J18 - Addendum to Spill Prevention and Response Plan The Red Plan
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J18
The Red Plan
RSA Spill Plan Excerpt
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
THE RED PLAN
PURPOSE IN THE EVENT OF A SPILL OF OIL OR A HAZARDOUS SUBSTANCE AT US ARMY GARRISONREDSTONE (RSA), ALABAMA, THE RED PLAN SERVES AS THE “JUMP START,” TO GET THE RIGHT RESPONSE ACTION ON TRACK AT THE EARLIEST POSSIBLE TIME. THE RSA OIL AND HAZARDOUS SUBSTANCE (OHS) SPILL PREVENTION AND RESPONSE PLAN REINFORCES THE RED PLAN AND PROVIDES IN-DEPTH INFORMATION ON RESPONSE, NOTIFICATION, ORGANIZATION, DUTIES, CONTAINMENT, CLEANUP AND REMEDIATION PROCEDURES. THE RED PLAN IS USED IN THE EARLY
STAGES OF A SPILL, AND THE USER IS EXPECTED TO TRANSITION TO THE OHS SPILL PREVENTION AND
RESPONSE PLAN, AFTER APPROPRIATE NOTIFICATIONS AND RESPONSE ACTIONS ARE UNDERWAY.
ANNEXES TO THE SPILL PREVENTION AND RESPONSE PLAN CONTAIN VITAL INFORMATION TO
SUPPORT THE RED PLAN AND ARE LOCATED AT THE GOLD TABS.
INITIAL RESPONSE ACTIONS
• WHENEVER A SPILL OCCURS OR IS DISCOVERED, e.g., DURING TANK LOADING OPERATIONS, FUEL
OPERATORS OR OTHER RESPONSIBLE PERSONNEL WILL TAKE IMMEDIATE ACTION TO:
(1) STOP THE PRODUCT FLOW – STOP TRANSFERS, SECURE PUMPS, CLOSE VALVES;
(2) WARN PERSONNEL – SOUND ALARMS, ENFORCE SAFETY AND SECURITY MEASURES;
(3) SHUT OFF IGNITION SOURCES – MOTORS, ELECTRICAL CIRCUITS, OPEN FLAMES;
(4) CONTAIN THE SPILL – SECURE VALVES, BLOCK DRAINS, DEPLOY ABSORBENTS;
(5) MAKE NOTIFICATIONS – SUPERVISOR, FIRE DEPARTMENT;
(6) BEGIN CLEANUP – IF WITHIN CAPABILITIES (SEE RESPONSIBLE UNIT ACTIONS).
• IF THERE IS A POTENTIAL LIFE, HEALTH, FIRE OR OTHER SAFETY HAZARD, THE US ARMY GARRISON
REDSTONE ARSENAL EMERGENCY SERVICES (FIRE, POLICE AND MEDICAL) WILL BE IMMEDIATELY
NOTIFIED.
US ARMY GARRISON-REDSTONE FIRE DEPARTMENT ⎯ 911
US ARMY GARRISON-REDSTONE POLICE AND MEDICAL SUPPORT ⎯ 911
• IN THE EVENT OF ANY SPILL, THE FACILITY SUPERVISOR/MANAGER OR THE SENIOR FIRE OFFICER
(FIRE DEPARTMENT) WILL NOTIFY THE ENVIRONMENTAL MANAGEMENT DIVISION (EMD). THE
EMD WILL TAKE ACTIONS TO NOTIFY AND ASSEMBLE NEEDED MEMBERS OF THE INSTALLATION
RESPONSE TEAM, i.e., KEY INSTALLATION RESPONDERS, AND, IF REQUIRED, CONTRACTOR
PERSONNEL. THE CHIEF, EMD, OR A DESIGNATED REPRESENTATIVE, ASSUMES DUTIES AS THE
INSTALLATION ON-SCENE COORDINATOR (IOSC) AND IS THE QUALIFIED INDIVIDUAL (QI) HAVING
FULL AUTHORITY TO IMPLEMENT THIS PLAN.
CHIEF, ENVIRONMENTAL MANAGEMENT DIVISION
TELEPHONE (DAY) (256) 955-6967 or (256) 876-6122
INSTALLATION OPERATIONS CENTER (24 HOUR) (256) 313-1043
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
RESPONSE STRATEGY/INSTALLATION ON-SCENE COORDINATOR ACTIONS
• THE FIRE DEPARTMENT IS THE INITIAL RESPONDER TO ALL SPILLS AT RSA AND WILL NOTIFY THE
EMD OF A DISCHARGE. ON ARRIVAL AT THE SPILL SITE, THEY TAKE APPROPRIATE STEPS TO
MINIMIZE OR ELIMINATE FIRE/EXPLOSION HAZARDS. IF POSSIBLE, THEY STOP THE SOURCE OF THE
DISCHARGE, CONTAIN THE OIL OR HAZARDOUS SUBSTANCE, AND CLEAN UP THE SPILL. EVERY
EFFORT IS MADE TO CONFINE THE SPILL ON LAND AND TO PREVENT IT FROM REACHING A SENSITIVE
AREA OR MOVING OFF THE INSTALLATION. THE SENIOR FIRE OFFICER SERVES AS THE ACTING INSTALLATION ON-SCENE COORDINATOR FOR THE SPILL UNTIL RELIEVED BY THE CHIEF, EMD.
INITIAL RESPONSE BY THE FIRE DEPARTMENT OCCURS WITHIN FIVE MINUTES OF NOTIFICATION AND
RESPONDING ELEMENTS MAY INCLUDE FIRE FIGHTING, EMERGENCY MEDICAL, AND MILITARY POLICE.
• A SPILL AT RSA WOULD MOST LIKELY BE DISCOVERED BY ON-DUTY OPERATORS, MILITARY
PERSONNEL IN THE AREA, PASSERSBY, OR BY ROVING MILITARY POLICE PATROLS. UPON
NOTIFICATION OF THE SPILL, THE FIRE DEPARTMENT DEPLOYS TO THE SPILL SITE WITH EMERGENCY
AND SPILL RESPONSE VEHICLES. THE EMD, UPON NOTIFICATION, ALERTS NEEDED MEMBERS OF THE
INSTALLATION RESPONSE TEAM (IRT) (SEE PAGE 4, THE RED PLAN). THE IRT IS DIRECTED TO
ASSEMBLE AT A DESIGNATED LOCATION, e.g., THE RSA INSTALLATION RESPONSE CENTER (CONTROL
ROOM OF THE INSTALLATION SUPPORT SERVICES CONTRACTOR), AS THE EMD MOVES TO THE SPILL
SITE AND JOINS UP WITH THE FIRE DEPARTMENT. AT THE SPILL SITE, THE CHIEF, EMD (OR A
DESIGNEE) ASSUMES DUTIES AS THE INSTALLATION ON-SCENE COORDINATOR (IOSC).
• WHEN THE IOSC ARRIVES AT THE SPILL SITE, THE SENIOR FIRE OFFICER QUICKLY PROVIDES A
BRIEFING ON THE SPILL SITUATION AND WHAT ACTIONS HAVE BEEN TAKEN. IF FURTHER FIRE
PREVENTION MEASURES ARE REQUIRED, THE SENIOR FIRE OFFICER MAKES THOSE DECISIONS,
WORKING WITH THE IOSC TO COORDINATE ACTIONS. IF EVACUATION IS REQUIRED DUE TO A RISK OF
FIRE OR EXPLOSION, THE IOSC INITIATES THE EVACUATION PLAN AT PAGE 7 OF THE RED PLAN
(ALSO SEE EVACUATION PLAN AT ANNEX C OF THE OHS SPILL PREVENTION AND RESPONSE PLAN).
• AS SOON AS ALL IMMEDIATE EMERGENCY ACTIONS HAVE BEEN INITIATED, THE IOSC REFERS TO
PAGE 5 OF THE RED PLAN AND ALERTS THE PRIMARY SPILL RESPONSE CONTRACTOR, IF
APPROPRIATE. EVERY EFFORT IS MADE TO ALERT THE SPILL RESPONSE CONTRACTOR WITHIN 30
MINUTES OF THE SPILL DISCOVERY. THE SPILL RESPONSE CONTRACTOR IS ALSO A VITAL COMPONENT
WITHIN THE OVERALL RSA SPILL RESPONSE.
• IF THE SPILL IS IN STATE WATERS, EXCEEDS THE CAPABILITY OF THE FIRE DEPARTMENT, OR
THREATENS/HAS REACHED BEYOND RSA BOUNDARIES, THE IOSC IS IMMEDIATELY APPRISED OF THIS
SITUATION. THE IOSC WILL ENSURE APPROPRIATE NOTIFICATION IS MADE TO FEDERAL, STATE AND
LOCAL OFFICIALS, PROVIDING AS MUCH INFORMATION AS POSSIBLE ON THE SIZE OF THE SPILL AND ITS
PATHWAY. KEY IRT MEMBERS ARE DIRECTED TO BEGIN MARSHALING INSTALLATION EQUIPMENT, SUPPLIES AND PERSONNEL TO ASSIST IN THE CLEANUP. ALL CLEANUP ACTIONS BEYOND THE
CAPABILITY OF THE IRT ARE REFERRED TO THE PRIMARY SPILL RESPONSE CONTRACTOR, BUT
COORDINATED WITH THE IOSC.
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
Oil and Hazardous Substance Spill Prevention and Response Plan
ORGANIZATION FOR SPILL RESPONSE
• THE ENVIRONMENTAL MANAGEMENT DIVISION RESPONSIBLE FOR MAKING ALL MANDATORY
NOTIFICATIONS USING THE OIL & HAZARDOUS SUBSTANCES DISCHARGE TELEPHONE REPORT FORM
AT THE END OF THE RED PLAN. THE NAME OF THE PERSON CALLED AND THE TIME NOTIFICATION
WAS MADE SHOULD BE RECORDED ON THE REPORT FORM. ANY SPILL THAT ENTERS STATE WATERS
(INCLUDING WATERS ON THE MILITARY RESERVATION) OR WETLANDS, OR ANY SPILL OVER 25
GALLONS, AND ANY HAZARDOUS SUBSTANCE DISCHARGES EQUAL TO OR GREATER THAN THE
DESIGNATED REPORTABLE QUANTITY (RQ) ARE REPORTABLE SPILLS, REQUIRING MANDATORY
NOTIFICATIONS BE MADE. HOWEVER, WHEN THE TIME SENSITIVITY OF AN EMERGENCY REQUIRES
IMMEDIATE NOTIFICATION, THE SENIOR FIRE OFFICER WILL INITIATE THIS PROCESS AND ENSURE
THAT THE IOSC AND THE ENVIRONMENTAL MANAGEMENT DIVISION IS INFORMED.
• WHEN SPILL RESPONSE CONTRACTOR SUPPORT IS REQUESTED, THE IOSC BRIEFS THEIR
OPERATIONS MANAGER UPON ARRIVAL AT THE SPILL SITE. PROTECTION PRIORITIES ARE
DETERMINED FROM ASSESSING THE CONDITIONS AT THE SPILL SITE AND REFERRING TO THE
PRIORITIES LISTED ON PAGE 6 OF THE RED PLAN. THE SPILL RESPONSE CONTRACTOR'S
OPERATIONS MANAGER AND THE IRT, WITH THE APPROVAL OF THE IOSC, DEVELOP A CLEANUP
PLAN TAILORED TO THE REQUIREMENTS AT THE SPILL SITE. THE IOSC THEN DIRECTS THE CLEANUP
ASSETS TO THE TASKS AND PRIORITIES AND BEGINS TRANSITION FROM THE RED PLAN TO THE
RSA OIL AND HAZARDOUS SUBSTANCE SPILL PREVENTION AND RESPONSE PLAN. THE IOSC
REFERS TO ANNEX B, NOTIFICATIONS, AND MAKES ALL APPROPRIATE REMAINING NOTIFICATIONS.
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
• FOR HAZARDOUS MATERIAL SPILLS OF ANY QUANTITY, THE IOSC MAY CONSULT WITH THE
HAZARDOUS WASTE MANAGER (DRMO) TO MAKE AN IMMEDIATE ASSESSMENT. BASED UPON THIS
ASSESSMENT, IF FURTHER CLEANUP ACTIONS ARE REQUIRED, A PLAN IS DEVELOPED AND
IMPLEMENTED BY THE IOSC, FOLLOWING THE GUIDANCE IN THE RED PLAN.
• RECOVERED SPILL MATERIAL MAY BE TREATED AS HAZARDOUS WASTE AND PADS, SOILED
ABSORBENT MATERIALS, ETC. ARE RECOVERED INTO SEALED PLASTIC BAGS OR OTHER APPROPRIATE
CONTAINERS. DISPOSAL OF THE HAZARDOUS WASTE IS ACCOMPLISHED THROUGH DRMO.
EMERGENCY NOTIFICATIONS
THIS IS A PRIORITIZED EMERGENCY NOTIFICATION LIST. FOR ADDITIONAL NUMBERS, SEE ANNEX B
OHS SPILL PREVENTION AND RESPONSE PLAN, NOTIFICATION CHECKLIST. RESPONSE TIMES FOR
THE FIRE DEPARTMENT AND MILITARY POLICE ARE NO MORE THAN 5 MINUTES AFTER NOTIFICATION.
| RSA Fire Department and Medical Support |
| 911 |
| RSA Military Police |
| 911 |
INSTALLATION RESPONSE TEAM (IRT) NOTIFICATIONS
ALL PERSONNEL ON THIS PRIORITIZED LISTING CAN BE AT THE EMD OFFICE OR THE SPILL SITE
WITHIN 60 MINUTES AFTER NOTIFICATION.
Chief, Environmental Management Division
(Installation On-Scene Coordinator & Qualified Individual) – Mr. Terry Hazle 955-6967
313-2066 (24 hr)
Chief, Installation Compliance Division Alternate Qualified Individual) 955-8504
313-2066 (24hrs)
| Installation Operations Center (IOC) |
| 313-1043 (24 hr) |
| Garrison Safety Office |
| 313-3297 |
| Provost Marshal (RSA Military Police) |
| 876-2222 |
876-4135
| Public Affairs Office |
| 876-4161 |
| Legal Office |
| 876-3405 |
| Directorate of Public Works (Contracting Officer’s Representative) |
| 876-4132 |
| Installation Support Services Contractor (Chugach Management Services) |
| 876-2007 |
* All numbers are area code 256 US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
MANDATORY NOTIFICATIONS**
REPORTABLE SPILLS ARE THOSE ENTERING SURFACE WATERS OR WETLANDS OR ANY SPILL OVER 25
GALLONS OR ANY RELEASE ABOVE THE REPORTABLE QUANTITY (RQ). MANDATORY NOTIFICATIONS
SHOULD BE MADE WITHIN 30 MINUTES OF DISCOVERY OF THE DISCHARGE.
SPILL RESPONSE CONTRACTOR NOTIFICATION****
OTHER ASSISTANCE*****
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
Oil and Hazardous Substance Spill Prevention and Response Plan
PROTECTION PRIORITIES
• THE VULNERABILITY ANALYSIS UNDER ANNEX E, OHS SPILL PREVENTION AND RESPONSE PLAN, IDENTIFIES INTAKES TO WATER TREATMENT PLANTS 1 AND 2,WHEELER WILDLIFE REFUGE AND THE
TENNESSEE RIVER AS BEING ENVIRONMENTALLY SENSITIVE TO OIL SPILLS AND OTHER POLLUTION.
THESE WATERWAYS, AND THE WETLANDS AND SHORELINE ASSOCIATED WITH THEM, ARE REGARDED
AS THE HIGHEST PRIORITY ENVIRONMENTALLY SENSITIVE AREAS THAT COULD BE AFFECTED BY A
SPILL FROM RSA. SHOULD A LARGE SPILL ENTER THESE WATERWAYS, IT COULD PLACE AT RISK
SOME SOCIOECONOMIC AND ENVIRONMENTALLY SENSITIVE AREAS. FOR SPILLS FROM RSA
THREATENING TO IMPACT OUTSIDE THE INSTALLATION BOUNDARIES, THE INSTALLATION RESPONSE
TEAM AND THE PRIMARY SPILL RESPONSE CONTRACTOR SHOULD TAKE IMMEDIATE ACTION TO
CONTAIN THE SPILL. THE RSA FIRE DEPARTMENT WOULD INITIALLY EMPLOY CONTAINMENT
MEASURES AT THE LIKELY POINTS LEADING FROM RSA. IF SPILLED PRODUCT CANNOT BE CONTAINED
AT THESE POINTS, THE SPILL RESPONSE CONTRACTOR WOULD ESTABLISH MULTIPLE CONTAINMENT
SITES AT OTHER CRITICAL AREAS. KEY TO THE SUCCESS OF A PROTECTION STRATEGY IS THE EARLY
NOTIFICATION OF THE SPILL RESPONSE CONTRACTOR AND NOTIFICATION OF THE POTENTIAL BOOMING
REQUIREMENTS.
RECOVERY OF SPILLS
• THE RSA FIRE DEPARTMENT IS TRAINED TO RECOVER SMALL FUEL OR HAZARDOUS MATERIAL
SPILLS ON THE GROUND. FUEL THAT ENTERS WATERWAYS AND IS CONFINED BY CONTAINMENT BOOM
AT THE ENTRY SITE, WILL BE RECOVERED ONLY BY TRAINED AND CERTIFIED SPILL RESPONSE
CONTRACTOR PERSONNEL. IN THESE CIRCUMSTANCES, SPECIALIZED SPARK FREE AND EXPLOSION
PROOF EQUIPMENT MUST BE USED DURING THE RECOVERY OPERATION.
RESPONSE TRAINING, EQUIPMENT TESTING AND DEPLOYMENT
• THE RSA FIRE DEPARTMENT, THE INITIAL RESPONDER TO ALL SPILLS ON THE INSTALLATION, HAS
PERSONNEL WHO ARE TRAINED TO DEAL WITH HAZARDOUS SUBSTANCE EMERGENCIES. ALL
MEMBERS OF THE INSTALLATION RESPONSE TEAM ARE TRAINED ON THE EXECUTION OF THE RSA OIL
AND HAZARDOUS SUBSTANCE SPILL PREVENTION AND RESPONSE PLAN, FOLLOWING GUIDELINES IN
THE NATIONAL PREPAREDNESS FOR RESPONSE EXERCISE PROGRAM (PREP). ADDITIONALLY, THESE
IRT MEMBERS ARE TRAINED ANNUALLY AT THE AWARENESS OR OPERATIONS LEVEL, AS REQUIRED
BY THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA).
• THE FIRE DEPARTMENT AND SELECTED MEMBERS OF THE IRT EMPLOY AND TEST THE ITEMS OF
SPILL RESPONSE EQUIPMENT STORED AT THE INSTALLATION WHEN THEY PARTICIPATE IN ANNUAL OIL
SPILL RESPONSE SIMULATION EXERCISES (OR ACTUAL SPILLS). THE IOSC CAN ARRANGE FOR OTHER
HEAVY RESPONSE EQUIPMENT TO BE DEPLOYED WITHIN 45 MINUTES OF NOTIFICATION DURING DUTY
HOURS AND WITHIN 2 HOURS, AFTER DUTY HOURS.
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
COMMUNICATIONS AND ALARM SYSTEMS
• COMMUNICATIONS AT RSA ARE EXTENSIVE AND ALLOW THE RSA FIRE DEPARTMENT, MILITARY
POLICE AND INSTALLATION OPERATIONS CENTER (IOC) TO BE FULLY FUNCTIONAL ON A 24-HOUR
BASIS. THE FIRE DEPARTMENT HAS MULTI-CHANNEL RADIO COMMUNICATIONS, AUGMENTED BY
CELLULAR TELEPHONES, WITH BACKUP TELEPHONE AND RADIO SYSTEMS AT THE FIRE STATION. THE
MILITARY POLICE, IOC AND PUBLIC WORKS HAVE COMPARABLE EMERGENCY COMMUNICATION
SYSTEMS.
INSTALLATION RESPONSE EQUIPMENT AND LOCATION
EQUIPMENT
ITEM NUMBER
LOCATION
EVACUATION PLAN (SEE ANNEX C FOR FURTHER DISCUSSION)
• IN THE EVENT THAT AN EVACUATION BEYOND THE IMMEDIATE AREA IS REQUIRED BECAUSE OF A
SPILL, THE MILITARY POLICE, IN COORDINATION WITH THE INCIDENT COMMANDER, WILL BLOCK
ROADS LEADING TO THE SPILL SITE AND RE-ROUTE TRAFFIC TO OTHER LOCATIONS ON THE
INSTALLATION. NON-ESSENTIAL PERSONNEL IN THE AREA OF THE SPILL SITE WILL BE EVACUATED TO
A SAFE DISTANCE BEYOND THE SPILL AREA.
• IF THE GENERAL EVACUATION OF MILITARY AND CIVILIAN PERSONNEL IS DEEMED NECESSARY, THE
INCIDENT COMMANDER WILL DIRECT THAT THE IRT TAKE ALL APPROPRIATE ACTIONS AND, IF
REQUIRED, COORDINATE RSA'S ACTIONS WITH THOSE OF ANY AFFECTED COMMUNITIES OUTSIDE THE
INSTALLATION'S BOUNDARIES.
• PERSONNEL TO BE EVACUATED WILL BE DIRECTED ALONG ROUTES DESIGNATED BY THE IRT TO
SELECTED ASSEMBLY AREAS AND SAFE HAVENS.
KEY REFERRAL SECTIONS AND ANNEXES
SECTION 10 — DISCOVERY, NOTIFICATION AND RESPONSE COUNTERMEASURES
SECTION 13 — PROTECTION AND CLEANUP PRIORITIES, METHODS AND TECHNIQUES
ANNEX C — EVACUATION PLAN
ANNEX D — SPILL RESPONSE ORGANIZATION AND DUTIES
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
RSA General Evacuation Map
US Army Garrison-Redstone Emergency Response Action Plan, THE RED PLAN
An addendum to the US Army Garrison-Redstone
Oil and Hazardous Substance Spill Prevention and Response Plan
Oil and Hazardous Substance Discharge Telephone Report Sheet
(Blank Forms also provided at Annex B)
Do not delay sending the report while awaiting complete or additional information.
1. Name, location and mailing address of facility
US Army Garrison-Redstone Environmental Management Division
IMSE-RED-PWE
Building 4488 Redstone Arsenal, AL 35898
2. Name and telephone number of Qualified Individual (To be contacted for further information).
Mr. Terry Hazle, Chief, Environmental Management Division
(256) 876-6122 (During Business Hours)
(256) 313-2066 (24 hr – via Command Operations Center)
3. Name and telephone number of person making report
4. Name/type of substance spilled (indicate if extremely hazardous)
5. Location of spill
6. Date/time of spill & weather conditions
7. Environment affected (Especially any body of water)
8. Cause and source of incident
9. Injuries (or anticipated health problems) or property damage
10. Quantity or duration of discharge
11. Remedial Actions (Ongoing, anticipated and recommended)
12. Agencies Notified (See Notification Checklist at Annex B.)