Mod_Document,_W9124M-17-R-0003,_Amendment_0003,_Stewart_DFA_Svcs.pdf
PDF 1 MB Posted
- Solicitation number
- W9124M-17-R-0003
About this file
Modification Document, Amendment 0003.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124M-17-R-0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise (1) Section B - Supplies or Services and Prices, (2) Section C – Descriptions and Specif ications,
(3) Section F - Deliveries or Performance, (4) Section I - Contract Clauses (5) Section J - List of Documents, Exhibits and Other Attachments (6) Section L INSTRS., CONDS., AND NOTICES TO OFFERORS
1. CONTRACT ID CODE PAGE OF PAGES
J 1 198
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Oct-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124M-17-R-0003
X 9B. DATED (SEE ITEM 11)
11-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Oct-2017
CODE
MICC CENTER - FORT BRAGG
MICC - FORT BRAGG
2175 REILLY ROAD STOP A
FORT BRAGG NC 28310-5000
W91247 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time 07-Nov-2017 10:00 AM has been added.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The pricing detail quantity has decreased by 29.00 from 30.00 to 1.00.
The unit of issue has changed from Days to Months.
CLIN 0002
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 207 to DFA Services Building 207.
The pricing detail quantity 90.00 has been deleted.
The unit of issue Job has been deleted.
CLIN 0003
The CLIN description has changed from DFA Building 642 to DFA Services Building 642.
CLIN 0004
The CLIN description has changed from DFA Building 3003 to DFA Services Building 3003.
The pricing detail quantity 314.00 has been deleted.
CLIN 0005
The CLIN description has changed from DFA Building 8439 to DFA Services Building 8439.
The CLIN extended description has changed from:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (1 Job = 1 Day)
To:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (1 Job = 1 Day).
The pricing detail quantity 336.00 has been deleted.
CLIN 0006
The CLIN description has changed from DFA Building 110 to DFA Services Building 110.
The cost constraint EST has been added.
CLIN 0007
The CLIN description has changed from DFA Building 7290 to DFA Services Building 7290.
The pricing detail quantity 60.00 has been deleted.
CLIN 0008
The CLIN description has changed from DFA Building 12902/03 to DFA Services Building 12902/03.
CLIN 0009
The CLIN description has changed from DFA Building 13102/03 to DFA Services Building 13102/03.
CLIN 0010
The CLIN description has changed from DFA Building 13302/03 to DFA Services Building 13302/03.
CLIN 0011
The CLIN description has changed from DFA Building 19104 to DFA Services Building 19104.
CLIN 0012
The CLIN description has changed from DFA Building 512 to DFA Services Building 512.
CLIN 0013
The CLIN description has changed from DFA Building 726 to DFA Services Building 726.
CLIN 0014
The following CLIN extended description has been deleted:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS.
(Buildings EST is 10 hours each) The pricing detail quantity 120.00 has been deleted.
The unit of issue Hours has been deleted.
The cost constraint NTE has been deleted.
CLIN 0015
The CLIN description has changed from Insulated Food Container (IFC) Service to Container/ Pot/ Pan Service.
CLIN 0016
This CLIN has been renumbered to CLIN 0018.
The CLIN extended description has changed from:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpwer Equivalent is not separately priced, insert "NSP" in theblank shown.
To:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in theblank shown..
CLIN 1002
This CLIN has been renumbered to CLIN 1001.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 207 to DFA Services Building 207.
CLIN 1003
This CLIN has been renumbered to CLIN 1002.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 642 to DFA Services Building 642.
CLIN 1004
This CLIN has been renumbered to CLIN 1003.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 3003 to DFA Services DFA Building 3003.
CLIN 1005
This CLIN has been renumbered to CLIN 1004.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 8439 to DFA Services Building 8439.
The pricing detail quantity 336.00 has been deleted.
CLIN 1006
This CLIN has been renumbered to CLIN 1005.
The CLIN description has changed from DFA Building 110 to DFA Services DFA Building 110.
CLIN 1007
This CLIN has been renumbered to CLIN 1006.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 7290 to DFA Services Building 7290.
CLIN 1008
This CLIN has been renumbered to CLIN 1007.
The CLIN description has changed from DFA Building 12902/03 to DFA Services Building 12902/03.
CLIN 1009
This CLIN has been renumbered to CLIN 1008.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 13102/03 to DFA Services Building 13102/03.
CLIN 1010
This CLIN has been renumbered to CLIN 1009.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 13302/03 to DFA Services Building 13302/03.
CLIN 1011
This CLIN has been renumbered to CLIN 1010.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 19104 to DFA Services Building 19104.
CLIN 1012
This CLIN has been renumbered to CLIN 1011.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 512 to DFA Services Building 512.
CLIN 1013
This CLIN has been renumbered to CLIN 1012.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Building 726 to DFA Services Building 726.
CLIN 1014
This CLIN has been renumbered to CLIN 1013.
The CLIN type priced has been deleted.
The CLIN description has changed from DFA Extended Services to DFA Services Extended Services.
The pricing detail quantity 120.00 has been deleted.
CLIN 1015
This CLIN has been renumbered to CLIN 1014.
The CLIN description has changed from Insulated Food Container (IFC) Service to Container/ Pot/ Pan
CLIN 1016
This CLIN has been renumbered to CLIN 1017.
The CLIN extended description has changed from:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpwer Equivalent is not separately priced, insert "NSP" in theblank shown.
To:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in the blank shown..
CLIN 2002
This CLIN has been renumbered to CLIN 2001.
The CLIN type priced has been deleted.
The pricing detail quantity 90.00 has been deleted.
The option status has changed from Option to No Status.
CLIN 2003
This CLIN has been renumbered to CLIN 2002.
The CLIN type priced has been deleted.
The pricing detail quantity 90.00 has been deleted.
CLIN 2004
This CLIN has been renumbered to CLIN 2003.
CLIN 2005
This CLIN has been renumbered to CLIN 2004.
The CLIN type priced has been deleted.
The pricing detail quantity 336.00 has been deleted.
CLIN 2006
This CLIN has been renumbered to CLIN 2005.
The CLIN extended description has changed from:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (1 Job = 1 Day)
To:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS and Technical Exhibit (TE) D. (1 Job = 1 Day).
CLIN 2007
This CLIN has been renumbered to CLIN 2006.
The CLIN type priced has been deleted.
The pricing detail quantity 60.00 has been deleted.
CLIN 2008
This CLIN has been renumbered to CLIN 2007.
The CLIN type priced has been deleted.
The pricing detail quantity 60.00 has been deleted.
CLIN 2009
This CLIN has been renumbered to CLIN 2008.
The CLIN type priced has been deleted.
The pricing detail quantity 60.00 has been deleted.
CLIN 2010
This CLIN has been renumbered to CLIN 2009.
The CLIN type priced has been deleted.
The pricing detail quantity 60.00 has been deleted.
CLIN 2011
This CLIN has been renumbered to CLIN 2010.
The CLIN type priced has been deleted.
The pricing detail quantity 60.00 has been deleted.
CLIN 2012
This CLIN has been renumbered to CLIN 2011.
The CLIN type priced has been deleted.
The pricing detail quantity 90.00 has been deleted.
CLIN 2013
This CLIN has been renumbered to CLIN 2012.
The CLIN type priced has been deleted.
The pricing detail quantity 314.00 has been deleted.
CLIN 2014
This CLIN has been renumbered to CLIN 2013.
The CLIN type priced has been deleted.
The CLIN extended description has changed from:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS.
(Buildings EST is 10 hours each)
To:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS..
The pricing detail quantity 120.00 has been deleted.
The unit of issue Hours has been deleted.
CLIN 2015
This CLIN has been renumbered to CLIN 2014.
The CLIN description has changed from Insulated Food Container (IFC) Service to Container/ Pot/ Pan
CLIN 2016
This CLIN has been renumbered to CLIN 2017.
CLIN 3002
This CLIN has been renumbered to CLIN 3001.
The CLIN type priced has been deleted.
CLIN 3003
This CLIN has been renumbered to CLIN 3002.
The CLIN type priced has been deleted.
CLIN 3004
This CLIN has been renumbered to CLIN 3003.
The CLIN type priced has been deleted.
CLIN 3005
This CLIN has been renumbered to CLIN 3004.
The CLIN type priced has been deleted.
CLIN 3006
This CLIN has been renumbered to CLIN 3005.
CLIN 3007
This CLIN has been renumbered to CLIN 3006.
The CLIN type priced has been deleted.
CLIN 3008
This CLIN has been renumbered to CLIN 3007.
The CLIN type priced has been deleted.
CLIN 3009
This CLIN has been renumbered to CLIN 3008.
The CLIN type priced has been deleted.
CLIN 3010
This CLIN has been renumbered to CLIN 3009.
The CLIN type priced has been deleted.
CLIN 3011
This CLIN has been renumbered to CLIN 3010.
The CLIN type priced has been deleted.
CLIN 3012
This CLIN has been renumbered to CLIN 3011.
The CLIN type priced has been deleted.
CLIN 3013
This CLIN has been renumbered to CLIN 3012.
The CLIN type priced has been deleted.
CLIN 3014
This CLIN has been renumbered to CLIN 3013.
The CLIN type priced has been deleted.
The CLIN extended description has changed from:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS.
(Buildings EST is 10 hours each)
To:
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS..
The pricing detail quantity 120.00 has been deleted.
CLIN 3015
This CLIN has been renumbered to CLIN 3014.
The CLIN description has changed from Insulated Food Container (IFC) Service to Container/ Pot/ Pan
CLIN 3016
This CLIN has been renumbered to CLIN 3017.
CLIN 4002
This CLIN has been renumbered to CLIN 4001.
The CLIN type priced has been deleted.
CLIN 4003
This CLIN has been renumbered to CLIN 4002.
The CLIN type priced has been deleted.
CLIN 4004
This CLIN has been renumbered to CLIN 4003.
The CLIN type priced has been deleted.
CLIN 4005
This CLIN has been renumbered to CLIN 4004.
The CLIN type priced has been deleted.
CLIN 4006
This CLIN has been renumbered to CLIN 4005.
CLIN 4007
This CLIN has been renumbered to CLIN 4006.
The CLIN type priced has been deleted.
CLIN 4008
This CLIN has been renumbered to CLIN 4007.
The CLIN type priced has been deleted.
CLIN 4009
This CLIN has been renumbered to CLIN 4008.
The CLIN type priced has been deleted.
CLIN 4010
This CLIN has been renumbered to CLIN 4009.
The CLIN type priced has been deleted.
CLIN 4011
This CLIN has been renumbered to CLIN 4010.
The CLIN type priced has been deleted.
CLIN 4012
This CLIN has been renumbered to CLIN 4011.
The CLIN type priced has been deleted.
CLIN 4013
This CLIN has been renumbered to CLIN 4012.
CLIN 4014
This CLIN has been renumbered to CLIN 4013.
The CLIN type priced has been deleted.
The pricing detail quantity 120.00 has been deleted.
CLIN 4015
This CLIN has been renumbered to CLIN 4014.
The CLIN description has changed from Insulated Food Container (IFC) Service to Container/ Pot/ Pan
CLIN 4016
This CLIN has been renumbered to CLIN 4017.
The CLIN extended description has changed from:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpwer Equivalent is not separately priced, insert "NSP" in theblank shown.
To:
The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are availableat http://www.ecmra.mil. NOTE: If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in the blank shown..
SUBCLIN 0002AA is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002AA 67 Job Building 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed in Technical Exhibit (TE) D. (1 Job = 1 Day) FOB: Destination
NET AMT
SUBCLIN 0002AB is added as follows:
0002AB 23 Job Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed in Technical Exhibit (TE) G. (1 Job = 1 Day)
SUBCLIN 0003AA is added as follows:
0003AA 67 Job Building 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed
SUBCLIN 0003AB is added as follows:
0003AB 23 Job Right Size Bldg 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed
SUBCLIN 0004AA is added as follows:
0004AA 235 Job Building 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 303 as listed
SUBCLIN 0004AB is added as follows:
0004AB 79 Job Right Size Bldg 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as listed in Technical Exhibit (TE) G. (1 Job = 1 Day)
SUBCLIN 0005AA is added as follows:
0005AA 252 Job Building 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed
SUBCLIN 0005AB is added as follows:
0005AB 84 Job Right Size Bldg 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as
SUBCLIN 0007AA is added as follows:
0007AA 45 Job Building 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed
SUBCLIN 0007AB is added as follows:
0007AB 15 Job Right Size Bldg 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as
SUBCLIN 0008AA is added as follows:
0008AA 45 Job Building 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as listed in Technical Exhibit (TE) D. (1 Job = 1 Day)
SUBCLIN 0008AB is added as follows:
0008AB 15 Job Right Size Bldg 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as
SUBCLIN 0009AA is added as follows:
0009AA 45 Job Building 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as
SUBCLIN 0009AB is added as follows:
0009AB 15 Job Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as
SUBCLIN 0010AA is added as follows:
0010AA 45 Job Building 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as
SUBCLIN 0010AB is added as follows:
0010AB 15 Job Right Size Bldg 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as
SUBCLIN 0011AA is added as follows:
0011AA 45 Job Building 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as
SUBCLIN 0011AB is added as follows:
0011AB 15 Job Right Size Bldg 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as
SUBCLIN 0012AA is added as follows:
0012AA 67 Job Building 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed
SUBCLIN 0012AB is added as follows:
0012AB 23 Job Right Size Bldg 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed
SUBCLIN 0013AA is added as follows:
0013AA 235 Job Building 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed
SUBCLIN 0013AB is added as follows:
0013AB 79 Job Right Size Bldg 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed
SUBCLIN 0014AA is added as follows:
0014AA 87 Hours DFA Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. 7 hours each are estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104 and 10 hours for building 110.
SUBCLIN 0014AB is added as follows:
0014AB 33 Hours Right Size Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. 3 hours each are estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.
CLIN 0016 is added as follows:
0016 20 Each Contingency Project Manager & Admin
FFP
The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, 726, 8439, and 100). 1 quantity=1 building for 1 month.
CLIN 0017 is added as follows:
Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6.
SUBCLIN 0017AA is added as follows:
0017AA 48 Days Full Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.
SUBCLIN 0017AB is added as follows:
0017AB 22 Days Right Size Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.
SUBCLIN 1001AA is added as follows:
1001AA 67 Job OPTION Building 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed
SUBCLIN 1001AB is added as follows:
1001AB 23 Job OPTION Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed
SUBCLIN 1002AA is added as follows:
1002AA 67 Job OPTION Building 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed
SUBCLIN 1002AB is added as follows:
1002AB 23 Job OPTION Right Size Bldg 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed
SUBCLIN 1003AA is added as follows:
1003AA 235 Job OPTION Building 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed
SUBCLIN 1003AB is added as follows:
1003AB 79 Job OPTION Right Size Bldg 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as
SUBCLIN 1004AA is added as follows:
1004AA 252 Job OPTION Building 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed
SUBCLIN 1004AB is added as follows:
1004AB 84 Job OPTION Right Size Bldg 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as
SUBCLIN 1006AA is added as follows:
1006AA 45 Job OPTION Building 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed
SUBCLIN 1006AB is added as follows:
1006AB 15 Job OPTION Right Size Bldg 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as listed in Technical Exhibit (TE) G.. (1 Job = 1 Day)
SUBCLIN 1007AA is added as follows:
1007AA 45 Job OPTION Building 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as
SUBCLIN 1007AB is added as follows:
1007AB 15 Job OPTION Right Size Bldg 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as
SUBCLIN 1008AA is added as follows:
1008AA 45 Job OPTION Building 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as
SUBCLIN 1008AB is added as follows:
1008AB 15 Job OPTION Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as
SUBCLIN 1009AA is added as follows:
1009AA 45 Job OPTION Building 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as
SUBCLIN 1009AB is added as follows:
1009AB 15 Job OPTION Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as
SUBCLIN 1010AA is added as follows:
1010AA 45 Job OPTION Building 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as
SUBCLIN 1010AB is added as follows:
1010AB 15 Job OPTION Right Size Bldg 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as
SUBCLIN 1011AA is added as follows:
1011AA 67 Job OPTION Building 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed
SUBCLIN 1011AB is added as follows:
1011AB 23 Job OPTION Right Size Bldg 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed
SUBCLIN 1012AA is added as follows:
1012AA 235 Job OPTION Building 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed
SUBCLIN 1012AB is added as follows:
1012AB 79 Job OPTION Right Size Bldg 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed
SUBCLIN 1013AA is added as follows:
1013AA 87 Hours OPTION DFA Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building 110 is estimated at 10 hours.
SUBCLIN 1013AB is added as follows:
1013AB 33 Hours OPTION Right Size Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.
CLIN 1015 is added as follows:
1015 12 Months OPTION Contingency Project Manager & Admin
FFP
The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, CLIN 1016 is added as follows:
OPTION Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA
SUBCLIN 1016AA is added as follows:
1016AA 48 Days OPTION Full Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, SUBCLIN 1016AB is added as follows:
1016AB 22 Days OPTION Right Size Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, SUBCLIN 2001AA is added as follows:
2001AA 67 Job OPTION Building 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed
SUBCLIN 2001AB is added as follows:
2001AB 23 Job OPTION Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed
SUBCLIN 2002AA is added as follows:
2002AA 67 Job OPTION Building 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed
SUBCLIN 2002AB is added as follows:
2002AB 23 Job OPTION Right Size Bldg 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed
SUBCLIN 2003AA is added as follows:
2003AA 235 Job OPTION Building 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed
SUBCLIN 2003AB is added as follows:
2003AB 79 Job OPTION Right Size Bldg 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as
SUBCLIN 2004AA is added as follows:
2004AA 252 Job OPTION Building 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed
SUBCLIN 2004AB is added as follows:
2004AB 84 Job OPTION Right Size Bldg 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as
SUBCLIN 2006AA is added as follows:
2006AA 45 Job OPTION Building 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed
SUBCLIN 2006AB is added as follows:
2006AB 15 Job OPTION Right Size Bldg 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as
SUBCLIN 2007AA is added as follows:
2007AA 45 Job OPTION Building 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as
SUBCLIN 2007AB is added as follows:
2007AB 15 Job OPTION Right Size Bldg 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as
SUBCLIN 2008AA is added as follows:
2008AA 45 Job OPTION Building 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as
SUBCLIN 2008AB is added as follows:
2008AB 15 Job OPTION Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as
SUBCLIN 2009AA is added as follows:
2009AA 45 Job OPTION Building 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as
SUBCLIN 2009AB is added as follows:
2009AB 15 Job OPTION Right Size Bldg 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as
SUBCLIN 2010AA is added as follows:
2010AA 45 Job OPTION Building 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as
SUBCLIN 2010AB is added as follows:
2010AB 15 Job OPTION Right Size Bldg 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as
SUBCLIN 2011AA is added as follows:
2011AA 67 Job OPTION Building 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed
SUBCLIN 2011AB is added as follows:
2011AB 23 Job OPTION Right Size Bldg 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed
SUBCLIN 2012AA is added as follows:
2012AA 235 Job OPTION Buildling 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed
SUBCLIN 2012AB is added as follows:
2012AB 79 Job OPTION Right Size Bldg 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed
SUBCLIN 2013AA is added as follows:
2013AA 87 Hours OPTION DFA Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building
SUBCLIN 2013AB is added as follows:
2013AB 33 Hours OPTION Right Size Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, CLIN 2015 is added as follows:
2015 12 Months OPTION Contingency Project Manager & Admin
FFP
The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, CLIN 2016 is added as follows:
Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA
SUBCLIN 2016AA is added as follows:
2016AA 48 Days OPTION Full Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, SUBCLIN 2016AB is added as follows:
2016AB 22 Days OPTION Right Size Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, SUBCLIN 3001AA is added as follows:
3001AA 67 Job OPTION Building 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed
SUBCLIN 3001AB is added as follows:
3001AB 23 Job OPTION Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed
SUBCLIN 3002AA is added as follows:
3002AA 67 Job OPTION Building 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed
SUBCLIN 3002AB is added as follows:
3002AB 23 Job OPTION Right Size Bldg 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed
SUBCLIN 3003AA is added as follows:
3003AA 235 Job OPTION Building 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed
SUBCLIN 3003AB is added as follows:
3003AB 79 Job OPTION Right Size Bldg 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as
SUBCLIN 3004AA is added as follows:
3004AA 252 Job OPTION Building 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed
SUBCLIN 3004AB is added as follows:
3004AB 84 Job OPTION Right Size Bldg 8439
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as
SUBCLIN 3006AA is added as follows:
3006AA 45 Job OPTION Building 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed
SUBCLIN 3006AB is added as follows:
3006AB 15 Job OPTION Right Size Bldg 7290
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as
SUBCLIN 3007AA is added as follows:
3007AA 45 Job OPTION Building 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as
SUBCLIN 3007AB is added as follows:
3007AB 15 Job OPTION Right Size Bldg 12902/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as
SUBCLIN 3008AA is added as follows:
3008AA 45 Job OPTION Building 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as
SUBCLIN 3008AB is added as follows:
3008AB 15 Job OPTION Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as
SUBCLIN 3009AA is added as follows:
3009AA 45 Job OPTION Building 13302/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as
SUBCLIN 3009AB is added as follows:
3009AB 15 Job OPTION Right Size Bldg 13102/03
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as
SUBCLIN 3010AA is added as follows:
3010AA 45 Job OPTION Building 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as
SUBCLIN 3010AB is added as follows:
3010AB Job OPTION Right Size Bldg 19104
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as
SUBCLIN 3011AA is added as follows:
3011AA 67 Job OPTION Building 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed
SUBCLIN 3011AB is added as follows:
3011AB 23 Job OPTION Right Size Bldg 512
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed
SUBCLIN 3012AA is added as follows:
3012AA 235 Jar OPTION Building 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed
SUBCLIN 3012AB is added as follows:
3012AB 79 Job OPTION Right Size Bldg 726
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed
SUBCLIN 3013AA is added as follows:
3013AA 87 Hours OPTION DFA Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building
SUBCLIN 3013AB is added as follows:
3013AB 33 Hours OPTION Right Size Extended Services
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, CLIN 3015 is added as follows:
3015 12 Months OPTION Contingency Project Manager & Admin
FFP
The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, CLIN 3016 is added as follows:
OPTION Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. (Buildings EST is 4 days per building)
SUBCLIN 3016AA is added as follows:
3016AA 48 Days OPTION Full Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, SUBCLIN 3016AB is added as follows:
3016AB 22 Days OPTION Right Size Opening & Closing Building
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, SUBCLIN 4001AA is added as follows:
4001AA 67 Job OPTION Building 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed
SUBCLIN 4001AB is added as follows:
4001AB 23 Job OPTION Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed
SUBCLIN 4002AA is added as follows:
4002AA 67 Job OPTION Building 642
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed
SUBCLIN 4002AB is added as follows:
4002AB 23 Job OPTION Right Size Bldg 207
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed
SUBCLIN 4003AA is added as follows:
4003AA 235 Job OPTION Building 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed
SUBCLIN 4003AB is added as follows:
4003AB 79 Job OPTION Right Size Bldg 3003
FFP
The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as
SUBCLIN 4004AA is added as follows:
4004AA 252 Job OPTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .