This is a technical specification document (Section 01 57 19 – Temporary Environmental Controls) for the American River Common Features (ARCF) project covering Natomas Basin Reach I Contract 2 and Reach H (Spec No. 2079). The specification establishes comprehensive environmental protection requirements that contractors must implement during construction activities.

The document defines extensive environmental management obligations across multiple disciplines including natural resource protection, stormwater management, air quality compliance, hazardous waste management, archaeological monitoring, and biological resource protection. Key requirements include: development and submission of an Environmental Protection Plan (EPP) within 30 days of contract execution; appointment of a qualified Environmental Manager; compliance with federal, state, and local environmental permits including NPDES Construction General Permits and SMAQMD air quality permits; implementation of erosion and sediment controls; protection of identified cultural resources and endangered species (Valley Elderberry Longhorn Beetle, migratory birds, state-listed bird species); archaeological and tribal monitoring during ground-disturbing activities with qualified monitors; waste management including hazardous waste determination, disposal documentation, and non-hazardous solid waste diversion reporting on a quarterly basis; air emissions compliance with NOx and PM10 thresholds; dust control and particulate matter management; noise monitoring and mitigation; oil and fuel storage with secondary containment; spill prevention and response procedures; and post-construction site cleanup and restoration. The contractor must maintain an Environmental Records Binder documenting all compliance activities, submit monthly reports on air quality controls and equipment inventory, and coordinate with multiple regulatory agencies including USACE, CVRWQCB, SMAQMD, CARB, and California Department of Fish and Wildlife.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American River Common Features (ARCF) Spec No. 2079 Natomas Basin - Reach I Contract 2 & Reach H

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15, CHG 4: 08/20

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Active Nest

1.2.2 Class I and II Ozone Depleting Substance (ODS)

1.2.3 Contractor Generated Hazardous Waste

1.2.4 Electronics Waste

1.2.5 Environmental Pollution and Damage

1.2.6 Environmental Protection

1.2.7 Hazardous Debris

1.2.8 Hazardous Materials

1.2.9 Hazardous Waste

1.2.10 Inactive Nest

1.2.11 Land Application for Discharge Water

1.2.12 Listed Bird Species

1.2.13 Non-Nesting Season

1.2.14 Municipal Separate Storm Sewer System (MS4) Permit

1.2.15 National Pollutant Discharge Elimination System (NPDES)

1.2.16 Oily Waste

1.2.17 Pesticide

1.2.18 Pesticide Treatment Plan

1.2.19 Pests

1.2.20 Regulated Waste

1.2.21 Sediment

1.2.22 Solid Waste

1.2.22.1 Debris

1.2.22.2 Green Waste

1.2.22.3 Material Not Regulated as Solid Waste

1.2.22.4 Non-Hazardous Waste

1.2.22.5 Recyclables

1.2.22.6 Surplus Soil

1.2.22.7 Scrap Metal

1.2.22.8 Wood

1.2.23 Surface Discharge

1.2.24 Wastewater

1.2.24.1 Storm Water

1.2.25 Waters of the United States

1.2.26 Wetlands

1.2.27 Universal Waste

1.3 GENERAL REQUIREMENTS

1.4 SUBMITTALS

1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.5.1 Protection Features

1.6 QUALITY CONTROL

1.6.1 Preconstruction Survey and Protection of Features

SECTION 01 57 19 Page 1

1.6.2 Regulatory Notifications

1.6.3 Environmental Brief

1.6.4 Environmental Manager

1.6.5 Employee Training Records

1.6.6 Non-Compliance Notifications

1.7 ENVIRONMENTAL PROTECTION PLAN

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

1.7.1.2 Duties

1.7.1.3 Procedures

1.7.1.4 Communications

1.7.1.5 Contact Information

1.7.2 General Site Information

1.7.2.1 Drawings

1.7.2.2 Work Area

1.7.2.3 Traffic Control Plan

1.7.2.4 Appointment Letter

1.7.3 Management of Natural Resources

1.7.4 Protection of Historical and Archaeological Resources

1.7.5 Stormwater Management and Control

1.7.6 Protection of the Environment from Waste Derived from

Contractor Operations

1.7.7 Non-Hazardous Solid Waste Disposal Plan

1.7.8 Regulatory Notification and Permits

1.7.9 Contaminant Prevention Plan

1.7.10 Clean Air Act Compliance

1.7.10.1 Air Quality Control Plan

1.7.10.2 Haul Route

1.7.10.3 Pollution Generating Equipment

1.7.10.4 Stationary Internal Combustion Engines

1.7.10.5 Refrigerants

1.7.10.6 Air Pollution-engineering Processes

1.7.11 Waste Water Management Plan

1.7.12 Historical, Archaeological, Cultural Resources Biological

Resources and Wetlands Protection Plans

1.7.13 Compliance

1.7.14 Appendix

1.8 LICENSES AND PERMITS

1.8.1 Air Quality

1.8.2 Portable Equipment Registration Program (PERP)

1.8.3 Dewatering Permit

1.8.4 Construction General Permit (NPDES Permit)

1.8.5 Solid Waste Management Permit

1.8.5.1 Solid Waste Management Report

1.9 ENVIRONMENTAL RECORDS BINDER

1.10 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS

1.11 NOTIFICATION

PART 2 PRODUCTS

2.1 COMPLIANT MATERIALS

2.2 PREVIOUSLY USED EQUIPMENT

PART 3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

3.1.1 Flow Ways

3.1.2 Vegetation

3.2 STORM WATER

SECTION 01 57 19 Page 2

3.2.1 Construction General Permit

3.2.1.1 Stormwater Pollution Prevention Plan

3.3 LAND RESOURCES

3.3.1 Work Area Limits

3.3.2 Contractor Facilities and Work Areas

3.3.3 Landscape

3.3.4 Tree Protection

3.3.4.1 Existing Tree Preservation

3.3.4.2 Fencing Existing Trees for Preservation

3.3.5 Erosion and Sediment Controls

3.3.6 Ground Vibration Monitoring and Control Program

3.3.6.1 Ground Vibration Monitoring

3.3.6.2 Measurement and Compliance Standards

3.4 WATER RESOURCES

3.4.1 Wetlands

3.5 ARCHAELOGICAL AND TRIBAL MONITORING AND SUPPORT SERVICES

3.5.1 Archaeological Monitor Qualifications

3.5.2 Archaeological Monitor Responsibilities

3.5.3 Tribal Monitors

3.5.4 Post Review Discoveries

3.5.5 Human Remains

3.5.6 Recovery of Human Remains

3.5.7 Storage Trailer for Archaeological and Tribal Monitoring

3.6 BIOLOGICAL RESOURCES

3.6.1 State Listed Birds

3.6.2 Migratory Birds

3.6.3 Elderberry Shrubs

3.6.4 Fish and Wildlife

3.6.4.1 Wildlife Encounters During Construction

3.7 AIR RESOURCES

3.7.1 Preconstruction Air Permits

3.7.2 Air Quality Control

3.7.3 Rule 201 Authority to Construct/Permit to Operate

3.7.4 Dust Control

3.7.4.1 Particulates

3.7.5 Odors

3.7.6 Burning

3.7.7 On-Road Equipment

3.7.8 Off-Road Diesel-Powered Equipment

3.7.8.1 NOx and PM Emissions

3.7.8.2 Visible Emissions

3.7.8.3 PM10 Dust

3.7.9 Diesel Generators

3.8 SOUND INTRUSION

3.8.1 Heavy Truck Delivery Restrictions

3.9 CHEMICAL MATERIALS MANAGEMENT AND WASTE DISPOSAL

3.9.1 Solid Wastes

3.9.2 Chemicals and Chemical Wastes

3.9.3 Contractor Generated Hazardous Wastes/Excess Hazardous

Materials

3.9.4 Fuel and Lubricants

3.10 RECYCLING AND WASTE MINIMIZATION

3.11 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT

3.12 WASTE MANAGEMENT AND DISPOSAL

3.12.1 Waste Determination Documentation

3.12.2 Solid Waste Management

3.12.2.1 Solid Waste Management Report

3.12.2.2 Control and Management of Solid Wastes

3.12.3 Control and Management of Hazardous Waste

SECTION 01 57 19 Page 3

3.12.3.1 Hazardous Waste/Debris Management

3.12.3.2 Universal Waste Management

3.12.3.3 Electronics End-of-Life Management

3.12.3.4 Disposal Documentation for Hazardous and Regulated Waste

3.12.4 Releases/Spills of Oil and Hazardous Substances

3.12.4.1 Response and Notifications

3.12.4.2 Clean Up

3.12.5 Mercury Materials

3.12.6 Wastewater

3.12.6.1 Treatment

3.12.6.2 Surface Discharge

3.12.6.3 Land Application

3.13 HAZARDOUS MATERIAL MANAGEMENT

3.13.1 Control and Management of Lead-Based Paint (LBP)

3.13.2 Control and Management of Polychlorinated Biphenyls (PCBS)

3.13.3 Control and Management of Lighting Ballast And Lamps

Containing PCBS

3.14 PREVIOUSLY USED EQUIPMENT

3.15 MAINTENANCE OF POLLUTION FACILITIES

3.16 MILITARY MUNITIONS

3.17 OIL

3.17.1 Used Oil Management

3.17.2 Oil Storage Including Fuel Tanks

3.18 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.19 TRAINING OF CONTRACTOR PERSONNEL

3.20 POST CONSTRUCTION CLEANUP

-- End of Section Table of Contents --

SECTION 01 57 19 Page 4

SECTION 01 57 19

TEMPORARY ENVIRONMENTAL CONTROLS

11/15, CHG 4: 08/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

CALIFORNIA AIR RESOURCES BOARD (CARB)

CARB 13 CCR 2450-2466 Portable Equipment and Engine Registration

CARB 17 CCR 93105 (2001) Asbestos ATCM for Construction, Grading, Quarrying, and Surface Mining Operations

CENTRAL VALLEY REGIONAL WATER QUALITY CONTROL BOARD (CVRWQCB)

GO R5-2013-0073-01 (2013) Waste Discharge Requirements for Limited Threat Discharges of Treated/Untreated Groundwater from Cleanup Sites, Wastewater from Superchlorination Projects, and Other Limited Threat Wastewaters to Surface Water

GO R5-2013-0074 (2013) Waste Discharge Requirements For Dewatering and Other Low Threat Discharges to Surface Waters

SACRAMENTO METROPOLITAN AIR QUALITY MANAGEMENT DISTRICT (SMAQMD)

NOx Mitigation SMAQMD Construction Emissions Mitigation

PERP Registration SMAQMD Portable Equipment Registration Program (PERP)

PM10 Plan SMAQMD Particulate Matter (PM) 10 Attainment Redesignation and Maintenance Plan

PM2.5 SIP SMAQMD Particulate Matter (PM) 2.5 State Implementation Plan

SMAQMD Rule 201 (2006) General Permit Requirements

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

ERDC/EL TR-08-28 (2008) Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid

SECTION 01 57 19 Page 5

West Region (Version 2.0)

TR Y-87-1 (1987) Corps of Engineers Wetlands Delineation Manual

U.S. Code (USC)

16 USC 703-712 Endangered Species Act

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

33 CFR 328 Definition of Waters of the United States

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 60 Standards of Performance for New Stationary Sources

40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories

40 CFR 112 Oil Pollution Prevention

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty Containers

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of

SECTION 01 57 19 Page 6

Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards for Universal Waste Management

40 CFR 273.2 Standards for Universal Waste Management - Batteries

40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment

40 CFR 273.5 Standards for Universal Waste Management - Lamps

40 CFR 279 Standards for the Management of Used Oil

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications

40 CFR 355 Emergency Planning and Notification

40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution

40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures

40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 171 - 178 Hazardous Materials Regulations

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

1.2 DEFINITIONS

1.2.1 Active Nest

Active nest refers to any bird nest with eggs or chicks present.

SECTION 01 57 19 Page 7

1.2.2 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.

https://www.epa.gov/ozone-layer-protection/ozone-depleting-substances .

1.2.3 Contractor Generated Hazardous Waste

Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.

1.2.4 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

1.2.5 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.

1.2.6 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.

The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.7 Hazardous Debris

As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261 . Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with 40 CFR 261 .

1.2.8 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172 .

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173 ; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120 ; or during end use, treatment, SECTION 01 57 19 Page 8 handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.2.9 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261 , Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261 , Subpart D.

1.2.10 Inactive Nest

Inactive nest refers to any bird nest without eggs or chicks present.

1.2.11 Land Application for Discharge Water

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" is allowed.

Comply with federal, state, and local laws and regulations.

1.2.12 Listed Bird Species

Listed bird species or "listed species" refers to any species of bird classified as threatened or endangered by the Federal Government or by the State of California. It also refers to any species of bird classified as a Species of Special Concern by the State of California.

1.2.13 Non-Nesting Season

Non-nesting season refers to the period beginning on September 2 and continuing through February 14.

1.2.14 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by projects to obtain NPDES permit coverage for their stormwater discharges.

1.2.15 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. Note:

the U.S. EPA delegates NPDES permitting authority to the State of California See SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL.

1.2.16 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, SECTION 01 57 19 Page 9

Oils, and Lubricants (POLs) and have become separated from that POLs.

Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount);

it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.2.17 Pesticide

Pesticide is any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.18 Pesticide Treatment Plan

A plan for the prevention, monitoring, and control to eliminate pest infestation.

1.2.19 Pests

Pests are arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.2.20 Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

1.2.21 Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.22 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

SECTION 01 57 19 Page 10

1.2.22.1 Debris

Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials may not be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.2.22.2 Green Waste

Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

1.2.22.3 Material Not Regulated as Solid Waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges;

regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.2.22.4 Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263 .

1.2.22.5 Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may not be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

1.2.22.6 Surplus Soil

Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.

SECTION 01 57 19 Page 11

1.2.22.7 Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.2.22.8 Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.2.23 Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.

1.2.24 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

1.2.24.1 Storm Water

Storm Water is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams. See SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL for construction storm water management requirements.

1.2.25 Waters of the United States

Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act and 33 CFR 328 .

1.2.26 Wetlands

Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, seasonal, semi-permanent, and permanent marshes, and bogs, and thereby, are considered as waters of the United States.

Official determination of whether or not an area is classified as a wetland must be done in accordance with TR Y-87-1 and the ERDC/EL TR-08-28 .

Use these documents to determine the limits or boundaries of jurisdictional Waters of the United States (which include wetlands).

1.2.27 Universal Waste

The universal waste regulations streamline collection requirements for

SECTION 01 57 19 Page 12 certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at

40 CFR 273 .

1.3 GENERAL REQUIREMENTS

Minimize environmental pollution and damage that may occur as the result of construction operations. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with all applicable environmental Federal, State, local laws, regulations, and mitigation requirements. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Preconstruction Survey ; G

Solid Waste Management Permit ; G

Regulatory Notifications ; G

Environmental Protection Plan ; G

Dirt and Dust Control Plan ; G

Environmental Manager Qualifications ; G

Air Quality Control Plan ; G

Waste Water Management Plan ; G

Asbestos Dust Mitigation Plan and Application ; G, DO

Historical, Archaeological, and Cultural Resources Protection Plan ;

G

Biological Resources and Wetlands Protection Plan ; G

Traffic Control Plan ; G

Storm Water Notice of Intent ; G

Environmental Permit Application

SD-06 Test Reports

SECTION 01 57 19 Page 13

SGARDENO

Polygon

Solid Waste Management Report ; G

Air Quality Control Plan Reports ; G, DO

PERP Data ; G, DO

Non-Hazardous Solid Waste Diversion Report

Solid Waste Disposal Report

SD-07 Certificates

Employee Training Records ; G

SD-11 Closeout Submittals

Waste Determination Documentation ; G

Hazardous Waste/Debris Management ; G

Disposal Documentation for Hazardous and Regulated Waste ; G

Assembled Employee Training Records ; G

Post-Construction Survey ; G

Sales Documentation ; G

Contractor Certification

Environmental Records Binder

Solid Waste Disposal Closeout Report

1.5 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.

Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Analytical work must be performed by qualified laboratories; and where required by law, the laboratories must be certified.

1.5.1 Protection Features

This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, the Contractor and the

SECTION 01 57 19 Page 14

Contracting Officer will make a joint condition survey. Immediately following the survey, prepare a brief report including a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the assigned storage areas and access routes) as applicable. Both the Contractor and the Contracting Officer will sign this survey report upon mutual agreement as to its accuracy and completeness.

Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference which their preservation may cause to the work under the contract.

1.6 QUALITY CONTROL

1.6.1 Preconstruction Survey and Protection of Features

This paragraph supplements the Contract Clause PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS. Prior to start of any onsite construction activities, perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the site. Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference that their preservation may cause to the work under the Contract.

1.6.2 Regulatory Notifications

Provide regulatory notification requirements in accordance with federal, state and local regulations. In cases where the Government will also provide public notification (such as stormwater permitting), coordinate with the Contracting Officer. Submit copies of regulatory notifications to the Contracting Officer within 30 days prior to commencement of work activities. Typically, regulatory notifications must be provided for the following (this listing is not all-inclusive): demolition, renovation, NPDES defined site work, construction, removal or use of a permitted air emissions source, and remediation of controlled substances (asbestos, hazardous waste, lead paint).

1.6.3 Environmental Brief

Attend an environmental brief to be included in the preconstruction meeting. Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the installation; and types and quantities of wastes/wastewater that may be generated during the Contract. Discuss the results of the Preconstruction Survey at this time.

Prior to initiating any work on site, meet with the Contracting Officer and installation Environmental Office to discuss the proposed Environmental Protection Plan (EPP). Develop a mutual understanding relative to the details of environmental protection, including measures

SECTION 01 57 19 Page 15 for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and other measures to be taken.

1.6.4 Environmental Manager

Appoint in writing an Environmental Manager for the project site. The Environmental Manager is directly responsible for coordinating contractor compliance with federal, state, local, and installation requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal); implement the EPP; ensure environmental permits are obtained, maintained, and closed out; ensure compliance with Stormwater Program requirements; ensure compliance with Hazardous Materials (storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however, the person in this position must be trained to adequately accomplish the following duties: ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out. Submit Environmental Manager Qualifications to the Contracting Officer.

1.6.5 Employee Training Records

Prepare and maintain Employee Training Records throughout the term of the contract meeting applicable 40 CFR requirements. Provide Employee Training Records in the Environmental Records Binder . Submit these Assembled Employee Training Records to the Contracting Officer at the conclusion of the project, unless otherwise directed.

Train personnel to meet federal, state, and local requirements. Conduct environmental protection/pollution control meetings for personnel prior to commencing construction activities. Contact additional meetings for new personnel and when site conditions change. Include in the training and meeting agenda: methods of detecting and avoiding pollution;

familiarization with statutory and contractual pollution standards;

installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control; anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of archaeological sites, artifacts, waters of the United States, and endangered species and their habitat that are known to be in the area. Provide copy of the Certification as required by California.

1.6.6 Non-Compliance Notifications

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with federal, state or local environmental laws or regulations, permits, and other elements of the Contractor's EPP. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such

SECTION 01 57 19 Page 16 suspensions. This is in addition to any other actions the Contracting Officer may take under the Contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

1.7 ENVIRONMENTAL PROTECTION PLAN

The purpose of the Environmental Protection Plan (EPP) is to present an overview of known or potential environmental issues that must be considered and addressed during construction. Incorporate construction related objectives and targets into the EPP. Include in the EPP measures for protecting natural and cultural resources, required reports, and other measures to be taken. Meet with the Contracting Officer or Contracting Officer Representative to discuss the EPP and develop a mutual understanding relative to the details for environmental protection including measures for protecting natural resources, required reports, and other measures to be taken. Submit the EPP within 30 days after execution of the notice to proceed and not less than 10 days before the preconstruction meeting. Define issues of concern within the EPP as outlined in this section. Address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Identify and discuss topics or issues which are not identified in this section but are considered necessary after those items formally identified in this section. The Environmental Engineer must meet the respective Experience Matrix requirements of SECTION 01 45 00 CONTRACTOR QUALITY CONTROL. Develop, enforce, and revise the EPP throughout the project to include any reporting requirements, changes in site conditions, or Contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any applicable federal, state, and local environmental protection laws and regulations.

Conduct an EPP meeting one week after NTP is executed by the Contracting Officer. Request and schedule the meeting to be held at the Resident Office. The following Contractor representatives must be present: the Project Manager (or appropriate technical person), and the environmental staff. Prepare to discuss implementation of the initial EPP; the process for future subsequent additions and revisions to the plan as necessary, including any reporting requirements; and methods for administration of the Environmental Plans. This meeting is required prior to Government approval of the EPP submittal.

The EPP includes, but is not limited to, the following elements:

a. list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits.

b. Methods for protection of features to be preserved within authorized work areas such as trees, shrubs, vines, grasses and ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, archaeological, and cultural resources.

c. Procedures to be implemented to provide the required environmental protection, to comply with the applicable laws and regulations, and to correct pollution due to accident, natural causes, or failure to follow the procedures of the environmental protection plan.

d. A contamination prevention section listing all potentially hazardous

SECTION 01 57 19 Page 17 petroleum products and toxic materials to be used on the job site and corresponding provisions to be taken to prevent accidental or intentional introduction of such materials into any waterway, the air, or the ground. This section must include plans for preventing polluted runoff from plant, equipment parking, and maintenance areas from entering directly into local water bodies.

e. A contaminant cleanup section including the procedures, instructions, and reports to be used. This section must include as a minimum: the name of the individual who will report any spills, be responsible for implementing and supervising containment and cleanup, and will follow-up with complete documentation for methods and procedures to be used for expeditious cleanup.

f. Indicate the location and type of solid waste disposal area. List wastes to be disposed.

g. Drawings showing locations of any proposed temporary excavations or embankments for haul roads, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials.

Deviation from drawings will require approval.

h. The traffic control plan must include all intended haul routes, location of signage, location of flaggers, approved permits, documentation of coordination with local and state agencies, location of potential traffic delays to vehicle and pedestrian traffic.

i. Methods of protecting surface and ground water during construction activities.

j. Plan showing the proposed activity in each portion of the work area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas. The plan must also include details on where construction fencing will be placed.

k. Drawing of borrow area location. Protection measures required at the work site must apply to the borrow areas including final restoration for subsequent beneficial use of the land.

l. A recycling and waste prevention plan with a list of measures to reduce consumption of energy and natural resources; for example, the possibility to shred fallen trees and use them as mulch must be considered as an alternative to landfill disposal. Burning onsite will not be allowed.

m. A wind and water erosion control section for any construction which will disturb the earth's surface and could introduce turbidity into water courses or dust into the air. This section must include the Contractor's plan for controlling erosion and disposing of wastes including surface drainage from cuts, fills, and waste disposal areas.

Temporary erosion and sediment control measures such as seeding, mulching, sprinkling, and installing temporary ditches, dikes, drains, or sedimentation basins must be identified. Elements of this plan must include provisions for responding to increases in river stage and local precipitation during construction.

n. Environmental monitoring plans for the job site, including land, water, air, and noise monitoring.

SECTION 01 57 19 Page 18

o. A time schedule specifying the approximate time of expected or possible turbidity generating activities.

p. Description of the Contractor's Environmental Protection Personnel training program.

q. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.

r. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

s. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Plan must include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.

t. A historical, archaeological, cultural resources biological resources, and wetlands plan that defines procedures for identifying and protecting historical, archaeological, cultural resources, biological resources, and wetlands known to be on the project site and/or identifies procedures to be followed if historical archaeological, cultural resources, biological resources and wetlands not previously known to be onsite or in the area are discovered during construction.

Include in the plan methods to assure the protection of known or discovered resources, identifying lines of communication between Contractor personnel and the Contracting Officer.

u. A plan to identify and safely remove any contaminants within the capped 4-inch diameter Sewer Force Main. A plan to identify and safely avoid any contaminants within the sewer force main.

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan, spill control plan, solid waste management plan, wastewater management plan, air pollution control plan, contaminant prevention plan, a historical, archaeological, cultural resources, biological resources and wetlands plan, traffic control plan Hazardous, Toxic and Radioactive Waste (HTRW) Plan, Non-Hazardous Solid Waste Disposal Plan, and borrowing material plan.

1.7.1.2 Duties

The duties and level of authority assigned to the person(s) on the job site who oversee environmental compliance, such as who is responsible for adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site (if applicable), and who is responsible for training the Contractor's environmental protection personnel.

a. Name(s) and qualifications of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the EPP.

SECTION 01 57 19 Page 19

b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.

c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.

d. Description of the Contractor's environmental protection personnel training program.

1.7.1.3 Procedures

A copy of any standard or project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.

1.7.1.4 Communications

Communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.

1.7.1.5 Contact Information

Emergency contact information (office phone number, cell phone number, and e-mail address).

1.7.2 General Site Information

1.7.2.1 Drawings

Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, jurisdictional wetlands, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess soil or spoil materials including methods to control runoff and to contain materials on the site. Drawings showing in-water structures, equipment locations, and material placement and disposal sites.

1.7.2.2 Work Area

Work area plan showing the proposed activity in each portion of the area and identify the areas of limited use or nonuse. Include measures for marking the limits of use areas, including methods for protection of features to be preserved within authorized work areas and methods to control runoff and to contain materials on site, and a traffic control plan.

1.7.2.3 Traffic Control Plan

Develop a Traffic Control Plan before start of construction activities and submit for approval. Include measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Also include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff. Provide temporary traffic control devices as required with the CDT MUTCD in accordance with Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS. As appropriate, include slow-moving-vehicle warning signs, barriers for separating construction and non-construction traffic, use of traffic-control flagmen, and any additional measures required for the sole convenience of non-construction

SECTION 01 57 19 Page 20 traffic to safely pass through and around construction areas and access points thereto. The Traffic Control Plan must include recreational traffic such as bicycles and pedestrians.

Implement the following measures:

a. Control traffic during mobilization, de-mobilization, and hauling activities, leading from the primary access road(s) and extending beyond the ingress and egress locations to the construction area. This includes the use of flagmen, signs, and/or limiting speeds to 15 m.p.h. as best management practices.

b. Schedule heavy truck traffic, unloading and hauling during non-peak periods. Schedule worker shift changes so as not to coincide with existing background traffic peak periods. Commence required bulk hauling of construction materials as soon as on-site storage and staging areas are developed. Spread out the required bulk hauling over a longer period of time to minimize impacts to the existing facilities. Include video or photos of the private and public roads used for construction access and hauling in the Preconstruction Survey and Protection of Features. Document the same features and submit post-construction survey after completion of construction. Repair all roads damaged during construction activities and daily sweep clean any mud or dirt it leaves on paved roads.

c. Coordinate emergency response vehicle routes with local emergency response agencies regarding any routes affected by construction traffic or closures. If additional haul routes are proposed, utilize routes where existing roadways would result in the least amount of impact to existing background traffic.

d. Expand existing intersections used for project access as required by Caltrans, the Contracting Officer, and County and City to reduce traffic conflicts and congestions and increase road safety for project and background traffic.

e. Encourage or facilitate ride-sharing among construction personnel to reduce worker commute trips entering and exiting the project area.

1.7.2.4 Appointment Letter

A letter signed by an officer of the firm appointing the Environmental Manager and stating that person is responsible for managing and implementing the Environmental Program as described in this contract.

Include in this letter the Environmental Manager's authority to direct the removal and replacement of non-conforming work.

1.7.3 Management of Natural Resources

a. Land resources

b. Tree protection

c. Replacement of damaged landscape features

d. Temporary construction

e. Fish and wildlife resources

SECTION 01 57 19 Page 21

f. Wetland areas

1.7.4 Protection of Historical and Archaeological Resources

Known historical, archaeological, and cultural resources within or adjacent the construction footprint will be protected from construction activities. Install exclusionary fencing around the known resource. If vehicular traffic must be maintained in the discovery area, the Contractor must work with the Government to develop a protective measure appropriate for the specific discovery, to the extent practicable. The exemption would be resources identified has having impacts from construction activities.

USACE Archaeologist will provide a map of know resources requiring protection.

It is possible for ground disturbing activity to expose prehistoric or historic archeological features and deposits. Should archeological features or deposits be discovered during any construction, demolition, excavation, grading, or related actions, the Contractor must suspend all activity that would affect the discovered archeology and must immediately notify the Contracting Officer. The exception to this is that work will not stop during the actual construction of the cutoff wall because of deep trenching methods employed and safety concerns. In the event of a discovery, all work in the vicinity of the discovery must stop until the site may be evaluated by an archaeologist that individually meets the standards of the Secretary of the Interior and required consultation/coordination can be completed with the State Historic Preservation Officer and, when American Indian archeology is included in the discovery, representatives of the Native American Indian community.