Answers_8.docx

DOCX document 12 KB Posted

Attached to
Skid Mounted Environmental Equipment (SMEE)
Solicitation number
W9124R-18-T-0002
Issued by

About this file

Answers 8

View the file

Other files

File Type Posted
Attachment_1_-_Minimum_Specifications_Revised_1-9-18.pdf PDF
Answers_7.docx DOCX document
Answers_6.pdf PDF
Answers_5.pdf PDF
Answers_4.docx DOCX document
Answers_3.pdf PDF
Attachment_1_-_Minimum_Specifications_Revised_12-14-17.pdf PDF
GP5_Site_Electrical_Layout.pdf PDF
Answers_2.DOCX DOCX document
CoN_CheckList_-_Redacted.pdf PDF
Answers_1.docx DOCX document
Attachment_2_-_Clauses_and_Provisions.pdf PDF
Attachment_3_-_Site_Visit_Information.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1:

Referring to description of current ACC type chamber in Answers #6, there is no way 3 – 1700 watt heaters can do the 3 hour transition with a 6000 pound dead load. Please elaborate.

Answer 1:

The Combined Synopsis/Solicitation (CSS) attachment titled "Answers 6" has an error we identified regarding the ACC heater question.

Total heating capacity in the existing ACC is ~15kW.

3 manually selectable banks of heaters, 3 EA 1700 Watt resistors per bank