AMD_0002_(Final),_TE_9_Task_Codes_19JUL19.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W9124M-18-R-0001
About this file
Amendment 0002, FINAL, TE 9 Task Codes 19JUL2019
View the file
Other files
Show 40 more
Latest 50 of 160 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TE 9 Task Codes for Services | |||
| PWS Attachments | Sections of PWS | Primary Source of GFEBS Coding | Secondary |
| Attachment 3 Solid Waste management | All | OWO | |
| Attachment 4 Grounds Maintenance | All | OWO | DMO's for section 2.2.10.3 Hedge and Shrub Pruning |
| Attachment 5 Pavement Clearance | All | OWO | Some DMO's for parking lots, motor pools, etc. |
| Attachment 6 Facility Maintenance - Vertical | 2.2 Natural Gas and Equipment | Establish New PM program | DMO for unscheduled repairs |
| 2.3 HVAC | Currently have a partial PM Program. | DMO for unscheduled repairs | |
| 2.4 Eyewashes and Safety Showers | DMO | ||
| 2.5 Roof Gutters, Drains, and Downspouts | PMO | DMO's in between celanings/inspections for unscheduled repairs. | |
| 2.6 Automatic Doors | Establish New PM program | DMO for unscheduled repairs | |
| 2.7 Overhead Doors | Establish New PM program | DMO for unscheduled repairs | |
| 2.8 Gates and Dock Levelers | Establish New PM program | DMO for unscheduled repairs | |
| 2.9 Air Compressors/Unfired Pressure Vessels | Establish New PM program | DMO for unscheduled repairs | |
| 2.10 Plumbing | DMO | ||
| 2.10.1, 2.10.2 | DMO | ||
| 2.10.3 Sump Pumps | PMO for annual inpsections | DMO's for unscheduled repairs | |
| 2.10.4 Hot Water Tanks | Establish New PM program | DMO for unschedueld repairs | |
| 2.10.5 Backflow Preventers | Currently have a PM program (PMO) | DMO for what is not covered under PM | |
| 2.10.7 Urinals | DMO's | ||
| 2.10.8 Wash facilities/Racks | DMO's | ||
| 2.11 Sanitary Wastewater Treatment and Collection System | OWO | PMO for annual PM; DMO for unscheduled repairs | |
| 2.12 IWWTP | OWO | PMO for annual PM; DMO for unscheduled repairs | |
| 2.13 Heating/Cooling Plants | OWO | PMO for annual PM; DMO for unscheduled repairs | |
| 2.15 Chemical Treatment of Water Systems | OWO | ||
| 2.16 Lift Stations | OWO | PMO for annual PM; DMO for unscheduled repairs | |
| 2.17 Maintenance Cycles | PMO | ||
| 2.18 Electrical | PMO for everything but repair work. | DMO/PWO for repair work | |
| 2.19 Generators | Currently have a PM program (PMO) | DMO/PWO for what is not covered under PM | |
| 2.20 Grounding Point Checks | PMO | DMO's for everything else | |
| 2.22 Fire Alarm/Suppression Systems | PMO | DMO's for everything else | |
| 2.23 Playgrounds | PMO | DMO's for everything else | |
| 2.24 PM for Barracks Buildings | Currently have a PM program (PMO) | DMO's for everything else | |
| 2.26 Swimming Pools, Spray Parks, and Hot Tubs | PMO | DMO's for everything else | |
| 2.27 Keys and Locks | OWO | DMO's | |
| 2.28 Food Service Equipment | PMO | DMO's | |
| 2.29 Signs | PMO | DMO's | |
| 2.30 Self-Help Services | OWO | ||
| 2.31 Packing and Crating | DMO | ||
| 2.32 Valve Pit/building Mechanical Room PM Program | Currently have a PM program (PMO) | ||
| 2.33 Dedicated Facility General Maintenance Workers | DMO | ||
| Attachment 7 Facility Maintenance - Horizontal | 2.1.1 Pot hole Repairs | DMO | |
| 2.1.2 Road Pavement Marking | DMO | ||
| 2.1.3 Range Raod Maintenance | PMO | ||
| 2.1.4 Tank Trails | PMO | ||
| 2.1.5 Bridge Maintenance | DMO/PWO | ||
| 2.1.6 Dam and Retention Pond Maintenance | DMO/PWO | ||
| 2.1.7 Army Airfield Pavement Maintenance | DMO/PWO | ||
| 2.2.1.1 UPS | PMO | DMO's for what is not covered under PM | |
| 2.2.1.3 Traffic Controls | PMO | DMO's for what is not covered under PM | |
| 2.2.2 Natural Gas Distribution System | PMO | DMOs for repair work | |
| 2.2.3 Water Distribution Systems | OWO | PMO for annual PM. DMO/PWO for repair work | |
| 2.2.4 Wastewater Collection System | OWO | DMO/PWO for repair work | |
| 2.2.5 Storm Water Collection System | OWO | PMO of annual PM; DMO/PWO for repair work | |
| 2.2.6 .1 Fuel Stroage and Distribution Systems | PMO | DMO's for what is not covered under PM | |
| 2.2.6.3 Emergency/Backup Generators (not attached to buildings) | PMO | DMO's for what is not covered under PM | |
| 2.2.6.4 Other Water Distribution Systems | OWO | DMO/PWO for repair work | |
| 2.2.6.5 Other Sanitary Wastewater Collection Systems | OWO | DMO/PWO for repair work | |
| 2.2.6.6 Fire Hydrants | Currently have a PM program (PMO) | DMO's for what is not covered under PM | |
| 2.2.6.7 Backflow Preventers | part of Attachment 6 section 2.10.5 | ||
| 2.2.6.8 Water Stop boxes | PMO | DMO/PWO for repair work | |
| 2.2.6.9 Water Testing and Disinfectiong | OWO | DMO/PWO for repair work | |
| 2.2.6.10 Monitoring Systems | OWO - moved to Attachment 9 | DMO/PWO for repair work | |
| 2.2.6.11 Golf Courses | PMO | DMO/PWO for repair work | |
| Attachment 8 Heating and Cooling Services | ALL | OWO | DMO/PWO for repair work |
| Attachment 9 Wastewater Services | ALL | OWO | DMO/PWO for repair work |
| Attachment 10 Pest Management | ALL | OWO | DMO's |
File details come from the government source that posted it.