECHANICAL EQUIPMENT
SUPPORTED FROM OVER HEAD STRUTURAL ELEMENTS.
111 112
113108
104A
135 134 133 147A
147A
156 157 158
SCALE: 1/4" = 1’
P-105 P-401
A B
O V
E S
L
L A
R G
E D D
E T
A
IL
S
P L
U M
B
IN
G P
L
P-401
SCALE: 1/4" = 1’P-106 P-401
PLUMBING AREA A
ENLARGED ABOVE SLAB
PLUMBING AREA B
ENLARGED ABOVE SLAB
PLUMBING AREA C
ENLARGED ABOVE SLAB
SCALE: 1/4" = 1’P-107 P-401
P-1
P-1
P-1A P-1A
P-4 P-4
P-3
P-3 P-3
P-3
P-1A
P-1
P-1
P-3
P-3 P-3
P-3
P-1AP-1A
P-1
P-1
P-2
P-3
P-3 P-3
P-3
P-4 P-4
P-4 P-4
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
P-2
GENERAL NOTES
KEYED NOTES
DWH-1A
1/2" DCW
1/2" DHW
2" FCO
2" FD
1 1/4" NG
1 1/4" NG TO PAHU-1A
CONNECTION
DOWN TO DHW
1 " NG BRANCH
2" FD
2" FCO 2" FCO
2" FD
4" WCO
1 1/4" NG
2" WCO
2" FCO
2" FD
2" FCO
P-5
1" DHW
2 1/2" DCW
1" DCW
DWH-1B
1 1/4" NG TO PAHU-1B
4" WCO 1
2" FCO
2" FD2" FD
2" FCO
P-6
1/2" DCW
1/2" DHW
2" FCO2" FD
TO AREA A
2 1/2" DCW
TO AREA B
2 1/2" DCW
P-5
2" FD
2" FCO
TO AREA C
2 1/2" DCW
1" DCW
1" DHW
TMV
2 1/2" DCW TO AREA C
2 1/2" NG TO AREA B
TO AREA A
2 1/2" NG
1" DCW
1" DHW
1" DCW
1" DHW
1" DHW
2" DCW
2 1/2" DCW 1" DCW
TO AREA B
1 1/4" DCW
CONNECTION
DOWN TO DHW
1 " NG BRANCH
2" FCO
2" FD
4" WCO 1
2" FD
2" FCO
1 1/4" NG TO PAHU-1C
2" FCO
2" FD
DWH-1C
TMV
CONNECTION
DOWN TO DHW
1 " NG BRANCH
1 1/4" NG
1 1/4" NG
2" WCO 1
P-5
2" FCO
2" FD
1" DHW
1" DCW
P-6
1" DHW
1" DCW
1/2" DCW
1/2" DHW
2" DCW
1" DCW
2 1/2" NG TO AREA B
2 1/2" DCW TO AREA C
TO AREA B
2" NG
2" NG TO AREA C
P-1A
P-2
4" DCW SUPPLY
2 1/2" NG TO AREA A
TMV
TO P-6
2" FCO
2 1/2" NG TO AREA A
4" NG SUPPLY
1/2" DCW
1/2" DHW
TO P-6
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
P-500 P-500
P-500
SCALE: NONE
P-500 NOT TO SCALE
P-500 NOT TO SCALE
HOT WATER MIXING VALVE
P-500 NOT TO SCALE
SEE STRUCTURAL DESIGN.
HOUSEKEEPING PAD.
HEATER (TYP).
AT CONNECTION TO
DIELECTRIC UNIONS
NOT TO SCALE
GAS SERVICE ENTRANCE DETAIL6
FEET
CUBIC
SWING JOINT
SWING JOINT
CONCRETE PAD
GRADE
UNION (TYP.)
PULSE INITIATOR
SHUT-OFF VALVE. SET TO 5 PSI
OVERPRESSURE PROTECTION
PILOT-OPERATED
GAS SHUT- OFF (TYP)
MIN. 8" ABOVE GRADE
RISER. EXTEND STEEL SLEEVE
NONMETALLIC ANODELESS
CONNECTION
EMERGENCY GAS
SEE PLANS FOR SIZE
3"
CONTRACTOR PROVIDED
UTILITY PROVIDED
D
T A
IL
S I
P L
U M
B
IN
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
P-500 NOT TO SCALE
TO AREA A TO AREA B TO AREA C
2 1/2"
4"
TYP.
AUTO METER READING MODULE
PULSE SIGNAL CABLE TO
1 1/2" GATE VALVE
DIELECTRIC UNION
SUPPORT AS REQUIRED
1 1/2" WASTE TEE
ALTERNATE SUPPLY (PLUG)
STRAPS
BOTTOM OF TEE, PLUGGED
FIT WALL
9" DIA. FLANGE CUT TO
SAFETY SIGN
EYE WASH
BALL VALVE
PADDLE HANDLE
1 1/2" DRAIN
FOOT TREADLE
FLOOR
EDGE OF WALL
8" DIA. EMERGENCY HEAD
25"
STAY-OPEN BALL VALVE
SETUP (OPTIONAL)
BALL VALVE FOR
TEMPERED FIXTURES
TRAP
HEAT
SOURCE
WATER
HOT
COLD SUPPLY
THERMOMETER
THERMOMETER
SHUTOFF VALVE
HOT WATER SUPPLY
CONTROL PANEL
DRAIN TO FLOOR DRAIN
T&P RELIEF VALVE
GAS SUPPLY LINE
CW SUPPLY
AND VENT PER MANUF. RECOMM.
GAS PRESSURE REGULATOR. SET
DIRT LEG
NEAREST FLOOR DRAIN
DRAIN VALVE. ROUTE TO
(TYPICAL)
PLUG VALVE
EMERGENCY SHOWER & EYEWASH DETAIL2
DOMESTIC HOT WATER HEATER PIPING DETAIL
DETAIL WITH SUB METERS
DOMESTIC WATER SUPPLY
PIPE SUPPORT
PIPE SUPPORT
P-500
CONNECTION TYP.
SYSTEM DRAIN WITH HOSE
TYP.
WITH PULSE INITIATOR
WATER SUB METER
MECH ROOM FLOOR
SUPPLY PIPING
DOMESTIC WATER
BELOW GROUND
30" ABOVE FLOOR
IN GALLONS
METER READ OUT
2200 CFH.
OUTLET. REGULATOR SIZED AT
PRESSURE REGULATORS TO 0.5 PSI AT
CUBIC FEET.
PULSE INITIATOR. READOUT TO INDEX IN
GAS METER WITH VISUAL READOUT AND
VOLUME 2 GALLON.
ACCEPTANCE
EXPANSION TANK
SYSTEM
TO AREA A TO AREA B TO AREA C
2 1/2"
4"
TYP.
AUTO METER READING MODULE
PULSE SIGNAL CABLE TO
PIPE SUPPORT
PIPE SUPPORT
MECH ROOM FLOOR
30" ABOVE FLOOR
WITH SUB-METERS
NATURAL GAS PIPING SUPPLY
TYP.
WITH PULSE INITIATOR
NATURAL GAS SUB METER
IN KCFH
METER READ OUT
WALL
MECH ROOM
IN YARD
METER
FROM GAS
2 1/2"2 1/2"
TYP.
SHUT-OFF VALVE
LINE SIZED
TYP.
SHUT-OFF VALVE
LINE SIZED
P-500
P-500 P-500 P-500P-500
OUTSIDE.
ROUTED FROM THE
INTAKE VENT
COMBUSTION AIR
OUTSIDE.
ROUTED TO THE
EXHAUST VENT
COMBUSTION AIR
MIXING VALVE
WATER FROM THERMOSTATIC
SUPPLIED BY 1 1/4" INCH TEMPERED
WATER HEATER.
SUPPLY PIPING TO
WATER METER ON DOMESTIC
WITH PULSE INITIATOR.
WATER SUB METER
IN GALLONS
METER READ OUT
AUTO METER READING MODULE.
PULSE SIGNAL CABLE TO
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
HINGED COVER
EQUIPMENT; MOUNT NEAR UNIT.
EMERGENCY SHOWER / EYEWASH
THERMOSTATIC MIXING VALVE FOR
P-501
WATER SUPPLY
FROM BUILDING
P-501 NOT TO SCALE
FLOOR DRAIN DETAIL
FLOOR DRAIN W/SEDIMENT BUCKET
FINISHED FLOOR
NON-SHRINK GROUT
SEE PLANS FOR SIZES
"P" TRAP.
NON-SHRINK GROUT
P-501 NOT TO SCALE
CLEANOUT DETAIL
COVERING AS REQUIRED
CONCRETE SURFACE OR FLOOR
POLISHED CLEANOUT COVER
CSK SCREW
CLEANOUT PLUG
FINISHED FLOOR
CAULKING FERRULE
FLOW
P-501 NOT TO SCALE
FINISHED ROOMS
WALL CLEANOUT FOR
FLOW
CLEANOUT PLUG
ACCESS COVER
POLISHED S.S.
C.I. CLEANOUT TEE
LINE CLEANOUT
1/8" BEND AND END OF
SCREW
COUNTERSUNK
REF. ARCH. DWGS.
FOR WALL CONST.
WASTE OR VENT
MAY EXTEND AS
LENGTH TO SUIT
WASTE LINE
WASTE LINE
P-501 NOT TO SCALE
SERVICE SINK DETAIL
THROUGH FLOOR
METALLIC PIPING
WALL
H C
METAL EDGE
SPOUT BRACE
10"
40"
END AND PAILHOOK
SPOUT WITH HOSE
SEDIMENT BUCKET
DRAIN WITH
VACUUM BREAKER
SERVICE FAUCET WITH
5/32" THICK
INSULATING WASHER,
STEEL WASHER
NUT
INSULATING SLEEVE
5/32" THICK
INSULATING WASHER,
STEEL WASHER
BOLT
GASKET
5/32" INSULATING
FLANGE
WELD-NECK
NOT TO SCALE
CLEANOUT TO GRADE DETAIL
CLEANOUT COVER
CLEANOUT PLUG
WASTE PIPE
FLOW
DEPTH AS REQUIRED
4"
24"
WASTE PIPE
TO GRADE
CO COVER
SET TOP 1" ABOVE GRADE
GRADE LEVEL
P-501 P-501 NOT TO SCALE
FREEZEPROOF WALL HYDRANT
WALL CLAMP (IF USED)
INSIDE (BACK) OF WALL
INLET CONNECTION
FINISHED WALL
WALL BOX FLANGE
HANGER
FLOOR (4 BOLTS EACH LEG)
BOLT SECURELY TO FINISHED
ELECTRIC WATER COOLER
EXPANSION BOLTS
FINISHED FLOOR
CARRIER
PIPE SPACE
P-501 NOT TO SCALE
ELECTRIC WATER COOLER MOUNTING DETAIL
WATER COOLER NOTE:
ELECTRICAL REQUIREMENTS: 115V, 60HZ.
PER SHEET AE411
SET SPOUT HEIGHT
PANEL OPENING
12" MIN. CLEAR
1" MIN. CLEAR
1 3/4" MIN. CLEARANCE WATER MAIN
PANEL OPENING
18" MIN. CLEAR
WATER MAIN (TYP.)
SURFACE
FINISHED WALL
SURFACE
FINISHED WALL
P-501 NOT TO SCALE
PANEL DETAIL (SINGLE & DOUBLE)
TYPICAL WATER HAMMER ARRESTER
WATER HAMMER DETAIL KEY
ITEM #
ITEM DESCRIPTION
WATER HAMMER ARRESTER
UNION
ITEM #
ITEM DESCRIPTION
WHICH IT IS ATTACHED.
PIPE SAME SIZE AS BRANCH IN CHASE TO
OPENING IN BALL VALVE TO MATCH PIPE I.D.
BALL VALVE, SAME NOMINAL SIZE AS PIPE BRANCH IN CHASE.
NOTE: PROVIDE REDUCER IF REQUIRED BETWEEN VALVE
P-501 NOT TO SCALE
1 DIELECTRIC FLANGED JOINT DETAIL
T A
IL
S I I
P L
U M
B
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
3 4
7 8 9
P-501
P-501
P-501 P-501
P-501
P-501
P-501 P-501 P-501
2" P-TRAP
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
1 1/4" NG
1 1/4" NG
DWH-1A
P-6
TMV
P-3 P-4
P-2
TO PAHU-1A
DWH-1B
1 1/4" NG
TO PAHU-1B
TMV
P-4 P-3
P-3
P-1A
1/2" DHW
1/2" DCW
P-1
1/2" DHW
1/2" DCW
P-1
P-1A
P-1A
P-3
P-3
P-3
1"DCW
1"DCW
2" DCW
1"DCW
1" DHW
1" DCW 2 1/2" DCW
1"DHW1"DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
4" DCW
MANIFOLD
2 1/2"DCW
1"NG TO
DWH
P-1A
1 1/4" NG
P-1
P-1 P-2
2 1/2" NG
AREA B
2 1/2" NG
AREA A
2 1/2" DCW
AREA A
1/2" DHW
1/2" DCW
TO P-6
TO P-5
2" NG TO
AREA B
2 1/2" NG TO
AREA A
1"DCW TYP.
P-1A , P-1 & P-2
1"DHW
1 1/4" NG
1 1/4" NG
1" NG 1"DHW
2"DCW
1" DCW
1" DCW
TO PAHU-1C
TMV
P-6
2 1/2"DCW
TO AREA C
TO P-5
1/2" DHW
1/2" DCW
P-4
1"DCW TYP.
P-1A , P-1 & P-2
P-1A
P-1A
P-1
P-1
P-3
P-3
P-3
P-3
P-2
2" NG TO
AREA C
1. SEE PLUMBING SHEETS P-401 FOR
ADDITIONAL INFORMATION.
DWH-1C
SIZE A PDI WHA
ON 2" DCW LINE
SEE DETAIL 9
SHT P-501
SIZE A PDI WHA
ON 2" DCW LINE
SEE DETAIL 9
SHT P-501
SIZE A PDI WHA
ON 2" DCW LINE
SEE DETAIL 9
SHT P-501
P-3
P-3
1"DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
2. SEE PLUMBING SHEETS P-500 & 501 AND
P-900 THRU P-902 FOR APPROPRIATE DETAILS.
P-901
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
P-901 P-901 SCALE: NONE
GENERAL NOTES
T A
IL
S
IS
O
M E
T R
IC
A
B O
V E S
L A
B P
L U
M B
AND NATURAL GAS PIPING AREA A
ISOMETRIC DETAIL DOMESTIC WATER SUPPLY
P-901 P-901 SCALE: NONE
AND NATURAL GAS PIPING AREA C
ISOMETRIC DETAIL DOMESTIC WATER SUPPLY
P-901 P-901 SCALE: NONE
AND NATURAL GAS PIPING AREA B
ISOMETRIC DETAIL DOMESTIC WATER SUPPLY
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
A U
G U
S T
1. SEE PLUMBING SHEETS FOR
ADDITIONAL INFORMATION.
P-3
P-3
P-3
P-3
P-2 P-1
P-1A
P-1A
P-1
4" WCO
2"V
4" SS
2" SS
2"V
2"V
3"V
2"V
2"V TYP.
2"V TYP.
2" FD
2" FCO
4" SS
2" FCO
2" FD
2"V
3"V
2"V TYP.
2"V
P-3
P-3
P-3
P-3
P-2
P-1A
P-1A
4" WCO
P-1
P-1
4" SS
4" SS
2" SS
P-4
P-4
4" SS
4" SS
2"V
2"V
2"V
3"V
2"V TYP.
4" WCO
P-1A
P-1A
P-1A
P-1A
P-2
P-3
P-3
P-3
P-3
P-4
2" FD
2" FCO
2" SS
2" SS
2" WCO
2" WCO
4" SS
2" SS
4" SS
2" SS
4" SS
2" WCO
2" SS
P-902
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
P-902 P-902 SCALE: NONE
GENERAL NOTES
AREA A
BELOW SLAB WASTE AND VENT
ISOMETRIC DETAIL PARTIAL ABOVE AND
AREA B
BELOW SLAB WASTE AND VENT
ISOMETRIC DETAIL PARTIAL ABOVE AND
P-902 P-902 SCALE: NONE
2 AREA C
BELOW SLAB WASTE AND VENT
ISOMETRIC DETAIL PARTIAL ABOVE AND
P-902 P-902 SCALE: NONE
T A
IL
S
B E
L O
W S
L A
B P
L U
M B
D
P A
R T
IA
L I S
O M
E T
R
IC
A
B O
V
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
A U
G U
S T
EXHAUST SYSTEM DUCTWORK SHALL BE CONSTRUCTED TO
A 2" PRESSURE CLASS RATING AND SEAL CLASS A.
ERV SYSTEM DUCTWORK SHALL BE CONSTRUCTED TO A 2"
PRESSURE CLASS RATING AND SEAL CLASS A.
L. PAHU DUCTWORK ( SUPPLY AND RETURN) SHALL BE
CONSTRUCTED TO A 3" PRESSURE CLASS RATING AND
SEAL CLASS A.
M.
N.
xxxxx
AP - ACCESS PANEL
ALT - ALTERNATE
AL/s - ACTUAL AIRFLOW IN L/s
AFF - ABOVE FINISHED FLOOR
ACFM - ACRUAL AIRFLOW IN CFM
A
GENERAL ABBREVIATIONS
L
LWT - LEAVING WATER TEMP.
LAT - LEAVING AIR TEMP.
L/s - LITERS PER SECOND m/s - METER PER SECOND
NTS - NOT TO SCALE
NPT - NATIONAL PIPE THREAD
NPS - NOMINAL PIPE SIZE
NO - NORMALLY OPEN
NIC - NOT IN CONTRACT
NC - NORMALLY CLOSED
NA - NOT APPLICABLE
M
N B
BOP - BOTTOM OF PIPE ELEV.
BOD - BOTTOM OF DUCT ELEV.
COP - CENTER OF PIPE
CONN - CONNECTION/CONNECT
COND - CONDENSATE/CONDENSER
CLG - CEILING
CL - CENTERLINE
CFM - CUBIC FEET PER MINUTE
CAV - CONSTANT AIR VOLUME
CA - COMBUSTION AIR
C
D
DX - DIRECT EXPANSION
DTC - DATA TERMINAL CABINET
DDC - DIRECT DIGITAL CONTROL
DB - DRY BULB TEMPERATURE OV - OUTLET VELOCITY
OED - OPEN END DUCT
OC - ON CENTER
OBD - OPPOSED BLADE DAMPER
OA - OUTSIDE AIR
O
EXH - EXHAUST
EV - EXHAUST VALVE
EWT - ENTERING WATER TEMP.
ETR - EXISTING TO REMAIN
ESP - EXTERNAL STATIC PRESSURE
AND CONTROL SYSTEM
EMCS - ENERGY MONITORING
EL - ELEVATION
EAT - ENTERING AIR TEMP.
EA - EXHAUST AIR
FPM - FINS PER METER
FO - FAIL OPEN
FLA - FULL LOAD AMPS
FID - FIELD INTERFACE DEVICE
FD - FLOOR DRAIN
FC - FAIL CLOSED
FAT - FINAL AIR TEMPERATURE
FIELD ADJUSTABLE
FA - FRESH AIR INTAKE/
SV - SUPPLY VALVE
SP - STATIC PRESSURE
SOG - SLAB ON GRADE
CONDITIONS IN L/s
SL/s - AIR FLOW AT STANDARD
CONDITIONS IN CFM
SCFM - AIR FLOW AT STANDARD
SAT - SUPPLY AIR TERMINAL
SA - SUPPLY AIR
TSP - TOTAL STATIC PRESSURE
TOP OF STEEL
TOS - TOP OF SLAB/
TOP - TOP OF PIPE ELEVATION
TOD - TOP OF DUCT ELEVATION
TBR - TO BE REMOVED
VTR - VENT THRU ROOF
VP - VELOCITY PRESSURE
VFD - VARIABLE FREQUENCY DRIVE
VAV - VARIABLE AIR VOLUME
WG - WATER GAUGE
WC - WATER COLUMN
WB - WET BULB
W - WATTSIE - INVERT ELEVATION
IA - INSTRUMENT AIR
HD - HUB DRAIN
GEV - GENERAL EXHAUST VALVE
GA - GAUGE
W
V
T
S
R
P
E
F
G
H
I
PIPING SYSTEMS
PIPING SYMBOLS
VALVES
DUCTWORK
DAMPERS
GENERAL CONTROL SYMBOLOGY
O A
O A
E A
E A
D
D
DIFFUSER, REGISTER AND GRILLE NOTATION
SUPPLY DIFFUSER
REGISTER OR GRILLE
RETURN/EXHAUST
BD
SD
FD-1.5
FD-3
FSD
BALL VALVE
GATE VALVE
PLUG VALVE
A
GLOBE VALVE
CHECK VALVE
SOLENOID VALVE
BUTTERFLY VALVE
SS
G
A
DOMESTIC COLD WATER
DOMESTIC HOT WATER
RETURN
DOMESTIC HOT WATER
SANITARY SEWER
VENT
NATURAL GAS
COMPRESSED AIR
CHILLED WATER SUPPLY
HWS
HWR
CD
CHILLED WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
CONDENSATE DRAIN
F
SUPPLY
CONDENSER WATER
RETURN
CONDENSER WATER
O
WO
WOV
RS
RLOXYGEN
WASTE OIL
WASTE OIL VENT
REFRIGERANT SUCTION
REFRIGERANT LIQUID
ACID
VAC
IW
ACID WASTE
VACUUM
INDUSTRIAL WASTE
RD ROOF DRAIN
HCS
HCR
SUPPLY
HEATING/CHILLED WATER
RETURN
HEATING/CHILLED WATER
DUCTWORK SPECIALTIES
T
TS
THERMOSTAT
TEMPERATURE SENSOR
T
N NIGHT SETBACK THERMOSTAT
SADDLE ON LIGHT
SUPPLY TROFFER WITH
SUPPLY SLOT DIFFUSER
SLOT RETURN
S
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW
ELBOW UP
ELBOW DOWN
TEE
UNION
UNION, FLANGED
FLOOR DRAIN WITH TRAP
CLEANOUT
FLOOR DRAIN WITH
TRAP PRIMER
FLOOR DRAIN WITH
DEEP TRAP
FLOOR DRAIN WITH
NO TRAP
FLOOR DRAIN WITH
HALF GRATE
FLOOR SINK WITH
FULL GRATE
FLOOR SINK WITH
PIPE PITCH
VTR VENT THRU ROOF
DIRECTION OF FLOW
CO
FD
TP
FD
DT
FD
NT
FD
FLOOR PENETRATION
WH
WALL HYDRANT
WALL CLEANOUT
WCO
TOP CONNECTION
BOTTOM CONNECTION
CONCENTRIC REDUCER
ECCENTRIC REDUCER
ARRESTOR/ACCESS
WATER HAMMER
VALVE
PRESSURE REDUCING
PRESSURE RELIEFPRV
TEMP & PRESS RELIEFTPRV
THERMOMETER
THERMOMETER WELL
COCK
PRESSURE GAUGE WITH
PRESSURE SWITCH
PS
FS
BALL JOINT
ANCHOR
W N
R=1.5W
S
SOLENOID TWO-WAY
MODULATING TWO-WAY
THREE-WAY
T
GRILLE, SIDEWALL
SUPPLY REGISTER OR
ON LIGHT
RETURN TROFFER
GRILLE, SIDEWALL
REGISTER OR
RETURN/EXHAUST
IDENTIFICATION
DEVICE
(CFM)
QUANTITY
AIR
ACID ACID VENT
PC PUMPED CONDENSATE
LPS LOW PRESSURE STEAM
CONDENSATE
LOW PRESSURELPC
AND HOSE CONNECTION
STRAINER W/BLOW-OFF
HB
HOSE BIB
VALVE
CALIBRATED BALANCING
VALVE
AUTOMATIC BALANCING
NO ARROWS: 4 WAY
4 ARROWS: 4 WAY
3 ARROWS: 3 WAY
2 ARROWS: 2 WAY
1 ARROW: 1 WAY
DIFFUSER AIR PATTERN
PD - PRESSURE DROP
PaG - PASCALS GAUGE
PaA - PASCALS ABSOLUTE
Pa - PASCALS
RPM - REVOLUTIONS PER MINUTE
RA - RETURN AIR
SECOND FIGURE: SIDE NOT SHOWN
FIRST FIGURE: SIDE SHOWN
FOR RECTANGULAR DUCT:
DIAO. INDICATES OVAL DUCT.
DIA INDICATES ROUND DUCT.
(RECTANGULAR DUCT SHOWN)
(NET INSIDE DIMENSIONS)
DUCT SIZE IN INCHES
36x24
TH
2 1
HS
HUMIDITY SENSOR
H
PS
HUMIDISTAT
DUCT PRESSURE SENSOR
S
DUCT SMOKE DETECTOR
SA
FLOW SWITCH
EXPANSION LOOP
AIR VENT, AUTOMATIC
AV
AIR VENT, MANUAL
GUIDE
EXPANSION JOINT
FLEXIBLE CONNECTOR
uP
CD CARBON MONOXIDE DETECTOR
AIR SEPARATOR
FLOW METER, ORIFICE
PETE’S PLUG
AS
THERMOSTAT
MICROPROCESSOR TYPE
(SOLID IS UP, BROKEN LINE IS DOWN)
SUPPLY AIR (SA) DUCT
(SOLID IS UP, BROKEN LINE IS DOWN)
RETURN AIR (RA) DUCT
(SOLID IS UP, BROKEN LINE IS DOWN)
OUTDOOR AIR (OA) DUCT
(SOLID IS UP, BROKEN LINE IS DOWN)
EXHAUST AIR (EA) DUCT
45^ ELBOWS (RECTANGULAR DUCT)
DUCT RISE (R)/DROP (D) WITH
(ROUND DUCT)
DUCT RISE/DROP WITH 90^ ELBOWS
(RECTANGULAR DUCT)
DUCT RISE/DROP WITH 90^ ELBOWS
(APPLIES TO ROUND AND RECTANGULAR)
RADIUS ELBOW
ELBOWS WITH TURNING VANES
MANUAL SPLITTER
45^ ELBOWS (ROUND DUCT)
DUCT RISE (R)/DROP (D) WITH
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
FIRE DAMPER; 1.5 HOUR RATED
FIRE DAMPER; 3 HOUR RATED
AUTOMATIC DAMPER
ACCESS DOOR
FLEXIBLE DUCT
DUCT TEST HOLE
FLEXIBLE DUCT CONNECTION
ACOUSTICALLY LINED DUCT
SOUND ATTENUATOR
BRANCH TAKEOFF
(PRESSURES IN INCHES H 0)
PRESSURE CLASS.
CHANGE IN DUCT CONSTRUCTION BY
DETAIL NO.
ZZ ZZ
REF: DET.NN/MZZ
NN NN
MZZ
DETAIL LOCATION
REFERENCE SYMBOLOGY
MZZ
DETAIL LOCATION
CHS
CHR
CWS
FIRE PROTECTION
CWR
SPECIFIED OTHERWISE.
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED. UNLESS
REGULATIONS OF FEDERAL, STATE AND LOCAL AUTHORITIES HAVING
AMENDMENTS, OR APPLICABLE STATUTES, ORDINANCES, CODES OR
PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,F.
S1 900
/8
GENERAL NOTES
REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTIONA.
THE EXACT LOCATION OF ALL CEILING MOUNTED DEVICES
REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR B.
OF ALL WALL MOUNTED DEVICES
THE ARCHITECT HAS DRAWN SUCH ELEVATIONS, FOR THE LOCATIONS
REFER TO ARCHITECTURAL INTERIOR ELEVATION DRAWINGS, WHEREC.
ALL DUCTWORK SIZES SHOWN ARE FREE AIR STREAM DIMENSIONSD.
SHALL BE IN ACCORDANCE WITH ELECTRICAL SPECIFICATIONS
IN ACCORDANCE WITH NFPA 70 (N.E.C.) MOTOR EFFICIENCIES
ALL WIRING AND ELECTRICAL CONTROLS SHALL BE INSTALLEDG.
SYSTEMS CONTRACTOR.
THESE CIRCUITS SHALL BE THE RESPONSIBILITY OF THE HVAC
DAMPERS IS A REQUIREMENT OF THE CONTRACT. COORDINATION OF
WIRING AND CONDUIT FOR THE PROPER OPERATION OF MOTORIZEDH.
CONDITIONS
ALL INDICATED AIR FLOW CAPACITIES WERE CALCULATED AT ALTITUDE I.
REFER TO SHT. P-001 FOR ADDITIONAL GENERAL NOTES.J.
THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE.
DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, IT IS THE K.
SLEEVES PRIOR TO EACH CONCRETE PLACEMENT.
COORDINATE WITH STRUCTURAL DISCIPLINE ALL SLAB PENETRATIONS AND E.
EQUIPMENT TAG
M-001
M E
C H
A N
IC
A L H
V A
C L
E G
E N
D
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
M-100M-100 SCALE: 1/16" = 1’
0 1648 3216
" = 1’-0"16
1SCALE:
M-100 M-103M-101M-100
M-100 M-102
OVER ALL HVAC FLOOR PLAN1
M-100
O V
E R A
L L H
V A
C F
L O
O R P
L A
N
GENERAL NOTES
1. OVER ALL HVAC PLAN.
116 121
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
NORTH
PLAN
N
SITE ORIENTATION
RE: CIVIL FOR
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
N
NORTH
TRUE
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
R
M -1
R E
M -1
GENERAL NOTES
M A
T C
H L
IN
E A
R E
A B
M A
T C
H L
IN
E A
R E
A B
2. ROUTE DUCT WORK TO SUPPLY / RETURN AIR DEVICES
AS INDICATED.
4. MOUNT T’STAT 60" ABOVE FLOOR.
KEYED NOTES BY
1. SEE SHEET M-001 FOR ADDITIONAL INFORMATION.
SUPPORT FROM OVER HEAD STRUCTURE AS INDICATED
M-504 DETAIL 1 FIGURE K.
9T s
T s
DWH- 4" O AIR INTAKE TUBING 9’ ABOVE FINISHED FLOOR.
ROUTE THROUGH WALL AND TERMINATE .
DWH- 4" O EXHAUST TUBING 9’ ABOVE FINISHED FLOOR.
ROUTE THROUGH WALL AND TERMINATE.
10 CRAC UNIT MOUNTED FROM CEILING. ROUTE CONDENSATE
LINE TO JANITOR CLOSET SINK
11 PROVIDE CONCRETE SUPPORT PAD FOR EQUIPMENT.
EXTEND PAD 4" BEYOND EQUIPMENT FOOT PRINT ON
ALL SIDES.
sT
T s
T s
T s
T s sT sT
13 MOUNTING HEIGHT BOTTOM OF HEATING UNIT 7’-5" AFF.
11 10
2 2
2 2
9 9
1 1
1 1
SUPPLY BOD (BOTTOM OF DUCT) 11’ ABOVE FINISHED FLOOR.
DUCT SIZES BY
A
B
C
D
E
F
G
H
I
J
9"22"/12"
10"/12"
10"/8"
8"/8"
8"/4"
8"
7"
6"
A
A
H F
I
H
H
H
H
F
F
C
I
F C
A
I
H H
FH
C
B
I
B
B
B
7. REFER TO ISOMETRIC DETAILS ON SHEET M-900 FOR
ADDITIONAL INFORMATION RELATED TO AREA A HVAC
5. IRH UNITS SHALL BE MOUNTED AT A OF 13’ ABOVE FLOOR.
EXHUAST FLUE SHALL EXTEND AND TERMINATE ABOVE ROOF
WITH APPROPRIATE VENT CAP. SEE DETAIL 12 SHEET M-500.
C
E
I
C
B
8. EXTERIOR WALL MOUNTED LOUVERS SHALL BE MOUNTED
SO THAT BOTTOM OF LOUVER IS A MINIMUM OF 10’ ABOVE
GRADE.
SUPPLY AIR DUCT (BOD) TRANSITION FROM 15-3"’ AFF TO
11’ AFF.
3. PAHU; BOTTOM OF SUPPLY DUCT SHALL PENETRATE
EXTERIOR WALL AT A BOD HEIGHT ABOVE GRADE
OF 15’-3". RETURN DUCT SHALL PENETRATE EXTERIOR WALL
BOD HEIGHT ABOVE GRADE OF 11’ . CONTRACTOR
MAY ADJUST SUPPLY OR RETURN DUCT INSTALLATION HEIGHT
REQUIREMENTS AS NEEDED FOR APPROPIATE INSTALLATION.
RETURN AIR DUCT OVER SUPPLY DUCT.
ROOF MOUNTED RELIEF LOUVERED PENTHOUSE.
REFER TO DETAIL SHEET M-502.
TYP. OF 2
TYP. OF 10
AT 50 CFM EA.
19 SIDE DISCHARGE SUPPLY GRILLE WITH DAMPER, SIZED TO FIT
8"/4" DUCT.
TYP. OF 6
AT 83 CFM EA.
9. PLACE SECURITY BARS IN EXTERIOR WALL WHERE
PAHU DUCT PENETRATE WALL.
IRH FLUE EXHAUST AND AIR INTAKE TUBE DIMENSION
PER MANUFACTURER. REFER TO SHEET M-501
DETAILS 6 AND 7.
4"/8"
RETURN
DUCT
SUPPLY
DUCT
EUH-1A
T
EUH-1A
T
F-1A MOUNT 13’ ABOVE FLOOR ; COORDINATE INSTALLATION
WITH ELECTRICAL PIPING EQUIPMENT.
SIDE INTAKE EXHAUST GRILLE WITH DAMPER, 75CFM, SIZED
TO FIT 8"/4" DUCT.
10"/6" EXHAUST GRILLE, 250 CFM EACH, MOUNTED TO 10"/12"
BRANCH DUCT.
ROOF MOUNTED EXHAUST FAN; REFER TO DETAIL 9 SHEET M-500.
BYPASS TERMINAL UNIT LOCATION. SIZE PER MANUFACTURER
REQUIREMENTS.
RESTROOM VENTILATION SHALL BE BY EF-1A. EXHAUST
AIR FROM MEN, WOMEN AND JANITORS CLOSET AREAS.
EXHAUST DUCT SHALL BE ROUTED UNDER DUCT FOR PAHU-1A.
SEE ENLARGED DETAIL OF PAHU-1A DETAIL 5, SHEET M-500.
TYPICAL GAS VENT AND COMBUSTION AIR INTAKE THROUGH ROOF.
SIZE PER MANFACTURER REQUIREMENTS. SEE DETAIL 8 SHEET M-501.
EF-2A
T
BOD 13’ AFF.
BOD 13’ AFF.
EUH-3A
T
T
IRH-3A 4A
REF-2A
T REF-3A
T
T F-1A
T
GFUH-6A
T
GFUH-5A
T T
GFUH-4AGFUH-3A
T
GFUH-1A GFUH-2A
T
T
ERV-1A
L-3A IS ABOVE L-2A; REFER TO DETAIL 1 SHEET M-900.21
IRH COMBUSTION AIR INTAKE, HEIGHT ABOVE
GRADE TO BE COORDINATED WITH IRH INSTALLATION.
AIR INTAKE HEIGHT SHALL BE 10’ TO 13’ ABOVE GRADE.
CO2 SENSOR, DALL MOUNTED 60" ABOVE FLOOR.22
s
CO2
6. BOTTOM OF GFUH UNITS SHALL BE MOUNTED AT A HEIGHT OF 13’
ABOVE FLOOR. EXHAUST FLUE SHALL EXTEND AND
TERMINATE ABOVE ROOF WITH APPROPRIATE VENT CAP.
SEE DETAIL 11 SHEET M-500 AND SHEET 501 DETAIL 8 .
REF 1A
REF 2A
REF 3A
GFUH 1A GFUH 2A
GFUH 3A GFUH 4A
GFUH 5AGFUH 6A
IRH 3A IRH 2A
IRH 1A
PAHU 1A
EF 1A
EF 2A
IRH 4A
EUH 3A
EUH 1A
EUH 2A
CRAC 1A
CRCU 1A
1AF
RPH 1A
ERV 1A
L 1A
L 4A
L 2A
L 3A
5AL
6AL L 7A
M-101M-100 SCALE: 1/8" = 1’
HVAC FLOOR PLAN AREA A1
M-101
M E
C H
A N
IC
A L P
L A
N A
R E
A A
0 824 168
" = 1’-0"8
1SCALE:
SITE ORIENTATION
RE: CIVIL FOR
NORTH
PLAN
N
R 50
E 50
E 50
G W
O O
D A
R D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
E 75
E 75
S 130
R 130
S 50
R 130
R 300
S 150
S 300 S 50
S 150 S 150
R 300
R 300
S 130
R 130
S 130
S 150
S 300
S 50
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
116 121 122
104A
R
M -1
R E
M -1
R E
M -1
R E
M -1
M A
T C
H L
IN
E A
R E
T C
H L
IN
E A
R E
A A
M A
T C
H L
IN
E A
R E
A C
M A
T C
H L
IN
E A
R E
A C
GENERAL NOTES
2. ROUTE DUCT WORK TO SUPPLY / RETURN AIR DEVICES
AS INDICATED.
4. MOUNT T’STAT 60" ABOVE FLOOR.
KEYED NOTES BY
1. SEE SHEET M-001 FOR ADDITIONAL INFORMATION.
SUPPORT FROM OVER HEAD STRUCTURE AS INDICATED
M-504 DETAIL 1 FIGURE K.
DWH- 4" O AIR INTAKE TUBING 9’ ABOVE FINISHED FLOOR.
ROUTE THROUGH WALL AND TERMINATE .
10 CRAC UNIT MOUNTED FROM CEILING. ROUTE CONDENSATE
LINE TO JANITOR CLOSET SINK
11 PROVIDE CONCRETE SUPPORT PAD FOR EQUIPMENT.
EXTEND PAD 4" BEYOND EQUIPMENT FOOT PRINT ON
ALL SIDES.
13 MOUNTING HEIGHT BOTTOM OF HEATING UNIT 7’-5" AFF.
SUPPLY BOD (BOTTOM OF DUCT) 11’ ABOVE FINISHED FLOOR.
7. REFER TO ISOMETRIC DETAILS ON SHEET M-900 FOR
ADDITIONAL INFORMATION RELATED TO AREA A HVAC
6. BOTTOM OF GFUH UNITS SHALL BE MOUNTED AT A OF 13’
ABOVE FLOOR. EXHAUST FLUE SHALL EXTEND AND
TERMINATE ABOVE ROOF WITH APPROPRIATE VENT CAP.
SEE DETAIL 11 SHEET M-500 AND SHEET 501 DETAIL 8 .
8. EXTERIOR WALL MOUNTED LOUVERS SHALL BE MOUNTED
SO THAT BOTTOM OF LOUVER IS A MINIMUM OF 10’ ABOVE
GRADE.
RETURN AIR DUCT OVER SUPPLY DUCT.
IRH COCMBUSTION AIR INTAKE, HEIGHT ABOVE
GRADE TO BE COORDINATED WITH IRH INSTALLATION.
AIR INTAKE HEIGHT SHALL BE 10’ TO 13’ ABOVE GRADE.
ROOF MOUNTED RELIEF LOUVERED PENTHOUSE.
REFER TO DETAIL 1 SHEET M-502.
19 SIDE DISCHARGE SUPPLY GRILLE WITH DAMPER, SIZED TO FIT
8"/4" DUCT.
9. PLACE SECURITY BARS IN EXTERIOR WALL WHERE
PAHU DUCT PENETRATE WALL.
DUCT SIZES BY
A
C
D
E
F
G
H
I
J
9"22"/12"
10"/12"
8"/10"
8"/8"
8"/4"
8"
7"
6"
B sT
T sT sT sT sT sT sT sT sT
IRH FLUE EXHAUST AND AIR INTAKE TUBE DIMENSION
PER MANUFACTURER. REFER TO SHEET M-501
DETAILS 6 AND 7.
1 2
21 21
21 2121
TYP. OF 6
AT 83 CFM EA.
B
TYP. OF 2
TYP. OF 10
AT 50 CFM EA.
B
C
BE
E
A
3. PAHU; BOTTOM OF SUPPLY DUCT SHALL PENETRATE
EXTERIOR WALL AT A BOD HEIGHT ABOVE GRADE
OF 11’. RETURN DUCT SHALL PENETRATE EXTERIOR WALL
BOD HEIGHT ABOVE GRADE OF 13’. CONTRACTOR
MAY ADJUST SUPPLY OR RETURN DUCT INSTALLATION HEIGHT
REQUIREMENTS AS NEEDED FOR APPROPIATE INSTALLATION.
10"/12" EXHAUST GRILLE MOUNTED TO 10"/12" BRANCH DUCT.
DWH- 4" O ROUTE EXHAUST TUBING ABOVE INTAKE EXHAUST TUBING.
ROUTE THROUGH WALL AND TERMINATE. REFER TO DETAIL 4 SHEET M-504.
B
TYPICAL GAS VENT AND COMBUSTION AIR INTAKE THROUGH ROOF.
SIZE PER MANFACTURER REQUIREMENTS. SEE DETAIL 8 SHEET M-501.
E
H
H
H
H
H
H CFI
G
C B
F
A
H
C
I
F
F
I J
4"/8"
A
I
SIDE INTAKE EXHAUST GRILLE WITH DAMPER, 75 CFM, SIZED TO
FIT 8"/4" DUCT.
BYPASS TERMINAL UNIT LOCATION. SIZE PER MANUFACTURER
REQUIREMENTS.
SUPPLY
DUCT
RETURN
DUCT
F-1B MOUNT 13’ ABOVE FLOOR ; COORDINATE INSTALLATION
WITH ELECTRICAL PIPING EQUIPMENT.
SUPPLY DUCT STATIC PRESSURE SENSOR LOCATION INDICATED BY .
REF-2B
T REF-2B
T
REF-3B
T
F-1B
T
IRH-1B 2BT
T EUH-1B
EUH-2BT
IRH-3B
T GFUH-1B
GFUH-2BT
GFUH-3B T
EF-3BT
T
T
EUH-3B
EF-2B
T GFUH-5B
RESTROOM VENTILATION SHALL BE BY EF-1B. EXHAUST
AIR FROM MEN, WOMEN AND JANITORS CLOSET AREAS.
EXHAUST DUCT SHALL BE ROUTED UNDER DUCT FOR PAHU-1B.
ROOF MOUNTED EXHAUST FAN; REFER TO DETAIL 9 SHEET
M-500.
T GFUH-4B
GFUH-6BT GFUH-7BT
ERV-1B
T
BOD 13’ AFF
BOD
13’
AFF
SEE ENLARGED DETAIL OF PAHU-1B DETAIL 5, SHEET M-500.
5. IRH UNITS SHALL BE MOUNTED AT A OF HEIGHT 13’ ABOVE FLOOR.
EXHUAST FLUE SHALL EXTEND AND TERMINATE ABOVE ROOF
WITH APPROPRIATE VENT CAP. SEE DETAIL 12 SHEET M-500.
21 CO2 SENSOR, WALL MOUNTED 60" ABOVE FLOOR.
s
CO2 21
REF 2BREF 3B
REF 1B
3BEF 1BEF
2BEF
PAHU 1B
GFUH 1B
GFUH 2B
GFUH 3B
GFUH 4B
GFUH
GFUH 6B GFUH 7B
5B
IRH 1B
IRH 2B IRH 3B
CRAC 1B
EUH 1B
EUH 2B
EUH 3B
CRU 1B
ERV 1B
RPH 1B
1AF
7BL
1BL
2BL
4BL
5BL
6BL
3BL
8BL
M-102
" = 1’-0"8
1SCALE:
024 168
M-102
M-100 SCALE: 1/8" = 1’
HVAC FLOOR PLAN AREA B
M E
C H
A N
IC
A L P
L A
N A
R E
A B
E 50
E 50
SITE ORIENTATION
RE: CIVIL FOR
NORTH
PLAN
N
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
S 130
R 130
S 130
R 130
S 130
R 130
S 130
S 50
S 50
S 300
R 300
R 50
R 50
S 150 S 150
S 250
R 250 S 50
R 300
R 300
S 150
S 150
S 50
R 130
E 75
E 75
S 50
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
139140
127A
132 147A
0 824 168
" = 1’-0"8
1SCALE:
M-103M-100 SCALE: 1/8" = 1’
HVAC FLOOR PLAN AREA C1
R E
M -1
R E
M -1
M A
T C
H L
IN
E A
R E
T C
H L
IN
E A
R E
A B
T s
T s
T s
T s
T s
T s
T s
T s
GENERAL NOTES
2. ROUTE DUCT WORK TO SUPPLY / RETURN AIR DEVICES
AS INDICATED.
4. MOUNT T’STAT 60" ABOVE FLOOR.
KEYED NOTES BY
1. SEE SHEET M-001 FOR ADDITIONAL INFORMATION.
SUPPORT FROM OVER HEAD STRUCTURE AS INDICATED
M-504 DETAIL 1 FIGURE K.
DWH- 4" O AIR INTAKE TUBING 9’ ABOVE FINISHED FLOOR.
ROUTE THROUGH WALL AND TERMINATE .
10 CRAC UNIT MOUNTED FROM CEILING. ROUTE CONDENSATE
LINE TO JANITOR CLOSET SINK
11 PROVIDE CONCRETE SUPPORT PAD FOR EQUIPMENT.
EXTEND PAD 4" BEYOND EQUIPMENT FOOT PRINT ON
ALL SIDES.
13 MOUNTING HEIGHT BOTTOM OF HEATING UNIT 7’-5" AFF.
SUPPLY BOD (BOTTOM OF DUCT) 11’ ABOVE FINISHED FLOOR.
7. REFER TO ISOMETRIC DETAILS ON SHEET M-900 FOR
ADDITIONAL INFORMATION RELATED TO AREA A HVAC
5. IRH UNITS SHALL BE MOUNTED AT A OF 13’ ABOVE FLOOR.
EXHUAST FLUE SHALL EXTEND AND TERMINATE ABOVE ROOF
WITH APPROPRIATE VENT CAP. SEE DETAIL 12 SHEET M-500.
8. EXTERIOR WALL MOUNTED LOUVERS SHALL BE MOUNTED
SO THAT BOTTOM OF LOUVER IS A MINIMUM OF 10’ ABOVE
GRADE.
RETURN AIR DUCT OVER SUPPLY DUCT.
19 SIDE DISCHARGE SUPPLY GRILLE WITH DAMPER, SIZED TO FIT
8"/4" DUCT.
9. PLACE SECURITY BARS IN EXTERIOR WALL WHERE
PAHU DUCT PENETRATE WALL.
3. PAHU; BOTTOM OF SUPPLY DUCT SHALL PENETRATE
EXTERIOR WALL AT A BOD HEIGHT ABOVE GRADE
OF 11’. RETURN DUCT SHALL PENETRATE EXTERIOR WALL
BOD HEIGHT ABOVE GRADE OF 13’. CONTRACTOR
MAY ADJUST SUPPLY OR RETURN DUCT INSTALLATION HEIGHT
REQUIREMENTS AS NEEDED FOR APPROPIATE INSTALLATION.
10"/12" EXHAUST GRILLE MOUNTED TO 10"/12" BRANCH DUCT.
DWH- 4" O ROUTE EXHAUST TUBING ABOVE INTAKE EXHAUST TUBING.
ROUTE THROUGH WALL AND TERMINATE. REFER TO DETAIL 4 SHEET M-504.
TYPICAL GAS VENT AND COMBUSTION AIR INTAKE THROUGH ROOF.
SIZE PER MANFACTURER REQUIREMENTS. SEE DETAIL 8 SHEET M-501.
DUCT SIZES BY
A
C
D
E
F
G
H
I
J
9"22"/12"
10"/12"
8"/10"
8"/8"
8"/4"
8"
7"
6"
B
4"/8"
13 12
E
B E
C
C
E
A
A
J I I
H
H
H
H
H
H
HC I
G
CCB
A
I
C
H
I
IRH FLUE EXHAUST AND AIR INTAKE TUBE DIMENSION
PER MANUFACTURER. REFER TO SHEET M-501
DETAILS 6 AND 7.
B
TYP. OF 10
AT 50 CFM EA.
21 21
T REF-2C
REF-2C T
T IRH -1C-2C
IRH -3C-4C T
T
TYP. OF 6
AT 83 CFM EA.
B
T EUH-2C
EUH-1CT
F-1C
SUPPLY
DUCT
RETURN
DUCT
TYP. OF 2
F-1B MOUNT 13’ ABOVE FLOOR ; COORDINATE INSTALLATION
WITH ELECTRICAL PIPING EQUIPMENT.
SIDE INTAKE EXHAUST GRILLE WITH DAMPER, 75 CFM, SIZED TO
FIT 8"/4" DUCT.
BYPASS TERMINAL UNIT LOCATION. SIZE PER MANUFACTURER
REQUIREMENTS.
SUPPLY DUCT STATIC PRESSURE SENSOR LOCATION INDICATED BY .
RESTROOM VENTILATION SHALL BE BY EF-1. EXHAUST
AIR FROM MEN, WOMEN AND JANITORS CLOSET AREAS.
EXHAUST DUCT SHALL BE ROUTED UNDER DUCT FOR PAHU-1C.
SEE ENLARGED DETAIL OF PAHU-1C DETAIL 5, SHEET M-500.
T TGFUH-1C GFUH-2C
GFUH-4CT GFUH-3CT
ROOF MOUNTED RELIEF LOUVERED PENTHOUSE.
REFER TO DETAIL 1 SHEET M-502.
T ERV-1C
GFUH-6CTGFUH-6CT
ROOF MOUNTED EXHAUST FAN; REFER TO DETAIL 9 SHEET
M-500.
9 9
BOD 13’ AFF
BOD 13’ AFF
6. BOTTOM OF GFUH UNITS SHALL BE MOUNTED AT A HEIGHT OF 13’
ABOVE FLOOR. EXHAUST FLUE SHALL EXTEND AND
TERMINATE ABOVE ROOF WITH APPROPRIATE VENT CAP.
SEE DETAIL 11 SHEET M-500 AND SHEET 501 DETAIL 8 .
IRH COMBUSTION AIR INTAKE, HEIGHT ABOVE
GRADE TO BE COORDINATED WITH IRH INSTALLATION.
AIR INTAKE HEIGHT SHALL BE 10’ TO 13’ ABOVE GRADE.
21 CO2 SENSOR, WALL MOUNTED 60" ABBOVE FLOOR.
sCO2 21
IRH 4C
GFUH 4C
IRH 1C
IRH 2C
IRH 3C
REF 1C
REF 2C
REF 3
GFUH 6C GFUH 5C
GFUH 3C
GFUH 1C GFUH 2C
1CEF
2CEF
1CPAHU
1CEUH
2CEUH
CRAC 1C
ERV 1C
RPH 1C
1CF
L 1C
L 2C
L 3C L 4C
L 6C L 5C
CRCU 1C
M-103
M E
C H
A N
IC
A L P
L A
N A
R E
A C
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
E 75
E 75
E 50
E 50
S 50
S 50
S 50 R 50
S 300
R 300R 130
S 130
R 130
S 130
R 130
S 130
R 130
S 130
S 150
R 300
S 150
S 50 R 250
S 250
S 50
S 150 S 150
R 150
R 50
SITE ORIENTATION
RE: CIVIL FOR
NORTH
PLAN
N
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
KEY PLAN
A B C
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
165161
150A
147A
M-501
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
K
W
IL
L
IA
M S P .E
H V
A C D
E T
A
IL
S
II
DUCT PENETRATION THROUGH CMU WALL TYPICAL CONDENSATE DRAIN DETAIL APPLIANCE GAS PIPING SCHEMATIC
STEEL SLEEVE
GALVANIZED
20 GAGE
BETWEEN
1" CLEARANCE
DUCT
TO SLEEVE
OR RIVETED
TACKWELDED
2"x2"x1/4"
GROUT
WALL
PER SIDE)
(MINIMUM 4 FASTENERS
ON 6 INCH CENTERS
ONLY). SECURE TO WALL
STEEL COLLAR (EXPOSED
20 GAGE GALVANIZED
INSULATION
SHALL BE STI MODEL SS-2301 OR APPROVED EQUAL.
DRAWINGS FOR SEQUENCE OF OPERATION. SWITCH
WHERE INDICATED ON THE PLAN VIEW. SEE CONTROL
WITH CLEAR LEXAN LIFT COVER. LOCATE 54" AFF AND
PROVIDE A GUARDED MOMENTARY PUSH BUTTON SWITCH
PUSH
SHUTDOWN
HVAC
3.25"
.8
CONDENSATE OUTLET
FLOOR DRAIN. COORDINATE LOCATION w/AHU
KEYED NOTE:
OUT
CLEAN
MIN.
UNIT S.P.
TOTAL2
S.P.
UNIT
TOTAL
1"
TOWARD DRAIN
PITCH DOWN
CLEAN OUT
BE THE DRAIN PAN NIPPLE SIZE
MINIMUM DRAIN LINE SIZE SHALL
PAN
DRAIN
UNION
WITH CAP
DIRT LEG
UNION
FLEX CONNECTOR
MANUFACTURERS CONTROLS
GAS PRESURSURE REGULATOR
BURNER
VALVE TYP.
ISOLATION
GAS SUPPLY
LOWER, MIN. HEIGHT IS 24"
AMBIENT IS -10°F OR
WHERE THE DESIGN
GEOGRAPHIC AREAS
CLIMATE NOTE: IN
12" MINIMUM COLD
(FIELD SUPPLIED)
FLASHING
BUILDING
ADJOINING
WALL OR
4 FT. MINIMUM
ROOF
2" IF ROOF IS COMBUSTIBLE (TOP OF BOX)
ADAPTER BOX
CONCENTRIC
WITH BRACKETS
ATTACH BOX TO ROOF
ANTICIPATED SHOW DEPTH
LEAST 6" HIGHER THAN
*INLET AIR CAP MUST BE ATMORE THAN 6" FROM THE BOX
ATTACH TO VENT RUN NO
DOUBLE-WALL VENT PIPE
ADAPTER BOX
CONCENTRIC
AIR PIPE
COMBUSTION
ROOF
SUPPLIED)
(FIELD
FLASHING
PIPE MAY EXTEND HIGHER
WALL VENT PIPE. SECTION OF
JOINTS) SECTION OF DOUBLE-
REQUIRED CONTINUOUS (NO
SHADED AREA REPRESENTS
AIR INLETS
COMBUSTION
WITH THE KIT
SEALANT SUPPLIED
SEAL WITH SILICONE
VENT PIPE
DOUBLE-WALL
TERMINAL
VENT (FLUE EXHAUST)
-3 /8
HVAC SYSTEM SHUTDOWN DETAIL
TYPICAL LOW INTENSITY (IRH) HEATER SUSPENSIONSUPPORT SCHEMATIC
TYPICAL IRH PIPING AND
ASSEMBLY FOR GAS FIRED UNIT HEATER
VERTICAL VENT TERMINAL / COMBUSTION AIR INLET
NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOT TO SCALENOT TO SCALE
NOT TO SCALE
RECOMMENDATIONS
MANUFACTURER’S
FLUE VENT SIZE PER
HANGER
REFLECTOR
TUBE AND
SUPPORT
REFLECTOR
BRACKET
REFLECTOR
STANDARD
MANUFACTURER
ADJUSTMENT BY HEATER
TURNBUCKLE WITH 3"
MANUFACTURER
CLASP BY HEATER
SPRING LOADED
TYPICAL
THREAD ROD
" ALL8
STRUCTURAL.
SUPPORT.SEE
(TYP. OF 2)
WITH 2" HOLE
OVERSIZED WASHER
2" X 2" SQUARE
(TYP. OF 2)
" - 16 NUT8
EXPANSION
FOR HEATER
THIMBLE ALLOW
2" CLEARANCE
CONSTRUCTION
COMBUSTIBLE
PASSING THROUGH
VENT WHEN
USE TYPE "B"
(26 GAUGE)
COMMON VENT - 6"
SINGLE VENT - 4"
VENT MATERIAL
OF OPENINGS
CAP NOTE POSITION
BRIEDERT VENT
BUILDING OVERHANG
36"
6"
CONNECTION
ELEC.
FLEXIBLE
THIS SHEET
SEE DETAIL 4
GAS LINE
REFLECTOR
VENT
FLUE
SCHEDULE
EQUIPMENT
REFER TO
TUBE AND REFLECTOR HANGER
SECTION OF REFLECTOR AT
LOCATE IN ROOMS 108, 131 & 154
REAR VIEW SIDE VIEW
1 2 3 4
8 7
NOT TO SCALE
AIR INTAKE TUBING
TYPICAL IRH COMBUSTION
MAXIMUM
4’
MINIMUM
*18"
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
A U
G U
S T
HV
AC
D
ET
AI
LS
X-XXXX-XXX
G
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
G
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
G
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
M-502
H V
C
T A
IL
S I
II
MOUNTING DETAIL
ELECTRIC UNIT HEATER
FOR ERV-1A, 1B, & 1C
EXHAUST PENTHOUSE DETAIL
NOT TO SCALE NOT TO SCALE
1 2
AIR TIGHT
MAKE OPENING
IRON FRAME.
ROOF OPENING & ANGLE
COUNTER FLASH
FLASH AND
BIRD SCREEN
EXTRUDED ALUMINUM TIERS
MASTIC INSULATION
ALL SIDES AS REQUIRED
SECURE HOOD TO CURB ON
MANUFACTURER
WITH ROOF
OR COORDINATED
FURNISHED BY
ROOF CURB
PRE-FABRICATED
ROOF INSULATION
METAL ROOF DECK
ROOF STRUCTURE
MOTOR OPERATED DAMPER
EXHAUST DUCT
HVAC FLOOR PLAN
ABOVE FLOOR PER
INSTALL UNIT HEATER
FLOOR
UNLESS NOTED OTHERWISE ON PLANS.
HORIZONTAL AIR FLOW POSITION
INSTALL UNIT HEATERS IN
FOR THERMOSTAT LOCATIONS.
NOTE: SEE FLOOR PLANS
HEATER
ELECTRIC UNIT
MOUNTING BRACKET
MANUFACTURER’S WALL
WALL
FROM
SUSPEND
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
A U
G U
S T
HV
AC
D
ET
AI
LS
X-XXXX-XXX
SCB ANCHORAGE
ADDITIONAL UPPER SUPPORT
REQUIRED CLEARANCES
DETAIL
ATTACHMENT
SCBH OPTIONAL
DUCT
ROD COUPLING
CLAMP IF REQUIRED
SRC OR UC - SEISMIC ROD
THREADED ROD
IF REQUIRED
ROD STIFFENER ANGLE
MAXIMUM 12 IN. O.C.
SHEET METAL SCREWS
No. 10 SELF-TAPPING
TRAPEZE SUPPORT
AIRCRAFT CABLE
NOTE 2: FOR TIGHTENING REQUIREMENTS OF BOLTS, NUTS AND STRUT NUTS.
NOTE 1: A ROD STIFFENER ANGLE MAY BE REQUIRED AS SHOWN. BRACE ANGLE RATIO MAY BE INCREASED TO 2(VERT.); 1(HORIZ.).
GUIDELINES FOR RECTANGULAR/OVAL DUCT
SUPPORT STRUCTURE
BRACE HOOK
SCBH - SEISMIC CABLE
SCB ANCHORAGE
SUPPORT STRUCTURE
ROD COUPLING
CLAMP IF REQUIRED
SRC OR UC - SEISMIC ROD
THREADED ROD
IF REQUIRED
ROD STIFFENER ANGLE
PIPE CLAMP OR U-BOLT
TRAPEZE SUPPORT
AIRCRAFT CABLE
SHOWN IN PLAN VIEW BELOW
SCBHs ARE REQUIRED AS
FOR CLARITY. ADDITIONAL
TRANSVERSE DIRECTION
SCBH ONLY SHOWN IN
SHOWN IN PLAN VIEW BELOW
SCBHs ARE REQUIRED AS
FOR CLARITY. ADDITIONAL
TRANSVERSE DIRECTION
SCBH ONLY SHOWN IN
WHEN REQUIRED
AT TRANSVERSE LOCATION
BRACE HOOK OR SCV-4
SCBH - SEISMIC CABLE
NOTE 2: FOR TIGHTENING REQUIREMENTS OF BOLTS, NUTS AND STRUT NUTS.
NOTE 1: A ROD STIFFENER ANGLE MAY BE REQUIRED AS SHOWN. BRACE ANGLE RATIO MAY BE INCREASED TO 2(VERT.); 1(HORIZ.).
GUIDELINES FOR TRAPEZE SUPPORTED PIPE
PIPING SUPPORTS DETAIL
RAD=RADIAN
FIGURE "E" FIGURE "I"
ROD
CLIP ANGLE
PIPE OR ANGLE
PIPE OR ANGLE
ROD OR ANGLE
45°
45°
45°
45°
45°
45° 45°
45°45°
45°45°
45°
FIGURE "A" FIGURE "F"
FIGURE "B"
CAST OR DRILLED-IN INSERT
FIGURE "G"FIGURE "C"
FIGURE "H"FIGURE "D"
OR TRUSS
VERTICAL MEMBER
FIELD WELD
CONNECTION OR
2-BOLTS IN EACH
ANGLE OR EQUAL
SWAY BRACE
RETAINING STRAP OR CLIP
BEAM C-CLAMP WITH
FOR STIFFENING
PIPE OVER ROD
CONCRETE WALL
COLUMN OR
INSERT
CAST OR DRILLED-IN
FOR MECHANICAL EQUIPMENT
LENGTHS IN ACCORDANCE WITH SPECIFICATIONS SECTION 13 48 00.00 10 - SEISMIC PROTECTION
RODS OR ANGLES MAY BE USED FOR SUPPORTS INTERCHANGEABLY. SEE MAXIMUM BRACING
NOTES:
G
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
FROM THE TOP OF PIPE TO THE BOTTOM OF THE SUPPORT FOR THE HANGER.
6. ALL PIPNG SUSPENDED BY INDIVIDUAL HANGERS 12 INCHES OR LESS IN LENGTH
5. ALL ROUND AIR-HANDLING DUCTS LESS THAN 28 INCHES IN DIAMETER.
CROSS-SECTIONAL AREA.
4. ALL RECTANGULAR AIR-HANDLING DUCTS OF LESS THAN 6 SQUARE FEET IN
3. ALL OTHER PIPING OF LESS THAN 2-1/2 INCHES INSIDE DIAMETER.
1-1/4 INCHES INSIDE DIAMETER.
2. PIPING IN BOILER AND MECHANICAL EQUIPMENT ROOMS OF LESS THAN
1. GAS PIPING OF LESS THAN 1-INCH INSIDE DIAMETER
M-503
A T F P
T A
IL
S I
ATFP RESISTRAINT PROVISIONS NOT OMITTED FROM ABOVE
FOR THE FOLLOWING INSTALLATIONS:
RESTRAINTS MAY BE OMITTED FROM MECHANICAL SYSTEMS INSTALLED
ATFP REQUIREMENTS
TRANSVERSE SWAY BRACING DETAIL - TWO PIPE
TRANSVERSE SWAY BRACING DETAIL - DUCTWORK
NOT TO SCALE NOT TO SCALE
NOT TO SCALE2
ARROWS INDICATE DIRECTION OF AVAILABLE FORCE RESISTANCE, TYPICAL.
CONNECTIONS.
14. PLACE STANDARD CUT LOCK WASHERS BETWEEN NUT AND ANGLE ON ALL BOLTED
IS SIZED FOR THE LARGER DUCT.
PROVIDED THE BRACING IS INSTALLED WITHIN FOUR FEET OF THE INTERSECTION AND
TRANSVERSE BRACING FOR ONE DUCT SECTION CONNECTED PERPENDICULAR TO IT.
LONGITUDINAL BRACING SHALL OCCUR AT INTERVALS OF 60�-0� MAXIMUM.
A DUCT RUN, AND ON STRAIGHT DUCT RUNS AT 30�-0� O.C. MAXIMUM.
TRANSVERSE BRACING SHALL BE INSTALLED AT EACH DUCT RUN, AT EACH END OF
13. FOR DUCTS REQUIRING BRACING, THE FREQUENCY SHALL BE AS FOLLOWS:
BE ISOLATED FROM EQUIPMENT BY NEOPRENE SLEEVE AND WASHER.
UFC 3-310-04. IF EQUIPMENT IS MOUNTED ON NEOPRENE PADS, ANCHOR BOLTS SHALL
SHALL BE SECURED TO THE FLOOR WITH ANCHOR BOLTS AS LISTED IN ACOE
12. EQUIPMENT WHICH IS RIGIDLY MOUNTED OR MOUNTED ON NEOPRENE PADS
SUPPORT SYSTEMS REQUIRED BY THE DRAWINGS AND USACE CRITERIA UFC 4-010-01.
DUCTWORK, PIPING AND EQUIPMENT WHICH IS IN ADDITION TO VERTICAL
11. DETAILS SHOWN PROVIDE A LATERAL BRACING SYSTEM FOR
RESTRAINT. RESTRAINTS SHALL BE IN ACCORDANCE WITH OPERATING WEIGHTS.
FRICTION SHALL NOT BE CONSIDERED AS A MEANS OF
10. ALL EQUIPMENT SHALL BE SECURED TO PREVENT LATERAL MOVEMENT.
MECHANICAL EQUIPMENT.
INSTALLED IN ACCORDANCE WITH THESE DETAILS AND USACE CRITERIA UFC 4-010-01 ATFP FOR
9. ALL MATERIAL, EQUIPMENT, ACCESSORIES AND CONNECTIONS SHALL BE
WEIGHT IN ANY DIRECTION AND 1.5 TIMES THE WEIGHT IN DOWNWARD DIRECTION.
DUCTWORK AND PIPE SUPPORTS SHALL RESIST FORCES OF 0.5 TIMES ITS
AND PIPING. THE MINIMUM DESIGN CRITERIA FOR THE EQUIPMENT,
8. ALL BUILDINGS REQUIRE ATFP SUPPORTED EQUIPMENT, DUCTWORK,
WHICH IT IS PLACED. SWAY BRACING TO BE USED FOR FLEXIBLE PIPING SYSTEMS.
DYNAMIC PROPERTIES OF THE PIPING SYSTEM AND THE BUILDING OR STRUCTURE IN
7. FLEXIBLE PIPING SYSTEMS TO ALLOW FOR RESTRAINTS IN BOTH THE
TO DETERMINE THE ALLOWABLE SPAN-DIAMETER RELATIONSHIP FOR STRUCTURES.
UFC 3-310-04 AND USGF ( SWF SPECIFICATION) 13 09 00 00 44 ARE TO BE USED
COPPER TUBING AND 85 RED BRASS OR SPS COPPER PIPE, REQUIREMENTS OF
6. FOR STANDARD (40S) PIPE, EXTRA STRONG (80S) PIPE, TYPES K, L, AND M
DURING AN BLAST EVENT.
BETWEEN PIPES ARE SUFFICIENT TO PREVENT CONTACT BETWEEN THE PIPES
ADJACENT PIPE LINES UNLESS THE PIPE SPANS AND THE CLEAR DISTANCE
5. SPREADERS TO BE PROVIDED AT APPROPRIATE INTERVALS TO SEPARATE
MOVEMENT BETWEEN THE SOIL AND BUILDING.
PROVIDED ON PIPES WHICH ENTER BUILDINGS TO ALLOW FOR RELATIVE
OF THE FLEXIBLE COUPLING OR EXPANSION JOINT, FLEXIBLE COUPLINGS TO BE
LATERALLY UNLESS SUCH LATERAL BRACING WILL INTERFERE WITH THE ACTION
DIAMETER. FLEXIBLE COUPLINGS AND EXPANSION JOINTS TO BE BRACED
PROVIDED AT THE BOTTOMS OF RISERS FOR PIPES LARGER THAN 3-1/2 INCHES IN
4. FLEXIBLE COUPLINGS AND EXPANSION JOINTS, FLEXIBLE COUPLINGS TO BE
PIPE JOINTS UNLESS CONTINUITY IS MAINTAINED.
CONCURRENT DEAD AND EQUIVALENT STATIC FORCES. PROVIDE SUPPPORTS AT
3. CONNECTIONS AND BRACKETS FOR PIPE TO BE DESIGNED TO RESIST
ACT CURRENTLY WITH THE FULL DEAD LOAD OF THE PIPE, INCLUDING CONTENTS.
HORIZONTAL PIPE, THE EQUIVALENT STATIC FORCE WILL BE CONSIDERED TO
2. HORIZONTAL PIPES AND ATTACHED VALVES FOR THE ATFP ANALYSIS OF
1. RISERS AND RISER CONNECTIONS.
US Army Corps of Engineers
A P
P R
D A
T E
D E
S C
R
IP
T
IO
N S
Y M
$FILEL$
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
$DATE$ $TIME$
S u b m it te d b y
C h e c k e d b y
D ra w n b y
D e s ig n e d b y
P L
O T D
A T
E
P L
O T S
C A
L E
F O
R T H
O O
D T
E X
A S
T
H A
IR
D
E F
E N
S E A
R T
IL
L E
R Y D
IV
IS
IO
N
P N
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
T
A Y
L O
R S
T
F O
R T W
O R
T H T
X
S U
P P
L Y S
U P
P O
R T A
C T
IV
IT
Y W
A R
E H
O U
S E
S o li c it a ti o n N o
C o n tr a c t
N o
Is s u e D a te
E N
G
IN
E E
R
IN
G B
R A
N C
H
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
E N
G
IN
E E
R
IN
G
NUMBER
SHEET
W
G -1
-B -0
A U
G U
S T
USED
HANGER LOOPS
BE OMITTED IF
SCREWS MAY
REINFORCEMENT
UNDER A BOTTOM
OR STRAP IS PLACED
UNLESS FOOT
HV
AC
D
ET
AI
LS
X-XXXX-XXX
G
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
G
W O
O D
A R
D P .E
G
W O
O D
A R
D P .E
C H
IE
F
M E
C H
A N
IC
A L S
E C
T
IO
N G
IL
B E
R T J
V A
L L
A P .E
M-504
GAP
GAP (TYP.)
ANCHOR BOLT
NOTES:
SUSPENDED EQUIPMENT
EQUIPMENT
(TYP. 4 SIDES)
ROD BRACING
TYPICAL
(WHERE APPLICABLE)
VIBRATION ISOLATION
(TYP. 4 SIDES)
DIAGONAL BRACE
EQUIPMENT
(TYPICAL)
ANCHOR BOLT
EQUIPMENT
(TYP. 4 SIDES)
DIAGONAL BRACE
OF STRUCTURAL BRACE
ACCEPTABLE IN LIEU
3 /8" OF SLACK IS
CABLE RESTRAINTS W/
(TYPICAL)
ANCHOR BOLT
(TYP.)
ASSEMBLY
ISOLATION
VIBRATION
(TYP.)
LOCK NUT
FIGURE "J"
FIGURE "L"
FIGURE "K"
EQUIPMENT SUPPORTS DETAIL
(TYP. 4 CORNERS)
OF BRACING
LOCATION
ALTERNATE
2,500 lbs. OF EQUIPMENT WEIGHT.
ADD (1) ADDITIONAL 3 /4" BOLT FOR EACH ADDITIONAL
EQUIPMENT WEIGHT OF 10,000 lbs. OR GREATER.
EQUIPMENT UP TO 10,000 lbs AND (4) 3 /4" BOLTS FOR
3. PROVIDE A MINIMUM OF (4) 1/ 2" ANCHOR BOLTS FOR
(TYP.)
BRACE FRAMING
(TYP,)
HANGER ROD
ANCHOR BOLT
ANGLE W/
TRANSVERSE SWAY BRACING DETAIL - ONE PIPE
COMBUSTION INTAKE EQUIPMENT DETAIL
PIPE HANGER DETAIL
SIDE VIEW
ADJUSTABLE CLEVIS HANGER ADJUSTABLE ROLLER HANGER
TO 1000 LBS UNIFORM LOAD
TRAPEZE HANGER FOR UP
NOTES:
SEE DETAIL FOR REQUIRED GUIDES AND ANCHORS.
A. SADDLE HANGERS, ROLLERS, AND TRAPEZE HANGERS ARE NOT CONSIDERED PIPE GUIDES.
DUCT HANGER DETAIL
EXTERIOR WALL
WALL FLANGE RING
WIRE MESH
CAP WITH 1/4"
CONTINUATION
FORSIZE AND
DUCT SEE PLANS
PVC OUTSIDE AIR
FOR ROD SIZING.
ACCORDANCE WITH MSS-SP-69
NOTE 3: HANGER RODS TO BE IN
OF BOLTS, NUTS AND STRUT NUTS.
NOTE 2: FOR TIGHTENING REQUIREMENTS
TO 2(VERT.): 1(HORIZ.).
ANGLE RATIO MAY BE INCREASED
BE REQUIRED AS SHOWN. BRACE
NOTE1: A ROD STIFFENER ANGLE MAY
GUIDELINES FOR CLEVIS SUPPORTED STYSTEMS
SUPPORT STRUCTURE
SCB ANCHORAGE
CABLE BRACE
SCB-SEISMIC
CABLE
AIRCRAFT ROD COUPLING IF REQUIRED
CLAMP IF REQUIRED
SRC-SEISMIC ROD
PIPE HANGAR
CLEVIS CROSS BRACE
ROD STIFFNER ANGLE
THREADED ROD
PLAN
BASE
EQUIPMENT
ASSEMBLY
ISOLATION
VIBRATION
ANCHOR BOLT
PADS
ANGLE W/RESILIENT
AS REQUIRED
PROVIDE GAP
BASE
EQUIPMENT BASE
EQUIPMENT
BASE
EQUIPMENT
ANCHOR BOLT
NEOPRENE PAD
REQ’D SHIM
PLATE AS
ANCHOR BOLT
PADS
ANGLE W/RESILIENT
BASE
EQUIPMENT
BRACKET
ISOLATION MOUNTING
FOR UPLIFT
RESTRAINING BOLT
EXTERIOR WALL
(WITH SCREEN)
WALL TERMINATION
EXHAUST OPENING
BETWEEN INLET &
4 FT (MINIMUM)
COORDINATE EXACT COLOR WITH ARCHTECTURAL
A. PAINT PIPING EXTENDING ON THE EXTERIOR OF BUILDING.
GENERAL NOTES:
WITH (4) 3/8" ALL THREAD RODS
SUSPEND FROM STRUCTURE
ISOLATOR
VIBRATION FLEX (TYP.)
REQUIRED
TRANSITION AS
PLANS
SIZE PER
EXHAUST FAN
SUPPLY OR
INLINE FAN DETAIL
31"
OR MORE
HANGAR STRAPS
SCREWS
1" MIN
ROD OR ANGLE
OR MORE
31" ROD
ANGLE
FOR LOAD
SIZE BOLTS
B. PROVIDE HANGERS IF SEISMIC RESTRAINTS ARE NOT REQUIRED.
A. HANGERS MUST NOT DEFORM DUCT SHAPE.
NOTES:
HANGAR
FASTENERS
LOAD RATED
24" DIA. MAX
AS HANGAR STRAP
BAND OF SAME SIZE
SHAPE IS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .