Conformed_Copy_Amendment_0004_W9124M-17-R-0003_18Oct17.pdf

PDF 514 KB Posted

Attached to
DRAFT Fort Stewart Dining Facility Attendant (DFA) Services
Solicitation number
W9124M-17-R-0003
Issued by

About this file

Conformed Copy Amend 0004

View the file

Other files

File Type Posted
Conformed_Copy,_W9124M-17-R-0003,_3_Nov_17.pdf PDF
Amendment_Document,_W9124M-17-R-0003,_3_Nov_17.pdf PDF
Conformed_Copy,_Amendment_0005,_W9124M-17-R-0003,_Stewart_DFA,_20Oct17.pdf PDF
Amendment_0005,_W9124M-17-R-0003,_Stewart_DFA,_20Oct17.pdf PDF
Amendment_0004_W9124M-17-R-0003_18Oct17.pdf PDF
Mod_Document,_W9124M-17-R-0003,_Amendment_0003,_Stewart_DFA_Svcs.pdf PDF
TECHNICAL_EXHIBIT_G,_Workload_Data_-Right_Size.pdf PDF
Conformed_Copy,_W9124M-17-R-0003,_Amendment_0003,_Stewart_DFA_Svcs.pdf PDF
TECHNICAL_EXHIBIT_D,_Workload_Historical_Data,_16Oct17.pdf PDF
ITPEU_Ft_Stewart-Hunter_AAF____Supplemental_Agreement_for_FY2018.pdf PDF
TECHNICAL_EXHIBIT_B,_Drawings.pdf PDF
W9124M-17-R-0003_Amendment_0002.pdf PDF
W9124M-17-R-0003_Amendment_0002_Conformed_Copy.pdf PDF
Amendment_0001,_W9124M-17-R-0003.pdf PDF
Conformed_Copy,_W9124M-17-R-0003.pdf PDF
Final_Solicitation,_W9124M-17-R-0003,_11_July_2017.pdf PDF
TECHNICAL_EXHIBIT_C,_Typical_Expendable_Durable_Supplies_List.pdf PDF
TECHNICAL_EXHIBIT_F,_WD.pdf PDF
DRAFT_Solicitation,_W9124M-17-R-0003,_Stewart_DFA,_10_July_17.pdf PDF
TECHNICAL_EXHIBIT_A,_Dining_Facility_Location_Map.pdf PDF
TECHNICAL_EXHIBIT_E,_CBA.pdf PDF
TECHNICAL_EXHIBIT_A1,_Dining_Facility_Location_Map.pdf PDF
TECHNICAL_EXHIBIT_D,_Workload_Historical_Data.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9124M-17-R-0003

CODE

(Hour)

PAGE(S)

until 10:00 AM local time 07 Nov 2017

X

A X B X C

D

EX

X G F 157 - 168

169 - 200 H 201 - 204

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 204

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W91247 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 94

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

95 - 128 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

129 - 133 134 - 146

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 147 - 149 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

150 - 155

PART II - CONTRACT CLAUSES

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

11 Jul 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

Section A - Solicitation/Contract Form

SECTION A - SOLICITATION/CONTR

SECTION A - SOLICITATION

Section A - Solicitation/Contract Form

A.1. In reference to block 12 of Standard Form 33, titled Solicitation, Offer and Award - Offerors are required to extend their offers to a minimum of 180 calendar days from the date of receipt.

TABLE OF CONTENTS

PART I – THE SCHEDULE

SECTION A – Solicitation/Contract Form SECTION B – Supplies or Services and Prices/Costs SECTION E – Inspection and Acceptance SECTION F – Description and Performance SECTION G – Contract Administration Data SECTION H – Special Contract Requirements

PART II – CONTRACT CLAUSES

SECTION I – Contract Clauses

PART III – LIST OF DOCUMENTS, EXIBITS AND OTHER ATTACHMENTS

SECTION J – List of Exhibits, Attachments, and Appendices

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – Representations, Certifications and Other Statements of Offerors or Respondents SECTION L – Solicitation Provisions and Instructors to Offerors SECTION M – Evaluation Factors for Award

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Months Phase-In for All Buildings

FFP

Phase-In IAW paragraph 3.2 . The contractor shall furnish all labor, personnel, equipment, supplies, materials, supervision and any other items necessary to perform Dining Facility Attendant (DFA) in strict compliance with the PWS, all specifications, terms, conditions, clauses, and all other provisions contained herein.

FOB: Destination

NET AMT

DFA Services Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (1 Job = 1 Day)

0002AA 67 Job Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed in Technical Exhibit (TE) D. (1 Job = 1 Day)

0002AB 23 Job Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed in Technical Exhibit (TE) G. (1 Job = 1 Day)

DFA Services Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0003AA 67 Job Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed

0003AB 23 Job Right Size Bldg 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed

DFA Services Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0004AA 235 Job Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 303 as listed

0004AB 79 Job Right Size Bldg 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as listed in Technical Exhibit (TE) G. (1 Job = 1 Day)

DFA Services Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0005AA 252 Job Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed

0005AB 84 Job Right Size Bldg 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as

0006 365 Job DFA Services Building 110

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

DFA Services Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0007AA 45 Job Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed

0007AB 15 Job Right Size Bldg 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as

DFA Services Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0008AA 45 Job Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as listed in Technical Exhibit (TE) D. (1 Job = 1 Day)

0008AB 15 Job Right Size Bldg 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as

DFA Services Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0009AA 45 Job Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as

0009AB 15 Job Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as

DFA Services Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0010AA 45 Job Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

0010AB 15 Job Right Size Bldg 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as

DFA Services Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0011AA 45 Job Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as

0011AB 15 Job Right Size Bldg 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as

DFA Services Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0012AA 67 Job Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed

0012AB 23 Job Right Size Bldg 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed

DFA Services Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

0013AA 235 Job Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed

0013AB 79 Job Right Size Bldg 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed

DFA Extended Services

FFP

0014AA 87 Hours DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. 7 hours each are estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104 and 10 hours for building 110.

0014AB 33 Hours Right Size Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. 3 hours each are estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.

0015 90 Job Container/ Pot/ Pan Service

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1.1. (1 Job = Min 200 Containers, Max 800 Containers)

0016 20 Each Contingency Project Manager & Admin

FFP

The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, 726, 8439, and 100). 1 quantity=1 building for 1 month.

Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6.

0017AA 48 Days Full Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.

0017AB 22 Days Right Size Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.

0018 1 Each

CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.

NOTE:

If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in the blank shown.

OPTION DFA Services Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1001AA 67 Job OPTION Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed

1001AB 23 Job OPTION Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed

OPTION DFA Services Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1002AA 67 Job OPTION Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed

1002AB 23 Job OPTION Right Size Bldg 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed

OPTION DFA Services DFA Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1003AA 235 Job OPTION Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed

1003AB 79 Job OPTION Right Size Bldg 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as

OPTION DFA Services Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1004AA 252 Job OPTION Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed

1004AB 84 Job OPTION Right Size Bldg 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as

1005 365 Job OPTION DFA Services DFA Building 110

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

OPTION DFA Services Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1006AA 45 Job OPTION Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed

1006AB 15 Job OPTION Right Size Bldg 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as listed in Technical Exhibit (TE) G.. (1 Job = 1 Day)

OPTION DFA Services Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1007AA 45 Job OPTION Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as

1007AB 15 Job OPTION Right Size Bldg 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as

OPTION DFA Services Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1008AA 45 Job OPTION Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as

1008AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as

OPTION DFA Services Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1009AA 45 Job OPTION Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

1009AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as

OPTION DFA Services Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1010AA 45 Job OPTION Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as

1010AB 15 Job OPTION Right Size Bldg 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as

OPTION DFA Services Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1011AA 67 Job OPTION Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed

1011AB 23 Job OPTION Right Size Bldg 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed

OPTION DFA Services Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1012AA 235 Job OPTION Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed

1012AB 79 Job OPTION Right Size Bldg 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed

OPTION DFA Services Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (Buildings EST is 10 hours each)

1013AA 87 Hours OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building 110 is estimated at 10 hours.

1013AB 33 Hours OPTION Right Size Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104.

1014 90 Job OPTION Container/ Pot/ Pan Service

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1.1. (1 Job = Min 200 Containers, 1015 12 Months OPTION Contingency Project Manager & Admin

FFP

The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, OPTION Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

1016AA 48 Days OPTION Full Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 1016AB 22 Days OPTION Right Size Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 1017 1 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.

NOTE:

If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in the blank shown.

DFA Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2001AA 67 Job OPTION Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed

2001AB 23 Job OPTION Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed

DFA Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2002AA 67 Job OPTION Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed

2002AB 23 Job OPTION Right Size Bldg 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed

DFA Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2003AA 235 Job OPTION Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed

2003AB 79 Job OPTION Right Size Bldg 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as

DFA Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2004AA 252 Job OPTION Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed

2004AB 84 Job OPTION Right Size Bldg 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as

2005 365 Job OPTION DFA Building 110

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS and Technical Exhibit (TE) D. (1 Job = 1 Day)

DFA Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2006AA 45 Job OPTION Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed

2006AB 15 Job OPTION Right Size Bldg 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as

DFA Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2007AA 45 Job OPTION Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as

2007AB 15 Job OPTION Right Size Bldg 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as

DFA Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2008AA 45 Job OPTION Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as

2008AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as

DFA Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2009AA 45 Job OPTION Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

2009AB 15 Job OPTION Right Size Bldg 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as

DFA Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2010AA 45 Job OPTION Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as

2010AB 15 Job OPTION Right Size Bldg 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as

DFA Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2011AA 67 Job OPTION Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed

2011AB 23 Job OPTION Right Size Bldg 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed

DFA Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2012AA 235 Job OPTION Buildling 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed

2012AB 79 Job OPTION Right Size Bldg 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed

DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS.

2013AA 87 Hours OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building

2013AB 33 Hours OPTION Right Size Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, 2014 90 Job OPTION Container/ Pot/ Pan Service

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1.1. (1 Job = Min 200 Containers, 2015 12 Months OPTION Contingency Project Manager & Admin

FFP

The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

2016AA 48 Days OPTION Full Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 2016AB 22 Days OPTION Right Size Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 2017 1 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.

NOTE:

If the reporting of Manpwer Equivalent is not separately priced, insert "NSP" in the

OPTION DFA Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3001AA 67 Job OPTION Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed

3001AB 23 Job OPTION Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed

OPTION DFA Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3002AA 67 Job OPTION Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed

3002AB 23 Job OPTION Right Size Bldg 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 642 "right size" square footage as listed

OPTION DFA Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3003AA 235 Job OPTION Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed

3003AB 79 Job OPTION Right Size Bldg 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as

OPTION DFA Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3004AA 252 Job OPTION Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed

3004AB 84 Job OPTION Right Size Bldg 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as

3005 365 Job OPTION DFA Building 110

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

OPTION DFA Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3006AA 45 Job OPTION Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed

3006AB 15 Job OPTION Right Size Bldg 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as

OPTION DFA Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3007AA 45 Job OPTION Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as

3007AB 15 Job OPTION Right Size Bldg 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as

OPTION DFA Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3008AA 45 Job OPTION Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as

3008AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as

OPTION DFA Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3009AA 45 Job OPTION Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

3009AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13302/03 "right size" square footage as

OPTION DFA Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3010AA 45 Job OPTION Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as

3010AB Job OPTION Right Size Bldg 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as

OPTION DFA Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3011AA 67 Job OPTION Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed

3011AB 23 Job OPTION Right Size Bldg 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed

OPTION DFA Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

3012AA 235 Jar OPTION Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed

3012AB 79 Job OPTION Right Size Bldg 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed

OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS.

3013AA 87 Hours OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building

3013AB 33 Hours OPTION Right Size Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, 3014 90 Job OPTION Container/ Pot/ Pan Service

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1.1. (1 Job = Min 200 Containers, 3015 12 Months OPTION Contingency Project Manager & Admin

FFP

The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, OPTION Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. (Buildings EST is 4 days per building)

3016AA 48 Days OPTION Full Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 3016AB 22 Days OPTION Right Size Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 3017 1 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.

NOTE:

If the reporting of Manpwer Equivalent is not separately priced, insert "NSP" in the

OPTION DFA Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4001AA 67 Job OPTION Building 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 207 as listed

4001AB 23 Job OPTION Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed

OPTION DFA Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4002AA 67 Job OPTION Building 642

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 642 as listed

4002AB 23 Job OPTION Right Size Bldg 207

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 207 "right size" square footage as listed

OPTION DFA Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4003AA 235 Job OPTION Building 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 3003 as listed

4003AB 79 Job OPTION Right Size Bldg 3003

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 3003 "right size" square footage as

OPTION DFA Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4004AA 252 Job OPTION Building 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 8439 as listed

4004AB 84 Job OPTION Right Size Bldg 8439

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 8439 "right size" square footage as

4005 365 Job OPTION DFA Building 110

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

OPTION DFA Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4006AA 45 Job OPTION Building 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 7290 as listed

4006AB 15 Job OPTION Right Size Bldg 7290

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 7290 "right size" square footage as

OPTION DFA Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4007AA 45 Job OPTION Building 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 12902/03 as

4007AB 15 Jar OPTION Right Size Bldg 12902/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19202/03 "right size" square footage as

OPTION DFA Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4008AA 45 Job OPTION Building 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13102/03 as

4008AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 13102/03 "right size" square footage as

OPTION DFA Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4009AA 45 Job OPTION Building 13302/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

4009AB 15 Job OPTION Right Size Bldg 13102/03

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 13302/03 as

OPTION DFA Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4010AA 45 Job OPTION Building 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 19104 as

4010AB 15 Job OPTION Right Size Bldg 19104

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 19104 "right size" square footage as

OPTION DFA Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4011AA 67 Job OPTION Building 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 512 as listed

4011AB 23 Job OPTION Right Size Bldg 512

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 512 "right size" square footage as listed

OPTION DFA Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4012AA 235 Job OPTION Building 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage of building 726 as listed

4012AB 79 Job OPTION Right Size Bldg 726

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for building 726 "right size" square footage as listed

OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS. (Buildings EST is 10 hours each)

4013AA 87 Hours OPTION DFA Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for the full square footage as listed in Technical Exhibit (TE) D. There is 7 hours (each) estimated for buildings are 207, 642,3003, 8439, 726, 512, 7920, 12902/12903, 13102/13103, 13302/13303, 19104. Building

4013AB 33 Hours OPTION Right Size Extended Services

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS for "right size" square footage as listed in Technical Exhibit (TE) G. There is 3 hours (each) estimated for buildings 207, 642,3003, 4014 90 Job OPTION Container/ Pot/ Pan Service

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1.1. (1 Job = Min 200 Containers, 4015 12 Months OPTION Contingency Project Manager & Admin

FFP

The contractor shall provide all labor and supervision necessary to provide Program Manager & Administrative Functions IAW PWS 2.2.3. This CLIN shall be used to cover additional management and admininstrative costs ONLY when additional buildings are opened (in addition to the 4 that are already open: 3003, OPTION Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA

4016AA 48 Days OPTION Full Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 4 Days of Opening & Closing Building under full square footage as listed in Technical Exhibit (TE) D. Buildings included are 110, 207, 642, 3003, 8439, 726, 4016AB 22 Days OPTION Right Size Opening & Closing Building

FFP

The contractor shall provide all labor and supervision necessary to provide DFA services as defined in the PWS paragraph 3.1.1.1 thru 3.1.1.2.6. Estimates are for 2 Days of Opening & Closing Building under "right size" square footage as listed in Technical Exhibit (TE) G. Buildings included are 207, 642, 3003, 8439, 726, 512, 4017 1 Each

OPTION CONTRACTOR MANPOWER REPORTING

FFP

The Contractor is required to enter data into the Contractor Manpower Reporting (CMR) system as outlined in the PWS. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMR during the data gathering period of every year, or part of a year, for which the contract is in force. Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil.

NOTE:

If the reporting of Manpower Equivalent is not separately priced, insert "NSP" in the blank shown.

CONTRACT MIN/MAX QUANTITY

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

Minimum Quantity Minimum Amount Maximum Quantity Maximum Amount $5,000.00…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .