US Army Corps Of Engineers Fort Worth District
SPECIFICATIONS
VOLUME I OF III
CORRECTED FINAL 100% SUBMITTAL
January 27, 2017
Contract No: W912HP-12-D-0002 Project: PN 68826 Mission Training Complex (MTC) Fort Hood, Texas
Simulations Center, Mission Training Complex (MTC) 5650
Simulatons Center, Mission Training Complex (MTC) 5650
PROJECT TABLE OF CONTENTS
VOLUME I OF III
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00.01 00 11 00.02 00 21 00 00 21 30 00 22 11
00 45 00 00 72 00 00 73 10 00 73 46
LIST OF DRAWINGS
SOLICITATION, OFFER AND AWARD, SF-1442
CONTRACT LINE ITEM SCHEDULE
[INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS]
SITE VISITS
LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL
PREPARATION
REPRESENTATIONS AND CERTIFICATIONS
CONTRACT CLAUSES
SUPPLEMENTAL CONTRACT REQUIREMENTS
WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 44 CONSTRUCTION SCHEDULE
01 10 00 STATEMENT OF WORK
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 31 19.00 44 PROJECT MEETINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 33 40.00 44 COLOR/FINISH SAMPLE BOARDS
01 35 10.00 44 SPECIAL PROJECT PROCEDURES FOR FORT HOOD
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 52 00.00 44 GOVERNMENT FIELD OFFICE
01 56 00.00 44 DUST CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 57 24.01 44 STORM WATER POLLUTION PREVENTION PLAN (TEXAS)
01 58 00 PROJECT IDENTIFICATION
01 71 23.00 44 SURVEY, LAYOUT, AND OTHER DATA
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.00 40 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DECONSTRUCTION: DISINTEGRATOR
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 AMERICAN WATER, CAST-IN-PLACE CONCRETE
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 48 20 AMERICAN WATER, VALVE BOXES AND METER VAULTS
PROJECT TABLE OF CONTENTS Page 1
00 01 15
DIVISION 04 - MASONRY
04 20 00 MASONRY
04 43 13 ANCHORED LIME STONE MASONRY VENEER
04 72 00 CAST STONE MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 43 00 CHANNEL STRUT FRAMING SYSTEM
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
05 72 00 METAL DUCT COVER SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 42 16 FLUSH WOOD PANELING
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 AIR BARRIERS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 90 00 PREFORMED, PRE-COMPRESSED, SELF-EXPANDING, SEALANT SYSTEM
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 METAL ROLLING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 BLAST RESISTANT METAL WALL LOUVERS
PROJECT TABLE OF CONTENTS Page 2
-- End of Project Table of Contents – VOLUME I OF III -
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. TITLE
VOLUME 1
GENERAL
GI001.1 VOLUME 1 - TITLE SHEET
GI002.1 VOLUME 1 - INDEX OF DRAWINGS
GI101 OVERALL LIFE SAFETY PLAN
GI102 PARTIAL LIFE SAFETY PLAN
GI103 PARTIAL LIFE SAFETY PLAN
GI104 PARTIAL LIFE SAFETY PLAN
GEOTECHNICAL
B-101 BORING LOCATIONS
B-201 LOGS OF BORINGS 1 OF 5
B-202 LOGS OF BORINGS 2 OF 5
B-203 LOGS OF BORINGS 3 OF 5
B-204 LOGS OF BORINGS 4 OF 5
B-205 LOGS OF BORINGS 5 OF 5
CIVIL
C-001 NOTES, LEGENDS AND ABBREVIATIONS
C-002 KEY PLAN AND HAUL ROUTE
CD101 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD102 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD103 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD104 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD105 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD106 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD107 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD108 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD109 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD110 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
DOCUMENT 00 01 15 Page 1
SEDIMENT CONTROL PLAN
CD111 EXISTING CONDITIONS, DEMOLITION AND INTIAL EROSION AND
SEDIMENT CONTROL PLAN
CD501 EROSION AND SEDIMENT CONTROL DETAILS
CG101 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG102 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG103 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG104 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG105 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG106 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG107 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG108 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG109 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG110 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG111 FINAL EROSION AND SEDIMENT CONTROL, GRADING AND DRAINAGE PLAN
CG201 STORM DRAIN PROFILES
CG202 STORM DRAIN PROFILES
CG203 STORM DRAIN PROFILES
CG501 DRAINAGE DETAILS
CG502 DRAINAGE DETAILS
CG503 DRAINAGE DETAILS
CG504 DRAINAGE DETAILS
CI101 SITE IMPROVEMENT PLAN
CI102 SITE IMPROVEMENT PLAN
CI103 SITE IMPROVEMENT PLAN
CI104 SITE IMPROVEMENT PLAN
CI105 SITE IMPROVEMENT PLAN
CI106 SITE IMPROVEMENT PLAN
CI107 SITE IMPROVEMENT PLAN
CI108 SITE IMPROVEMENT PLAN
CI109 SITE IMPROVEMENT PLAN
CI110 SITE IMPROVEMENT PLAN
CI111 SITE IMPROVEMENT PLAN
CI401 ENLARGED SITE IMPROVEMENT PLAN
CI501 SITE DETAILS
CI502 SITE DETAILS
CI503 SITE DETAILS
CI601 LAYOUT CONTROL DATA
CU101 NOT USED
CU102 NOT USED
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CU106 UTILITY PLAN
CU107 UTILITY PLAN
CU108 UTILITY PLAN
CU109 UTILITY PLAN
CU110 UTILITY PLAN
CU111 UTILITY PLAN
CU112 UTILITY PLAN
CU113 UTILITY PLAN
CU201 UTILITY PROFILES
CU202 UTILITY PROFILES
CU203 UTILITY PROFILES
CP101 PAVEMENT MARKING PLAN
CT101 INTERSECTION SIGNIZLATION PLAN
LANDSCAPE
LP101 LANDSCAPE IMPROVEMENT PLAN
DOCUMENT 00 01 15 Page 2
LP102 LANDSCAPE IMPROVEMENT PLAN
LP103 LANDSCAPE IMPROVEMENT PLAN
LP104 LANDSCAPE IMPROVEMENT PLAN
LP105 LANDSCAPE IMPROVEMENT PLAN
ARCHITECTURAL
A-001 ARCHITECTURAL LEGENDS AND NOTES
AE101 OVERALL FLOOR PLAN
AE102 PARTIAL FLOOR PLAN - AREA 'A'
AE103 PARTIAL FLOOR PLAN - AREA 'B'
AE104 PARTIAL FLOOR PLAN - AREA 'C'
AE105 PARTIAL FLOOR PLAN - AREA 'D'
AE106 PARTIAL FLOOR PLAN - AREA 'E'
AE107 PARTIAL FLOOR PLAN - AREA 'F'
AE108 PARTIAL FLOOR PLAN - AREA 'G'
AE109 PARTIAL FLOOR PLAN - AREA 'H'
AE110 PARTIAL FLOOR PLAN - AREA 'J'
AE111 PARTIAL FLOOR PLAN - AREA 'K'
AE112 PARTIAL FLOOR PLAN - AREA 'L'
AE113 PARTIAL FLOOR PLAN - AREA 'M'
AE114 PARTIAL FLOOR PLAN - AREA 'N'
AE115 PARTIAL FLOOR PLAN - AREA 'P'
AE116 OVERALL CEILING PLAN
AE117 PARTIAL CEILING PLAN - AREA 'A'
AE118 PARTIAL CEILING PLAN - AREA 'B'
AE119 PARTIAL CEILING PLAN - AREA 'C'
AE120 PARTIAL CEILING PLAN - AREA 'D'
AE121 PARTIAL CEILING PLAN - AREA 'E'
AE122 PARTIAL CEILING PLAN - AREA 'F'
AE123 PARTIAL CEILING PLAN - AREA 'G'
AE124 PARTIAL CEILING PLAN - AREA 'H'
AE125 PARTIAL CEILING PLAN - AREA 'J'
AE126 PARTIAL CEILING PLAN - AREA 'K'
AE127 PARTIAL CEILING PLAN - AREA 'L'
AE128 PARTIAL CEILING PLAN - AREA 'M'
AE129 PARTIAL CEILING PLAN - AREA 'N'
AE130 PARTIAL CEILING PLAN - AREA 'P'
AE131 OVERALL ROOF PLAN
AE132 PARTIAL ROOF PLAN
AE133 PARTIAL ROOF PLAN
AE134 PARTIAL ROOF PLAN
AE135 SECURITY ACCESS FACILITY
AE136 SECURITY ACCESS FACILITY
AE137 SECURITY ACCESS FACILITY
AE201 OVERALL EXTERIOR ELEVATIONS
AE202 PARTIAL EXTERIOR ELEVATIONS
AE203 PARTIAL EXTERIOR ELEVATIONS
AE204 PARTIAL EXTERIOR ELEVATIONS
AE205 PARTIAL EXTERIOR ELEVATIONS
AE206 PARTIAL EXTERIOR ELEVATIONS
AE207 PARTIAL EXTERIOR ELEVATIONS
AE208 PARTIAL EXTERIOR ELEVATIONS
AE209 PARTIAL EXTERIOR ELEVATIONS
AE210 PARTIAL EXTERIOR ELEVATIONS
AE301 OVERALL BUILDING SECTIONS
AE302 PARTIAL BUILDING SECTIONS
AE303 PARTIAL BUILDING SECTIONS
AE304 PARTIAL BUILDING SECTIONS
AE305 PARTIAL BUILDING SECTIONS
DOCUMENT 00 01 15 Page 3
AE306 PARTIAL BUILDING SECTIONS
AE307 PARTIAL BUILDING SECTIONS
AE311 WALL SECTIONS
AE312 WALL SECTIONS
AE313 WALL SECTIONS
AE314 WALL SECTIONS
AE315 WALL SECTIONS
AE316 WALL SECTIONS
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE403 ENLARGED PLANS
AE404 ENLARGED PLANS
AE405 ENLARGED PLANS
AE406 ENLARGED PLANS
AE407 ENLARGED PLANS - DISINTEGRATOR AND MTC DUMPSTER
AE410 AAR INTERIOR ELEVATIONS
AE411 AAR INTERIOR ELEVATIONS
AE412 AAR DETAILS
AE501 PARTITION TYPES AND DETAILS
AE502 ROOF DETAILS
AE503 ROOF DETAILS
AE504 SCREENWALL DETAILS
AE505 WALL SECTION & PLAN DETAILS
AE506 INSULATED METAL PANEL DETAILS - VERTICAL INSTALLATION
AE507 ENLARGED PLAN DETAILS
AE508 INSULATED METAL PANEL DETAILS - HORIZONTAL INSTALLATION
AE509 POLYCARBONATE DETAILS
AE510 POLYCARBONATE DETAILS
AE511 ENLARGED PLAN DETAILS
AE512 ENLARGED PLAN DETAILS
AE513 ENLARGED PLAN DETAILS
AE514 CURTAIN WALL DETAILS
AE601 DOOR SCHEDULE
AE602 DOOR SCHEDULE, DOOR AND FRAME TYPES
AE603 DOOR DETAILS
AE701 WINDOW TYPES AND DETAILS
AE801 CASEWORK ELEVATIONS
AE802 CASEWORK ELEVATIONS
AE803 CASEWORK SECTIONS AND DETAILS
AE901 OVERALL AIR BARRIER PLAN
AE902 PARTIAL AIR BARRIER PLAN
AE903 PARTIAL AIR BARRIER PLAN
AE904 PARTIAL AIR BARRIER PLAN
AE905 AIR BARRIER SECTIONS
INTERIORS
AF101 PARTIAL FINISH PLAN - AREA 'A'
AF102 PARTIAL FINISH PLAN - AREA 'B'
AF103 PARTIAL FINISH PLAN - AREA 'C'
AF104 PARTIAL FINISH PLAN - AREA 'D'
AF105 PARTIAL FINISH PLAN - AREA 'F'
AF106 PARTIAL FINISH PLAN - AREA 'G'
AF107 PARTIAL FINISH PLAN - AREA 'H'
AF108 PARTIAL FINISH PLAN - AREA 'K'
AF109 PARTIAL FINISH PLAN - AREA 'L'
AF110 PARTIAL FINISH PLAN - AREA 'M'
AF111 PARTIAL FINISH PLAN - AREA 'N'
AF401 INTERIOR ENLARGED PLANS, FINISH ELEVATIONS AND DETAILS
AF402 INTERIOR ELEVATIONS
DOCUMENT 00 01 15 Page 4
AF601 FINISH SCHEDULE
AF602 FINISH LEGEND & INTERIOR PATTERN DETAILS
AG601 SIGNAGE DETAILS AND NOTES
AG602 SIGNAGE DETAILS AND NOTES
IF101 FURNITURE PLAN
IF102 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'A'
IF103 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'B'
IF104 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'C'
IF105 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'D'
IF106 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'E'
IF107 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'F'
IF108 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'G'
IF109 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'H'
IF110 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'J'
IF111 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'K'
IF112 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'L'
IF113 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'M'
IF114 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'N'
IF115 PARTIAL FURNITURE AND SIGNAGE PLAN - AREA 'P'
AND SECURITY ACCESS FACILITY
STRUCTURAL
S-001 LEGEND, NOTES, AND ABBREVIATIONS
S-002 GENERAL NOTES
S-003 SPECIAL INSPECTIONS
SB100 OVERALL FOUNDATION PLAN
SB101 PARTIAL FOUNDATION PLAN - AREA 'A'
SB102 PARTIAL FOUNDATION PLAN - AREA 'B'
SB103 PARTIAL FOUNDATION PLAN - AREA 'C'
SB104 PARTIAL FOUNDATION PLAN - AREA 'D'
SB105 PARTIAL FOUNDATION PLAN - AREA 'E'
SB106 PARTIAL FOUNDATION PLAN - AREA 'F'
SB107 PARTIAL FOUNDATION PLAN - AREA 'G'
SB108 PARTIAL FOUNDATION PLAN - AREA 'H'
SB109 PARTIAL FOUNDATION PLAN - AREA 'J'
SB110 PARTIAL FOUNDATION PLAN - AREA 'K'
SB111 PARTIAL FOUNDATION PLAN - AREA 'L'
SB112 PARTIAL FOUNDATION PLAN - AREA 'M'
SB113 PARTIAL FOUNDATION PLAN - AREA 'N'
SB114 PARTIAL FOUNDATION PLAN - AREA 'P'
SB115 PARTIAL STRUCTURAL SLAB PLAN - AREA 'A'
SB116 PARTIAL STRUCTURAL SLAB PLAN - AREA 'B'
SB117 PARTIAL STRUCTURAL SLAB PLAN - AREA 'C'
SB118 PARTIAL STRUCTURAL SLAB PLAN - AREA 'D'
SB119 PARTIAL STRUCTURAL SLAB PLAN - AREA 'E'
SB120 PARTIAL STRUCTURAL SLAB PLAN - AREA 'F'
SB121 PARTIAL STRUCTURAL SLAB PLAN - AREA 'G'
SB122 PARTIAL STRUCTURAL SLAB PLAN - AREA 'H'
SB123 PARTIAL STRUCTURAL SLAB PLAN - AREA 'J'
SB124 PARTIAL STRUCTURAL SLAB PLAN - AREA 'K'
SB125 PARTIAL STRUCTURAL SLAB PLAN - AREA 'L'
SB126 PARTIAL STRUCTURAL SLAB PLAN - AREA 'M'
SB127 PARTIAL STRUCTURAL SLAB PLAN - AREA 'N'
SB128 PARTIAL STRUCTURAL SLAB PLAN - AREA 'P'
SB301 FOUNDATION SECTIONS
SB302 FOUNDATION SECTIONS
SB303 FOUNDATION SECTIONS
SB501 TYPICAL FOUNDATION/SLAB DETAILS
SB502 TYPICAL GRADE BEAM DETAILS
DOCUMENT 00 01 15 Page 5
SB503 TYPICAL FOUNDATION DETAILS
SF100 OVERALL ROOF FRAMING PLAN
SF101 PARTIAL ROOF FRAMING PLAN - AREA 'A'
SF102 PARTIAL ROOF FRAMING PLAN - AREA 'B'
SF103 PARTIAL ROOF FRAMING PLAN - AREA 'C'
SF104 PARTIAL ROOF FRAMING PLAN - AREA 'D'
SF105 PARTIAL ROOF FRAMING PLAN - AREA 'E'
SF106 PARTIAL ROOF FRAMING PLAN - AREA 'F'
SF107 PARTIAL ROOF FRAMING PLAN - AREA 'G'
SF108 PARTIAL ROOF FRAMING PLAN - AREA 'H'
SF109 PARTIAL ROOF FRAMING PLAN - AREA 'J'
SF110 PARTIAL ROOF FRAMING PLAN - AREA 'K'
SF111 PARTIAL ROOF FRAMING PLAN - AREA 'L'
SF112 PARTIAL ROOF FRAMING PLAN - AREA 'M'
SF113 PARTIAL ROOF FRAMING PLAN - AREA 'N'
SF114 PARTIAL ROOF FRAMING PLAN - AREA 'P'
SF201 BRACED FRAME ELEVATIONS
SF202 BRACED FRAME ELEVATIONS
SF203 BRACED FRAME ELEVATIONS
SF204 BRACED FRAME DETAILS
SF301 FRAMING SECTIONS
SF302 FRAMING SECTIONS
SF401 LOBBY ROOF FRAMING PLANS
SF402 ANTENNA PLATFORM FRAMING
SF403 BARREL VAULT SUPPORT FRAMING PLANS
SF404 SECURITY ACCESS FACILITY
SF501 TYPICAL FRAMING DETAILS
SF502 TYPICAL FRAMING DETAILS
SF503 TYPICAL FRAMING DETAILS
VOLUME 2
GENERAL
GI001.2 VOLUME 2 - TITLE SHEET
GI002.2 VOLUME 2 - INDEX OF DRAWINGS
MECHANICAL
M-001 MECHANICAL LEGEND
MH101 PARTIAL FLOOR PLAN - AREA 'A'
MH102 PARTIAL FLOOR PLAN - AREA 'B' AND SECTION
MH103 PARTIAL FLOOR PLAN - AREA 'C'
MH104 PARTIAL FLOOR PLAN - AREA 'D'
MH105 PARTIAL FLOOR PLAN - AREA 'E'
MH106 PARTIAL FLOOR PLAN - AREA 'F' AND SECTION
MH107 PARTIAL FLOOR PLAN - AREA 'G'
MH108 PARTIAL FLOOR PLAN - AREA 'H'
MH109 PARTIAL FLOOR PLAN - AREA 'J'
MH110 PARTIAL FLOOR PLAN - AREA 'K'
MH111 PARTIAL FLOOR PLAN - AREA 'L'
MH112 PARTIAL FLOOR PLAN - AREA 'M'
MH113 PARTIAL FLOOR PLAN - AREA 'N'
MH114 PARTIAL FLOOR PLAN - AREA 'P' AND SECURITY ACCESS FACILITY
MP101 PARTIAL FLOOR PLAN - AREA 'A'
MP102 PARTIAL FLOOR PLAN - AREA 'B'
MP103 PARTIAL FLOOR PLAN - AREA 'C'
MP104 PARTIAL FLOOR PLAN - AREA 'D'
MP105 PARTIAL FLOOR PLAN - AREA 'E'
MP106 PARTIAL FLOOR PLAN - AREA 'F'
MP107 PARTIAL FLOOR PLAN - AREA 'G'
DOCUMENT 00 01 15 Page 6
MP108 PARTIAL FLOOR PLAN - AREA 'H'
MP109 PARTIAL FLOOR PLAN - AREA 'J'
MP110 PARTIAL FLOOR PLAN - AREA 'K'
MP111 PARTIAL FLOOR PLAN - AREA 'L'
MP112 PARTIAL FLOOR PLAN - AREA 'M'
MP113 PARTIAL FLOOR PLAN - AREA 'N'
MP114 PARTIAL FLOOR PLAN - AREA 'P' AND SECURITY ACCESS FACILITY
M-401 ENLARGED PLANS
M-501 ATFP DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-602 SCHEDULES
M-603 SCHEDULES
M-701 PIPING DIAGRAMS
M-801 CONTROLS
M-802 CONTROLS
M-803 CONTROLS
M-804 CONTROLS
FIRE PROTECTION
F-001 FIRE PROTECTION LEGEND
F-002 FIRE ALARM LEGEND
FP101 PARTIAL FLOOR PLAN - AREA 'A'
FP102 PARTIAL FLOOR PLAN - AREA 'B'
FP103 PARTIAL FLOOR PLAN - AREA 'C'
FP104 PARTIAL FLOOR PLAN - AREA 'D'
FP105 PARTIAL FLOOR PLAN - AREA 'E'
FP106 PARTIAL FLOOR PLAN - AREA 'F'
FP107 PARTIAL FLOOR PLAN - AREA 'G'
FP108 PARTIAL FLOOR PLAN - AREA 'H'
FP109 PARTIAL FLOOR PLAN - AREA 'J'
FP110 PARTIAL FLOOR PLAN - AREA 'K'
FP111 PARTIAL FLOOR PLAN - AREA 'L'
FP112 PARTIAL FLOOR PLAN - AREA 'M'
FP113 PARTIAL FLOOR PLAN - AREA 'N'
FP114 PARTIAL FLOOR PLAN - AREA 'P'
PLUMBING
P-001 PLUMBING LEGEND
PF101 PARTIAL FOUNDATION PLAN - AREA 'A'
PF102 PARTIAL FOUNDATION PLAN - AREA 'B'
PF103 PARTIAL FOUNDATION PLAN - AREA 'C'
PF104 PARTAIL FOUNDATION PLAN - AREA 'D'
PF105 PARTIAL FOUNDATION PLAN - AREA 'E'
PF106 PARTIAL FOUNDATION PLAN - AREA 'F'
PF107 PARTIAL FOUNDATION PLAN - AREA 'G'
PF108 PARTIAL FOUNDATION PLAN - AREA 'H'
PF109 PARTIAL FOUNDATION PLAN - AREA 'J'
PF110 PARTIAL FOUNDATION PLAN - AREA 'K'
PF111 PARTIAL FOUNDATION PLAN - AREA 'L'
PF112 PARTIAL FOUNDATION PLAN - AREA 'M'
PF113 PARTIAL FOUNDATION PLAN - AREA 'N'
PL101 PARTIAL FLOOR PLAN - AREA 'A'
PL102 PARTIAL FLOOR PLAN - AREA 'B'
PL103 PARTIAL FLOOR PLAN - AREA 'C'
PL104 PARTIAL FLOOR PLAN - AREA 'D'
PL105 PARTIAL FLOOR PLAN - AREA 'E'
PL106 PARTIAL FLOOR PLAN - AREA 'F'
PL107 PARTIAL FLOOR PLAN - AREA 'G'
DOCUMENT 00 01 15 Page 7
PL108 PARTIAL FLOOR PLAN - AREA 'H'
PL109 PARTIAL FLOOR PLAN - AREA 'J'
PL110 PARTIAL FLOOR PLAN - AREA 'K'
PL111 PARTIAL FLOOR PLAN - AREA 'L'
PL112 PARTIAL FLOOR PLAN - AREA 'M'
PL113 PARTIAL FLOOR PLAN - AREA 'N'
PL114 PARTIAL FLOOR PLAN - AREA 'P'
PL115 PARTIAL ROOF PLAN
PL116 PARTIAL ROOF PLAN
PL117 PARTIAL ROOF PLAN
P-401 ENLARGED PLANS
P-402 ENLARGED PLANS
P-403 ENLARGED PLANS
P-404 ENLARGED PLAN
P-405 ENLARGED PLAN
P-501 DETAILS
P-601 SCHEDULES
P-701 RISER DIAGRAMS
P-702 RISER DIAGRAMS
P-703 RISER DIAGRAMS
P-704 RISER DIAGRAMS
ELECTRICAL
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL NOTES AND ABBREVIATIONS
ES100 ELECTRICAL SITE DEMOLITION PLAN
ES101 PARTIAL ELECTRICAL SITE PLAN - AREA A
ES102 PARTIAL ELECTRICAL SITE PLAN - AREA B
ES103 PARTIAL ELECTRICAL SITE PLAN - AREA C
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
ES503 ELECTRICAL SITE DETAILS
ES504 ELECTRICAL SITE DETAILS
ES505 ELECTRICAL SITE DETAILS
EG101 PARTIAL LIGHTNING PROTECTION PLAN - AREA A
EG102 PARTIAL LIGHTNING PROTECTION PLAN - AREA B
EG103 PARTIAL LIGHTNING PROTECTION PLAN - AREA C
EG104 PARTIAL LIGHTNING PROTECTION PLAN - AREA D
EG105 BID OPTION NO. 03 (5% PHOTOVOLTAIC SYSTEM - AREA A)
EG106 BID OPTION NO. 03 (5% PHOTOVOLTAIC SYSTEM - AREA D)
EG107 BID OPTION NO. 02 (PARTIAL LIGHTNING PROTECTION PLAN - AREA A)
EG108 BID OPTION NO. 02 (PARTIAL LIGHTNING PROTECTION PLAN - AREA B)
EG109 BID OPTION NO. 02 (PARTIAL LIGHTNING PROTECTION PLAN - AREA D)
EG501 LIGHTNING PROTECTION DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EL101 LIGHTING PARTIAL FLOOR PLAN - AREA A
EL102 LIGHTING PARTIAL FLOOR PLAN - AREA B
EL103 LIGHTING PARTIAL FLOOR PLAN - AREA C
EL104 LIGHTING PARTIAL FLOOR PLAN - AREA D
EL105 LIGHTING PARTIAL FLOOR PLAN - AREA E
EL106 LIGHTING PARTIAL FLOOR PLAN - AREA F
EL107 LIGHTING PARTIAL FLOOR PLAN - AREA G
EL108 LIGHTING PARTIAL FLOOR PLAN - AREA H
EL109 LIGHTING PARTIAL FLOOR PLAN - AREA J
EL110 LIGHTING PARTIAL FLOOR PLAN - AREA K
EL111 LIGHTING PARTIAL FLOOR PLAN - AREA L
EL112 LIGHTING PARTIAL FLOOR PLAN - AREA M
EL113 LIGHTING PARTIAL FLOOR PLAN - AREA N
EL114 LIGHTING PARTIAL FLOOR PLAN - AREA P
DOCUMENT 00 01 15 Page 8
EL501 LIGHTING FIXTURE SCHEDULE
EL502 LIGHTING FIXTURE DETAILS
EL503 LIGHTING FIXTURE DETAILS
EL504 LIGHTING FIXTURE DETAILS
EL505 LIGHTING FIXTURE DETAILS
EL506 LIGHTING CONTROL DETAILS
EL507 LIGHTING CONTROL DETAILS
EL508 LIGHTING CONTROL DETAILS
EL509 LIGHTING CONTROL DETAILS
EL510 LIGHTING CONTROL DETAILS
EL511 LIGHTING CONTROL DETAILS
EP101 POWER PARTIAL FLOOR PLAN - AREA A
EP102 POWER PARTIAL FLOOR PLAN - AREA B
EP103 POWER PARTIAL FLOOR PLAN - AREA C
EP104 POWER PARTIAL FLOOR PLAN - AREA D
EP105 POWER PARTIAL FLOOR PLAN - AREA E
EP106 POWER PARTIAL FLOOR PLAN - AREA F
EP107 POWER PARTIAL FLOOR PLAN - AREA G
EP108 POWER PARTIAL FLOOR PLAN - AREA H
EP109 POWER PARTIAL FLOOR PLAN - AREA J
EP110 POWER PARTIAL FLOOR PLAN - AREA K
EP111 POWER PARTIAL FLOOR PLAN - AREA L
EP112 POWER PARTIAL FLOOR PLAN - AREA M
EP113 POWER PARTIAL FLOOR PLAN - AREA N
EP114 POWER PARTIAL FLOOR PLAN - AREA P
EP115 PARTIAL ELECTRICAL ROOF PLAN - POWER - AREA A
EP116 PARTIAL ELECTRICAL ROOF PLAN - POWER - AREA B
EP117 PARTIAL ELECTRICAL ROOF PLAN - POWER - AREA C
EP401 ENLARGED ELECTRICAL PLANS
EP402 SECURITY ACCESS FACILITY AND ENLARGED ELECTRICAL PLANS
EP403 ENLARGED ELECTRICAL PLANS
EP404 ENLARGED ELECTRICAL PLANS
EP405 ENLARGED ELECTRICAL PLANS
EP406 ENLARGED ELECTRICAL PLANS
EP407 ENLARGED ELECTRICAL PLANS
EP501 ELECTRICAL DETAIL
EP502 ELECTRICAL DETAILS
EP503 ELECTRICAL DETAILS
EP504 ELECTRICAL DETAILS
EP601 MECHANICAL CONNECTION SCHEDULE
EP602 PANELBOARD SCHEDULES
EP603 PANELBOARD SCHEDULES
EP604 PANELBOARD SCHEDULES
EP605 PANELBOARD SCHEDULES
EP606 PANELBOARD SCHEDULES
EP607 PANELBOARD SCHEDULES
EP608 PANELBOARD SCHEDULES
EP701 ELECTRICAL SINGLE-LINE DIAGRAM
EP702 ELECTRICAL SINGLE-LINE DIAGRAM
EP703 ELECTRICAL SINGLE-LINE DIAGRAM
EP704 RISER DIAGRAM
SYSTEMS
TY001 SYSTEMS LEGEND, NOTES AND ABBREVIATIONS
TY100 SECURITY PARTIAL SITE PLANS
TY101 SECURITY PARTIAL FLOOR PLAN - AREA A
TY102 SECURITY PARTIAL FLOOR PLAN - AREA B
TY103 SECURITY PARTIAL FLOOR PLAN - AREA C
TY104 SECURITY PARTIAL FLOOR PLAN - AREA D
DOCUMENT 00 01 15 Page 9
TY105 SECURITY PARTIAL FLOOR PLAN - AREA E
TY106 SECURITY PARTIAL FLOOR PLAN - AREA F
TY107 SECURITY PARTIAL FLOOR PLAN - AREA G
TY108 SECURITY PARTIAL FLOOR PLAN - AREA H
TY109 SECURITY PARTIAL FLOOR PLAN - AREA J
TY110 SECURITY PARTIAL FLOOR PLAN - AREA K
TY111 SECURITY PARTIAL FLOOR PLAN - AREA L
TY112 SECURITY PARTIAL FLOOR PLAN - AREA M
TY113 SECURITY PARTIAL FLOOR PLAN - AREA N
TY114 SECURITY PARTIAL FLOOR PLAN - AREA P
TY501 SECURITY SYSTEM DOOR DETAILS
TY502 SECURITY SYSTEM DOOR DETAILS
TY701 PA RISER DIAGRAM
TELECOM
T-001 TELECOM LEGEND
T-002 TELECOM SITE KEY PLAN
T-003 PARTIAL TELECOM SITE PLAN
T-004 PARTIAL TELECOM SITE PLAN
T-005 PARTIAL TELECOM SITE PLAN
T-006 PARTIAL TELECOM SITE PLAN
T-007 PARTIAL TELECOM SITE PLAN
T-008 PARTIAL TELECOM SITE PLAN
T-009 PARTIAL TELECOM SITE PLAN
T-010 PARTIAL TELECOM SITE PLAN
T-011 PARTIAL TELECOM SITE PLAN
T-012 TELECOM SITE DETAILS
T-013 TELECOM SITE DETAILS
T-100 CABLE TRAY AND TELECOM CONDUIT OVERALL PLAN
T-101 TELECOM PARTIAL FLOOR PLAN - AREA A
T-102 TELECOM PARTIAL FLOOR PLAN - AREA B
T-103 TELECOM PARTIAL FLOOR PLAN - AREA C
T-104 TELECOM PARTIAL FLOOR PLAN - AREA D
T-105 TELECOM PARTIAL FLOOR PLAN - AREA E
T-106 TELECOM PARTIAL FLOOR PLAN - AREA F
T-107 TELECOM PARTIAL FLOOR PLAN - AREA G
T-108 TELECOM PARTIAL FLOOR PLAN - AREA H
T-109 TELECOM PARTIAL FLOOR PLAN - AREA J
T-110 TELECOM PARTIAL FLOOR PLAN - AREA K
T-111 TELECOM PARTIAL FLOOR PLAN - AREA L
T-112 TELECOM PARTIAL FLOOR PLAN - AREA M
T-113 TELECOM PARTIAL FLOOR PLAN - AREA N
T-114 TELECOM PARTIAL FLOOR PLAN - AREA P
T-401 ENLARGED PLANS
T-402 ENLARGED PLANS
T-403 ENLARGED PLANS
T-404 ENLARGED PLANS
T-405 ENLARGED PLANS
T-406 ENLARGED PLANS
T-407 ENLARGED PLANS
T-408 ENLARGED PLANS
T-501 TELECOM DETAILS
T-502 TELECOM DETAILS
T-503 TELECOM DETAILS
T-504 TELECOM DETAILS
T-505 TELECOM DETAILS
T-506 TELECOM DETAILS
T-507 TELECOM DETAILS
T-508 TELECOM DETAILS
DOCUMENT 00 01 15 Page 10
T-509 TELECOM DETAILS
T-510 TELECOM DETAILS
T-511 TELECOM DETAILS
T-601 RACK SCHEDULES
T-602 RACK SCHEDULES
T-603 RACK SCHEDULES
T-604 RACK SCHEDULES
T-605 RACK SCHEDULES
T-606 RACK SCHEDULES
T-607 RACK SCHEDULES
T-608 RACK SCHEDULES
T-609 RACK SCHEDULES
T-610 RACK SCHEDULES
T-611 RACK SCHEDULES
T-612 RACK SCHEDULES
T-613 RACK SCHEDULES
T-614 RACK SCHEDULES
T-615 RACK SCHEDULES
T-701 TELECOM RISER DIAGRAMS
T-702 SIPR RISER DIAGRAM
-- End of Document --
DOCUMENT 00 01 15 Page 11
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W9126G-17-R-0008 X
2-Feb-2017 1 OF 2
W9126G
U.S. ARMY ENGINEER DISTRICT, FORT WORTH
ATTN: CESWF-CT
819 TAYLOR STREET, ROOM 2A17
FORT WORTH, TEXAS 76102-0300
(SEE BLOCK 7)
Richard D. Feller (817) 886-1165
Project Title: Mission Training Center Simulation Center, Fort Hood, Texas
THIS IS A UNRESTICTED solicitation.
E-MAIL: richard.feller@usace.army.mil
ONE (1) 1095
X X Section 01 00 00.00 44
X 10
1 2:00 PM
21 Mar 2017
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
E-MAIL ADDRESS:
DUNS: CAGE CODE:
( ) - ; FAX ( ) -
AS SET FORTH IN THE BID SCHEDULE
Section: 00 11 00 W9126G-17-R-0008
SECTION 00 11 00 Page 1 of 3
Item Unit Line Item No. Description Quantity Unit Price Amount
0001 All work required for construction of the Simulation Center (MTC) as described in the RFP, exclusive of all other work listed seperately. 1 JOB *** $
0002 Exterior work outside the building's 5 ft line including utilities, earthwork, paving, sidewalk, curb and gutter, screen walls,dumpster enclosure, parking lot lighting, parking lot signage, striping, exclusive of all other work listed. 1 JOB *** $
0003 Caisson Lengths/Reinforcing Steel (Piers) (24" Diameter) 15,042.5 VLF $ $
0004 Caisson Lengths/Reinforcing Steel (Piers) (18" Diameter) 1,485 VLF $ $
$TOTAL BASE OFFER
Simulatons Center, Mission Training Complex (MTC) Fort Hood, Texas
CONTRACT LINE ITEM SCHEDULE
BASE OFFER: All work required by the plans and specifications exclusive of work required by the Option Items.
Section: 00 11 00 W9126G-17-R-0008
SECTION 00 11 00 Page 2 of 3
Item Unit Line Item No. Description Quantity Unit Price Amount
Simulatons Center, Mission Training Complex (MTC) Fort Hood, Texas
CONTRACT LINE ITEM SCHEDULE
OPTIONS
0005 OPTION NO. 01: All work required to provide traffic signals at intersection. 1 JOB *** $
0006 OPTION NO. 02: All work required to provide rooftop mechanical screens. 1 JOB *** $
0007 OPTION NO. 03: All work required to provide photo voltaic (PV) system. 1 JOB *** $
Contract Duration in Calendar Days After the Notice to Proceed is received.*
DAYS
*Note: Contract duration for all work shall NOT exceed the duration specified in Section 01 00 00.00 44 CONSTRUCTION SCHEDULE. See Note No. 3.
TOTAL OFFER (BASE + ALL OPTIONS)
TOTAL ALL OPTIONS
Simulatons Center, Mission Training Complex (MTC) Fort Hood, TX
Solicitation No.W9126G-17-R-0008
CLIN SCHEDULE
SECTION 00 11 00 Page 3 of 3
NOTES:
1. Costs attributable to Division 01 - General Requirements are assumed to be prorated among bid items listed.
2. Responders are advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process based on decisions related to DOD changes in force structure and disposition of the Armed Forces.
3. The Offeror shall propose a total integrated contract duration in number of calendar days after the Notice to Proceed (NTP) is received by the Contractor, whether via electronic means or hard copy, whichever is the earliest method of delivery. The total number of proposed calendar days for construction through completion, ready for turnover shall not exceed the number of calendar days specified in 01 00
00.00 44 – CONSTRUCTION SCHEDULE. The proposed duration shall become the required contract duration. The Government may issue the NTP via e-mail or Facsimile (FAX) or by other means. Day number 1 is the day after the date of receipt of the NTP.
4. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
(a) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(b) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
5. At the option of the Government, the Government may require the Contractor to perform the work identified as Optional line item(s) at the price(s) stated in the CLIN Schedule. The Contracting Officer may exercise one or more of the Option(s) by written notice to the Contractor within [__] 30 calendar days after the date of the acknowledgment of the [Task Order] Notice to Proceed by the Contractor.
There is no separate completion period for these option(s) and the work included therein shall be completed within the contract duration as proposed above . Exercise of the Option(s) shall be evidenced on Standard Form 30, citing this CLIN Schedule note as the authority for exercising the Option. The Option shall be deemed exercised at the time the Government deposits the SF30 in the mail or, if earlier, at the time it is delivered to the Contractor.
6. Any proposal that is materially unbalanced as to prices for the Base CLIN Schedule may be rejected. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.
END OF CLIN SCHEDULE
W9126G-17-R-0008
Section 00 21 00 - Instructions, Conditions and Notices to Offerors
LOCAL INSTRUCTIONS
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR’S QUESTION AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARDS/ NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL INSTRUCTIONS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 BID GUARANTEE
1.13 CONTRACT PRICES-BIDDING SCHEDULE
1.14 ESTIMATED CONSTRUCTION COST
1.1. GENERAL DESCRIPTION OF WORK
The scope of the project includes all work required for the new construction of the Mission Training Center Simulation Center at Fort Hood in Killeen, Texas. The work shall be in accordance with the Request for Proposal documents. Proposed project will be a competitive, firm-fixed price, contract procured in accordance with FAR 15.101, Negotiated Procurement using the “Tradeoff Process”.
1.2. GOVERNMENT REQUIREMENTS FOR INCOMING MAIL AND PACKAGES
The Offeror(s) must ensure that ALL mail inquiries are sent to the Fort Worth District, U.S. Army Corps of Engineers, relating to either pre-contract or post-contract award. A return mailing address is required on the outside of the envelope, package, box, etc. All mail must be addressed to the Contracting office as specified below (no exceptions):
U.S. Army Engineer District, Fort Worth ATTN: CESWF-CT-C, Contract Specialist, Richard Feller PO Box 17300 819 Taylor Street (Room 2A17) Fort Worth, TX, 76102-0300
All Federal Express/UPS/etc. packages are required to have Offeror’s physical address and the above contracting office address including room number, contract specialist’s name and telephone number for proper delivery.
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and all amendments are available by INTERNET ACCESS ONLY. All solicitation documents and amendments will be posted on Federal Business Opportunities (FBO) website at http://www.fbo.gov/ and Offeror can access solicitation documents by the solicitation number, W9126G-17-R-0008.
It is solely the Contractor’s responsibility to check the fbo.gov website for the solicitation and any amendments prior to the RFP closing date. The Offeror shall submit in its proposal all requested information as specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation. The Offeror must be registered with the System for Award Management Database (SAM) to receive a Government contract award.
Additional information regarding this solicitation and potential Offerors (i.e., interested vendors list) and/or subcontractors will be available fbo.gov website under the solicitation number.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to these documents should be submitted via e-mail to:
Contract Specialist – Primary POC U.S. Army Corps of Engineers, Fort Worth District ATTN: CECT-SWF (Richard Feller) Phone: (817) 886-1165 Email: Richard.Feller@usace.army.mil
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via:
Bidder Inquiry in ProjNet at http://www.projnet.org/projnet
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
From this page you may view all bidder inquiries or add inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9126G-17-R-0008
The Bidder Inquiry Key is: WX3KK6-6BDB6Q
The Bidder Inquiry System will be unavailable for new inquires seven (7) days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
See Section 00 45 00, FAR 52.204-8 for the small business size standard/NAICS Code.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay as a direct charge any costs incurred by the Offeror in the preparation and submission of its proposal or revisions.
1.7. SITE VISIT
Pursuant to Contract Clause "FAR 52.236-3, Site Investigation and Conditions Affecting the Work," prospective offerors will be permitted to inspect the site where services are to be performed and to satisfy themselves as to all general and local conditions that may affect the cost of performance of the Contract to the extent such information is reasonably obtainable. Offerors are urged and expected to inspect the site where the work will be performed.
Reference Section 00 21 30 for site visit details.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth with full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTALS AND PROPOSAL FORMAT & GENERAL INSTRUCTIONS
a. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions should be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W9126G-17-R-0008_COMPANY NAME_PRICE
W9126G-17-R-0008_COMPANY NAME_TECHNICAL
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at https://safe.amrdec.army.mil/safe/. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).
When completing the information for transmittal at the AMRDEC SAFE website, notification should also be submitted to both the Contracting Officer and the Contract Specialists listed below that you have submitted (and uploaded) a proposal in the AMRDEC SAFE Website. The Contracting Officer for this project is: Mr. John H. Rodgers. Email address is john.h.rodgers@usace.army.mil. The Contract Specialist for this project is: Mr. Richard D. Feller. Email address is richard.feller@usace.army.mil.
Proposal(s) shall be transmitted to both of these email addresses.
Include the solicitation number in your Email Subject Line: W9126G-17-R-0008
Exception: Special instruction pertaining to hand-carried electronic offers: Pre-Approval request will be required for “Hand- Carried Electronic Offers”. Any Offerors submitting a “Hand carried electronic proposal must pre-coordinate with richard.feller@usace.army.mil. It is the responsibility of the Offeror to ensure their proposal is received prior to the due time and no later than the date in this solicitation or amendments. Hand carried electronic proposals must be coordinated no later than 5 working days prior to due date and time. Paper proposals shall not be accepted otherwise. Late proposals are unacceptable and may be determined ineligible for award.
Any hand-carried electronic offers shall be delivered to USACE Office at:
ADDRESS PACKAGES TO:
U.S. Army Corps of Engineers, Fort Worth District ATTN: CESWF-CT, Richard Feller 819 Taylor Street, Room 2A17 Fort Worth, TX, 76102-0300
For packaging that contains allowable hand carried proposals shall be marked:
“Proposals for Solicitation Number: W9126G-17-R-0008, DO NOT OPEN”
See Standard Form SF 1442 for proposal due date and time. Late proposals will be marked as late and not evaluated, unless otherwise determined by the Contracting Officer that a late proposal is deemed received acceptable for evaluation. A notice of late proposals will be sent to the Offeror via email. Electronic proposals are date and timed stamped upon receipt. It is recommended Offerors submit their proposal with sufficient submission time to preclude possible errors when loading or transferring documents.
1.10. PROPOSAL FORMAT
Submit only the electronic documents. Submit only the electronic files that are specifically requested in Section 00 22 11. All files submitted shall be in PDF format. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages shall be numbered.
PDF pages shall be formatted to print on 8 ½ by 11 inch paper, unless another paper size is specifically authorized for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers of the solicitation, project title and company. PDF drawings and summary schedule diagrams shall be sized to print on 11x17 inch paper.
Hard copies shall not be submitted, with the exception of the bid guarantee. Refer to this section, 1.12 Bid Guarantee, for bid guarantee submission requirements.
“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.
Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.
For submissions with page limitations, the corresponding PDF pages will be counted.
Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision or amendment, e.g., Error, Omission or Clarification shall be included and be annotated for each revision. Proposal replacement pages shall be numbered and clearly marked “REVISED”, with the date of revision.
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or Hub Zone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12. BID GUARANTEE
Submit the Bid Guarantee in accordance Provision 52.228-1, Bid Guarantee. One (1) copy of the bid guarantee shall be submitted electronically as part of Volume 2 and one (1) hard copy submission of the bid guarantee is due by the date and time for proposal submission. The bid guarantee shall be sent to the address in this section, 1.9 Proposal Submittals and Proposal Format & General Instructions, on or before the date indicated in Box 13 of the
SF1442.
1.13. CONTRACT PRICES - BIDDING SCHEDULE
Payment for the items listed in the Bidding Schedule shall constitute full compensation for furnishing all plant, labor, equipment, appliances, materials and bonds (performance and payment), and for performing all operations required to complete the work in conformity with the drawings and specifications. All costs for work not specifically mentioned in the Bidding Schedule shall be included in the contract prices for the items listed.
1.14. ESTIMATED CONSTRUCTION COST
The estimated cost of the proposed construction is between $25,000,000.00 and $100,000,000.00.
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016 52.211-2 Availability of Specifications, Standards, and Data Item
Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)
APR 2014
52.214-18 Preparation of Bids-Construction APR 1984 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-16 Facilities Capital Cost of Money JUN 2003 52.215-20 Requirements for Certified Cost or Pricing Data or
Information Other Than Certified Cost or Pricing Data
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .