B08 - W9123822C0006 - Attachment 03 - Bid Schedule - 202220308.pdf

PDF 188 KB Posted

Attached to
USACE SPK ARCF LAR Project 2 - Erosion Control, Bank Protection, and Stabilization Sites 2-2 and 2-3 - Sacramento, CA
Solicitation number
W9123822B0006
Issued by

About this file

This document contains bid schedule and solicitation details for a federal construction contract. The U.S. Army Corps of Engineers, Sacramento District, is soliciting bids for bank protection and stabilization work at two sites along the American River in Sacramento, California under solicitation number W9123822B0006. The work at Site 2-2 involves clearing vegetation, excavation, placement of soil fill and various rock materials, and installation of erosion control and landscaping to protect approximately 1,200 feet underneath the Howe Avenue Bridge. At Site 6,600 foot long Site 2-3, the work involves similar clearing, excavation and placement of soil and rock materials, as well as installation of rock revetments, tiebacks and instream wood structures. The total estimated cost of construction is between $25-100 million. The bid schedule outlines estimated quantities and unit pricing for various line items to be completed over two construction seasons.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123822B0006 Page 1 of 3 Rev: 08March2022

W9123822B0006 Lower American River Contract 2 – Sites 2-2 & 2-3

Bid Schedule

CLIN

ITEM

DESCRIPTION

EST

QTY

UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

0001 Year 1: Mobilization and Demobilization 1 Job

0002 Year 1: Traffic Control 1 Job

0003 Year 1: Temporary Fencing and Vegetation Protection 1 Job

0004 Year 1: Temporary Storm Water Pollution Control 1 Job

0005 Year 1: Clearing and Grubbing 1 Job

0006 Year 1: Grass Seeding and Erosion Control 1 Job

0007 Year 1: Live Cuttings 1,710 EA

0008 Year 1: Site 2-3: Demolition 1 Job

0009 Year 1: Site 2-3 Earthwork 81,200 CY

0010 Year 1: Site 2-3: Riprap Channel 1,620 Ton

0011 Year 1: Site 2-3: Excess Material Offhaul 92,000 CY

Year 1: Site 2-3: Launchable Spur and Buried Rock Tie- Back

15 EA

0013 Year 1: Site 2-3 Topsoil 2,874 CY

0014 Year 1: Site 2-3: IWM Type 1 66 EA

0015 Year 1: Site 2-3: IWM Type 2 27 EA

0016 Year 1: Site 2-3: Removal of Debris 10 Ton

0017 Year 1: Site 2-3: Cobble Soil Mix 2,830 CY

TOTAL COST CLIN 0001

W9123822B0006 Page 2 of 3

CLIN

ITEM

DESCRIPTION

EST

QTY

UNIT OF

MEASURE

UNIT

PRICE

TOTAL

PRICE

0001 Year 2: Mobilization and Demobilization 1 Job

0002 Year 2: Traffic Control 1 Job

0003 Year 2: Temporary Fencing and Vegetation Protection 1 Job

0004 Year 2: Temporary Storm Water Pollution Control 1 Job

0005 Year 2: Clearing and Grubbing 1 Job

0006 Year 2: Grass Seeding and Erosion Control 1 Job

0007 Year 2: Live Cuttings 3100 EA

0008 Year 2: Site 2-3: Demolition 1 Job

0009 Year 2: Site 2-3 Earthwork 157,800 CY

0010 Year 2: Site 2-3: Relocate Existing Paved Bike Trails 2,612 LF

Year 2: Site 2-3: Remove and Replace Existing Paved Bike Trails

6,711 LF

0012 Year 2: Site 2-3: Launchable Rock Trench 3,990 Ton

0013 Year 2: Site 2-3: Excess Material Offhaul 224,300 CY

0014 Year 2: Site 2-3: Clean Rock 170 Ton

0015 Year 2: Site 2-3: Soil Filled Rock 4,700 CY

0016 Year 2: Site 2-3: Cobble/Soil Mix 5,750 CY

0017 Year 2: Site 2-2: Earthwork 1 Job

0018 Year 2: Site 2-2: Soil Filled Rock 4,700 CY

Year 2: Site 2-2: Rock Slope Protection at Howe Avenue Bridge Abutment

470 CY

Year 2: Site 2-3: Launchable Spur and Buried Rock Tie- Back

38 EA

0021 Year 2: Site 2-3 Topsoil 18,150 CY

W9123822B0006 Page 3 of 3

0022 Year 2: Site 2-3: IWM Type 1 138 EA

0023 Year 2: Site 2-3: IWM Type 2 62 EA

0024 Year 2: Site 2-3: Removal of Debris 20 Ton

0025 Year 2: Site 2-2: Launchable Rock Toe Protection 10,100 Ton

0026 Year 2: Site 2-2: Soil Fill 9,500 CY

0027 Year 2: Site 2-2: Blended Bedding 5,300 Ton

0028 Year 2: Site 2-2: Aggregate Filled Rock 5,400 Ton

0029 Year 2: Site 2-2: Topsoil 3,400 CY

0030 Year 2: Site 2-2: IWM Type 3 18 EA

TOTAL COST CLIN 0002

TOTAL ALL CLINs