W9124D-16-B-0001_Amendment_0003_Conformed_Copy.pdf
PDF 414 KB Posted
- Attached to
- Building 1467 Renovations Federal contract opportunity
- Solicitation number
- W9124D-16-B-0001
About this file
W9124D-16-B-0001 Amendment 0003 Conformed Copy
View the file
Other files for this federal contract opportunity
Show all 50
Building 1467 Renovations has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9124D-16-B-0001-0003
0010778372-0001
Renovation of Building 1467, at Fort Knox, KY.
Estimated Construction Cost: Betw een $10,000,000.00 and $25,000,000.00, but closer to $10,000,000.00
Aw ard w ill be made to the low est bidder.
NAICS code is 236220. Size Determination: $36.5 Million.
This is a HUBZone Small Business set a side.
Site Visit information for this project is available in Section 00010, Clause 52.235-27 Alt 1.
X
GLORIA R. RITTER 502-624-5846
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Apr-2016
(RFP)
(IFB)
CALL:
Bldg 1467 Renovation
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________03 May 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 373
199 6TH AVE
FORT KNOX KY 40121-5720
W9124D
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
LG-03729-5J
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 502-624-2153 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9124D-16-B-0001
Section SF 30 - BLOCK 14 CONTINUATION PAGE
AMDT 1 SUMMARY OF CHANGES
1. Site visit.
1a. See revised FAR52.236-27 Alt 1 Site Visit (Construction) for changes to date and location.
1b. Contractor MUST register by notifying Gloria Ritter at gloria.r.ritter.civ@mail.mil and Robert Woolsey at robert.l.woolsey2.civ@mail.mil no later than 9:00 a.m. Eastern, on 14 April 2016. Request for registration must include: name of company, name of each individual attending (limited to a maximum of two per company), and email address for each attendee.
2. Questions concerning the solicitation, Section 00600 Representations & Certifications, Instructions to bidders, question 2 has been revised to: Questions concerning this solicitation must be submitted in writing by email to robert.l.woolsey2.civ@mail.mil and gloria.r.ritter.civ@mail.mil and shall be received by 2:00 p.m. Eastern, on Wednesday, 20 April 2016. Question shall be submitted to both email addresses.
3. SF 1442, pg 1, block 13A is revised to extend the bid due date to 1:00:00 p.m. Eastern, 3 May 2016.
4. Amendment 0002 will be issued no later than 12 April 2016, please access FedBizOpps for all changes and updated documents.
AMDT 2 SUMMARY OF CHANGES
SECTION 00010
1. Added "STE" to fill in FAR Clause 52.232-2
SECTION 00600
2. Added FAR Provision 52.225-25 by reference
3. Added FAR Provision 52.252-1 as full text
SECTION 00700
4. Added FAR Clause 52.222-10 by reference
5. Added FAR Clause 52.223-10 by reference
6. Added FAR Clause 52.223-12 by reference
7. Added FAR Clause 52.223-19 by reference
8. Removed FAR Clause 52.228-14 as full text and added it as reference
9. Removed FAR Clause 52.232-16
10. Removed FAR Clause 52.236-4
SECTION 00800
11. All revisions made in the Special Contract Requirements and Statement of Work are highlighted for reference.
ATTACHMENTS
12. Added Attachment 1a Drawings Volume 1 with changes dated 13 April 2016
13. Added Attachment 1b Drawings Volume 2 with changes dated 13 April 2016
14. Added Attachment 2 CADD Drawings (PDF & DWG) with changes dated 13 April 2016
AMDT 3 SUMMARY OF CHANGES
Block 14. DESCRIPTION OF AMENDMENT/MODIFICATION A. The following attachments are added to and made a part of this solicitation and subsequent award:
‐ Responses to Requests for Information/Questions
‐ Addendum No. 2, dated 18 April 2016 ‐ Addendum NO. 3, dated 22 April 2016
B. The following Drawing Sheets and Specifications are replaced as a part of this amendment and are attached:
Addendum No. 2:
DRAWINGS
M110A - MECHANICAL GROUND FLOOR DUCT WORK - NEW WORK PLAN 'A'
M110B - MECHANICAL GROUND FLOOR DUCT WORK - NEW WORK PLAN 'B'
M110D - MECHANICAL SECOND FLOOR DUCT WORK - NEW WORK PLAN 'D'
E120C - ELECTRICAL GROUND FLOOR NEW WORK - POWER PLAN 'C'
E120D - ELECTRICAL GROUND FLOOR NEW WORK - POWER PLAN 'D'
E306 - ELECTRICAL PANEL SCHEDULES
SPECIFICATIONS
03 35 43 POLISHED CONCRETE FINISHING
Addendum No. 3:
DRAWINGS
CS100 SITE PLAN
AD111 FIRST FLOOR DEMOLITION PLAN ‘A’
AD112 FIRST FLOOR DEMOLITION PLAN ‘B’
AD113 FIRST FLOOR DEMOLITION PLAN ‘C’
AD114 FIRST FLOOR DEMOLITION PLAN ‘D’
A-481 INTERIOR SECTION DETAILS
PD110B
C. General Decision Number KY160170, Modification 1, dated 19 February 2016, is deleted and replaced with Davis-Bacon Act General Decision Number KY160170, Modification 2, dated 25 March 2016.
D. There is no change to the bid due date of 03-May-2016, 01:00 p.m. Eastern.
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
RENOVATION OF BLDG 1467
FFP
FURNISH ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION AND
SUPERVISION REQUIRED TO RENOVATE BUILDING 1467, FORT KNOX,
KY IN ACCORDANCE WITH THIS SOLICITATION AND THE ENCLOSED
STATEMENT OF WORK. PERIOD OF PERFORMANCE IS 15 MAY 2016
THROUGH 14 MAY 2017.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010778372-0001
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Each
CONTRACTOR MANPOWER REPORTING
FFP
CONTRACTOR MANPOWER REPORTING: AS DIRECTED BY THE
SECRETARY OF THE ARMY IN ACCORDANCE WITH THE GUIDANCE
PROVIDED HEREIN. PERIOD OF PERFORMANCE 15 MAY 2016 THOUGH
14 MAY 2017.
NET AMT
BID SCHEDULE
Bid Schedule
Bldg. 1467 Renovation and Repair Project
BIDDER'S NAME____________________________________
Item # Nomenclature Bid
B1
Substructure
B2
Superstructure
B3
Exterior Closure
B4
Roofing
B5
Interior Construction
B6
TAFS Coating
B7
Polished Concrete
B8
Elevator
B9
Plumbing
B10
HVAC
B11
HW Boiler
B12
Fire Protection Systems
B13
Electric Power & Lighting
B14
Electrical Systems
B15
Furnishings
B16
Demolition
B17
Demolition abatement
B18
Site Work
Total Base Bid
Item # Bid Options (Details on Plans and Specs) Prices Good 120 Days from award Bid
OPT1
Excavate around the perimeter of the 'D' wing foundation wall and reseal area below grade down to footing. Install a french drain to storm or exterior sump pump. Reseal existing perimeter Ground floor as shown on A‐104. Extents to be as indicated by Key note #103.
Extents shall be between column Line D5 to D8 along Col line 1, From Col 1 to col 7 along col line D8, and From Col D6 to D8 along Col line 7. See Detail 1/A‐320 showing the waterproofing
OPT2 Provide Masonry site sign for unit per Fort Knox standard design as detailed on Sheet C‐500 at location shown on CS100.
OPT3
Provide 2 access control Turnstiles including card readers and any misc. required components.
Provide installation of all Turnstile components, coordinate with security Equipment and installer, and connect and test as required to provide a complete and operational Access Control Turnstile entry system. Turnstiles to be installed in location indicated on A‐113, A‐
411. See specification section 111210 SECURITY ENTRANCE LANE and 28 13 16 Security Management System. Operational system shall include all Electrical and Security items as noted on associated “E” and “T” sheets.
OPT4
Provide Fence and Gate infill at exterior stair towers and all associated Hardware, Anchors and connections. Area of fence and gate as illustrated on 1/A‐201, 3/A‐210, 4/A‐201, and 5/A‐
201. Exterior stair towers located in ‘B’, ‘C’, and ‘D’ wings. Fence to be Galvanized material to match color of existing rail system.
OPT5 Provide and install card reader, conduit, wiring, drop arm Gate, and connection/interface with security system at location and per requirements indicated on drawing CS100.
OPT6
PAO Studio Upgrade: For Rooms 3A15 and 3A14; Provide upgrade to existing Masonry walls to remain. Extend existing walls to deck with metal studs and 5/8” GWB. Utilize ‘S5’ wall type to extend to deck. Infill existing penetrations in wall with ‘S5’ type wall or CMU to match existing. Infill existing door opening with S5 in lieu of S3. Provide 5/8” GWB on furring on both sides of existing CMU. Remove existing door 3A15 and provide new doors at 3A14 and 3A15 locations as STC‐45 door and frame assembly. Modify all existing wall conditions as required for new door and frame. Seal complete around all edges of existing walls, including floor deck at bottom and top of wall conditions and around all penetrations in wall whether through complete or only on one face of wall for minimum STC‐45 wall system.
OPT7
Revise new interior walls in the following Ground Floor 'A' wing rooms to be wall type ‘S5’‐ STC‐45. Add full perimeter door seals, including door bottom and threshold as may be required for sound rating to STC‐35 to all doors to the following rooms. Rooms include GA02 thru GA09, GA11 thru GA17, and GA19 thru GA22.
OPT8
Extend all existing walls to deck with metal stud infill as required. Install 2 layers of 5/8” Gypsum board on both sides of existing and new metal studs where no Gypsum wall board exists and Add one additional layer of 5/8” Gypsum wall board over existing single layer on both sides of wall (for STC‐45). Seal all around perimeter of wall and all existing and new penetrations through wall and membrane on either side of wall with acoustic sealant. Add full perimeter door seals on new or existing doors, including door bottom and threshold as may be required for sound rating to STC‐35 on all doors to the rooms noted. Where new walls are indicated, install wall type ‘S5’ in lieu of ‘S3’. These criteria apply to the following rooms and associated doors: 1D16, 1D18, 1D19, 1D20, 1D231, 1D22, 1D23, 1D24, 1D25, 1D26, 1D27, 1D28, 1D29, 1D30, 1D31, 1D32.
OPT9
Add full perimeter door seals, including door bottom and threshold as may be required for sound rating to STC‐35 on all of the following doors: 2A03 thru 2A08, 2A12, 2A14 thru 2A17, 2B04 thru 2B07, 2B01thru 2B02, 2B11thru 2B12, 2B15, 2C01 thru 2C03, 2C15 thru 2C17, 2C08, 2C091, 2C090, 2D02 thru 2D03, 2D16, 3A15 thru 3A21, 3A08 thru 3A09, 3A11thru
3A12, 3A05, 3B25 thru 3B28, 3B07 thru 3B09, 3B13 thru 3B15, 3C04, 3C09, 3C20 thru
3C23
OPT10
Access Control Area Upgrades: Provide new interior walls around perimeter of the following rooms as wall type ‘S62’ in lieu of ‘S5 and ‘S32’. Provide STC door and frame assemblies to these rooms: GD08, GD10, GD11, GD12, GD13, GD14, GD15, GD16, GD17, GD19, and GD20.
OPT11
D Wing Ground floor Add Alternate for Future Shower:
Provide Add Alternate cost to complete the following rooms: GD23, GD31, GD32, GD343, GD34, and GD35. (This Alternate does not include Base Scope wall defining room GD22 and Door GD23). Alternate to include All new walls, Doors, Ceilings, floor/wall Finishes, Electrical Power and Lighting, and Mechanical systems. Plumbing systems for this area shall include, but not be limited to, 1) The drainage piping collecting all the shower drains shall consist of cast iron piping with hub and spigot fittings; 2) The water supply piping consist of Corzan CPVC piping with plastic valves to match existing system; 3) Thermostatic mixing valves shall chrome plated. Finishes shall include, but not be limited to, PT‐2 floor tile (Daltile, Keystones, Mottled Medium Brown 2”x2”), CT‐1 wall tile (Daltile, semi‐gloss 4”x4” to match existing color), CTB‐1 base (Daltile, semi‐gloss 4”x4” coved base to match existing color).
OPT12 Provide Lump Sum cost for Built‐in Casework in OPS CNTR 2D07 as detailed on sheet A ‐
456. Coordinate all built‐in case work with Electrical and Telecomm work in this area
OPT13
Add alternate to replace existing fans in attic:
Provide Lump Sum Add cost for 12 New Attic fans in compartments with associated Outdoor air intake louvers and dampers. Fan type and performance is shown on sheet M302. New pipe connections and new control points are required. See sheet M602 for list of control points required. Provide ALL required components complete for installation of fans and louvers/dampers including power, controls, and any modifications to existing louver/dampers as may be required. And provide new forced ventilation fans to support airflow in each compartment defined by new smoke/draft partitions. $/EA
Total Bid Options
Total Base and Options $
NOTES FOR BID SCHEDULE
1. The company name should be indicated on the face of the Bid Schedule to preclude being misplaced.
2. Bidders must insert a price on all numbered items of the Bid Schedule. Failure to do so may result in the offer being unacceptable.
WAGE RATES
General Decision Number: KY160170 03/25/2016 KY170
Superseded General Decision Number: KY20150170
State: Kentucky
Construction Type: Building
County: Hardin County in Kentucky.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 02/19/2016 2 03/25/2016
BOIL0040-001 10/01/2014
Rates Fringes
BOILERMAKER......................$ 35.80 24.26
ELEC0369-015 05/27/2015
Rates Fringes
ELECTRICIAN......................$ 30.01 15.65
ENGI0181-054 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
(Drill)..........................$ 28.85 14.40
ENGI0181-079 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
(Loader).........................$ 28.85 14.40
ENGI0181-081 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
(Crane)..........................$ 28.85 14.40
CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL
RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER,
INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE.
ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE
WAGE, REGARDLESS OF BOOM LENGTH.
ENGI0181-082 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
(Forklift).......................$ 28.85 14.40
ENGI0181-093 06/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
(Oiler)..........................$ 25.13 14.40
IRON0044-017 06/01/2015
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 26.40 19.15
IRON0070-014 06/01/2015
Rates Fringes
IRONWORKER (Structural and Reinforcing).....................$ 27.56 20.30
LABO0576-012 07/01/2015
Rates Fringes
LABORER (Mason Tender - Cement/Concrete).................$ 19.62 9.48
LABO0576-018 07/01/2015
Rates Fringes
LABORER (Power Tool Operator)....$ 19.62 9.48
PLUM0502-006 08/01/2015
Rates Fringes
PLUMBER..........................$ 32.00 19.13
PLUM0633-001 07/01/2015
Rates Fringes
PIPEFITTER.......................$ 31.54 14.78
* SFKY0669-001 01/01/2016
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 31.35 18.02
SHEE0110-005 12/01/2014
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 29.45 18.70
* UAVG-KY-0014 06/02/2015
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 27.53 14.79
SUKY2015-030 06/02/2015
Rates Fringes
BRICKLAYER.......................$ 24.24 8.25
CARPENTER (Acoustical Ceiling Installation Only)...............$ 25.77 7.40
CARPENTER (Drywall Hanging and Metal Stud Installation Only)............................$ 21.72 13.52
CARPENTER (Floor Laying-Vinyl Only)............................$ 29.99 1.32
CARPENTER (Form Work Only).......$ 22.19 12.25
CARPENTER, excludes Acoustical Ceiling Installation, Drywall Hanging and Metal Stud Installation, Formwork and Floor Laying - Vinyl............................$ 23.54 9.10
CEMENT MASON/CONCRETE FINISHER...$ 20.21 9.70
LABORER: Common or General......$ 18.86 5.22
LABORER: Mason Tender - Brick...$ 19.24 3.79
LABORER: Pipelayer..............$ 20.36 9.90
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 24.35 13.00
OPERATOR: Bulldozer.............$ 21.49 3.84
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 22.52 4.00
OPERATOR: Roller................$ 23.60 12.65
PAINTER (Brush and Roller).......$ 20.83 11.84
PAINTER: Spray..................$ 22.81 11.87
ROOFER...........................$ 20.61 5.12
TILE FINISHER....................$ 15.42 5.63
TILE SETTER......................$ 22.64 6.10
TRUCK DRIVER: Dump Truck........$ 23.60 8.03
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 16-MAY-2016 TO
15-MAY-2017
N/A ESD DIRECTOR OF PUBLIC WORKS
JAY
1110A 126TH 6TH AVE
FORT KNOX KY 40121-5719
502-624-5831
W22PES
0002 POP 16-MAY-2016 TO
15-MAY-2017
N/A (SAME AS PREVIOUS LOCATION)
W22PES
CLAUSES INCORPORATED BY REFERENCE
52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Hardin County: 9.6% Hardin County: 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Hardin County, in the state of Kentucky.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Gloria R. Ritter, 199 Sixth Avenue, Building 1109B, STE 373, Fort Knox, KY 40121.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Friday, 15 April 2016 at 9:00 AM
(c) Participants will meet at-- Participants will meet at Mission Installation Contracting Command (MICC) Conference Room 257 on the 2nd floor of Building 1109 located at 199 6th Ave, Fort Knox, KY 40121
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO BIDDERS
In preparing your bid -----
1. Have you signed the bid? Are all blank spaces filled in?
2. If signing on behalf of your company, have you attached evidence of your authority to sign the bid?
3. Have you acknowledged receipt of all amendments?
4. Have you checked your bid for possible errors? Arithmetically?
5. Have you furnished all information required by the invitation for bids and/or the specifications?
6. Are you submitting your bid on time? If mailed, will it reach the place of bid opening at the designated hour?
7. Have you identified on the face of the envelope containing your bid, the invitation number to which it pertains, and the date and hour of opening? See 52.214-5, Submission of Bids.
8. The ‘Bid Schedule’ must be filled out and submitted as part of the bid package.
NOTE: Delivery of mail for bid submission purposes is not considered complete until the bid reaches the location stated in ‘Item 7’ of the SF1442.
52.204-16 Commercial and Government Entity Code Reporting JUL 2015 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
DEC 2015
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
Section 00600 - Representations & Certifications
INSTRUCTIONS TO BIDDERS
GENERAL INFORMATION
1. NOTICE: All contractors shall be registered in the System for Award Management (SAM) to be eligible for award of a contract. Contractors shall ensure SAM registration is active. The official SAM website is https://www.sam.gov/portal/public/SAM/. See Federal Acquisition Regulation (FAR) Clause 52.204-8 in Section 00600 of this solicitation for additional information. Contractors shall ensure that the contractor name and address provided in Block 14 of SF1442 matches the contractor name and address shown in SAM database. Submission of a bid using a contractor name and/or address other than the exact name and address shown in the SAM database could result in rejection of the bid or nonpayment of invoices.
2. Questions concerning this solicitation must be submitted in writing by email to robert.l.woolsey2.civ@mail.mil and gloria.r.ritter.civ@mail.mil, and shall be received by 2:00 p.m. on Wednesday, 20 April 2016.
4. Bidders are reminded to complete and return with their bids all representations and certifications in Section of this solicitation. Additionally prior to submission of a bid in response to this solicitation, the bidder shall complete the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. See FAR 52.204-8 in Section 00600 of this solicitation for additional information.
5. Offeror shall complete and return with its bid the following information:
DUNS NUMBER: ______________________; CAGE CODE: _______________________
FED TAX ID#: ______________________
PHONE NO: ______________________; FAX NO: _______________________
E-MAIL ADDRESS: ______________________
THIS SOLICITATION CONSISTS OF THE FOLLOWING SECTIONS WHICH ARE INCORPORATED
HEREIN AND MADE A PART HEREOF:
TITLE SECTION
1. STANDARD FORM 1442 -------
2. SOLICITATION CONTRACT FORM 00010
3. INSTRUCTIONS TO BIDDER 00100
4. REPRESENTATIONS AND CERTIFICATIONS 00600
5. CONTRACT CLAUSES 00700
6. SPECIAL CONTRACT REQUIREMENTS 00800
7. ATTACHEMENTS: TO DOWNLOAD ATTACHMENTS PLEASE GO TO the FedBizOpps website at http:..www.fbo.gov. Fort Knox Building 1467 Renovation
a. ATTACHMENT 1a - Drawings Volume 1
b. ATTACHMENT 1b - Drawings Volume 2
c. ATTACHMENT 2 - CADD Drawings
d. ATTACHMENT 3 - Combined Specifications Book
e. ATTACHMENT 4 - Fort Knox DPW CADD Deliverables
f. ATTACHMENT 5 - Fort Knox Environmental Handbook 2016
g. ATTACHMENT 6 - Fort Knox Safety Regulation
h. ATTACHMENT 7 - Fort Knox Fire Department Specifications
i. ATTACHMENT 8 - Fort Knox Locates
j. ATTACHMENT 9 - Building 1467 Site and Storage Plan
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under and Federal Law
FEB 2016
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2016)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $36,500,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.209-11, Representation by Corporations Regarding elinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(viii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(ix) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(x) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(xi) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xvi) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xvii) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xviii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $77,533, the provision with its Alternate II applies.
(D) If the acquisition value is $77,533 or more but is less than $100,000, the provision with its Alternate III applies.
(xix) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225- 5.
(xx) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxi) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxii) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).
(vi) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC
2014)
The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .