Attachment_1_-_Minimum_Specifications_Revised_12-14-17.pdf

PDF 1 MB Posted

Attached to
Skid Mounted Environmental Equipment (SMEE)
Solicitation number
W9124R-18-T-0002
Issued by

About this file

Attachment 1 - Minimum Specifications Revised 12-14-17

View the file

Other files

File Type Posted
Answers_8.docx DOCX document
Attachment_1_-_Minimum_Specifications_Revised_1-9-18.pdf PDF
Answers_7.docx DOCX document
Answers_6.pdf PDF
Answers_5.pdf PDF
Answers_4.docx DOCX document
Answers_3.pdf PDF
GP5_Site_Electrical_Layout.pdf PDF
Answers_2.DOCX DOCX document
CoN_CheckList_-_Redacted.pdf PDF
Answers_1.docx DOCX document
Attachment_2_-_Clauses_and_Provisions.pdf PDF
Attachment_3_-_Site_Visit_Information.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION OF WORK

US Army Yuma Proving Ground

Weapons Firing Chamber

Skid Mounted Environmental Equipment

Revision: 14 December 2017

December 14, 2017 i

TABLE OF CONTENTS

1. Overview

1.1. Proposal

1.2. Background

2. Applicable Documents

3. Requirements

3.1. General Requirements

3.2. Skid Mounted Environmental Equipment (SMEE)

3.3. Option 1: Low Temperature Cooling (Cascade) Equipment

3.4. Option 2: Ammunition Conditioning Chamber (ACC)

3.5. Commercial Drawings/Models/Software And Associated List

4. Program Management

4.1. Site Access and Scheduling

4.2. Design Review and Quality Assurance

4.3. Pre‐Delivery Inspection (Approximately 4‐weeks prior to delivery)

4.4. The contractor shall conduct a final acceptance test at the WFC site after delivery and installation

4.5. A Government representative shall operate the chamber during post‐installation acceptance testing

5. Antiterrorism (AT) & Operations Security (OPSEC):

6. Government Property

7. Shipping

8. Warranties

APPENDIX A ‐ Existing Equipment

APPENDIX B ‐ Example Temperature, Humidity, And Time Profiles From MIL‐STD‐180G CN 1

APPENDIX C ‐ Example Temperature, Humidity, And Time Profiles From MIL‐STD‐331C

APPENDIX D – ACRONYMS

ii

This Page Intentionally Left Blank

1. Overview

This purchase description sets forth the minimum requirements for the purchase of Skid Mounted Environmental

Equipment (SMEE) to support the existing Weapons Firing Chamber (WFC) at the US Army Yuma Proving Ground

(YPG). The equipment will condition the WFC to temperatures ranging from ‐65°F to 165°F, and Relative Humidity

(RH) ranging from 1 ‐ 100%.

1.1. Proposal

The Contractor’s proposal shall include sufficient conceptual configuration drawings, and design theory to permit full evaluation of the proposal. The proposal shall include billing amount for each deliverable, and a timeline for project execution.

1.1.1. SMEE equipment shall supply conditioned air to the existing WFC to produce the necessary conditions within the chamber to meet various test requirements. The SMEE shall include all items and controls necessary to meet chamber performance requirements.

1.1.2. The proposal shall include an option to provide additional refrigeration capacity for the WFC SMEE.

The Government may exercise this option prior to delivery of the chamber, or after installation of

WFC SMEE equipment.

1.1.3. The proposal shall include an option to provide a separate Ammunition Conditioning Chamber

(ACC). The Government may exercise this option prior to delivery of the chamber, or after installation of WFC SMEE equipment.

1.2. Background

U.S. Army Yuma Proving Ground is located near the Arizona‐California border, adjacent to the Colorado River, approximately 24 miles north of the city of Yuma (pop 87,000), Arizona. YPG conducts tests on medium and long range artillery, aircraft target acquisition equipment and armament, armored and wheeled vehicles, a variety of munitions, and personnel and supply parachute systems; and is the Army's center for desert natural environment testing as well as the management of cold weather and tropic testing. At 1300, square miles, YPG is one of the largest military installations in the world, and provides facilities, instrumentation, and expertise to test equipment for the Department of Defense, other government agencies, foreign entities, and private industry customers.

Yuma has subtropical desert environment, Köppen climate classification: BWh. The SMEE installation site is at the existing WFC test site approximately 400 feet above sea level. The equipment will be installed outdoors and subjected to local weather conditions including rain, wind, solar effects, temperature, and dust storms. On average 118 days per year exceed 100°F. The record high temperature is 124°F, and the record low is 22°F.

YTC’s (Yuma Test Center) GP‐5 (Gun Position 5) Weapons Firing Chamber has the capability to perform environmental testing while maintaining the ability to directly and indirectly fire large caliber weapon systems.

The WFC was manufactured in 1992 and consists of a large, earth covered steel culvert. The chamber test volume is approximately 13,000ft3, includes an earthen floor for emplacing artillery, and is accessed via a large, insulated rolling door. Weapons are fired from an adjustable, insulated firing port (reference Appendix A – Existing

Equipment).

2. Applicable Documents

MIL‐STD‐810G “Environmental Engineering Considerations and Laboratory Tests” Change Notice 1, Methods 501.6

High Temperature, 502.6 Low Temperature, and 507.6 Humidity.

MIL‐STD‐331C “Fuze And Fuze Components, Environmental And Performance Tests For”, Test C1 ‐ Single Chamber

Method

Department of the Army Pamphlet 385‐64 Safety, Ammunition and Explosives Safety Standards

ANSI/NFPA 79, Electrical Standard for Industrial Machinery

ANSI B9.1, Standard Code for Mechanical Refrigeration

3. Requirements

NOTE

The proposing company shall enter compliance (C – fully meets the requirement), non‐ compliance (NC – does not meet all or part of the requirement) or exception (E – the requirement is partially met or the requirement is met in a different way) for each requirement and bullet. A statement is requested for any non‐compliance or exception.

3.1. General Requirements

3.1.1. The equipment design, manufacturing, delivery, installation and operation to be accomplished within established timelines. It is the Contractor’s responsibility to verify existing site, equipment, utility, configuration, size, and location information is adequate prior to design review. All components shall be new and Original Equipment Manufacturer (OEM). No demonstration or used components are acceptable.

3.1.2. Equipment will connect to the existing site utilities for power, Reverse Osmosis (RO) system for raw water, and the compressor for pressurized air. For the purpose of providing a proposal, reference

Appendix A for details of the current equipment’s power connections (assumed site availability).

Proposals should indicate if current site power is expected to be sufficient for the proposed equipment.

3.1.3. Required performance met when equipment is exposed to the local conditions described:

Outdoor temperatures reaching as high as 120°F in the summer and as low as 30°F in the winter

High temperatures coupled with outdoor RH exceeding 50% and the Wet Bulb Globe

Temperature (WBGT) reaching 95°F

Solar Insolation of 1100 langly (Ly) per day

Periodic wind, sand, and dust storms – gusts up to 45mph with sustained winds up to 30mph for 15 minutes

Seasonal episodes of heavy rainfall rates of 2.5 inches per hour for 20 minutes

Moderate to light rainfall over extended periods – up to 2 inches in a day

3.1.4. The equipment will be emplaced in close proximity to firing of large (up to 155mm Artillery and

120mm Tank) cannon (reference Appendix A). Design and manufacture will be such that the equipment withstands the shock and overpressure of cannon firing from the WFC, and remains operating during weapons firing.

3.1.5. Equipment will be designed to facilitate repair, replacement, and troubleshooting of system components. Access doors and hatches will be used where appropriate. Wiring to comply with

ANSI/NFPA 79, Electrical Standard for Industrial Machinery as applicable.

3.1.6. Design, manufacture, and material types and grades should provide a 20 year minimum equipment life/usage expectancy given the conditions described above. All exterior surfaces of the equipment shall be primed and painted with exterior grade white paint suitable for the respective surfaces.

Surfaces that are normally not painted, such as aluminum condenser fan enclosures, are excluded from this requirement.

3.1.7. Appropriate insulation shall be used on cold piping to reduce condensation. Guard(s) shall be used to prevent hot piping from unintentional touches by personnel. Outdoors, metal wrapped insulation should be used throughout. All insulation to be adequately protected to prevent degradation when exposed to the environment.

3.2. Skid Mounted Environmental Equipment (SMEE)

The SMEE will supply conditioned air to the existing Weapons Firing Chamber to provide the necessary environments within the chamber to meet various test requirements. The SMEE will include all equipment, instrumentation, and controls necessary to provide, control, and monitor WFC conditions. Design calculations and manufacture should assume a 60,000 pound static load of steel in the WFC, and a minimum uninterrupted test length no less than 30 days.

3.2.1. SMEE Performance Requirements

3.2.1.1. The SMEE shall control and provide the necessary cooling, heating, humidification, and dehumidification of the WFC environment to perform tests in accordance with MIL‐STD‐810G

“Environmental Engineering Considerations and Laboratory Tests” Change Notice 1, Methods

501.6 High Temperature, 502.6 Low Temperature, and 507.6 Humidity. (Reference Appendix

B – Example Temperature, Humidity, and Time Profiles from MIL‐STD‐810G CN 1).

3.2.1.2. The temperature range in the WFC shall be controllable from ‐65°F to +165°F ±3.6°F with no less than ±1°F control accuracy as measured at the control sensor after stabilization has been reached. The sensor designated as “control” will be mounted to a movable stand placed near the return air intake.

3.2.1.3. The relative humidity in the WFC shall be controllable from 1% to 100% RH ±5% as defined in the tables from MIL‐STD‐180G CN 1 provided in Appendix B. [NOTE: Reference Appendix B regarding the relationship between temperature and humidity in MIL‐STD‐810G CN1. Of particular note, very low humidity values (1‐8%) are coupled with high temperatures.]

3.2.1.4. The SMEE shall be programmable to transition the WFC chamber temperature from +70°F to either temperature extreme (‐65°F or +165°F) at a rate not to exceed 5°F per minute.

Equipment sizing and calculations for static chamber temperature to change from +100°F to

‐65°F should not be expected to exceed 48 hours under the worst case conditions described in 3.1.3 (60,000 static load in the chamber).

Equipment sizing and calculations for static chamber temperature to change from +50°F to

+165°F should not be expected to exceed 24 hours under the worst case conditions described in 3.1.3 (60,000 static load in the chamber) given available site power. Performance

Requirement 3.2.1.1 shall be met regardless.

3.2.2. SMEE Control and Instrumentation

The SMEE will include a control and system which monitors the conditions within the WFC, and controls the SMEE to adjust or maintain conditions in the test chamber as programmed by the user. The SMEE will include instrumentation and data recording capabilities including the ability to output and display chamber and equipment data.

3.2.2.1. The SMEE shall be fully operated from the existing WFC control room while connected to or disconnected from the YPG Installation Campus Area Network (ICAN).

3.2.2.2. Custom recipe programming should be performed via an intuitive Graphical User Interface

(GUI). The user will program repeatable recipes cable of continuous operation regardless of the test duration. The user will program and store recipes for chamber temperature, humidity, and ramp rates for cyclic or static testing.

3.2.2.3. Chamber monitoring and control should be performed via an intuitive GUI. The user will monitor and review test chamber conditions and equipment performance metrics. The test chamber environment shall be controlled by adjusting only one controller set point for each test variable. Data can be displayed in both real‐time, and over time as a graph.

3.2.2.4. The following information should be displayed in real‐time, logged, and exported as required.

The data defined in this document will be exportable as a CSV (or equivalent) file in the WFC control room, and accessible via remote VPN connection:

Timestamp: configurable setting and sample rate

Chamber and temperature and humidity set points

Chamber, mixing box, and outdoor temperature and humidity

Chamber differential pressure

Each evaporator’s inlet and outlet temperatures

Each compressor’s suction, discharge, and oil temperatures

Each compressor’s suction, discharge, and oil pressures

Each compressor’s motor temperatures

All damper door positions and set points

Wet bulb pressures

Amperage draws of motors (e.g. compressors, air handlers, condenser fans)

All heater and defroster amperage draws

All humidity generation and control equipment amperage draws

All supply and return air velocities through evaporator coils

All system fault statuses (e.g., Emergency‐stop, temperature safeties, equipment safeties)

Any additional feedback, safety, I/O as necessary for the SMEE to meet performance requirements

12 additional channels to be provided for potential future use, both thermocouple and

Instrumentation Under Test (IUT) at 4 – 20 mV input.

3.2.2.5. Type T thermocouple shall be used throughout.

3.2.2.6. The system shall be designed such that no data is lost as a result of a test interruption (e.g., Emergency‐stop, manual shut down, malfunction, power outage). Recipes should be capable of recovery from a test interruption including addition of “make up time”. Data recording equipment will include its own Uninterrupted Power Supply (UPS), and remain running during emergency stop (E‐stop) or power outage conditions for no less than one hour.

3.2.2.7. Automated control systems shall utilize only the number of modules necessary to meet a specific temperature ramp or set point. Otherwise, non‐active modules will be in a defrost, pre‐cool, stand‐by/shut‐down, or offline state. Automated controls should operate modules to equally share runtime between them. If operators choose to deviate from the automatic rotation, the controls will allow for manual selection of active modules, and the states of non‐ active modules.

3.2.2.8. The refrigeration systems shall utilize automatic load controls, which regulate the cooling effect by means other than by stopping and starting the system compressors or air circulation fans, e.g. “hot gas bypass” and “liquid injection”.

3.2.2.9. In the event operators determine any module is to be brought off‐line, operators will be able to shut off power to the affected module via lock‐out/tag‐out to allow for repairs or maintenance to be conducted on the off‐line module while the remaining modules continue to support chamber operations. (It is understood reduced conditioning capacity could result in conditions within the WFC not meeting required set‐points while modules are off‐line).

3.2.2.10. Operators shall be capable of logging into the chamber and fully operating it remotely via the YPG Internet Capable Area Network (ICAN) and Virtual Private Network (VPN) connected with the YPG ICAN. This requires control systems be compliant with Army Cyber

Security Requirements.

3.2.2.11. An independent, configurable over and under hardware temperature safety shall terminate all air circulation and all heating and cooling actions of the SMEE when an over‐ or under‐temperature condition exists within the WFC. A visual indication that an over‐ temperature condition has occurred shall be provided on the main control interface.

3.2.2.12. A secondary, software based, temperature safety shall be included with recipe programming to flag and mitigate over and under temperature issues prior to reaching the hardware safety limit.

3.2.2.13. The chamber will include a minimum of three E‐stops including one at the control station in the existing control room, one at the SMEE, and one located in the WFC airlock.

Activation will cut power to mechanical equipment and heaters.

3.2.2.14. An interlock shall be provided to prevent operation of the SMEE heating or cooling systems with circulation fans not operating.

3.2.3. SMEE Design Architecture

YPG’s experience with current systems ‐ their use, maintenance, repair, reliability, costs to operate, and risk in the event of system failures drives the following requirements.

3.2.3.1. The SMEE shall be constructed of modular, skid mounted sub‐systems allowing for offsite construction and testing, ease of transport, and minimized installation timelines. The assembled height of the SMEE should not exceed 20 feet, and the equipment will be placed on the existing concrete pad.

3.2.3.2. The system architecture (reference Figure 1), shall be such that each modular equipment unit has its own, isolated cooling circuits. Should a coolant circuit in any one module lose integrity resulting in the release of refrigerant, only the refrigerant in that one module will be affected.

The proposed configuration of these modules, and how they supply conditioned air to the

WFC may differ from Figure 1 and will be determined by the Offeror.

Figure 1: Conceptual System Architecture ‐ FOR REFERENCE ONLY

Proposed configuration, equipment type, and layout, will be determined by the Offeror.

3.2.3.3. The SMEE shall be preconfigured (including all necessary wiring, controls interfacing, damper doors, block off plates, etc.) to accommodate optional equipment to increase the low temperature cooling capacity of the system a minimum of 20%.

3.2.3.4. Well insulated, rigid supply and return ducts to connect the SMEE to the WFC shall be provided by the vendor.

3.2.3.5. Automatic drains for the defrost water and condensation to the outside of the ducts and equipment modules shall be provided. They will be appropriately controlled to prevent drawing outside air into the system without requiring manual intervention. Water and water vapor generated during defrost will be prevented from entering the WFC or alternate cooling circuits.

3.2.3.6. Exterior lighting: Adequate outdoor lighting will be provided to illuminate the exterior of the

SMEE to facilitate safe movement of personnel about the SMEE at night. Each light will be

100 watts minimum, swivel mounted and rated for outdoor installation. The exterior light controls shall be located on the main control panel.

3.2.3.7. Interior lighting: The interior light level will be such that inspections and maintenance can be performed throughout the modules (as applicable to the proposed design).

3.2.4. SMEE Cooling and Heating Equipment – General Requirements

3.2.4.1. The refrigerants used shall comply with the US Environmental Protection Agencies Significant

New Alternatives Program for Refrigeration and Air Conditioning. No CFCs shall be used.

3.2.4.2. The system shall be designed to prevent ignition of volatile fuels which may be present in the

WFC (e.g., explosion proof motors and contactors to be used if exposed to the WFC supply & return airflow).

3.2.4.3. The air supplied shall remain safe for unassisted breathing by personnel with the exception of hazards normally associated with exposure to high or low temperatures and humidity conditions within the WFC (e.g., no cryogenic Liquid Nitrogen or Carbon Dioxide boost).

Note: Removal of vehicle exhaust fumes from the WFC is the responsibility of the

Government and is accomplished with existing equipment and toxic fumes monitoring devices.

3.2.4.4. The refrigeration systems shall be equipped with all protective devices required for safeguarding the system against excessive pressures and temperatures as generally outlined in ANSI B9.1, Standard Code for Mechanical Refrigeration, reference 2.2. Required devices to include:

The refrigeration systems shall be provided with refrigeration sight glasses as appropriate.

The refrigeration systems shall include a suction accumulator, appropriately sized according to the manufacturer's recommendations, for the capacity of the compressors.

The refrigeration systems shall include a cartridge type liquid line filter dryer, with a

Schrader valve pressure tap. Discharge line oil separators for the compressors shall be provided and connected as recommended by the compressor manufacturer.

Crankcase Heaters: Crankcase heaters for compressors shall be used.

Vibration isolators shall be provided on the discharge and suction side of the compressors.

3.2.4.5. All compressors shall include an equalizing valve between the liquid and suction lines (or an equivalent mechanism) to allow for prompt restart in the event of a shutdown.

3.2.4.6. Refrigeration service valves (shutoff valves) shall be provided to isolate the compressors, condensers, and the liquid and suction line filters, and dryers of the refrigeration systems as warranted by the type of equipment proposed.

3.2.5. SMEE Low Temperature Cooling (Cascade) Equipment

3.2.5.1. Low temperature (approximately less than 45°F) cooling of the circulating air shall be accomplished using a cascade refrigeration system which employs a direct expansion vapor compression cycle.

3.2.5.2. The identical Low Temperature Cascade Modules shall be sized such that each supplies no more than 20% of the total low temperature cooling capacity of the system.

3.2.5.3. R508B (Suva95) is the preferred refrigerant for the low temperature cooling stage.

3.2.5.4. A means to pre‐cool the cascade modules prior to each actively conditioning the WFC will be used to prevent temperature spikes.

3.2.6. SMEE High Temperature Cooling Equipment

3.2.6.1. High temperature (approximately greater than 35°F) cooling of the circulating air shall be accomplished using a direct expansion vapor compression cycle.

3.2.6.2. Pre‐cools the chamber prior to Cascade activation and controls chamber temperature during cyclic testing at temperatures between 35°F and 165°F.

3.2.6.3. A minimum of two identical modules shall be utilized to provide the necessary High

Temperature Cooling capability.

3.2.7. SMEE Heating and Defrost Equipment

3.2.7.1. Heating shall be accomplished using electric resistance heating.

3.2.7.2. Heater Sheath Temperature Safety – in order to comply with explosive safety regulations, there shall be an independent heater sheath temperature cut‐off device with a manual reset, which is independent from all other safeties.

3.2.7.3. The maximum temperature which the heater surface is allowed to attain shall be adjustable down to 228°F to comply with explosive safety regulations.

3.2.8. SMEE Humidity Control Equipment

3.2.8.1. Wet‐bulb evaporator or equivalent for humidity control during high‐humidity conditions

(approximately 20% – 100% RH).

3.2.8.2. Desiccant dehumidifier or equivalent for humidity control during low‐humidity conditions

(approximately 0% – 30% RH).

3.2.8.3. It is permissible to integrate the wet‐bulb humidity control equipment with the High

Temperature Cooling equipment.

3.2.9. Make‐up air shall be provided while operating vehicle engines in the chamber. Make‐up air shall supply a minimum of 800 Cubic Feet per Minute (CFM) between ‐25°F and + 120°F.

3.3. Option 1: Low Temperature Cooling (Cascade) Equipment

3.3.1. The vendor will provide additional cascade module(s) which conform to the requirements for the

Low Temperature Cooling (Cascade) Equipment, increasing the SMEE low temperature cooling capacity 20%.

3.3.2. The additional cascade module(s) shall be preconfigured to seamlessly integrate into the SMEE equipment and control systems.

3.4. Option 2: Ammunition Conditioning Chamber (ACC)

The ACC shall be a complete stand‐alone turn‐key unit, and provide the necessary cooling, heating, humidification, control and instrumentation of the conditions within an attached test cell – inside dimensions measuring 10’L x

7’W x 6’6”H, and will support preconditioning of ammunition fired from the WFC. Design calculations and manufacture should assume a 6,000 pound static load of steel in the WFC, and a minimum uninterrupted test length no less than 30 days.

3.4.1. ACC Performance

3.4.1.1. The ACC shall perform tests in accordance with MIL‐STD‐810G “Environmental Engineering

Considerations and Laboratory Tests” Change Notice 1, Methods 501.6 High Temperature,

502.6 Low Temperature, and 507.6 Humidity.; and MIL‐STD‐331C Test C1, single chamber method upon delivery and installation. Reference Appendices B and C.

3.4.1.2. The temperature capability range shall be from ‐80°F to +170°F ±3.6°F with no less than ±1°F control accuracy as measured at the control sensor after stabilization has been reached.

3.4.1.3. Relative humidity shall be controllable from 1% to 100% RH ±5% as defined in the tables from

MIL‐STD‐180G CN 1 and MIL‐STD‐331C.

3.4.1.4. Temperature and RH change rates shall meet MIL‐STD‐810G and MIL‐STD‐331C requirements.

3.4.2. ACC Control and Instrumentation

Meets requirements specified for the SMEE Control and Instrumentation unless otherwise specified.

Requirements referencing multiple modules do not apply.

Requirements referencing the SMEE or WFC are applicable to the ACC and ACC test cell.

A minimum of two emergency stops, one at the control station and one at the ACC are required.

3.4.3. ACC Design and Manufacture

3.4.3.1. The ACC shall be skid mounted allowing for offsite construction and testing, ease of transport, and minimized installation timelines.

3.4.3.2. Interior surfaces shall be manufactured from stainless steel and seams fully welded to prevent leakage of air and moisture in and out of the test cell.

3.4.3.3. An automated drain shall be installed to remove condensation from the test cell.

3.4.3.4. The test cell floor shall be constructed to support an evenly distributed load of than 10,000 pounds (143 lb/ft2).

3.4.3.5. Exterior lighting shall be provided above the main chamber door, and at the equipment area access panel. Each blast proof light will be 100 watts minimum, swivel mounted and weather proof.

3.4.3.6. The mechanical conditioning equipment and test cell shall be illuminated by blast proof lights such that inspections and maintenance can be performed unassisted throughout.

3.4.3.7. The Main Chamber Door

The door shall fully open and expose the 7’W x 6’6”H chamber cross section.

A high security hasp NSN 5340‐01‐196‐2547 shall be welded to the test compartment door so that the test compartment can be locked.

An 11” x 4”x ¼” thick plate will allow welding the security hasp onto the chamber.

The door shall be fitted with a seal to prevent leakage of air and moisture in and out of the test cell.

3.4.4. ACC Cooling and Heating Equipment – General Requirements

Meets requirements specified for the SMEE Cooling and Heating Equipment – General Requirements unless otherwise specified.

Requirements referencing the SMEE or WFC are applicable to the ACC and ACC test cell.

References to vehicle exhaust fumes do not apply.

3.4.5. ACC Low Temperature Cooling (Cascade) Equipment

Meets requirements specified for the SMEE Low Temperature Cooling (Cascade) Equipment unless otherwise specified.

3.4.6. ACC High Temperature Cooling Equipment

Meets requirements specified for the SMEE High Temperature Cooling Equipment unless otherwise specified.

3.4.7. ACC Heating and Defrost Equipment

Meets requirements specified for the SMEE Heating and Defrost Equipment unless otherwise specified.

A separate defrost capability for the low temperature cooling is not required if the ACC meets performance requirements uninterrupted.

3.4.8. ACC Humidity Control Equipment

Meets requirements specified for the SMEE Humidity Control Equipment unless otherwise specified.

3.5. Commercial Drawings/Models/Software And Associated List

3.5.1. The contractor shall provide all documentation in both digital and hard copy for each of the following areas: manuals, two sets of installation and equipment electrical/mechanical drawings and operator maintenance manuals, a bill of materials (BOM) with original manufacture and part number information, and suggested repair parts list to be maintained on hand.

3.5.2. DVD installation disks of all installed application software to include Operation System and all necessary drivers and software.

4. Program Management

4.1. Site Access and Scheduling

4.1.1. The Government will coordinate with the Contractor to schedule access. The exact scheduling times for the installation will be coordinated between the Government and the Contractor during the design review process.

4.1.2. The Contractor cannot complete final terminations/connections to Real Property service (water, electric, gas, etc). Government personnel will coordinate this effort, and will require input from the

Contractor for scope and scheduling.

4.1.3. The contractor cannot have access to the government information network system unsupervised and should make an effort to work offline as much as possible to upgrade these systems.

No contractor computer system or SMEE component shall be connected to the YPG network without approval, guidance and support from YPG Network Enterprise Center

(NEC) support personnel.

Any equipment, software upgrade components, or applications intended to eventually connect to the YPG network shall be installed under the guidance of YPG NEC support personnel.

4.1.4. Unless driven by Government delay – the overall timeline shall not exceed 68 weeks after contract award.

Completed design drawings within 16 weeks after contract award is preferred.

Manufacture and pre‐delivery inspection within 32 weeks after acceptance of final system design.

Installation and Contractor shakedown testing should not exceed 12 weeks after delivery. The proposed modular design architecture should support this timeline.

Training and Acceptance testing should not exceed 4 weeks.

4.2. Design Review and Quality Assurance

It is the Government’s position continued communication during the design, build, manufacturing, and installation process benefit the project as a whole and ensure the successful installation of the procured equipment. At minimum the following events will be supported by the Contractor and Government.

4.2.1. Project Kick‐Off (Approximately 2‐weeks ARO)

The Contractor will submit a documentation which addresses equipment, operational theory, controls theory, description of instrumentation, and an updated timeline.

Should include preliminary drawings, identified long lead‐time items, The Government will respond to questions or requests for clarification the Contractor may have, and will provide input.

A site visit to confirm site layout and infrastructure.

4.2.2. 50% Design Review The Contractor will submit a design which addresses equipment, operational theory, and description of instrumentation, description of controls, an updated timeline, and health of the project.

Will include draft drawings and schematics, identified equipment list, identified long lead‐time items, known issues, and other pertinent information.

The Government will respond to questions or requests for clarification the Contractor

4.2.3. 90% Design Review

The Contractor will submit an essentially complete design which addresses equipment, operations, instrumentation, control systems, an updated timeline, and health of the project.

Will include completed drawings and schematics, identified equipment list, identified long lead‐time items, status of manufacturing and programming efforts, known issues, preliminary acceptance test plan, and other pertinent information.

The Government will respond to questions or requests for clarification the Contractor

The Government will provide a design review.

4.2.4. Manufacturing Review

During the Manufacturing period, the Contractor will provide updates regarding the status of the project.

Will include status of long lead‐time items, status of manufacturing and programming efforts, description of non‐trivial design changes, known issues, and other pertinent information including example photographs of subsystems and modules being manufactured.

Results of any in‐house testing or pre‐delivery check outs.

The Government will respond to questions or requests for clarification the Contractor

4.3. Pre‐Delivery Inspection (Approximately 4‐weeks prior to delivery).

The purpose of the inspection is to provide the Government with confidence that the level of completion of modular subsystems, components, programming, etc. is sufficient to support the Contractor’s proposed installation timeline.

4.3.1. The Contractor will provide documentation (including photographs, drawings, or video) which demonstrates equipment is on‐track to be shipped and installed to meet established timelines.

4.3.2. The Government may travel to the Contractor’s facility to inspect the equipment prior to delivery.

The contractor shall coordinate as necessary with the Government and provide relevant access.

4.3.3. Following the Pre‐Delivery inspection the Government will take the WFC off‐line and remove the existing equipment.

4.4. The contractor shall conduct a final acceptance test at the WFC site after delivery and installation.

4.4.1. Acceptance testing shall be preceded by operator training. Upon completion, operators shall have been instructed on:

Introduction to system components (Hardware and Software).

Basic Operation of SMEE and ACC: power up, programming, program saving, program execution, equipment operations.

Basic Application Operation: log‐on, help screens, error screens, menu selections, editing, file processing, file saving and error recovery.

System peripheral devices, operation and calibration.

4.5. A Government representative shall operate the chamber during post‐installation acceptance testing.

4.5.1. This testing shall include demonstration of functionality per MIL‐STD‐810G, specifications, and confirmation of the requirements set forth in this document.

4.5.2. The acceptance test plan shall be developed by the contractor and approved by the government prior to conducting the test.

4.5.3. Testing will include an appropriately sized thermal test load provided by the Government.

5. Antiterrorism (AT) & Operations Security (OPSEC):

The following requirements must be met for contractor personnel entering YPG in support of the onsite effort.

1. AT Level I training. All contractor employees, to include subcontractor employees, requiring access

Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a

COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:

http://jko.jten.mil

2. Access and general protection/security policy and procedures. Contractor and all associated sub‐ contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency

Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by

DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2a. N/A

2b. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist

Screening Database (TSDB) (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3. N/A

4. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

5. N/A

6. For contracts that require a formal OPSEC program. The contractor shall follow the most current YPG

OPSEC Plan as well as annexes and updates; the contractor is not required to develop their own OPSEC

Plan. The Contractor should be able to answer the following questions after a review of the YPG

OPSEC Plan.

What is YPG's critical information?

What critical information am I personally responsible for protecting?

How is the threat trying to acquire my critical information?

What steps are we taking to protect our critical information?

Who is my YPG OPSEC Officer (in order to report an OPSEC concern, compromise, or ask an

OPSEC question)?

This requirement shall be flowed down to all subcontractors with access to Controlled Unclassified Information

(CUI). The YPG OPSEC Plan will be made available for appropriate personnel.

Additionally, the following are specific OPSEC measures that the contractor shall follow to the greatest extent possible without sacrificing effectiveness or efficiency:

Avoid repetitive or stereotyped tactics and procedures for executing operations or activities in terms of time, place, and event sequencing at YPG.

Dispose of all Army products as classified trash.

Follow all applicable guidelines for Controlled Unclassified Information.

Avoid bulletin board plan of the day or planning schedule notices that reveal when events will occur at YPG.

7. Requirement for OPSEC training. Per AR 530‐1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within thirty (30) calendar days of their reporting for duty and annually thereafter.

8‐11. N/A

12. For contracts that require handling or access to classified information. The Contractor is not required to handle and/or access classified information. However, any Controlled Unclassified Information (CUI) and/or "For Official Use Only" (FOUO) information should be handled in accordance with the attached document "PROTECTING 'FOR OFFICIAL USE ONLY' (FOUO) INFORMATION".

13. Threat Awareness Reporting Program. All Contractor employees, to include subcontractor employees, will report threat‐related incidents, behavioral indicators, and other matters of CI interest specified in AR

381‐12, chapter 3, to the nearest military CI office, the Federal Bureau of Investigation, or the Defense

Security Service.

14. N/A

6. Government Property

All hardware components in‐place are considered Government property and shall remain with the Government.

The Government is responsible for removal of the existing environmental conditioning equipment.

7. Shipping

The contractor shall provide the equipment including shipping and complete installation at US Army Yuma Test

Center (YTC), Yuma Proving Ground, AZ. The contractor shall install the SMEE and ACCs at the provided location at

YTC. The Proposal shall specify FOB destination: US Army Yuma Test Center facility located at Yuma Proving

Ground. Note: SMEE and ACC skids shall be delivered directly to the installation site on the KOFA firing range.

US Army Yuma Test Center

Transportation Division

Building 2710 Sanchez Street

Yuma, AZ 85365‐9498

928‐328‐9498

8. Warranties

Contractor shall ensure all OEM warranties are transferred to the Government upon delivery. The contractor shall provide a one year commercial warranty and technical support which fully covers repair, reprogramming, or replacement of parts and any labor to keep the system running properly under its intended use. The vendor warranty shall cover all parts and labor for the system to include free software updates and patch releases, and e‐ mail and telephone technical support. The warranty period shall not start until formal acceptance by the

Government.

APPENDIX A

A‐1

APPENDIX A ‐ Existing Equipment

Figure A ‐ 1: Weapon Firing Chamber (WFC)

Figure A ‐ 2: Satellite View

A‐2

Figure A ‐ 3: South Module and Condenser

Figure A ‐ 4: View of Ducts Entering the WFC

Figure A ‐ 5: View of Front of Chamber with Firing Port

Door Closed

Figure A ‐ 6: North Module and Condenser

Figure A ‐ 7: North Module Coil Cabinet

Figure A ‐ 8: Lower Coil Cabinet Opened (North

Module) Background

Current Equipment o Originally Built in 1992 by Mallory Engineering.

o Refrigerant upgrade in 2002 o Control Systems Upgraded in 2016.

Testing per MIL‐STD‐810

A‐3 o Temperature: ‐65 °F to 160 °F o Humidity: 5% to 95% o Static and Cyclic Temperature/Humidity Profiles

Accommodates large Army Equipment o Combat Vehicles o Tactical Vehicles o Towed artillery o Self Propelled artillery o Aircraft

Figure A ‐ 9: Test Vehicle in Chamber Figure A ‐ 10: Towed Howitzer Emplaced for Firing

Test Chamber o Chamber Volume: Approximately 13,000 ft3 o Soil floor for emplacing artillery o Construction: Galvanized culvert insulated with 6” foam and earth backfill.

o One Supply duct per cascade module o One Return duct per cascade module

Figure A ‐ 11: Application of Foam Insulation ‐

3/20/1992

Figure A ‐ 12: Earth Backfill ‐ 6/19/1992

A‐4

Figure A ‐ 13: Chamber Equipment Diagram

Cascade Refrigeration Systems o North & South Cascade Modules (Each)

400A, 480V, 3‐Phase supply power

High Stage Compressors: VMC 350 ES (75HP motor N, 100HP motor S)

Low Stage Compressors: VMC 320 (75HP motors N&S)

High Stage Refrigerant: HP62 R404A (phase out)

Low Stage Refrigerant: Suva95 R508B

Cascade Condenser: Bohn BNED08(73/62)

R‐508B Desuperheater: PFC‐8

Hot‐Gas bypass ‐ continuous

Dual evaporative coils

Mutually isolated and operate independently

Allows operation on one coil while the other defrosts

9KW, 30A, 208V, 3‐Phase Defrost heater each coil

Each coil circuit includes a 8,000 CFM fan (two per module)

30KW, 100A, 208V, 3‐Phase Heating coils

Boiler: Chromolox CES100A

8,000 – 9,250 CFM Supplied

Electronically controlled drain valves.

High Temperature Cooling System o 600A, 480V, 3‐Phase supply power o Compressor: VMC 350 ES (75HP motor) o Refrigerant: R134A (phase out) o Cascade Condenser: PFC‐112 o Hot‐Gas bypass o Combustion Air – Up to 2,500 CFM routed through the Evaporative Coils

North Cascade Skid

South Cascade Skid

High Temperature Skid

High Temperature

Coils

Dehumidifier

Combustion &

Make‐up Air

Supply Power

A‐5 o Dual evaporative coils

Single compressor with two coils

Operation on one or both coils o Dehumidifier: HC9000 o Make Up Air

Compressor & Condensing Unit: Copland C7DB‐0750‐TFD‐001

Refrigerant: MP39 R401A (phase out, 30F lowest temp)

500 CFM Fan o Electronically controlled drain valves.

APPENDIX B

B‐1

APPENDIX B ‐ Example Temperature, Humidity, And Time Profiles From MIL‐STD‐180G CN 1

APPENDIX B

B‐2

APPENDIX C

C‐1

APPENDIX C ‐ Example Temperature, Humidity, And Time Profiles From MIL‐STD‐331C

Figure B‐ 1: MIL‐STD‐331C C1 Single Chamber Cycle ‐ Chart

Figure B‐ 2: MIL‐STD‐331C C1 Single Chamber Cycle ‐ Diagram

APPENDIX D

D‐1

APPENDIX D – ACRONYMS

ACC Ammunition Conditioning Chambers ARO After Receipt of Order AT Anti‐Terrorism ATO Anti‐Terrorism Officer BOM Bill Of Materials CAC Common Access Card CFC chlorofluorocarbon CFM Cubic Feet per Minute CI Criminal Investigation COR Contracting Officer’s Representative DOD Department Of Defense DPW Department of Public Works DVD Digital Video Disk FAR Federal Acquisition Regulation FOUO For Official Use Only FPCON Force Protection Condition GP‐5 Gun Position 5 GUI Graphical User Interface GWP Global Warming Potential HQDA Head Quarters – Department of the Army ICAN Installation Campus Area Network I/O Input / Output IUT Instrumentation Under Test Ly Langly N/A Not Applicable NCIC‐III National Crime Information Center Interstate Identification Index NEC Network Enterprise Center NLT No Later Than OCONUS Outside Continental United States OEM Original Equipment Manufacturer OPSEC Operational Security RH Relative Humidity RO Reverse Osmosis SCR Silicon Control Rectifier SMEE Skid Mounted Environmental Equipment

TSDB Terrorist Screening Database UPS Uninterrupted Power Supply VPN Virtual Private Network WFC Weapons Firing Chamber WBGT Wet Bulb Globe Temperature YPG Yuma Proving Ground YTC Yuma Test Center

File details come from the government source that posted it.