This document provides acronyms, definitions, and background related to a solicitation for an optimized remediation contract. The solicitation seeks performance-based environmental remediation services at sites in California and covers all known contaminated areas at installations. The selected contractor will be incentivized to efficiently achieve response complete or no further action endpoints through performance-based objectives and a firm fixed-price contract valued over the period of performance through projected site closeout, up to 30 years after award. Remediation will encompass comprehensive site characterization, design, construction, operation, and long-term management of remedies to address hazardous and radioactive waste in alignment with Comprehensive Environmental Response, Compensation, and Liability Act requirements and restoration advisory board oversight.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure 1: Acronyms and Definitions
ACRONYMS
AF Air Force
AFCEC Air Force Civil Engineer Center
AFF Aqueous Film Forming Foam
AGC Advanced Geophysical Classification
APP Accident Prevention Plan
ASTM American Society for Testing and Materials
BCE Base Civil Engineer
BRAC Base Realignment and Closure
CAC Common Access Cards
CADD Computer-Aided Design And Drafting
CD Compact Discs
CERCLA Comprehensive Environmental Response, Compensation, and Liability Act
CIP Common Installation Picture
CLIN Contract Line Item Number
CMRA Contractor Manpower Reporting Application
COC Contaminants of Concern
CONUS Continental United States
COR Contracting Officer’s Representative
CPSMR Contractor’s Progress, Status, and Management Report
CQP Construction Quality Plan
CSDGM Content Standards for Digital Geospatial Metadata
CSM Conceptual Site Model
CWM Chemical Warfare Material
DAGCAP DoD Advanced Geophysical Classification Accreditation Program
DD Decision Document
DERP Defense Environmental Restoration Program
DLH Data Loading Handbook
DoD Department of Defense
DOT Department of Transportation
ELAP Environmental Laboratory Accreditation Program
EMS Environmental Management System
EOD Explosive Ordnance Disposal
ERP Environmental Restoration Program
ERPIMS Environmental Resources Program Information Management System
ESD Explanation of Significant Differences
ESRI Environmental Systems Research Institute's
ESTCP Environmental Security Technology Certification Program
FAR Federal Acquisition Regulation
FFA Federal Facility Agreement
FGDC Federal Geographic Data Committee
FS Feasibility Study
FUSRAP Formerly Utilized Sites Remedial Action Program
FY Fiscal Year
GCO Geophysical Classification Organization
GFI Government Furnished Information
GFP Government Furnished Property
GIO Geospatial Integration Office
GIS Geographic Information System
GPS Global Positioning Systems
GSR Green and Sustainable Remediation
HSP Health and Safety Plan
HTRW Hazardous, Toxic, and Radioactive Waste
IBC International Building Code
IDW Investigation Derived Waste
IMS Integrated Master Schedule
IRP Installation Restoration Program
ITRC Interstate Technology and Regulatory Council
LCC Life-cycle Cost
LTM Long Term Management
MC Munitions Constituents
MCL Maximum Contaminant Level
MDL Master Document List
MDS Mission Data Set
MEC Munitions and Explosives of Concern
MMRP Military Munitions Response Program
MOU Memorandum of Understanding
MPS Milestone Payment Schedule
NACE National Association of Corrosions Engineers
NCP National Oil and Hazardous Substances Contingency Plan
NEC National Electrical Code
NFA No Further Action
NFPA National Fire Protection Association
NPL National Priorities List
O&M Operations and Maintenance
OGC Office of the General Counsel
ORC Optimized Remediation Contract
OSHA Occupational Safety and Health Administration
OSWER Office of Solid Waste and Emergency Response (USEPA)
PAO Public Affairs Officer
PCB Polychlorinated Biphenyls
PFBS Perfluorobutane Sulfonate
PFOA Perfluorooctanoic Acid
PFOS Perfluorooctane Sulfonate
PMP Project Management Plan
PMR Project Management Review
PO Performance Objectives
POC Point of Contact
POP Period of Performance (overall contract/task order)
PP Performance Period (specific to Performance Objective)
PWS Performance Work Statement
QASP Quality Assurance Surveillance Plan
QPP Quality Program Plan
QSM Quality Systems Manual
RA-O Remedial Action-Operation
RAO Remedial Action Objectives
RAB Restoration Advisory Board
RC Response Complete
RCRA Resource Conservation and Recovery Act
RECAP Risk Evaluation Corrective Action Program
REMG Resident Engineer Management Guide
RFI RCRA Facility Investigation
RI Remedial Investigation
RIP Remedy in Place
ROD Records of Decision
SARA Superfund Amendments and Reauthorization Act
SC Site Closeout
SDSFIE Spatial Data Standards for Facilities, Infrastructure, and Environment
SHM Safety and Health Manager
SSHP Site Safety and Health Plan
SSI Supplemental Site Investigation
SSPC Steel Structures and Painting Counsel
TCE Trichloroethene
UFC Uniform Fire Code
USACE United States Army Corps of Engineers
DEFINITIONS
The definitions included in this Enclosure were adapted from the following sources:
1. New Jersey Department of Environmental Protection Site Remediation Program
Technical Guidance for Preparation and Submission of a Conceptual Site Model dated 16
December 2011.
2. Air Force Instruction 32-7020 dated 7 November 2014.
3. Council on Environmental Quality Aligning National Environmental Policy Act
Processes with Environmental Management Systems, A Guide for NEPA and EMS
Practitioners dated April 2007.
4. Interstate Technical Regulatory Council Green and Sustainable Remediation: A Practical
Framework dated November 2011.
5. Air Force Civil Engineer Center Optimized Exit Strategy Compendium for Performance-
Based Remediation dated October 2014.
6. 42 U.S. Code § 9601 Comprehensive Environmental Response, Compensation, and
Liability Act Definitions.
7. United States Environmental Protection Agency Guide to Preparing Superfund Proposed
Plans, Records of Decision, and Other Remedy Selection Decision Documents dated July
1999.
8. National Academies Press Contaminants in the Subsurface: Source Zone Assessment and
Remediation dated 2005.
In the case where the definition provided below does not align with the source reference, the source reference shall prevail.
Definitions
Alternate Objective See PWS Section 1.2.7.
Conceptual Site Model1 A written and/or illustrative representation of the physical, chemical and biological processes that control the transport, migration and actual/potential impacts of contamination (in soil, air, ground water, surface water and/or sediments) to human and/or ecological receptors. It can range from a simple illustration to a more sophisticated comprehensive document and applied to all phases of the remedial process to understand the relationship between sources, migration pathways, and receptors associated with the site or area of concern and identified COCs. It serves to identify currently complete or potentially complete pathways to receptors and the potential for future risks. It should be continually revised to reflect the current understanding of the site during all phases of the investigation, remediation and support the remedial decision.
Decision Document2 A generic name for the document that selects a response action under all legal authorities. All DDs, including PPs and RODs, must go through legal and technical review. The remedial action objectives defined in the DD will be used later in the environmental restoration process to confirm and demonstrate that DOD has met the obligations established in the DD.
Draft Document Document submitted for AF and USACE review and approval. In all respects, Draft Documents shall be complete; substantively correct and consistent with applicable laws, regulations, and DoD/AF policies; in proper format; and free of grammatical and typographical errors. In general, Draft Documents are the initial version reviewed by AF and USACE. Draft Documents shall not be submitted to regulatory agencies for review.
Draft Final Document Document incorporating AF and USACE comments and submitted for regulatory agency review and/or approval. Draft Final Documents may also be required prior to Final Document preparation. Note some documents may initially be submitted to the regulatory agencies as Final with any comments being incorporated into subsequent documents as appropriate (e.g., system status reports, monitoring reports, “data dumps”).
Emerging
Contaminant2
Contaminants that either (1) do not have regulatory standards based on peer-reviewed science, or (2) contaminants that have the regulatory standards which may change due to new science, detection capabilities, or pathways.
Environmental
Management System3
A structure of procedures and policies used to systematically identify, evaluate, and manage environmental impacts of ongoing activities, products, and services.
Designed to provide order and consistency for organizations to address environmental concerns in a comprehensive manner, an EMS for a Federal agency is intended to ensure that all necessary actions are taken to integrate environmental accountability into day-to-day decision-making and long-term planning processes.
An EMS employs a continuous, rigorous, self-monitoring cycle for continual improvement of environmental performance.
Exit Strategy See PWS Section 8.1.2.
Final Document Document that has received AF and USACE approval, and where applicable, regulatory agency concurrence and/or approval. For documents requiring AF and/or regulatory agency signature, the document will not be considered Final until it is signed by the appropriate signatory(ies).
Green and Sustainable Remediation4
The site-specific employment of products, processes, technologies, and procedures that mitigate contaminant risk to receptors while making decisions that are cognizant of balancing community goals, economic impacts, and net environmental effects.
Land Use Control2 Any type of physical, legal, proprietary or administrative mechanism that restricts the use of, or limits access to, real property to prevent or reduce risks to human health and the environment. Physical mechanisms (i.e., engineering controls) encompass a variety of engineered remedies to contain or reduce contamination and physical barriers to limit access to property, such as landfill caps, fences, or signs. The legal, proprietary, or administrative mechanisms used for LUCs are generally the same as those used for Institutional Controls (ICs), as discussed in the National Contingency Plan. Examples of ICs include deed notices; IC registries, property easements and covenants; installation administrative controls, such as construction and work request review and approval processes; and administrative orders and cleanup agreements.
Life-Cycle Cost (LCC) An estimate of POP and post-POP costs based on proposed activities, activity duration, and assumptions from contract award through Contractor’s projected Site
Closeout date (or 30 years for sites with indefinite closeout dates).
Long-Term
Management2
Environmental monitoring, review of site conditions, and maintenance of a remedial action to ensure continued protection as designed once a site achieves
Response Complete. LTM includes operation and maintenance which are the measures required to maintain the effectiveness of response actions. LTM should not be used until no further environmental restoration response actions are appropriate or anticipated. LTM should not be used to refer to monitoring after
RIP (this includes sites for which the selected response action is natural attenuation). Examples of LTM include landfill cap maintenance, leachate disposal, fence monitoring and repair, management of five-year review execution, and LUC maintenance.
Note: the requirements for Five-Year Reviews are in accordance with the PWS and may not be included in LTM required under ORCs.
Optimized
Remediation
Contract
A contract that will effectively and efficiently manage the Air Force ERP in a performance-based, results-oriented, and cost conscious framework. One significant component will be the incorporation of lessons learned during PBRs in the development of ORC performance objectives. ORCs will be firm fixed price contracts and generally cover all known sites at an installation. Contractors will be incentivized to achieve performance objectives in keeping with the end state of choice as determined by a business case analysis of total life cycle cost with the objective of minimizing future Air Force liability and cost to the greatest degree feasible. While that end state of choice is generally RC, ORCs will utilize existing site data to inform realistic performance objective selection.
Performance Goal5 A standard being used to define when an effort has achieved satisfactory performance for a site for which the Performance Objective is OES. In a
Performance Model, it is the value for a specific Performance Indicator that distinguishes success from failure of the implemented approach. As such, the
Performance Goal is the pass/fail criterion for a given Performance Indicator.
Performance Indicator5 A measurable or calculable feature of an approach, system, or process that provides direct interpretive value with respect to (1) remedial mechanisms or (2) achievement of a remedial objective.
Performance Metric5 A unit of measure for a Performance Indicator.
Performance Model5 A predictive graphic model that describes the expected course of the remediation process (i.e., how conditions are expected to change over time as measured using appropriate Performance Indicators from the current state until the Performance
Goal is achieved).
Performance
Objective
The contractually required endpoint, status, condition, or requirement.
Performance
Period
The contractually required duration to achieve the Performance Objective.
Performance Standard The condition that must be satisfied to demonstrate a Performance Objective has been achieved.
Record of Decision2 The document required by CERCLA containing the final decision and statutory determinations of the lead agency concerning selection of the remedial action at a site(s). This includes any preliminary phase of a remedial action, such as an interim remedial action, which would require an interim ROD.
Reduce Life-Cycle
Cost
See PWS Section 1.2.5.
Remedial Action6 Those actions consistent with permanent remedy taken instead of or in addition to removal actions in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment. The term includes, but is not limited to, such actions at the location of the release as storage, confinement, perimeter protection using dikes, trenches, or ditches, clay cover, neutralization, cleanup of released hazardous substances and associated contaminated materials, recycling or reuse, diversion, destruction, segregation of reactive wastes, dredging or excavations, repair or replacement of leaking containers, collection of leachate and runoff, onsite treatment or incineration, provision of alternative water supplies, and any monitoring reasonably required to assure that such actions protect the public health and welfare and the environment. The term includes the costs of permanent relocation of residents and businesses and community facilities where the President determines that, alone or in combination with other measures, such relocation is more cost-effective than and environmentally preferable to the transportation, storage, treatment, destruction, or secure disposition offsite of hazardous substances, or may otherwise be necessary to protect the public health or welfare; the term includes offsite transport and offsite storage, treatment, destruction, or secure disposition of hazardous substances and associated contaminated materials.
Remedial Action –
Construction2
The period of time in which a response action is being implemented, but is not yet operating as designed. At the end of this phase of work, a remedy is in place.
Remedial Action
Objectives7
Describe what the proposed site cleanup is expected to accomplish.
Note: these are generally defined in the DD.
Remedial Action -
Operation2
The period of time that a selected remedy must operate before achieving remedial action objectives. At the end of this phase of work, the response is complete.
Remedial Design7 An engineering phase during which additional technical information and data identified are incorporated into technical drawings and specifications developed for the subsequent remedial action. These specifications are based upon the detailed description of the selected remedy and the cleanup criteria provided in the ROD.
Remedy in
Place2
Designation that a final remedial action has been constructed, is functional, and is operating as planned in the RD and would be expected to meet the remedial action objectives detailed in the DD. Examples of RIP are a soil vapor extraction system or an in situ chemical treatment system that is installed and operating as designed and for which performance data indicate the system will achieve remedial action objectives, thus demonstrating proper operation of the system. Because remedial action objectives have not been met, the site cannot be considered RC.
Response
Complete2
A milestone signifying that the DoD Component has met the remedial action objectives for a site, documented the determination, and sought regulatory agreement. RC signifies that DoD has determined at the end of the PA/SI or RI that no additional response action is required; achieved RIP and the required RA-
O has achieved the remedial action objectives; or where there is no RA-O phase, then the remedial action-construction has achieved the remedial action objectives.
LTM may occur after RC is achieved and precedes Site Closeout.
Site Closeout2 The stage at which the DoD has completed active management and monitoring at an environmental restoration site, and no additional environmental restoration funds will be expended at the site. SC occurs when environmental restoration goals have been achieved that allow unlimited use and unrestricted exposure of the property (e.g., no further LTM, including LUCs, is required).
Note: achieving Site Closeout may include, but not be limited to, the dismantling, removal, recycling, reclamation and/or disposal of all remedial activity systems and ancillary equipment above and underground to return the site to its natural state, well abandonment, and site restoration in accordance with Installation and regulatory requirements.
Source Strength8 The mass of contaminant present in the source zone and its flux from the source zone to the larger groundwater plume. The source strength is intended to convey information not only about the longevity of the source, but also about the size of the plume that would be created due to the flux from the source. Source-strength evaluations shall quantitatively determine the magnitude of each source relative to observed transport and attenuation rates and shall include all applicable
COCs. Data gap evaluations to delineate the extent of source-zone contamination shall be performed consistent with state-of-the-science methodologies (e.g., application of high resolution aquifer profiling, DNAPL partitioning tracer tests, vapor-phase tomography, downhole geophysics) and guidance.
Source Zone Delineation8
The location of a primary contaminant source in the subsurface (both horizontally and vertically) to include all applicable phase partitioning (e.g., NAPL, sorbed, dissolved, and vapor) and distribution into low permeability materials.