Technical Exhibit 3B - Position Disincentives (29Jan20).pdf

PDF 71 KB Posted

Attached to
Soldier For Life-Transition Assistance Program Federal contract opportunity
Solicitation number
W9124D20R00160001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston

About this file

This document contains a technical exhibit outlining performance requirements for a federal services contract. The contract requires providing Soldier for Life-Transition Assistance Program services to support the U.S. Army Human Resources Command, including operating transition assistance locations, counseling, transition planning, career skills support, education and employment assistance, and event support. Performance will be monitored against requirements for quality, timeliness, and compliance. The contract value will be deducted if a position remains vacant for more than 14 or 21 days depending on location. The related opportunity is a 100% Service-Disabled Veteran-Owned Small Business set-aside to provide SFL-TAP services throughout the continental U.S. and in Korea, Kuwait, Germany and Italy. The contract period of performance is 5 years including a 2-month phase-in. The anticipated NAICS code is 624310 and size standard is $12 million. The agency is the Department of the Army Mission and Installation Contracting Command at Fort Sam Houston.

View the file

Other files for this federal contract opportunity

Other files attached to Soldier For Life-Transition Assistance Program, newest first.
File Type Posted
Draft Request for Proposal W9124D20R0016 SFL-TAP HRC.pdf PDF
Technical Exhibit 9A- TAP Exit-Transition Questionnaire SurveyMonkey (1.pdf PDF
Technical Exhibit 9B - TAP Post-Transition Questionnaire SurveyMonkey (1.pdf PDF
Technical Exhibit 4 Preseparation by Location (20NOV19).pdf PDF
Technical Exhibit 10 - Site Management Manual (SMM).pdf PDF
Technical Exhibit 4E - New Clients by Type and Affiliation (21NOV19).pdf PDF
Technical Exhibit 4D - Virtual Center Historical Workload FY17-18 (17DEC....pdf PDF
Technical Exhibit 13 - TAP XXI Center Maintenance User Guide.pdf PDF
Technical Exhibit 3 -Staffing Plan (FY 20-25) (03JAN2020).pdf PDF
Technical Exhibit 15 - AHE Facilitator Guide_2018.pdf PDF
Technical Exhibit 1 - PRS (31DEC2019).pdf PDF
Technical Exhibit 7A - Travel Expense Report (17DEC19).pdf PDF
Technical Exhibit 3A- Qualifications (17DEC19).pdf PDF
Technical Exhibit 8A - FTST MISSION REQUEST SOP (17DEC19).pdf PDF
Technical Exhibit 4A New Client by Location (17DEC19).pdf PDF
Technical Exhibit 16 - Career Skills Programs SOP.PDF PDF
Technical Exhibit 4C - Workload Data for Total Force by Task (20NOV19).pdf PDF
Technical Exhibit 14 - AR 600-81 Soldier For Life Transition Assistance.pdf PDF
Technical Exhibit 6 - eForm (2648).pdf PDF
Draft Request for Proposal W9124D20R0016 SFL-TAP.pdf PDF
Technical Exhibit 9 - TAP Pre-Transition Questionnaire SurveyMonkey (17.pdf PDF
Technical Exhibit 11 - FP Facilitator Guide 10JAN2018.pdf PDF
Technical Exhibit 2 - Deliverables (17DEC19).pdf PDF
Technical Exhibit 7 Travel Request Form.pdf PDF
Technical Exhibit 5 - Places of Performance (21NOV19).pdf PDF
Technical Exhibit 12 - SFL-TAP Survival Guide MAR2018.pdf PDF
Technical Exhibit 8 - FTST Mission Request (17DEC19).pdf PDF
Technical Exhibit 4B CSPIA Workload By Garrison FY21-25 (20NOV2019).pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 3B

PERFORMANCE REQUIREMENT SUMMARY

SUPPLEMENT FOR UNSATISFACTORY PERFORMANCE DEDUCTIONS

A. General:

This Performance Requirements Summary lists certain required services which will be monitored by a Contracting Officer Representative (COR) or his/her designee during the term of this Contract , the required standard of service, maximum allowable deviation from perfect performance (also Performance Threshold), method of monitoring, and the specified remedy for exceeding the Performance Threshold.

B. Quality Assurance:

During each calendar month, Contractor's performance will be compared to the services standards and Performance Threshold. COR his/her designee may use a variety of inspection methods to evaluate the Contractor's performance. The methods of monitoring that may be used include, but are not limited to client surveys, government surveillance, inspection of output items on a periodic basis (dally, weekly, monthly, quarterly, semi-annually or annually) as necessary to assure of Contractor performance; and system reports.

C. Performance Requirements Summary Charts:

The Performance Requirements Summary Charts at the end of this Attachment:

1. List some of the services considered important to acceptable contract performance (Column 1).

2. Define the standard of performance for each such service (Column 2).

3. Show the maximum allowable degree of deviation from perfect performance or the

Performance Threshold for each such service that is allowed before remedy is required (Column 3).

4. Show the quality assurance method the Government will use to surveille and evaluate Contractor's performance in meeting requirements for each service (Column 4).

5. Show the remedy or corrective action if the service has not been satisfactorily performed.

Notwithstanding a finding of unsatisfactory service performance and imposition of a Position Vacancy Deduction, the Contractor must, as soon as possible, remedy any and all deficiencies in the provision of services, and, as deemed possible or feasible by COR or his/her designee, perform such services again at an acceptable level.

D. Criteria for Acceptable and Unacceptable Performance:

Performance of a listed service is considered acceptable when the number of deficiencies found by the COR/Designated Government Representative during contract monitoring does not exceed the number of deficiencies allowed by the Performance Threshold for that service. When the performance is unacceptable, Contracting Officer may complete a Non-Compliance Report (NCR). The NCR requires the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented. Unacceptable service performance may result in Unsatisfactory Performance Evaluation in the Contractor Performance Assessment Reporting System or Position Vacancy Deduction, if applicable, as described below.

E. Unsatisfactory Performance/ Position Vacancy Deductions:

The deductions discussed below are contingent on the KO determination that the contractor is non-compliant with contract requirement(s), to include but not limited to, those items listed in Contract Exhibit 1, Performance Requirements Summary, and a Nonconformance Report (NCR) being issued and a vacancy occurring within the same month at the same location. In the event any Contractor location is staffed at less personnel than the staffing identified in the attached Staffing Plan for any position description, the Contractor shall notify the COR by email within 48 hours of such occurrence. If both an NCR is issued and the NCR occurred in a short staffed location, the Contractor may be assessed a Position Vacancy Deduction for such location in the corresponding monthly invoice for services under the associated CLIN XXXX. Contractor is granted a 14 calendar days (applicable to CONUS locations)/21 calendar days (applicable to OCONUS locations only) grace period to fill a vacancy;

after such time, a Position Vacancy Deduction may be assessed. For positions subject to the Service Contract Act, the Position Vacancy Deduction (TE 3B) shall be calculated monthly as follows: the number of days the position is vacant in the corresponding month of each vacancy times eight (hours), times the DOL conformed hourly wage rate plus burdens for that position. For positions exempt from the Service Contract Act, the Position Vacancy Deduction shall be calculated monthly as follows: the number of days the position is vacant in the corresponding month of each vacancy times eight (hours), times the fully burdened labor hourly labor rate for each position. The Position Vacancy Deduction is in addition to, and does not abrogate or diminish, any other performance related remedy of the contract.

Contracting Officer shall evaluate Contractor's explanation on the NCR, and if Contracting Officer or his/her designee determines, in his/her sole discretion, that the particular defective performance for the particular service was caused by accident, strike, or similar occurrence beyond the control and without the fault or negligence of Contractor, then Contracting Officer shall decline to count such days as defective performance.

File details come from the government source that posted it. Updated .