APPENDIX_A.pdf
PDF 21 KB Posted
- Attached to
- Job Order Contract (JOC) - Construction Federal contract opportunity
- Solicitation number
- W9124P-16-R-0006
About this file
Appendix A Attachment - JOC Credit Card Program
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a-1
APPENDIX A
JOC CREDIT CARD PROGRAM
1.0 SCOPE OF WORK
The Contractor shall provide, upon receipt of a task order, all work required to accomplish credit card projects at Redstone Arsenal, Alabama. The Contractor’s work and responsibility shall include all planning, scheduling, coordination and quality control as specified in this appendix and within individual task orders. Credit card work shall be coordinated with the using service. In-progress inspections shall be performed, and the Contractor shall schedule final inspections with the using service, subcontractor, and the DPW Project Manager. After completion of any punchlist items, the Contractor shall contact the DPW Project Manager requesting final payment.
1.1 The Contractor shall not begin excavation for construction or repairs without obtaining a completed and approved excavation permit showing the location of all underground utilities. Excavation permits are issued by the Base Operations contractor, the telephone contractor, and the sewage contractor. The Contractor shall obtain this permit by calling the service order desk at 876-2801. Excavation permits must be requested a minimum of 24 hours in advance.
1.1.1 It will be the DPW Project Manager’s responsibility to prepare a Record of Environmental Consideration (REC), if required, prior to initiating a task order. RECs will be required for all task orders that require excavation or disturbance of soil and/or vegetation. The Contractor shall coordinate with the DPW Project Manager to ensure that an approved REC is on file prior to allowing the subcontractor to start work.
1.2 The Contractor shall obtain a Hot Work Permit or Flame Permit, as applicable, prior to allowing the subcontractor to perform any work requiring open flame devices in, on, or within 25 feet of buildings. Open flame devices include, but are not limited to, blow torches, portable furnaces, tar kettles, and gas or electric welding and cutting equipment.
1.2.1 A Hot Work Permit is issued by the Fire Prevention and Inspection Division on DA Form 5383-R. The Contractor shall obtain this permit by calling the dispatcher at 876- 5974.
1.2.2 A Flame Permit is identical to a Hot Work Permit with the exception that this permit is issued by the Garrison Public Safety Office for work in explosive and/or hazardous areas. Flame Permits must be requested a minimum of 24 hours in advance.
The Contractor shall obtain this permit by calling the Garrison Safety Office at 842-8635.
a-2
2.0 CREDIT CARD CONTRACT VALUE
It is estimated that the maximum value of credit card work required will not exceed $8,000,000/year. If the Government’s requirements for services set forth in the solicitation do not result in orders in the amount described as “estimated maximum,” the event shall not constitute the basis for an equitable price adjustment under this contract.
2.1 Individual Task Order Limitations
Credit card task orders will not be more than $100,000.00 and will not be less than $2,000.00.
3.0 ORDERING PROCEDURES
The DPW Project Manager (DPW PM) will receive a job order request and schedule a mandatory site visit with the Contractor and qualified sources for accomplishing the required work. The DPW PM will receive subcontractor quotes and complete a JOC Credit Card Order Form (See Attachment J13). The form will include a project description, general scope of work, suggested source, and source bid. The completed form will be sent to the Contractor along with the subcontractor quotes, scope of work, and a copy of the job order request. The Contractor will review and sign the JOC Credit Card Order Form and return it to the DPW PM. The signature from the Contractor’s Program Manager shall indicate acceptance of the suggested source and source bid, and the signed JOC Credit Card Order Form shall be the Contractor’s proposal for the required work. The DPW PM will complete the task order package and deliver it to the Contracting Officer for review and approval. Upon approval, the Contracting Officer will issue a task order to the Contractor for accomplishment of the required work.
4.0 PAYMENT PROCEDURES
Payments will generally be made after the final inspection has been performed and all punchlist items have been completed. However, partial payments may be made at the discretion of the DPW Project Manager if deemed appropriate. The Contractor shall pay subcontractors within seven days of receipt of the Government’s payment.
5.0 RATE OF WAGES
The Davis Bacon Wage Rates described in contract paragraph H.24 also apply for credit card task orders. It shall be the Contractor’s responsibility to ensure that all subcontractors comply with the required wage rates.
| APPENDIX A |
| JOC CREDIT CARD PROGRAM |
| 1.0 SCOPE OF WORK |
| 2.0 CREDIT CARD CONTRACT VALUE |
| 2.1 Individual Task Order Limitations |
| 3.0 ORDERING PROCEDURES |
| 4.0 PAYMENT PROCEDURES |
| 5.0 RATE OF WAGES |