IB08_Solicitation Attachment 0004_Site Visit Documents_W9124D26QA266-0003_Low Voltage Cabling.pdf
PDF 2 MB Posted
- Attached to
- USMEPCOM Low Voltage Cable Removal
- Solicitation number
- W9124D26QA266
About this file
This file consists of photographs and a floor plan document related to building infrastructure and network installation work.
The photographs depict various stages of electrical and data cabling installation within a building structure. The images show: ladder and equipment setup against brick walls; extensive colorful electrical conduit and cable bundling (yellow, blue, and black wiring); network equipment including red and black server components mounted on walls; overhead cable management systems with organized routing; junction boxes and electrical distribution equipment; and interior spaces with installed infrastructure. The final image is a floor plan labeled "Bldg 3400 3rd Floor Current Floor Plan" showing room layouts numbered 300-319 and 301-307, with handwritten notes indicating cable quantities and jack assignments for various circuits. The notes reference specific cable counts, labeling requirements, and jack placements, with a notation indicating the work was completed at 5:30. The documentation appears to track the status of network and electrical infrastructure deployment across the third floor of Building 3400, likely for a federal facility requiring detailed installation records and compliance documentation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IC03_Cable Removal Site Visit Photos
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
IC03_J6 IT Cable Drawing