CS100-ADDENDUM3.pdf

PDF 2 MB Posted

Attached to
Building 1467 Renovations Federal contract opportunity
Solicitation number
W9124D-16-B-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Knox

About this file

Addendum No. 3 Drawing CS100 Site Plan

View the file

Other files for this federal contract opportunity

Other files attached to Building 1467 Renovations, newest first.
File Type Posted
W9124D-16-B-0001_Amendment_0003_Conformed_Copy.pdf PDF
A-481_-_INTERIOR_SECTION_DETAILS-ADDN3.pdf PDF
Addendum_No2-033543_Polished_Concrete_Finishing.pdf PDF
Mechanical_Addendum_2-18Apr2016.pdf PDF
PD110B-ADDN3.pdf PDF
Addendum_No3-22Apr2016.pdf PDF
Responses_to_Requests_for_Information _W9124D-16-B-0001 _22Apr2016.pdf PDF
W9124D-16-B-0001 _Pre-Bid_Site_Visit_Attendees.pdf PDF
9 INT-Combined Int-Furniture Set.zip ZIP file
8 TELE-Telecomm-ALLwithADDN1.zip ZIP file
4 FIRE-LS- Fire Protection-ALLwithADDN1.zip ZIP file
7 ELEC-Electrical-ALLwithADDN1.zip ZIP file
1_GEN-CIVwAmnd_2_(2).zip ZIP file
3 ARCHwAmnd 2.zip ZIP file
6 PLUMwAmnd 2.zip ZIP file
9 INTwAmnd 2.zip ZIP file
2 STRCwAmnd 2.zip ZIP file
4 FIREwAmnd 2.zip ZIP file
5 MECHwAmnd 2.zip ZIP file
8-TELEwAmnd 2.zip ZIP file
5a MECHwAmnd 2.zip ZIP file
7 ELECwAmnd 2.zip ZIP file
Volume_1-ALLwith_Amnd_2.pdf PDF
Solicitation_Amendment_W9124D-16-B-0001-0002_1467_Renovation_13_Apr_16.pdf PDF
W9124D-16-B-0001-0001.pdf PDF
5_MECH.zip ZIP file
9b_INT.zip ZIP file
6_PLUM.zip ZIP file
5a_MECH.zip ZIP file
9_INT.zip ZIP file
4_FIRE.zip ZIP file
1_GEN-CIVIL.zip ZIP file
2_STRC.zip ZIP file
3_ARCH.zip ZIP file
3_ARCH.zip ZIP file
9_INT.zip ZIP file
8_TELE.zip ZIP file
7_ELEC.zip ZIP file
5_MECH.zip ZIP file
4_FIRE.zip ZIP file
6_PLUM.zip ZIP file
1_GEN-CIVIL.zip ZIP file
Attachment_1b_-_Drawings_Volume_2_31Mar2016.pdf PDF
Attachment_1a_-_Drawings_Volume_1_31Mar2016.pdf PDF
Attachment_6_-_Fort_Knox_Safety_Reg_385-10.pdf PDF
Attachment_7_-_Fort_Knox_Fire_Department_specifications.pdf PDF
Attachment_4_-_Ft_Knox_DPW_CADD_Deliverables.pdf PDF
Attachment_9_-_Bldg_1467_Site_ _Storage_Plan.pdf PDF
Attachment_3_-_Combined_Specification_Book.pdf PDF
SOW_draft_16-Q-5098_Construction_Bldg_1467_22_Mar_16_Redacted.pdf PDF
Show all 50

Building 1467 Renovations has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE PLAN

PJS/TB

DA.

PJS

1" = 30'

60'

SCALE:1"= 30'

0 30'

CS100

SHEET:

DATE:

DESIGNED BY:

JOB NO:

DRAWN BY:

CHECKED BY:

SCALE:

OF

APPROVED BY:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

P

L U

M

S

T R

E E

T

T

H

F

L O

O R

C I N

C I N

N A

T I

O

H I O

P H

O N

E

SHEET IDENTIFICATION

B U

I L D

I N

G

R E

N O

V A

T I O

N

F T

K

N O

X

K

Y

F O

U O

54581

R E

V I S

I O

N S

N O

D

E S

C R

I P

T I O

N D

A T

E

31MAR16

S

U B

M I T

T A

L

M

A R

EXISTING SITE UTILITIES ARE FROM PROVIDED GIS

INFORMATION AND NOT A SITE SURVEY

SITE LAYOUT AND ELECTRICAL SITE PLAN

1"=30'-0"

DROP ARM GATE DETAIL

NTS

PIPE BOLLARD DETAIL

NTS

ELECTRICAL CODED NOTES

PROVIDE (2) 2” SCHEDULE 40 PVC BURIED 3'-0” BELOW FINISHED GRADE(ONE FOR POWER AND ONE FOR CONTROLS). STUB UP 6” ABOVE FINISHED GRADE AT DROP ARM

GATE LOCATION AND AT EXTERIOR WALL OF BUILDING AS INDICATED. PROVIDE 2#10 AWG + 1#10 AWG GROUND IN ONE OF THE CONDUITS.

TRANSITION CONDUITS FROM 2” SCHEDULE 40 PVC TO 2” RIGID GALVANIZED STEEL AND EXTEND UP EXTERIOR WALL 8'-0” ABOVE FINISHED GRADE. STUB CONDUIT

THROUGH WALL. REFER TO SHEET E120C FOR CONTINUATION.

PROVIDE (3) 3” (POWER) AND (2) 1-1/2” (CONTROLS) SCHEDULE 40 PVC BURIED 3'-0” BELOW FINISHED GRADE. REFER TO SHEET E401 FOR FEEDER SIZES. STUB UP 6” ABOVE

FINISHED GRADE AT GENERATOR PAD LOCATION AND AT EXTERIOR WALL OF BUILDING AS INDICATED.

TRANSITION CONDUITS FROM SCHEDULE 40 PVC TO RIGID GALVANIZED STEEL AND STUB THROUGH WALL. REFER TO SHEET E120B FOR CONTINUATION.

PROVIDE 36”X36”X36” (MINIMUM) HANDHOLE.

PROVIDE 2#10 AWG + 1#10 AWG IN 1” SCHEDULE 40 PVC BURIED 36” BELOW GRADE. STUB UP 6” ABOVE FINISHED GRADE AT STORM PUMP AND AT THE EXTERIOR WALL OF

BUILDING AS INDICATED. ROUTE IN FIELD TO AVOID EXISTING UTILITIES, FIELD VERIFY LOCATION AND DEPTH.

TRANSITION CONDUIT FROM 1” SCHEDULE 40 PVC TO 1” RIGID GALVANIZED AND EXTEND UP EXTERIOR WALL 8'-0” ABOVE FINISHED GRADE. STUB CONDUIT THROUGH WALL.

REFER TO SHEET E120C & E120D FOR CONTINUATION.

A D

D E

N D

M

A

P R

A D

D E

N D

M

A

P R

File details come from the government source that posted it. Updated .