This is a Bid Schedule (Attachment 15) for contract W9123826BA010 covering the Natomas Reach I Contract 2 project in Sacramento, California. The schedule presents three Contract Line Items (CLINs) with quantities and units of measure for bidding purposes.
CLIN 0001 covers Reach I Design-Bid-Build (DBB) Construction from Station 0+00 to 115+00 and includes seven line items: Reach I Construction (1 job), Expose and Backfill 12-Inch Asbestos Cement Waterline (1,196 linear feet), Excavation (22,634 cubic yards), Borrow Site Excavation (11,570 cubic yards), Place and Compact Soil Type 1 (27,052 cubic yards), Aggregate Base (5,600 tons), and Asphalt Concrete Pavement (58 tons). CLIN 0002 covers Reach H DBB Construction from Station 0+00 to 13+00 and includes seven line items: Reach H, Subreach 1 Construction (1 job), Excavation (4,525 cubic yards), Borrow Site Excavation (2,777 cubic yards), Place and Compact Soil Type 1 (6,038 cubic yards), Aggregate Surface Course (767 tons), Aggregate Base (54 tons), and Asphalt Concrete Pavement (31 tons). CLIN 0003 consists of three deliverables: As-Built Drawings (1 job), Operations and Maintenance Manuals (1 job), and Traffic Control and Signage (1 job). The schedule provides columns for unit pricing and total cost calculations, with a final row for the total proposed cost across all CLINs.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123826BA010 Attachment 15 - Bid Schedule Natomas Reach I Contract 2 - Sacramento, California
Section 00 10 00 - Contract Line Item Number (CLIN) Schedule
CLIN 0001: REACH I DBB CONSTRUCTION: STA 0+00 TO 115+00 (Volume 2) Sub
CLIN ITEM DESCRIPTION QTY UOM UNIT PRICE TOTAL
AA Reach I Construction 1 JOB
AB
Expose and Backfill 12-Inch Asbestos Cement Waterline 1,196 LF
AC Excavation 22,634 CY
AD Borrow Site Excavation 11,570 CY
AE
Place and Compact Soil Type
1 27,052 CY
AF Aggregate Base 5,600 TON
AG Asphalt Concrete Pavement 58 TON
SUBTOTAL CLIN 0001:
CLIN 0002: REACH H DBB CONSTRUCTION: STA 0+00 TO 13+00 (Volume 3) Sub
CLIN ITEM DESCRIPTION QTY UOM UNIT PRICE TOTAL
AA
Reach H, Subreach 1 Construction 1 JOB
AB Excavation 4,525 CY
AC Borrow Site Excavation 2,777 CY
AD
Place and Compact Soil Type
1 6,038 CY
AE Aggregate Surface Course 767 TON
AF Aggregate Base 54 TON
AG Asphalt Concrete Pavement 31 TON
SUBTOTAL CLIN 0002:
CLIN ITEM DESCRIPTION QTY UOM UNIT PRICE TOTAL
0003 As-Built Drawings 1 JOB
0003 O&M Manuals 1 JOB
0003 Traffic Control and Signage 1 JOB
TOTAL PROPOSED COST (including all CLINs)