Solicitation_Amendment_W9124D-16-B-0001-0002_1467_Renovation_13_Apr_16.pdf
PDF 244 KB Posted
- Attached to
- Building 1467 Renovations
- Solicitation number
- W9124D-16-B-0001
About this file
Amendment 0002 for Solicitation W9124D-16-B-0001 1467 Renovations 13 Apr 16
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010778372-0001 LG-03729-5J
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Administrative changes to solicitation and Statement of Work.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9124D-16-B-0001
X 9B. DATED (SEE ITEM 11)
06-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2016
CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC FORT KNOX
BLDG 1109B STE 373
199 6TH AVE
FORT KNOX KY 40121-5720
W9124D 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9124D-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMDT 2 SUMMARY OF CHANGES
SECTION 00010
1. Added "STE" to fill in FAR Clause 52.232-2
SECTION 00600
2. Added FAR Provision 52.225-25 by reference
3. Added FAR Provision 52.252-1 as full text
SECTION 00700
4. Added FAR Clause 52.222-10 by reference
5. Added FAR Clause 52.223-10 by reference
6. Added FAR Clause 52.223-12 by reference
7. Added FAR Clause 52.223-19 by reference
8. Removed FAR Clause 52.228-14 as full text and added it as reference
9. Removed FAR Clause 52.232-16
10. Removed FAR Clause 52.236-4
SECTION 00800
11. All revisions made in the Special Contract Requirements and Statement of Work are highlighted for reference.
ATTACHMENTS
12. Added Attachment 1a Drawings Volume 1 with changes dated 13 April 2016
13. Added Attachment 1b Drawings Volume 2 with changes dated 13 April 2016
14. Added Attachment 2 CADD Drawings (PDF & DWG) with changes dated 13 April 2016
The following have been modified:
AMDT 1 SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
BID SCHEDULE
Bid Schedule
Bldg. 1467 Renovation and Repair Project
BIDDER'S NAME____________________________________
Item # Nomenclature Bid
B1
Substructure
B2
Superstructure
B3
Exterior Closure
B4
Roofing
B5
Interior Construction
B6
TAFS Coating
B7
Polished Concrete
B8
Elevator
B9
Plumbing
B10
HVAC
B11
HW Boiler
B12
Fire Protection Systems
B13
Electric Power & Lighting
B14
Electrical Systems
B15
Furnishings
B16
Demolition
B17
Demolition abatement
B18
Site Work
Total Base Bid
Item # Bid Options (Details on Plans and Specs) Prices Good 120 Days from award Bid
OPT1
Excavate around the perimeter of the 'D' wing foundation wall and reseal area below grade down to footing. Install a french drain to storm or exterior sump pump. Reseal existing perimeter Ground floor as shown on A‐104. Extents to be as indicated by Key note #103.
Extents shall be between column Line D5 to D8 along Col line 1, From Col 1 to col 7 along col line D8, and From Col D6 to D8 along Col line 7. See Detail 1/A‐320 showing the waterproofing
OPT2 Provide Masonry site sign for unit per Fort Knox standard design as detailed on Sheet C‐500 at location shown on CS100.
OPT3
Provide 2 access control Turnstiles including card readers and any misc. required components.
Provide installation of all Turnstile components, coordinate with security Equipment and installer, and connect and test as required to provide a complete and operational Access Control Turnstile entry system. Turnstiles to be installed in location indicated on A‐113, A‐
411. See specification section 111210 SECURITY ENTRANCE LANE and 28 13 16 Security Management System. Operational system shall include all Electrical and Security items as noted on associated “E” and “T” sheets.
OPT4
Provide Fence and Gate infill at exterior stair towers and all associated Hardware, Anchors and connections. Area of fence and gate as illustrated on 1/A‐201, 3/A‐210, 4/A‐201, and 5/A‐
201. Exterior stair towers located in ‘B’, ‘C’, and ‘D’ wings. Fence to be Galvanized material to match color of existing rail system.
OPT5 Provide and install card reader, conduit, wiring, drop arm Gate, and connection/interface with security system at location and per requirements indicated on drawing CS100.
OPT6
PAO Studio Upgrade: For Rooms 3A15 and 3A14; Provide upgrade to existing Masonry walls to remain. Extend existing walls to deck with metal studs and 5/8” GWB. Utilize ‘S5’ wall type to extend to deck. Infill existing penetrations in wall with ‘S5’ type wall or CMU to match existing. Infill existing door opening with S5 in lieu of S3. Provide 5/8” GWB on furring on both sides of existing CMU. Remove existing door 3A15 and provide new doors at 3A14 and 3A15 locations as STC‐45 door and frame assembly. Modify all existing wall conditions as required for new door and frame. Seal complete around all edges of existing walls, including floor deck at bottom and top of wall conditions and around all penetrations in wall whether through complete or only on one face of wall for minimum STC‐45 wall system.
OPT7
Revise new interior walls in the following Ground Floor 'A' wing rooms to be wall type ‘S5’‐ STC‐45. Add full perimeter door seals, including door bottom and threshold as may be required for sound rating to STC‐35 to all doors to the following rooms. Rooms include GA02 thru GA09, GA11 thru GA17, and GA19 thru GA22.
OPT8
Extend all existing walls to deck with metal stud infill as required. Install 2 layers of 5/8” Gypsum board on both sides of existing and new metal studs where no Gypsum wall board exists and Add one additional layer of 5/8” Gypsum wall board over existing single layer on both sides of wall (for STC‐45). Seal all around perimeter of wall and all existing and new penetrations through wall and membrane on either side of wall with acoustic sealant. Add full perimeter door seals on new or existing doors, including door bottom and threshold as may be required for sound rating to STC‐35 on all doors to the rooms noted. Where new walls are indicated, install wall type ‘S5’ in lieu of ‘S3’. These criteria apply to the following rooms and associated doors: 1D16, 1D18, 1D19, 1D20, 1D231, 1D22, 1D23, 1D24, 1D25, 1D26, 1D27, 1D28, 1D29, 1D30, 1D31, 1D32.
OPT9
Add full perimeter door seals, including door bottom and threshold as may be required for sound rating to STC‐35 on all of the following doors: 2A03 thru 2A08, 2A12, 2A14 thru 2A17, 2B04 thru 2B07, 2B01thru 2B02, 2B11thru 2B12, 2B15, 2C01 thru 2C03, 2C15 thru 2C17, 2C08, 2C091, 2C090, 2D02 thru 2D03, 2D16, 3A15 thru 3A21, 3A08 thru 3A09, 3A11thru
3A12, 3A05, 3B25 thru 3B28, 3B07 thru 3B09, 3B13 thru 3B15, 3C04, 3C09, 3C20 thru
3C23
OPT10
Access Control Area Upgrades: Provide new interior walls around perimeter of the following rooms as wall type ‘S62’ in lieu of ‘S5 and ‘S32’. Provide STC door and frame assemblies to these rooms: GD08, GD10, GD11, GD12, GD13, GD14, GD15, GD16, GD17, GD19, and GD20.
OPT11
D Wing Ground floor Add Alternate for Future Shower:
Provide Add Alternate cost to complete the following rooms: GD23, GD31, GD32, GD343, GD34, and GD35. (This Alternate does not include Base Scope wall defining room GD22 and Door GD23). Alternate to include All new walls, Doors, Ceilings, floor/wall Finishes, Electrical Power and Lighting, and Mechanical systems. Plumbing systems for this area shall include, but not be limited to, 1) The drainage piping collecting all the shower drains shall consist of cast iron piping with hub and spigot fittings; 2) The water supply piping consist of Corzan CPVC piping with plastic valves to match existing system; 3) Thermostatic mixing valves shall chrome plated. Finishes shall include, but not be limited to, PT‐2 floor tile (Daltile, Keystones, Mottled Medium Brown 2”x2”), CT‐1 wall tile (Daltile, semi‐gloss 4”x4” to match existing color), CTB‐1 base (Daltile, semi‐gloss 4”x4” coved base to match existing color).
OPT12 Provide Lump Sum cost for Built‐in Casework in OPS CNTR 2D07 as detailed on sheet A ‐
456. Coordinate all built‐in case work with Electrical and Telecomm work in this area
OPT13
Add alternate to replace existing fans in attic:
Provide Lump Sum Add cost for 12 New Attic fans in compartments with associated Outdoor air intake louvers and dampers. Fan type and performance is shown on sheet M302. New pipe connections and new control points are required. See sheet M602 for list of control points required. Provide ALL required components complete for installation of fans and louvers/dampers including power, controls, and any modifications to existing louver/dampers as may be required. And provide new forced ventilation fans to support airflow in each compartment defined by new smoke/draft partitions. $/EA
Total Bid Options
Total Base and Options $
NOTES FOR BID SCHEDULE
1. The company name should be indicated on the face of the Bid Schedule to preclude being misplaced.
2. Bidders must insert a price on all numbered items of the Bid Schedule. Failure to do so may result in the offer being unacceptable.
1. Site visit.
1a. See revised FAR52.236-27 Alt 1 Site Visit (Construction) for changes to date and location.
1b. Contractor MUST register by notifying Gloria Ritter at gloria.r.ritter.civ@mail.mil and Robert Woolsey at robert.l.woolsey2.civ@mail.mil no later than 9:00 a.m. Eastern, on 14 April 2016. Request for registration must include: name of company, name of each individual attending (limited to a maximum of two per company), and email address for each attendee.
2. Questions concerning the solicitation, Section 00600 Representations & Certifications, Instructions to bidders, question 2 has been revised to: Questions concerning this solicitation must be submitted in writing by email to robert.l.woolsey2.civ@mail.mil and gloria.r.ritter.civ@mail.mil and shall be received by 2:00 p.m. Eastern, on Wednesday, 20 April 2016. Question shall be submitted to both email addresses.
3. SF 1442, pg 1, block 13A is revised to extend the bid due date to 1:00:00 p.m. Eastern, 3 May 2016.
4. Amendment 0002 will be issued no later than 12 April 2016, please access FedBizOpps for all changes and updated documents.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Gloria R. Ritter, 199 Sixth Avenue, Building 1109B, STE 373, Fort Knox, KY 40121.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of provision)
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been added by reference:
52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998
INSTRUCTIONS TO BIDDERS
GENERAL INFORMATION
1. NOTICE: All contractors shall be registered in the System for Award Management (SAM) to be eligible for award of a contract. Contractors shall ensure SAM registration is active. The official SAM website is https://www.sam.gov/portal/public/SAM/. See Federal Acquisition Regulation (FAR) Clause 52.204-8 in Section 00600 of this solicitation for additional information. Contractors shall ensure that the contractor name and address provided in Block 14 of SF1442 matches the contractor name and address shown in SAM database. Submission of a bid using a contractor name and/or address other than the exact name and address shown in the SAM database could result in rejection of the bid or nonpayment of invoices.
2. Questions concerning this solicitation must be submitted in writing by email to robert.l.woolsey2.civ@mail.mil and gloria.r.ritter.civ@mail.mil, and shall be received by 2:00 p.m. on Wednesday, 20 April 2016.
4. Bidders are reminded to complete and return with their bids all representations and certifications in Section of this solicitation. Additionally prior to submission of a bid in response to this solicitation, the bidder shall complete the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. See FAR 52.204-8 in Section 00600 of this solicitation for additional information.
5. Offeror shall complete and return with its bid the following information:
DUNS NUMBER: ______________________; CAGE CODE: _______________________
FED TAX ID#: ______________________
PHONE NO: ______________________; FAX NO: _______________________
E-MAIL ADDRESS: ______________________
THIS SOLICITATION CONSISTS OF THE FOLLOWING SECTIONS WHICH ARE INCORPORATED
HEREIN AND MADE A PART HEREOF:
TITLE SECTION
1. STANDARD FORM 1442 -------
2. SOLICITATION CONTRACT FORM 00010
3. INSTRUCTIONS TO BIDDER 00100
4. REPRESENTATIONS AND CERTIFICATIONS 00600
5. CONTRACT CLAUSES 00700
6. SPECIAL CONTRACT REQUIREMENTS 00800
7. ATTACHEMENTS: TO DOWNLOAD ATTACHMENTS PLEASE GO TO the FedBizOpps website at http:..www.fbo.gov. Fort Knox Building 1467 Renovation
a. ATTACHMENT 1a - Drawings Volume 1
b. ATTACHMENT 1b - Drawings Volume 2
c. ATTACHMENT 2 - CADD Drawings
d. ATTACHMENT 3 - Combined Specifications Book
e. ATTACHMENT 4 - Fort Knox DPW CADD Deliverables
f. ATTACHMENT 5 - Fort Knox Environmental Handbook 2016
g. ATTACHMENT 6 - Fort Knox Safety Regulation
h. ATTACHMENT 7 - Fort Knox Fire Department Specifications
i. ATTACHMENT 8 - Fort Knox Locates
j. ATTACHMENT 9 - Building 1467 Site and Storage Plan
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.223-10 Waste Reduction Program MAY 2011 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-19 Compliance with Environmental Management Systems MAY 2011 52.228-14 Irrevocable Letter of Credit NOV 2014
The following have been deleted:
52.228-14 Irrevocable Letter of Credit NOV 2014 52.232-16 Progress Payments APR 2012
52.236-4 Physical Data APR 1984
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
BEFORE STARTING CONSTRUCTION
Contractor’s Review of Contract Documents: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to the Contracting Officer's Representative (COR) any conflict, error, ambiguity, or discrepancy which the Contractor may discover and shall obtain a written interpretation or clarification from the KO before proceeding with any Work affected thereby.
Preliminary Schedule: Within ten calendar days after the Effective Date of the Contract, Contractor shall submit to the assigned Fort Knox Directorate of Public Works (DPW) - Engineering and Services Division (ESD) Inspector for its timely review:
1. A preliminary progress schedule indicating times for starting and completing the various stages of the Work, including Milestones specified in the Contract Documents.
2. A preliminary schedule of values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as a basis for progress payments during the performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of the Work.
INITIAL ACCEPTANCE OF SCHEDULES
Unless otherwise provided in the Contract Documents, at least ten calendar days before submission of the first Application of Payment a conference attended by the Contractor, Project Manager and ESD Inspector, and others appropriate will be held to review acceptability of the Schedules. Contractor shall have an additional ten days to make corrections and adjustments to the Schedules and resubmit the Schedules. No progress payment will be approved by the ESD Inspector until acceptable schedules are submitted to the Inspector.
Such acceptance of the Schedules will not impose on the ESD Inspector responsibility for the progress schedule, for sequencing, scheduling, or progress of the Work nor interface with or relieve Contractor from Contractor’s full responsibility therefore.
Contractor’s schedule of values will be acceptable to the ESD Inspector as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work.
SCHEDULE OF VALUES
The schedule of values established in the above section "Before Starting Construction" will serve as a basis for the progress payments and will be incorporated into a form of Application for Payment acceptable to the ESD Inspector.
Progress payments on account of Unit Price Work will be based on the number of units completed.
PROGRESS PAYMENTS
Progress payments will be made in accordance with the approved Schedule of Values as established in paragraph 2, with a retainage of 20 percent of the assigned value of the assigned Work.
If payment is requested on the basis of material and equipment not incorporated in the Work but delivered and suitably stored at the Site, or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that the material and equipment are free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect the Government’s interest therein, all of which must be satisfactory to the ESD Inspector.
LIQUIDATED DAMAGES
The parties recognize that Government will suffer financial loss if the Work is not substantially completed with the Contract Time. They also recognize the delays, expense, and difficulty to both parties involved in proving or contesting the amounts of those losses. Instead of proof of those amounts, it is agreed that Contractor shall be liable for and will pay Government the following amounts under Occupant’s Damages, and DPW/ESD’s (Engineering Services Division) Damages, all as liquidated damages, and not as a penalty:
General Construction:
Occupant’s Damages: $ 0.00/day DPW/ESD Damages: $ 2,500.00/day Total Liquidated Damages: $ 2,500.00/day
Liquidated Damages will be assessed for the above listed amount(s) for each and every day the Work remains incomplete after the completion date.
Completion for the above listed item(s) will be defined as completely installed including all associated appurtenances, tested and ready for the intended service.
DAILY REPORTS
Contractor shall submit a “Daily Report” to the ESD Inspector on a daily basis.
This daily report shall contain names of Contractor’s Representative and Sub-Contractor’s names on site, site conditions, weather, etc. for each day of Work. A copy of a Daily Report format will be handed out by Inspections at the Pre-Construction meeting.
ENVIRONMENTAL ISSUES
The Contractor shall contact DPW/EMD (Environmental Management Division) regarding requirements for separation of materials for trash, recycling, and erosion control, etc.
QUALITY CONTROL
Contractor shall submit a written quality control plan within 10 calendar days after receipt of notice to proceed, which contains as a minimum, the following:
a. The name(s) of those individuals authorized to conduct and sign daily construction contractor quality control report. Individual(s) designated shall be someone other than personnel engaged in the actual preparation and completion of work. Working salaried superintendents when approved by the Contracting Officer, may sign the daily construction Quality Control Report.
b. Proposed methods or tests to insure compliance with specifications if not dictated by the specification.
c. Proposed frequency of QCI, which shall as a minimum provide for all interim inspections called for by the specification and submission of a construction contractor quality control report for each calendar day exclusive of weekends and holidays unless work was performed.
The job superintendent shall be required to call in or visit the contract inspection branch between 0730 – 0800 a.m., at 502-624-7188 or the basement of building 1109D. The superintendent shall also be required to complete daily quality control reports (copies furnished at Building 1109) and submit them to the inspector each day. The contractor shall keep a copy of this report for his records.
FINAL ACCEPTANCE
Final acceptance of work performed hereunder shall be made by the Contracting Officer.
CONTRACT MANAGEMENT
Contract management will be effected by the Contracting Officer, Contract Management Division, Mission and Installation Contracting Command (MICC) Fort Knox, 199 Sixth Ave, Building 1109B, STE 373, Fort Knox, Kentucky 40121-5720. Changes in or deviations from the specifications shall not be effected without a written modification to the contract executed by the Contracting Officer.
PAYMENT STATUS INQUIRY
Contract payment status may be found using MyInvoice at https://myinvoice.csd.disa.mil.
MAGNITUDE OF PROJECT
The magnitude of this project is between $10,000,000.00 and $25,000,000.00.
REQUIRED INSURANCE
A. The contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance:
TYPE AMOUNT
(1) WORKMEN’S COMPENSATION:
The required workmen's compensation insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.00.
(2) COMPREHENSIVE GENERAL LIABILITY WITH MINIMUM LIMITS OF:
Per accident or occurrence for bodily injury: $500,000.00.
This insurance shall include contractor's protective liability and contractual liability.
(3) COMPREHENSIVE AUTOM0BILE LIABILITY WITH MINIMUM LIMITS OF:
Per person: $200,000.00 Per accident for bodily injury: $500,000.00 Per accident for property damage: $ 20,000.00
B. Prior to commencement or work hereunder, the contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interest of the government in such insurance shall not be effective for such periods as may be prescribed by the laws or the state in which this contract is to be performed.
C. The contractor agrees to insert the substance of this clause, including this paragraph (c) in all subcontracts hereunder.
LIABILITY OF CONTRACTOR
A. The contractor shall be:
(1) liable to the government for loss of or damage to property, real and personal, owned by the government or for which the government is liable;
(2) responsible for, and hold the government harmless from, loss of or damage to property not included in (1) above; and
(3) responsible for, and hold the government harmless from that portion of bodily injury and death of persons, occasioned either in whole or in part by the negligence or fault of the contractor, his officers, agents, or employees in the performance of work under this contract.
B. The amount of the loss or damage as determined by the Contracting Officer will be withheld from payment otherwise due the contractor if any claim is not otherwise resolved.
C. The contractor shall give the government immediate notice of any suit or action filed, or prompt notice of any claim made against the contractor arising out of the performance of this contract.
D. It is expected that the contractor shall resolve any claim filed by a third person within 60 calendar days of receipt by the contractor. If it appears resolution will not be reached within 60 calendar days, the contractor shall notify the Contracting Officer of the expected delay and a proposed schedule for resolution of the claim.
E. If the government should settle any claim against the contractor arising out of the performance of this contract, the government will obtain a subrogated interest against the contractor for the amount of the settlement.
PART-TIME EMPLOYMENT
Neither military personnel not government civilian employees shall be employed to perform work under this contract without first obtaining approvals required by 5 C.F.R 2635, Standards of Ethical Conduct for Federal Employees, effective 3 February 1993. In no event shall such personnel be utilized in a supervisory capacity in the performance of the contract work.
FIRE PREVENTION AND PROTECTION
The contractor shall comply with all pertinent provisions of the following directives, as amended, as they pertain to fire prevention and protection. These directives are available for inspection in the office of the Directorate of Contracting.
A. ARMY REGULATION 420-90, FIRE PREVENTION AND PROTECTION
B. ENGINEER MANUAL 385-1-1, GENERAL SAFETY REQUIREMENTS
C. ARMOR CENTER REGULATION 420-8, FIRE REGULATIONS
The contractor shall also take or cause to be taken such additional protective measures as the Contracting Officer may determine to be reasonably necessary for such purpose.
OPERATIONS AND STORAGE AREA
Contractor shall not maintain an operations and storage area under this contract unless authorized in writing by the Contracting Officer. Contractor shall submit a written request for approval specifying desired location and availability date; equipment that will be used for operations; storage area; and a point of contact to include phone number. Written request shall be submitted within ten (10) working days prior to desired availability date.
In conjunction with clause "Operations and Storage Areas (APR 1984)", FAR 52.236-10, contractor shall keep its assigned area maintained to include grass mowing, cutting of weeds, cleaning of fence rows, and daily removal of all trash, scrap material, and other debris. Maintenance of the assigned area constitutes part of each contractor invoice for payment. Failure to properly maintain assigned area could result in delay or payment of withholding of funds.
Contract completion time includes removal of all contractor-owned facilities, material, and utilities from the assigned area and final maintenance of the area in accordance with paragraph above. Contract shall not be completed until contractor has complied with this paragraph; therefore, liquidated damages as specified in the contract requirements of this contract will be assessed for each day over contract completion time.
NORMAL WORKING HOURS
Inasmuch as this installation observes a normal five-day, 40-hour work week, Monday through Friday (excluding legal public holidays), the contractor shall schedule his working hours between 7:00 a.m. and 5:00 p.m., to coincide with the working hours of the installation. No construction work shall be performed during other workdays or during other hours without the written authority of the Contracting Officer.
Days that have been established as legal public holidays, Reference 5 U.S.C. Section 6103(a), are:
New Years Day 1 January Martin Luther King Jr’s Birthday 3d Monday in January Washington's Birthday 3d Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day 1ST Monday in September Columbus Day 2D Monday in October Veterans Day 11 November Thanksgiving Day 4TH Thursday in November Christmas Day 25 December
UTILITY SERVICES
It has been determined by the Contracting Officer that the existing electrical, water, natural gas, and sewer systems are adequate for the needs of both the government and the contractor. All utilities (excluding utilities for contractor owned and/or leased office and storage facilities) shall be furnished by the government without charge to the contractor. The contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Contractor shall obtain the written approval of the Contracting Officer prior to any desired hookup. A minimum of seven calendar days shall be allowed for this action. Before final acceptance by the government, the contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
BONDS
A. PERFORMANCE AND PAYMENT BONDS: Within 10 days after receipt of the contract, the contractor shall provide two bonds, each with good and sufficient surety or sureties acceptable to the government, furnished namely a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A).
The penal sum of such bonds will be as follows:
(1) PERFORMANCE BOND: The penal sum of the performance bond shall equal one hundred percent (100%) of the contract price.
(2) PAYMENT BOND: The penal sum of the payment bond shall equal one hundred percent (100%) of the contract price.
For contracts that contain option periods, the contractor shall furnish performance and payment bonds for the base year period only. Each option period shall be treated as a separate contract for the purposes of submitting payment and performance bonds.
B. Any bonds required will be furnished by the contractor to the government prior to commencement of contract performance.
C. Information and assistance: Any information or assistance required in connection with the bonding requirements under this procurement may be obtained from the Contracting Officer, Mission and Installation Contracting Command (MICC), Building 1109B, STE 373, Fort Knox, KY 40121-5000, telephone 502-624-8062.
EM 385-1-1
Offerors are advised to utilize EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual in preparing solicitation offers and in performing the work. EM 385-1-1 may be reviewed at the Mission and Installation Contracting Command (MICC), Building 1109B, STE 373, Fort Knox, Kentucky, between the hours of 8:00 am and 3:30 pm, Monday through Friday, excluding legal public holidays. EM 385-1-1 may be ordered through the U.S. Government Printing Office, Washington, DC 20402 (stock number 008022002812) (telephone 202-512-1800).
REFUND TO THE GOVERNMENT OF PERFORMANCE AND PAYMENT BOND COST
This is a requirements-type contract which requires bonding coverage for the full amount of the contract pursuant to FAR 28.102-2(c)(1). In the event the quantities estimated for this contract are not fully ordered, excess bonding capacity will have been purchased and the bonding company will issue a premium refund. If a bond refund occurs on this project and the government has previously paid you for your bonding costs, the contractor shall reimburse the government in the amount of the refund required. Reimbursement shall be made within 30 calendar days of the completion of the contract term.
PAYMENT PROTECTIONS
A. The contractor shall submit one of the following payment protections:
(1) Payment Bond (Standard Form 25A) or;
(2) An irrevocable letter of credit.
B. The penal sum of the payment protection shall be one hundred percent (100%) of the amount of the contract.
C. The submission of the payment protection is required within 10 calendar days after receipt of contract.
For contracts that contain option periods, the contractor shall furnish payment bonds for the base year period only.
Each option period shall be treated as a separate contract for the purposes of submitting a payment bond.
D. The payment protection shall provide protection for the full contract performance period plus a one-year period.
E. Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
EQUIPMENT AND MATERIALS STORAGE
(a) Definitions.
(1) Contractors’ Row, as used in this clause, means the area designated by the government for the storage of construction trailers, construction offices, and construction materials.
(2) Inspection Branch means the DPW Contract Inspection Branch, which is the government’s duly authorized representative in all matters concerning Contractors’ Row and sites for setting a contractor's construction trailers.
(b) The government may make available Contractors' Row or other premises for the contractor to utilize for the storage of equipment and materials being used for the performance of this contract. If such use is granted by the government, it shall be without any representations or warranties whatsoever and without any obligations on the part of the government.
(c) The contractor's use of Contractors' Row shall be:
1. without cost or expense to the government;
2. subject to the right of the government to improve, use or maintain the premises;
3. personal to the contractor and any interest therein, may not be transferred;
4. subject to continued performance of contract. .
(d) The contractor shall pay the cost of all utilities at its assigned place of storage of equipment and materials as well as the cost of installing utilities and metering. The contractor shall submit a reimbursable customer agreement form to Inspection Branch after the service is ready to be connected to the utility. Inspection Branch will inspect and request the service to be connected by the DPW shop personnel. The government will be under no obligation to furnish utilities or services. Payments shall be made promptly upon receipt of bill. Failure to pay in a timely manner will result in services being disconnected and the contractor being evicted.
(e) The contractor shall keep the premises in good order and in a clean, safe condition by and at the expense of the contractor. The contractor shall be responsible for any damage that may be caused to the property of the government by the activities of the contractor. The contractor shall exercise due diligence in the protection of all property located on the premises against fire or damage from any and all other causes. Any property of the government damaged or destroyed by the contractor shall be promptly repaired or replaced to the satisfaction of the inspection branch.
(f) The government shall not be responsible for damages to property or injuries to persons which may arise from or be incident to the contractor's use of the storage site or for damages to the property of the contractor, or for damages to the property or injuries to the contractor’s officers, agents, or employees or others who may be on the premises at their invitation or the invitation of any one of them, and the contractor shall hold the government harmless from any and all such claims.
(g) On or before the expiration or termination of the contract, the contractor shall vacate the premises, remove property, and restore the premises to a condition satisfactory to Inspection Branch. If, for whatever reason, the contract is terminated, the contractor shall vacate the premises, remove said property and restore the premises to the aforesaid condition within such time that Inspection Branch may designate. In either event, if the contractor shall fail or neglect to remove said property and restore the premises, then at the option of the Inspection Branch, the property shall be considered abandoned by the contractor and disposed of as abandoned property, or the government may cause the property to be removed. In either case, no claim for damages against the government shall be created by or made on account of such disposal, removal and/or restoration work. The contractor shall also pay the government on demand any sum which may be expended by the government after the expiration, revocation, or termination of the contract in removing and/or restoring the premises.
(h) The contractor shall protect the premises against pollution of its air, ground, and water. The contractor shall comply with any laws, regulations, conditions, or instructions affecting the activity hereby authorized if and when issued by the Environmental Protection Agency, or any federal, state, interstate, or local government agency having jurisdiction to abate or prevent pollution. The disposal of any toxic or hazardous materials within the premises are specifically prohibited. The contractor shall not discharge waste or effluent from the premises in such a manner that the discharge will contaminate streams or other bodies of water or otherwise become a public nuisance.
The contractor shall use all reasonable means available to protect the environment and natural resources, and where damage nonetheless occurs from the contractor’s activities, the contractor shall be liable to restore the damaged resources.
The contractor shall obtain written approval from the Contracting Officer before any pesticides or herbicides are applied to the premise.
(i) The contractor shall police and maintain its assigned area (maintenance includes the mowing of grass and weeds) in a condition acceptable to Inspection Branch throughout the life of the contract.
All materials, supplies, and recyclables shall be stored in the storage trailers.
All permanent type office trailers shall be tied down and underpinned.
All trailers, office trailers shall display a placard that includes the contractor’s name, contract number, and a telephone number for a local point of contact.
LANDFILL USAGE
1. Effective immediately, all contractors utilizing the construction debris (CD) landfill at Fort Knox, Kentucky must separate the waste coming into the landfill.
2. Waste that is allowed into the CD landfill is solid waste which results from the construction, remodeling, repair, and demolition of structures and roads, and for the disposal of uncontaminated solid waste consisting of vegetation resulting from land clearing and grubbing, utility line maintenance and seasonal and storm related cleanup. Such waste includes, but is not limited to, bricks, shredded or segmented tires, concrete and other masonry materials, soil, rock, wood, wall coverings, plaster, drywall, plumbing fixtures, tree stumps, limbs, saw dust, leaves, yard waste, paper and paper products which are the result of construction, remodeling, repair, and demolition, metals, furniture, insulation, roofing shingles, asphaltic pavement, glass, plastics that are not sealed in a manner that conceals other waste, electrical wiring and components containing no liquids or hazardous metals.
3. No waste containing "FREE LIQUIDS" such as paint and/or petroleum, oils, lubricants (POL) products, or any hazardous waste will be accepted into the CD landfill. These items shall be containerized for turn-in. For turn-in guidance, call DPW Environmental Management division at 502-624-3629.
4. Paint containers containing dried paint are acceptable for disposal into the CD landfill.
5. When practical, large quantities of soil should be hauled to the landfill separately for use as future landfill cover.
This soil shall be free of any large rocks, wood, and tree limbs.
6. When practical, tree limbs and other such vegetation shall be separated and delivered to the Fort Knox composting facility.
7. Waste such as lunch wrappers, small quantities of cardboard, paper trash (paper towels, newspapers, etc.) shall be placed into the 40 yard containers located at the landfill.
8. Large quantities of cardboard waste shall be disposed of at the Recycle Center on Radio Street or the contractor can make arrangements for pickup of large quantities of cardboard at the site by calling 502-624-5026.
9. Nonclear plastic bags containing CD waste will not be accepted. Plastic shall not conceal other waste as stated in paragraph 2 above. Clear plastic bags that contain CD waste are acceptable.
10. Paper and paper products as outlined in Paragraph 2 do not include shipping and packing material.
MATERIAL APPROVAL SUBMITTALS The contractor shall submit all submittals (to include catalog cuts, samples, manufacturer's data and descriptive literature) to the Contracting Officer within ten (10) calendar days after "Notice of Award". The contractor shall submit four copies of all submittals.
Failure to submit or to obtain approval of all material submittals within this time frame will not constitute an extension of the contract completion time stipulated in the contract.
CONTRACT DESCRIPTION
Contract to be awarded under this solicitation is for the Renovation of Bldg. 1467 a 130,000 SF administrative facility located on the installation of Fort Knox, Kentucky. The work is required in support of the Directorate of Public Works activities. The contract will cover the construction tasks required by the construction specifications and plans provided. Construction activities will consist of but are not limited to: work related to both interior and exterior surfaces, demolition, asbestos, mold remediation, painting, TAFF, tile, rubber floor coverings, concrete polishing, cabinets, ceiling tile, HVAC, plumbing, fire sprinkler, mass notification, electrical, roofing, furnishing, piping, site work, windows, doors, hardware, specialty locks, equipment, steps, elevator, concrete work, masonry, fencing, soils, grading, seeding and more. Communications and furniture are to be provided under separate contracts but contractor and subcontractors of this contract shall be expected to coordinate/cooperate for these installations under this contract.
STATEMENT OF WORK
DIRECTORATE OF PUBLIC WORKS
CONSTRUCTION
STATEMENT OF WORK
SECTION 1 GENERAL REQUIREMENTS
1.1 Scope of Work. The scope of this contract will be for construction services as described herein. This contract is a contract for Small Businesses HUB Zone set aside. The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government considering only price and the price-related factors specified elsewhere in the solicitation. (see FAR Provision 52-214-10)
The contractor shall provide all management, supervision, labor, supplies/materials and tools/equipment necessary to provide construction services as described herein. Specifically, the contractor shall provide new construction, Maintenance and Repair (M&R) relating to, but not limited to, construction of new structures, infrastructure or facilities, energy conservation, environmental, logistical, and operational type work. All construction work will be performed in support of Directorate of Public Works.
1.1.1 General Work to Be Performed: Listed below are general types of work to be performed by the contractor.
This list is not all inclusive.
1.1.1.1 Architectural - Enclosures, building systems, mobile buildings, chimneys, grout, mortar, concrete, brick, concrete masonry units (CMUs), waterproofing, insulation, caulking and sealant, roofing, gutters, drains, exterior surfacing, ramps, stairs, shelving, windows, doors, painting, finishes, louvers, awnings, shutters, panels, grills, ceilings, acoustical areas, walls, paneling, flooring (conductive and nonconductive), carpeting, tiles, builder’s hardware, signage, metals, woods and plastics, millwork, thermal and moisture protection, fireproofing, equipment systemization layouts, building fixtures and furnishings, elevators, landscaping layout, antiterrorism, and handicap systemization.
1.1.1.2 Civil - Topographic surveying, grading and earthwork, surface and subsurface storm drainage, erosion and sediment control, signage, gates and fencing, landscaping, seeding sodding.
1.1.1.3 Electrical - Electrical distribution and network balancing (aerial and underground), ducts, raceways, conduits, tubing, connectors, wires, cable, cable trays, outlet boxes, cabinets and enclosures, supports, concrete pads, insulators, transformers, capacitors, switches, relays, fuses, grounding, lighting protection, service entrances, panel boards, circuit breakers, motor control centers, special equipment/systems, batteries, generators, receptacles, lighting fixtures, lamps, ballasts, equipment connections, special outlets, disconnect switches, splices, terminations, control systems, security systems, audio and visual communication system, instrumentation systems, and fire detection and alarm systems.
1.1.1.4 Environmental - Industrial and sanitary sewers, water distribution systems, potable and fire water supplies including; piping, pumps, valves, sprinklers, and hazardous waste analyses, lead and asbestos removal, and disposal of waste products.
1.1.1.5 Mechanical - Heating, ventilation, and air-conditioning (HVAC) systems and components, chillers, refrigerants, cooling towers, air handling equipment, energy conservation, mold testing and remediation, heat transfer surfaces, furnaces, air distribution, valves, pumps and associated piping and ducts, elevators, with associated electrical and hydraulic controls, boilers, steam lines, plumbing fixtures, fuel distribution (i.e., propane, natural gas, and slurries), piping systems, fire suppression (water, chemical, and gas), steam systems, pipe insulation, and plumbing systems involving water, solids, and hazardous waste.
1.11.6 Safety - Life safety, fire protection systems, industrial hygiene, inflammatory gases, medical safety and hygiene, asbestos and/or lead based paint evaluation and (removal/encapsulation), Occupational Safety and Hazards Act (OSHA) and American Disability Act (ADA) evaluations.
1.1.1.7 Structural - Building systems and ancillary structures (concrete, masonry, steel, etc.), foundations, reinforced concrete, equipment mounting, shock isolation, reinforced masonry, wood, seismic design and evaluations, welding procedures, detailing of structural components and hardened (protective) structures. Earthquake consideration of utility systems. Anchorage and support of mechanical and electrical equipment. Applications of industry building codes and standards.
1.1.1.8 Systems - Quality control, operations and maintenance (O&M) manuals and procedures both preventative and breakdown, training, human factors engineering. O&M documentation to obtain support. O&M and training efforts shall be required to support M&R. System/equipment and life safety repair and maintenance efforts for existing systems/equipment may be required. Logistical support shall be provided where required.
1.11.9 Asbestos and/or lead based paint abatement may be required during equipment/systems remediation.
Mold detection or remediation should also be carried out on site inspection and checkout of M&R efforts shall be required.