This document contains a bid schedule and related federal contract opportunity notice for bank protection and stabilization services. The U.S. Army Corps of Engineers, Sacramento District, is seeking a contractor to provide roughly 7,800 feet of stream bank protection and stabilization at two sites along the American River in Sacramento, California over two construction seasons. Services required include clearing, grubbing, excavating, placing soil and various types of rock riprap, constructing planting benches, installing instream wood structures, and planting and seeding. The contractor will import and place over 52,500 tons of rock, 49,000 tons of bedding material, and 295 instream wood structures. Additional requirements include excavating and off-hauling approximately 365,000 cubic yards of soil. The solicitation number is W9123822B0006 and the government estimates the contract value will be between $25-100 million. Responses are due through the beta.SAM.gov portal.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123822B0006 Page 1 of 3
W9123822B0006 Lower American River Contract 2 – Sites 2-2 & 2-3
Bid Schedule
CLIN
ITEM
DESCRIPTION
EST
QTY
UNIT OF
MEASURE
UNIT
PRICE
TOTAL
PRICE
0001 Year 1: Mobilization and Demobilization 1 Job
0002 Year 1: Traffic Control 1 Job
0003 Year 1: Temporary Fencing and Vegetation Protection 1 Job
0004 Year 1: Temporary Storm Water Pollution Control 1 Job
0005 Year 1: Clearing and Grubbing 1 Job
0006 Year 1: Grass Seeding and Erosion Control 1 Job
0007 Year 1: Live Cuttings 1,710 EA
0008 Year 1: Site 2-3: Demolition 1 Job
0009 Year 1: Site 2-3 Earthwork 81,200 CY
0010 Year 1: Site 2-3: Riprap Channel 1,620 Ton
0011 Year 1: Site 2-3: Excess Material Offhaul 92,000 CY
Year 1: Site 2-3: Launchable Spur and Buried Rock Tie- Back
15 EA
0013 Year 1: Site 2-3 Topsoil 2,874 CY
0014 Year 1: Site 2-3: IWM Type 1 66 EA
0015 Year 1: Site 2-3: IWM Type 2 27 EA
0016 Year 1: Site 2-3: Removal of Debris 10 Ton
0017 Year 1: Site 2-3: Cobble Soil Mix 2,830 CY
TOTAL COST CLIN 0001
W9123822B0006 Page 2 of 3
CLIN
ITEM
DESCRIPTION
EST
QTY
UNIT OF
MEASURE
UNIT
PRICE
TOTAL
PRICE
0001 Year 2: Mobilization and Demobilization 1 Job
0002 Year 2: Traffic Control 1 Job
0003 Year 2: Temporary Fencing and Vegetation Protection 1 Job
0004 Year 2: Temporary Storm Water Pollution Control 1 Job
0005 Year 2: Clearing and Grubbing 1 Job
0006 Year 2: Grass Seeding and Erosion Control 1 Job
0007 Year 2: Live Cuttings 3100 EA
0008 Year 2: Site 2-3: Demolition 1 Job
0009 Year 2: Site 2-3 Earthwork 157,800 CY
0010 Year 2: Site 2-3: Relocate Existing Paved Bike Trails 2,612 LF
Year 2: Site 2-3: Remove and Replace Existing Paved Bike Trails
6,711 LF
0012 Year 2: Site 2-3: Launchable Rock Trench 3,990 Ton
0013 Year 2: Site 2-3: Excess Material Offhaul 224,300 CY
0014 Year 2: Site 2-3: Clean Rock 170 Ton
0015 Year 2: Site 2-3: Soil Filled Rock 4,700 CY
0016 Year 2: Site 2-3: Cobble/Soil Mix 5,750 CY
0017 Year 2: Site 2-2: Earthwork 1 Job
0018 Year 2: Site 2-2: Soil Filled Rock 4,700 CY
Year 2: Site 2-2: Rock Slope Protection at Howe Avenue Bridge Abutment
470 CY
Year 2: Site 2-3: Launchable Spur and Buried Rock Tie- Back
38 EA
0021 Year 2: Site 2-3 Topsoil 18,150 CY
W9123822B0006 Page 3 of 3
0022 Year 2: Site 2-3: IWM Type 1 138 EA
0023 Year 2: Site 2-3: IWM Type 2 62 EA
0024 Year 2: Site 2-3: Removal of Debris 20 Ton
0025 Year 2: Site 2-2: Launchable Rock Toe Protection 10,100 Ton
0026 Year 2: Site 2-2: Rock Tie- Backs 6 EA
0027 Year 2: Site 2-2: Topsoil and Soil Fill in Planting Benches 3,400 CY
0028 Year 2: Site 2-2: IWM Type 3 18 EA
TOTAL COST CLIN 0002
TOTAL ALL CLINs