IB08 PWS_Revised 14 July 2026_Final Version.pdf

PDF 238 KB Posted

Attached to
USMEPCOM Low Voltage Cable Removal
Solicitation number
W9124D26QA266
Issued by

About this file

This is a Performance Work Statement (PWS) for low voltage cable removal services at Building 3400, headquarters of the United States Military Entrance Processing Command (USMEPCOM) located in North Chicago, Illinois. The contract is a non-personal services, Firm Fixed Price engagement requiring the contractor to identify, de-energize, and remove abandoned low-voltage cabling throughout the four-story, 280,000 square foot facility while preserving active systems.

The contractor must execute a four-phase cable identification and removal workflow. Phase 1 involves tracing and temporarily tagging potentially abandoned cables using industry-standard tools. Phase 2 requires submission of a "Proposed Cable Removal Log" to the Contracting Officer Representative (COR) on a rolling basis no more frequently than every two business days, documenting cable type, color, source location, far-end location, existing tags, and contractor field assessment for each cable. Phase 3 involves Government review and verification within five business days, with the COR coordinating with facility stakeholders (IT, Security, Fire/Life Safety) to determine operational status and mark cables as APPROVED, DENIED, or HOLD. Phase 4 authorizes physical removal only of APPROVED cables; the contractor assumes liability for damages resulting from negligence or removing DENIED/HOLD cables, but the Government retains responsibility for verification accuracy. Additionally, the contractor must de-energize all energized abandoned circuits using OSHA-compliant Lockout/Tagout procedures, remove approved cabling using non-destructive methods while avoiding disturbance to active systems, perform minimal cleanup including ceiling tile replacement and blank wall plate installation, and dispose of materials according to EPA and local environmental regulations. Work must be performed Monday through Friday, 7:30 a.m. to 4:30 p.m. CT, excluding federal holidays. The contractor furnishes all personnel, equipment, tools, materials, and supervision, while the Government provides facility access, escorts where required, and a designated exterior staging area for a contractor-provided dumpster. Key personnel include a Project Manager and lead/supervising Certified Electrician, both of whom must be available during business hours. The contractor must deliver a Quality Control Plan within 30 days of award, complete Annual Cyber Awareness Training within 10 days of award, and submit Proposed Cable Removal Logs on a rolling basis. Performance standards require 100% compliance across cable identification, de-energization, removal, cleanup/safety, and disposal compliance, with non-conforming work subject to correction at contractor cost or potential termination for cause.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Building 3400 – Low Voltage Cable Removal

PART 1

GENERAL INFORMATION

1. GENERAL: This is a non-personal services contract to provide low voltage cable removal to Building 3400 at Headquarters (HQ) United States Military Entrance Processing Command (USMEPCOM). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform low voltage cable removal as defined in this PWS, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2. Background: Building 3400 (4 floors, approx. 280,000 sq ft) contains legacy systems containing low-voltage cabling installed over multiple decades. These systems primarily include legacy CCTV, access control, public address/speaker, intercom, and fire alarm systems. This poses safety risks, restricts ceiling access, and creates fire load concerns.

1.3. Objectives:

1.3.1. Safe Identification of Cabling

1.3.1.1. Ensure accurate distinction between active and inactive cabling to prevent disruption to operational systems. The Government shall retain final authorization for the physical removal of any cabling.

1.3.2. Elimination of Energized Abandoned Circuits

1.3.2.1. Identify and safely de-energize non-operational but energized cables using

Lockout/Tagout (LOTO) procedures.

1.3.3. Removal of Abandoned Cabling

1.3.3.1. Remove unused and abandoned low-voltage cabling throughout the facility.

1.3.4. Maintain Safe Operating Environment

1.3.4.1. Ensure remaining cabling is safe, accessible, and not obstructing facility operations.

1.4. Scope: The contractor shall provide all labor, tools, materials, and supervision necessary to identify, de-energize, and remove abandoned low-voltage cabling within the entirety of Building 3400. Systems may include legacy security, access control, video surveillance, intercom, public address, fire alarm, and other non-Government low-voltage systems. Government NIPR network cabling, patch panels, cabinets, racks, switches, and related network infrastructure are excluded from this requirement. Work is limited to safety-focused execution, including cable identification, lockout/tagout of energized abandoned circuits, removal of unused cabling, minimal cleanup, and proper disposal. No system reconfiguration, cable management, or documentation is required. All work shall be performed using non-destructive access methods. Removal activities may include accessible telecommunications rooms, equipment racks, cabinets, patch panels, wall-mounted enclosures, head-end equipment locations, ceiling spaces, and accessible pathways. Demolition of walls, hard ceilings, conduit systems, building finishes, or other structural components is not permitted.

1.5. RESERVED

1.6. General Information

1.6.1. Quality Control (QC): The contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which the contractor assures that work complies with the requirement of the contract. contractor shall deliver a comprehensive QCP to the Contracting Officer (KO) and the

Contracting Officer Representative (COR) within 30 days of contract award, and within 5 days of any changes being made. The QCP is contingent on final acceptance by the KO. After acceptance of the QCP, the contractor shall receive the KO’s acceptance in writing of any proposed change to the QC system.

1.6.2. Quality Assurance: The government shall evaluate the contractor’s performance under this contract

IAW the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3. Recognized Holidays: The contractor shall not be required to perform services on holidays.

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

1.6.4. Hours of Operation: The contractor shall conduct business between the hours of 07:30 a.m. to 4:30 p.m. CT Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5. Place of Performance: HQ USMEPCOM, 2834 Green Bay Road, North Chicago, IL 60064.

1.6.6. Type of Contract: Firm Fixed Price

1.6.7. Security Requirements: Contractor personnel requiring physical access to Government facilities shall satisfy installation access screening requirements prior to performance in accordance with applicable installation security procedures.

1.6.7.1. PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.7.2. Key Control. USMEPCOM will not be issuing keys. Dedicated Government personnel will be available to open doors as needed during business hours.

1.6.7.3. Lock Combinations. RESERVED

1.6.7.4. Anti-Terrorism and Information Assurance Training. IAW ATTP 4-10 (FM 3-100.21)

1.6.7.5. Access and General Protection/Security Policy and Procedures. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency

Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by

DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Access will be coordinated through the COR. Escorts may be required in certain controlled areas. The percentage of areas requiring escorts is unknown.

1.6.7.5.1 Government-Provided Access and Escorts: The Government will provide the Contractor with required access to all work areas, including locked rooms and controlled spaces, during the business hours specified in PWS Section 1.6.4. Where Government escorts are required, the Government will provide them in a timely manner to allow for continuous Contractor performance. If the Contractor's work is stopped or delayed due to the Government's failure to provide said access or escorts, the delay will be considered excusable.

1.6.7.6. Contractor Employees Who Require Access to Government Information Systems. RESERVED

1.6.7.7. Global Address Listing (GAL). RESERVED

1.6.7.8. Annual Cyber Awareness Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete the Annual

Cyber Awareness Training located at the US Army IA Training Center web site listed below (previous training expires 25/Nov/13): Link: https://ia.signal.army.mil/DoDIAA/default.asp.

1.6.7.9. Acceptable Use Policy. RESERVED

1.6.7.10. For contractors that do not require CAC but require access to a DoD facility or installation.

Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and

Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, IAW status of forces agreements and other theater regulations.

1.6.8. Special Qualifications. RESERVED

1.6.9. Post Award Conference/Periodic Progress Meetings. The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Revolutionary

Federal Acquisition Regulation Overhaul (RFO FAR) 42.302(a)(3). The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance.

At these meetings the KO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10. Contracting Officer Representative (COR). The COR will be identified by separate letter. The

COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the KO and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11. Key Personnel. The following personnel are considered key personnel by the government: The

Project Manager and the lead/supervising Certified Electrician. The shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to

4:30p.m. CT, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.6.12. Identification of Contractor Employees. All contract personnel attending meetings, answering

Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel shall be required to obtain and wear badges in the performance of this service.

1.6.13. Contractor Travel. RESERVED

1.6.14. Other Direct Costs. RESERVED

1.6.15. Data Rights. RESERVED

1.6.16. Organizational Conflict of Interest. Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent

Organizational Conflict of Interests (OCI) as defined in RFO FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS, ACRONYMS, AND ABBREVIATIONS

2. DEFINITIONS, ACRONYMS, AND ABBREVIATIONS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to assist in the administration of the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORKDAY. The number of hours per day the Contractor provides services IAW the contract.

2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS AND ABBREVIATIONS:

ACOR Alternate Contracting Officer's Representative

AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation

CCE Contracting Center of Excellence

CFR Code of Federal Regulations

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996

KO Contracting Officer

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services : RESERVED

3.2. Facilities : RESERVED

3.3. Utilities: RESERVED

3.4. Equipment: RESERVED

3.5. Materials : RESERVED

3.6 Contractor Staging Area: The Government will designate a mutually agreeable exterior space on the facility grounds for the placement of one contractor-provided dumpster, bin, or other appropriate collection container for the temporary staging of removed materials prior to off-site disposal. The Contractor is responsible for furnishing, managing, and securing the container and its contents. The designated space shall not interfere with Government operations or traffic flow.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General : The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance : RESERVED

4.3. Materials . RESERVED

4.3.1. RESERVED

4.3.2. RESERVED

4.4. Equipment. RESERVED

4.4.1. RESERVED

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Low Voltage Cable Removal in Bldg. 3400 as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

5.2 Cable Identification and Verification Workflow

5.2.1 General Approach. The Government acknowledges that accurate as-built drawings and cable inventories are unavailable for Building 3400. To prevent disruption to mission-critical, life-safety, or dormant security systems, the Contractor shall not independently determine the operational status of any cable. The Contractor shall utilize a batch-identification and verification workflow, utilizing a "Proposed

Cable Removal Log," to obtain explicit Government authorization prior to the physical removal of any cabling

5.2.2 Phase 1: Tracing and Temporary Tagging. The Contractor shall employ industry-standard tracing tools and methodologies to identify potentially inactive or abandoned low-voltage cabling.

5.2.2.1 Upon identifying a candidate cable, the Contractor shall affix a temporary, highly visible physical tag (e.g., numbered zip-tie or label) to the cable.

5.2.2.2 The tag number must strictly correspond to a unique identifier generated by the Contractor for tracking purposes.

5.2.3 Phase 2: Proposed Cable Removal Log Submission. The Contractor shall document all tagged candidate cables in a "Proposed Cable Removal Log" and submit the Proposed Cable Removal Log electronically to the COR on a rolling basis. Submissions can be made upon the completion of a designated work area (e.g., a building wing, a quadrant, or a group of 50-100 cables) but shall not occur more frequently than once every two (2) business days. This approach is intended to create a continuous workflow, allowing Government review to occur in parallel with the Contractor's ongoing identification efforts. The log shall include, at a minimum, the following data fields for each cable:

5.2.3.1 Unique Tracking ID (matching the physical temporary tag)

5.2.3.2 Cable Type and Color

5.2.3.3 Source Location (e.g., IDF/MDF closet, rack, patch panel)

5.2.3.4 Far-End Location (e.g., Room number, ceiling grid coordinate)

5.2.3.5 Any existing legacy tags or labels found on the cable

5.2.3.6 Contractor's field assessment (e.g., "no voltage detected," "physically severed in ceiling")

5.2.4 Phase 3: Government Review and Verification. The Government retains ultimate authority and responsibility for determining the operational status of all facility systems.

5.2.4.1 Upon receipt of the Proposed Cable Removal Log, the COR will coordinate with facility stakeholders (IT, Security, Fire/Life Safety) to verify the operational status of the submitted cables.

5.2.4.2 Government SLA: The COR shall return the reviewed log to the Contractor within five (5) business days of submission.

5.2.4.3 The returned log will explicitly mark each cable with a status of APPROVED, DENIED, or HOLD.

5.2.5 Phase 4: Execution and Liability. The Contractor shall proceed with physical demolition and removal only under the following conditions:

5.2.5.1 Approved Removals: The Contractor is authorized to cut and remove only those cables that possess a physical tag matching an explicitly "APPROVED" status on the returned log.

5.2.5.2 Denied / Hold: Cables marked as "DENIED," "HOLD," or those for which the

Government cannot determine the status, shall not be removed. These cables shall be categorized as "abandoned in place," and the Contractor shall remove their temporary tags. If the Contractor identifies a cable that it believes cannot be removed safely or is inaccessible using the non-destructive access methods authorized by this PWS, it shall document its rationale (including photographic evidence) and present it to the COR. The COR and Contractor will conduct a joint assessment. If the COR concurs, the cable will be officially designated 'abandoned in place' and will be excluded from the scope of removal work with no negative impact on the contractor's performance evaluation or payment..

5.2.5.3 Liability: The Government retains ultimate responsibility for the verification and approval of cables for removal. The Contractor is authorized to rely entirely on the Government's final, written approval provided via the returned 'Proposed Cable Removal Log.' The Contractor shall not be held liable for any service disruptions that result from the removal of a cable explicitly marked 'APPROVED' by the Government. However, the Contractor remains fully liable for any damages or disruptions caused by its own negligence, failure to follow the approved log (e.g., removing a 'DENIED' or 'HOLD' cable), or damage to surrounding infrastructure.

5.3 De-Energization of Abandoned Cabling (System Deactivation). The contractor shall safely deenergize all abandoned low-voltage cabling that remains energized but does not support active systems.

5.3.1 Sub-Tasks and Performance Standards. The contractor shall:

5.3.1.1 Identify energized abandoned circuits.

5.3.1.2 Coordinate with the COR and facility personnel prior to de-energizing any abandoned circuits to verify the circuits do not support active operational systems.

5.3.1.3 Perform LOTO procedures IAW Occupational Safety and Health Administration (OSHA) requirements.

5.3.1.4 Verify zero energy state prior to removal

5.3.2 Performance Standard.

5.3.2.1 All abandoned energized circuits are safely de-energized prior to removal.

5.3.3 Performance Threshold (AQL).

5.3.3.1 100% compliance (no energized abandoned cables remain).

5.3.4 Reference Standards:

5.3.4.1 OSHA 29 CFR 1910.147 (LOTO).

5.3.4.2 NFPA 70E (Electrical Safety in the Workplace).

5.4. Removal and Disposal of Abandoned Cabling (System Removal and Disposal). The contractor shall remove and dispose of all abandoned low-voltage cabling that has been properly identified, tagged, and approved per the procedures in PWS paragraph 5.2 to eliminate safety hazards and restore accessible ceiling space.

5.4.1 Sub-Tasks and Performance Standards. The contractor shall:

5.4.1.1 Remove all identified abandoned cabling using non-destructive access methods. Where practical, abandoned cable should be removed back to the source or termination point without impacting active systems. Final disposition shall be coordinated with the COR.

5.4.1.2 Avoid disturbance to active cabling and infrastructure.

5.4.1.3 Perform minimal cleanup necessary to eliminate hazards.

5.4.1.4 Dispose of removed materials IAW applicable environmental regulations.

5.4.2 Performance Standard:

5.4.2.1 Complete removal of abandoned cabling within defined scope.

5.4.3 Performance Threshold (AQL):

5.4.3.1 All abandoned low-voltage cabling identified by the contractor and accepted by the COR for removal shall be removed.

5.4.4 Reference Standards:

5.4.4.1 EPA disposal and recycling guidelines

5.4.4.2 Local environmental and building codes

5.5. Conduit may exist within the facility. Removal of conduit is not required unless specifically identified and approved by the KO and COR. Demolition of walls, hard ceilings, conduit systems, building finishes, or other structural components is not permitted.

5.6. All information provided in this PWS is what is currently available. A site visit will be scheduled to allow prospective vendors the opportunity to view the site.

5.7. Cleanup and Safety Assurance ( Site Restoration). The contractor shall ensure all work areas are left in a safe and accessible condition. The contractor is responsible for exercising due care and following industry best practices to prevent damage to active systems. Any damage resulting from contractor operations remains the contractor's responsibility. The contractor shall note any pre-exising damage observed in each work area prior to starting work on a section and bring it to the attention of the Government. Failure to do so will result in such damage be considered the fault of the contractor with resultant obligations to repair.

5.7.1 Basic Site Restoration: While full cosmetic restoration is not within scope, the Contractor is responsible for basic site restoration in the immediate areas of cable removal. This is strictly limited to:

5.7.1.1. Replacing any drop-ceiling tiles temporarily displaced during performance back into the ceiling grid.

5.7.1.2 Furnishing and installing standard plastic blank wall plates over any wall boxes where all cabling and original faceplates have been removed as part of this contract.

5.7.1.3 The Contractor is not required to perform painting, drywall patching, firestopping remediation, or floor repair, unless such remediation is required due to direct Contractor negligence or damage outside the normal scope of extraction.

5.8 Unforeseen Conditions: The Contractor shall immediately notify the COR upon discovery of any physical conditions at the site that differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this contract. This includes, but is not limited to, the discovery of suspected hazardous materials or undocumented critical utility lines intertwined with abandoned cabling. The Contractor shall not disturb such conditions or perform any related work until they receive direction from the COR or the KP of this will involve work outside of the scope of this PWS.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

1. NFPA 70 (National Electrical Code – NEC)

2. NFPA 70E (Standard for Electrical Safety in the Workplace)

3. OSHA 29 CFR 1910.147 (Control of Hazardous Energy – Lockout/Tagout)

4. OSHA 29 CFR 1910 Subpart S (Electrical Standards)

5. OSHA 29 CFR 1926 Subpart K (Electrical – Construction) (if applicable based on work classification)

6. EPA Regulations for Waste Handling and Disposal (40 CFR applicable sections)

7. State and Local Environmental and Building Codes (applicable to cable removal and disposal)

8. Installation Access, Safety, and Security Policies and Procedures

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

Attachment/Technical Exhibit List:

7.1. Technical Exhibit A – Performance Requirements Summary

7.2. Technical Exhibit B – Deliverables Schedule

TECHNICAL EXHIBIT A

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE

OBJECTIVE

PERFORMANCE

STANDARD

PERFORMANCE

THRESHOLD

INCENTIVE / DISINCENTIVE

Cable

Identification

Contractor identifies and tags potentially abandoned low voltage cabling. Cabling is collected into a

“Proposed Cable

Removal Log” that is submitted for final

Government verification and approval.

100% compliance; The

Contractor remains

100% liable for any damages or disruptions caused by its own negligence, failure to follow the approved log

(e.g., removing a

'DENIED' or 'HOLD' cable), or damage to surrounding infrastructure

Non-conforming services shall be corrected by the contractor at no cost to the Government. Any disruption to active systems requires immediate correction. Failure to correct may be grounds for Termination for Cause.

De-Energization All abandoned energized circuits are safely de-energized using OSHA-compliant

LOTO procedures prior to removal

100% compliance; zero energized abandoned cables remain

Non-conforming services shall be corrected by the contractor at no cost to the Government. Failure to correct, especially in the event of a safety violation, may result in a stop-work order issued by the KO and/or

Termination for Cause.

Cable Removal Contractor removes all abandoned low-voltage cabling without damaging active systems or infrastructure

100% compliance; all abandoned low-voltage cabling identified by the contractor and approved by the COR/stakeholders for removal shall be removed.

The Government will not accept the work for payment until all approved cables are removed. If the contractor fails to complete the removal, the

Government may require re-performance or seek an equitable price reduction for acceptance of non-conforming work.

Cleanup and

Safety

Work areas are left free of hazards; remaining cabling is safe and accessible

100% compliance; zero safety hazards

The Government will not accept the work for payment until all work areas are verified to be safe and free of hazards. The contractor shall correct all deficiencies at no cost to the

Government.

Disposal

Compliance

All removed materials are disposed of IAW

EPA, state, and local regulations

100% compliance Contractor must provide evidence of proper disposal upon request. The contractor bears all costs and liability associated with disposal. Failure to comply may result in non-acceptance of the work and/or Termination for Cause.

TECHNICAL EXHIBIT B

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

PWS 1.6.1.- Quality

Control Plan

Once, within 30 calendar days after contract award

1 Electronic (MS

Word/PDF)

COR

KO

PWS 1.6.7.8. –

Annual Cyber

Awareness Training

Once, within 10 calendar days after contract award.

1 Electronic (MS

Word/PDF)

COR

KO

PWS 5.2.3 Proposed

Cable Removal Log

On a rolling basis but not more frequently than once every two (2) business days.

1 Electronic (MS

Word/PDF/Excel)

COR

KO