Enclosure 2A_AR Pull_AFP 42_20210218.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- CA Group Optimized Remediation Contract Federal contract opportunity
- Solicitation number
- W9123821R0017
About this file
This is a solicitation for the CA Group Optimized Remediation Contract posted by the Department of the Army Corps of Engineers Engineering District Sacramento. The solicitation seeks proposals for environmental remediation and construction services at sites in California, with an estimated value of $50 million over five years. Offerors must submit proposals by 30 April 2021, with contract award anticipated in July 2021. The contract is set aside for small businesses. The incumbent contractor is Plexus Scientific Corporation. Services required include investigation, design, and remediation of soil and groundwater contamination; operation and maintenance of treatment systems; and preparation of closure documentation.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Installation Name | AR File | Installation File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site ERP_CD | Site SWMU_CD | Rod # | Image Number |
| AF Plant 42, CA | 15,844 | 3050 | Jan/31/2002 | Abandonment of Water-Supply and Groundwater Monitoring Wells - Phase II, Final | Mohammad Estiri and S. Wilson Cablk | Panacea, Inc. | USACOE Los Angeles District | PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08 | 03050.PDF | |||
| AF Plant 42, CA | 15,845 | 3058 | Jan/31/2004 | Abandonment of Water-Supply Well Site 1 (Well DWR6N12W1J1) | Mohammad Estiri and S. Wilson Cablk | Panacea, Inc. | USCOE Los Angeles District | SD001 | 03058.PDF | |||
| AF Plant 42, CA | 15,846 | 2010 | Mar/05/2002 | Additional Burned Rubber Removal Activities at Arrea of Concern (AOC) 1, AFP 42, Palmdale CA Letter | Tim Smith | CH2MHill | Tayseer Mahmoud and Tim Post | DTSC and Regional Water Quality Control Board | AOC 1 | 02010.PDF | ||
| AF Plant 42, CA | 15,847 | 1025 | Apr/23/2001 | Adopted Board Order No. 6-01-13 Rescission of Waste Discharge Requirements - Air Force Plant No. 42, Wastewater Treatment Plant, Los Angles County | Rebecca Phillips | California Regional Water Quality Control Board | George H. Warner | ASC/ENVR, Wright-Patterson AFB, OH. | WWTP | 01025.PDF | ||
| AF Plant 42, CA | 15,848 | 10026 | Mar/01/2005 | AFP 42 March 2005 Informational Flyer | Air Force | Public | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10026.PDF | ||||
| AF Plant 42, CA | 15,849 | 10007 | Aug/28/2003 | Air Force response to public comments on the Draft final Remedial Investigation Report for Operable Units 1, 2, 3, 4, and 5 AFP 42, Palmdale CA | William G. Machingo | HQ AFMC | Walter Ranger | Community Members | 10007.PDF | |||
| AF Plant 42, CA | 15,850 | 11006 | May/31/2006 | Analytical Data Informal Technical Information Report for Interim Removal Actions at IRP Sites 4 and 6 | CH2MHill | ASC/ENVR and AFCEE | FT006|ST004 | 11006.PDF | ||||
| AF Plant 42, CA | 15,851 | 11007 | May/31/2006 | Analytical Data Informal Technical Information Report for the 2005 Groundwater Monitoring AFP 42 | CH2MHill | ASC/ENVR and AFCEE | OT029 | 11007.PDF | ||||
| AF Plant 42, CA | 15,852 | 3024 | Jun/18/1999 | Appendix A USAF IRP Draft Remedial Investigation Health and Safety Plan Addendum for, Organic Lead Confirmation Shallow Soil Sampling at IRP Sites 6, 7, 11, 20, and 27. Addendum to the General Health and Safety Plan. Appendix B USAF IRP Draft Remedial | CH2M Hill | ASC/ENVR and AFCEE | DP011|FT006|SS007|SS020|ST027 | 03024 draft.PDF | ||||
| AF Plant 42, CA | 15,853 | 3063V2 | Dec/31/2003 | Appendix A-1 thru F - Comments Received on Draft Remedial Investigation Report for Operable Units 1,2,3,4, and 5 Appendix B - Technical Memoranda on Draft Remedial Investigation Report for Operable Units 1,2,3,4, and 5 Appendix C - Soil on Draft Remedial | Tayseer Mahmoud | Dept of Toxic Substances Control | George H. Warner | ASC/ENVR | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|OT029|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 03063V2.PDF | ||
| AF Plant 42, CA | 15,854 | 3063V3 | Dec/31/2003 | Appendix F - Comparison of Ecological Risk Estimates Using AFP42 and BTAG Toxicity Factors | CH2MHill | ASC/ENVR and AFCEE | DP002|DP010|DP013|DP018|FT017|SD001 | 03063V3.PDF | ||||
| AF Plant 42, CA | 15,856 | 3063V5 | Dec/31/2003 | Appendix G continued - Soil Analytical Data Summary of Draft Remedial Investigation Report for Operable Units 1,2,3,4 and 5 | CH2MHill | ASC/ENVR and AFCEE | 03063V5.PDF | |||||
| AF Plant 42, CA | 15,857 | 3060 | Mar/18/2004 | Approval for final Remedial Investigation Report for Operable Units (OUs) 1,2,3,4 and 5 Except for Installation Restoration Program Sites 23 & 29, AFP 42, Palmdale CA | Emad B. Yemut | Dept of Toxic Substances Control US EPA | George H. Warner | ASC/ENVR | DP002|DP009|DP010|DP011|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027 | 03060.PDF | ||
| AF Plant 42, CA | 15,858 | 2007 | Mar/04/2003 | Approval of Final Site Closure Report for Area of Concern (AOC) 1 Air Force Plant 42 (AFP 42), Palmdale, California | John E. Scandura | Department of Toxic Substances Control | George H. Warner | ASC/ENVR | AOC 1 | 02007.PDF | ||
| AF Plant 42, CA | 15,859 | 3071 | Sep/13/2004 | Areas of Concern 2 and 3, Former Firing Ranges | Brian K. Davis, Ph.D. | Dept of Toxic Substances Control, CA | Tayseer Mahmoud | Dept of Toxic Substances Control, CA | AOC 3|FR100 | 03071.PDF | ||
| AF Plant 42, CA | 15,860 | 6003 | Mar/16/1998 | California EPA Ltr., 16 Mar 98, Subject, comments on Draft Interim Groundwater Study for AFP 42 | Mike Plaziak, Engineering Geologist, Toxics Section | California EPA | George H. Warner | ASC/ENVR | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 06003.PDF | ||
| AF Plant 42, CA | 15,861 | 3027 | Sep/08/1999 | CH2MHiII Letter, Subject, Final Summary Report for Spinner Logging and Depth-Specific Sampling at Wells DW1-2 and DW2-2 | John Lovenburg for Tim Smith | CH2M HilI | Tizita Bekele, DTSC and Mike Plaziak, RWQCB | Dept. of Toxic Substance Control (DTSC) and California Regional Water Quality Control Board (RWQCB) | DW1-2|DW2-2 | 03027.PDF | ||
| AF Plant 42, CA | 15,862 | 3026 | Jul/08/1999 | CH2MHiIl Letter, Subject, Planning Document Addendum for Organic Lead Confirmation Shallow Soil Sampling at IRP Sites 6, 7, 11, 20, and 27, Air Force Plant 42, Palmdale, California | Tim Smith | CH2M HiII | Tizita Bekele, DTSC and Mike Plaziak, RWQCB | Dept. of Toxic Substance Control (DTSC) and California Regional Water Quality Control Board (RWQCB) | DP011|FT006|SS007|SS020|ST027 | 03026.PDF | ||
| AF Plant 42, CA | 15,863 | 3113 | Jul/16/2007 | CH2MHill Telephone Conversation Record, IRP Site 27 Rubble Pile Path Forward Discussion | James Laws | CH2MHill | Peter Jan | California Integrated Waste Management Board | ST027 | 03113.PDF | ||
| AF Plant 42, CA | 15,864 | 3007 | May/09/1991 | Comments on Air Force Plant 42, Draft Final Remedial Investigation/Feasibility Study | Hamid Saebfar | State of California, Department of Health Services (H. Saebfar) | Carl Stoltz | ACS/ACE, HQ AFSC Wright-Patterson AFB | FT005|FT006|FT017|SD001|SS007|SS015 | 03007.PDF | ||
| AF Plant 42, CA | 15,865 | 3078 | Aug/19/2005 | COMMENTS on DRAFT REMEDIAL INVESTIGATION REPORT ADDENDUM SUPPLEMENTAL DEEP SOIL INVESTIGATION, AT IRP SITE 23, AIR FORCE PLANT 42, PALMDALE, LOS ANGELES COUNTY | Greg Cash | California Regional Water Quality Control Board | Robin Stankoff | ASC/ENVR | SS003 | 03078.pdf | ||
| AF Plant 42, CA | 15,866 | 3068 | Apr/16/2002 | Comments on Draft Remedial Investigation Report for Operable Units 1,2,3,4, and 5, IRP Sites, AFP 42 | Tim E. Post | CA Regional Water Quality Control Board | John Lovenburg | CH2M Hill | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|OT029|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 03068.PDF | ||
| AF Plant 42, CA | 15,867 | 3067 | Apr/15/2002 | Comments on Draft Remedial Investigation Report for Operable Units 1,2,3,4,& 5 at AFP 42, Palmdale CA | Tayseer Mahmoud | Dept of Toxic Substance Control, CA | George H. Warner | ASC/ENVR | 03067.PDF | |||
| AF Plant 42, CA | 15,868 | 3069 | Oct/02/2002 | Comments on Draft Site Closure Report for Area of Concern 1, AFP 42, Palmdale | Greg Cash | CA Regional Water Quality Control Board | Tim Smith | CH2M Hill | AOC 1 | 03069.PDF | ||
| AF Plant 42, CA | 15,869 | 3093 | Sep/29/2005 | COMMENTS on DRAFT TECHNICAL MEMORANDUM, TECHNOLOGY SCREENING, TCE SOURCE AREA CONTROL AND PLUME CONTAINMENT WORK AT INSTALLATION RESTORATION PROGRAM (IRP) SITE 29, AIR FORCE PLANT (AFP) 42, PALMDALE, CALIFORNIA | Tayseer Mahmoud | California Department of Toxic Substances Control | Robin Stankoff | ASC/ENVR | OT029 | 03093.pdf | ||
| AF Plant 42, CA | 15,870 | 3086 | May/13/2005 | Comments on Draft Work Plan for Soil Vapor Extraction Pilot Test and In Situ Chemical Oxidation Treatability Studies and Monitoring Well Installations at IRP Site 29, AFP 42, Palmdale, CA | Tayseer Mahmoud | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | OT029 | 03086.PDF | ||
| AF Plant 42, CA | 15,871 | 3012 | Nov/07/1997 | Comments on Draft Workplan for Installations and Sampling of a Monitoring well at UST Area T3-2/T3-3, Air Force Plant (AFP) 42, Palmdale, Los Angeles County | Mike Plaziak, Engineering Geologist, Toxics Section | California EPA | George H. Warner | ASC/EMVR | AOC 6|AOC 7 | 03012.PDF | ||
| AF Plant 42, CA | 15,872 | 5002 | Feb/19/2003 | Comments on Final Site Closure Report for Area of Concern 1, Air Force Plant 42, Palmdale, Loa Angeles County | Greg Cash | CA RWQCB | Tim Smith | CH2M Hill | AOC 1 | 05002.PDF | ||
| AF Plant 42, CA | 15,873 | 3062A | Jun/14/2004 | Comments on General Field Sampling Plan, General Quality Assurance Project Plan, Air Force Plant 42, Palmdale CA | Tayseer Mahmoud | Dept of Toxic Substances Control California EPA | George H. Warner | ASC/ENVR | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 03062A.PDF | ||
| AF Plant 42, CA | 15,874 | 3070 | Aug/25/2003 | Comments on March 2003 Groundwater Monitoring Event Report | Tayseer Mahmoud | Dept of Toxic Substances Control, CA | George H. Warner | ASC/ENVR | DP018|FT005|OT029|SD023 | 03070.PDF | ||
| AF Plant 42, CA | 15,875 | 3051 | Mar/08/2002 | Comments on the Final Report - Abandonment of Water Supply and Groundwater Monitoring Wells - Phase II for AFP 42 | Stephen Layne | Los Angeles County Dept of Health Services | Mohammad Estiri, Ph. D. | Panacea, Inc. | PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08 | 03051.PDF | ||
| AF Plant 42, CA | 15,876 | 10031 | Jan/31/2008 | Community Involvement Plan | Aeronautical Systems Center, Aquisition Environmental Management. Wright-Patterson Air Force Base, Ohio | AFP 42, Cal-EPA and DTSC | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10031.PDF | ||||
| AF Plant 42, CA | 15,877 | 10001 | Jun/30/1995 | Community Relations Plan, Final, Air Force Plant 42, Palmdale, California | Aeronautical Systems Center, Aquisition Environmental Management. Wright-Patterson Air Force Base, Ohio | AFP 42, Cal-EPA and DTSC | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10001.PDF | ||||
| AF Plant 42, CA | 15,878 | 10020 | Aug/29/2004 | Contaminated Soil Plan Open for Review | Antelope Valley Press | Public | FT006|ST004 | 10020.PDF | ||||
| AF Plant 42, CA | 15,879 | 10006 | Jan/14/2000 | Correspondence Regarding Demolishing the Wastewater Treatment Plant and Fire Fighting Training Facility at AFP 42 | David A. Maddox | ASC/ENV | Environmental Restoration Advisory Board (ERAB) Members | FFTF|WWTP | 10006.PDF | |||
| AF Plant 42, CA | 15,880 | 12017 | Jul/31/2006 | Data Validation Reports for the 2005 Semi-Annual Groundwater Monitoring Events at IRP Site 29, AFP 42,Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | OT029 | 12017.PDF | ||||
| AF Plant 42, CA | 15,881 | 3064 | Mar/31/2000 | Draft Remedial Investigation Planning Documents for the Soil Investigation at Area of Concern 1, AFP 42, Palmdale, CA | CH2MHill | ASC/ENVR and AFCEE | AOC 1 | 03064.PDF | ||||
| AF Plant 42, CA | 15,882 | 3059 | Jul/31/2002 | Draft Response to Regulatory comments for the Draft Remedial Investigation Report for the Operable Units 1,2,3,4, and 5 AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | 03059.PDF | |||||
| AF Plant 42, CA | 15,883 | 3013 | Aug/25/1997 | Draft Sampling and Analysis Plan for Groundwater Production Wells - Air Force Plant 42, Palmdale, California | Milasol C. Gaslan, P.E., Unit Chief | California EPA | George H. Warner | ASC/EMVR | DP002|SD001|SS007|SS015|SS020 | 03013.PDF | ||
| AF Plant 42, CA | 15,884 | 3112 | Jul/14/2009 | Email, Air Force Plant 42, IRP Site 27 Rubble Pile Reports | Peter Jan | California Integrated Waste Management Board | James Laws | CH2M Hill | ST027 | 03112.PDF | ||
| AF Plant 42, CA | 15,885 | 3092 | Mar/28/2006 | Email, Final SVE Pilot Test Work Plan Ltr, Comments on Draft Technical Memorandum,Technology Screening, TCE Source Area Control and Plume Containment Work at Installation Restoration Program (IRP) Site 29, AFP 42 | Doug Feay | CA Regional Water Quality Control Board Dept of Toxic Substances Control CA | Robin Stankoff | ASC/ENVR | OT029 | 03092.PDF | ||
| AF Plant 42, CA | 15,886 | 3109 | Jan/08/2009 | Email, Site 27 Field Sampling Plan | James Laws | CH2MHill | George H. Warner and Joe Urrutia | ASC/ENVR | ST027 | 03109.PDF | ||
| AF Plant 42, CA | 15,887 | 1021 | Jun/20/1996 | Endangered Species Survey, Air Force Plant 42 Final Installation Report | Parsons Engineering Science, inc. | ASC and AFCEE | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 01021.PDF | ||||
| AF Plant 42, CA | 15,888 | 3029 | Dec/03/1999 | Environmental Assessment Demolition of the Fire Fighting Training Facility US Air Force Plant 42 | USAF | AFP 42 | FFTF | 03029.PDF | ||||
| AF Plant 42, CA | 15,889 | 3031 | Dec/03/1999 | Environmental Assessment Demolition of the Wastewater Treatment Plant, US Air Force 42 | USAF | AFP 42 | WWTP | 03031.PDF | ||||
| AF Plant 42, CA | 15,890 | 10023 | Dec/01/2004 | Environmental Restoration Advisory Board (ERAB) Meeting Minutes 1997 - 2004 | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10023.PDF | ||||
| AF Plant 42, CA | 15,891 | 10029 | Apr/04/2007 | Environmental Restoration Advisory Board (ERAB) Meeting Minutes for 2007 | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10029.PDF | ||||
| AF Plant 42, CA | 15,892 | 10030 | Apr/01/2008 | Environmental Restoration Advisory Board (ERAB) Meeting Minutes for 2008 | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10030.PDF | ||||
| AF Plant 42, CA | 15,893 | 10028 | Mar/01/2006 | Environmental Restoration Advisory Board (ERAB) Meeting Miutes for 2006 | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10028.PDF | ||||
| AF Plant 42, CA | 15,894 | 10024 | Dec/07/2005 | Environmental RestorationAdvisory Board (ERAB) Meeting Minutes March, June, September, December 2005 | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10024.PDF | ||||
| AF Plant 42, CA | 15,895 | 10012 | Apr/01/2000 | Fact Sheet - AFP 42 Installation Restoration Program Site 27 Removal Action | ASC Office of Public Affairs | Community Members | ST027 | 10012.PDF | ||||
| AF Plant 42, CA | 15,896 | 10015 | Jun/21/1999 | Fact Sheet - AFP42 - Community Board | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10015.PDF | ||||
| AF Plant 42, CA | 15,897 | 10016 | Mar/01/2004 | Fact Sheet - AFP42 - General Information | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10016.PDF | ||||
| AF Plant 42, CA | 15,898 | 10017 | Jun/01/2004 | Fact Sheet - AFP42 - Institution and Land Use Controls | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10017.PDF | ||||
| AF Plant 42, CA | 15,899 | 10018 | Aug/15/2004 | Fact Sheet - AFP42 - Public Review and Comment on Proposed Soil Cleanup at Installation Restoration Program Sites 4 and 6 | ASC Office of Public Affairs | Community Members | FT006|ST004 | 10018.PDF | ||||
| AF Plant 42, CA | 15,900 | 10014 | Apr/01/2002 | Fact Sheet - AFP42 Groundwater Investigation | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10014.PDF | ||||
| AF Plant 42, CA | 15,901 | 10009 | Jan/01/2011 | Fact Sheet - AFP42 Playing a Key Role in Aerospace History | Larine Barr | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10009.PDF | |||
| AF Plant 42, CA | 15,902 | 10013 | Mar/01/2001 | Fact Sheet - AFP42 Remedial Investigation | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10013.PDF | ||||
| AF Plant 42, CA | 15,903 | 10011 | Oct/01/1998 | Fact Sheet - Remedial Investigation Progress | ASC Office of Public Affairs | Community Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10011.PDF | ||||
| AF Plant 42, CA | 15,904 | 12019 | Mar/31/2004 | Fall 2003 Sampling Report for Groundwater Monitoring Wells for the Former Wastewater Treatment Facility AFP 42 | CH2MHill | ASC/ENVC and AFCEE | WWTP | 12019.PDF | ||||
| AF Plant 42, CA | 15,905 | 10025 | Mar/31/2005 | Final Air Force Plant 42 IRP ERAB Charter | Air Force | Environmental Restoration Advisory Board (ERAB) Members | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10025.PDF | ||||
| AF Plant 42, CA | 15,906 | 4003 | Jan/08/2007 | Final Bench-Scale ISCO Treatability Study Site 29, AFP 42 | Michael Neimet, Gary Hickman and Sanjay Vancheeswaran | CH2MHill | Doug Feay, Brian Davis and Tayseer Mahmoud | CA Regional Water Quality Control Board and Dept of Toxic Substances Control CA | OT029 | 04003.PDF | ||
| AF Plant 42, CA | 15,907 | 3106 | Jul/31/2007 | Final Biological Report for AOC 3 Air Force Plant 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | AOC 3 | 03106.PDF | ||||
| AF Plant 42, CA | 15,908 | 3107 | Oct/31/2008 | Final Biological Report for IRP Site 27 AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | ST027 | 03107.PDF | ||||
| AF Plant 42, CA | 15,909 | 10008 | Jan/31/2004 | Final Community Involvement Plant, AFP 42 | CH2MHill | ASC/ENVR and AFCEE | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10008.PDF | ||||
| AF Plant 42, CA | 15,910 | 10005 | Nov/30/1997 | Final Community Relations Plan, Air Force Plant 42, Palmdale, California | Aeronautical Systems Center, Aquisition Environmental Management. Wright-Patterson Air Force Base, Ohio | AFP 42, Cal-EPA and DTSC | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 10005.PDF | ||||
| AF Plant 42, CA | 15,911 | 3041 | Oct/31/2000 | Final Document Addendum for Installation and Sampling of Ground Water Monitoring Wells at IRP Site 29, AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | OT029 | 03041.PDF | ||||
| AF Plant 42, CA | 15,912 | 3003 | Sep/30/1988 | Final Draft, Installation Restoration Progam Phase II and IVA, Stage 2, Remedial investigation/Feasibility Study Work Plan, U.S. Air Force Plant No. 42 | Engineering-Science, inc. | Lt. Peter Reynolds | ASD/PMDA Wright-Patterson AFB, AFSC/SGPB Andrews AFB and USAFOEHL/TS Brooks AFB | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SD024|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 03003.PDF | |||
| AF Plant 42, CA | 15,913 | 9002 | Feb/28/1996 | Final Environmental Assessment for the Transfer of Wastewater from the U.S. Air Force Plant 42 to the Los Angeles County Sanitation District | Stanley Consultants, Inc. | USCOE Los Angeles District | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 09002.PDF | ||||
| AF Plant 42, CA | 15,914 | 3017 | Dec/08/1996 | Final Fate and Transport-Based Vadose Zone Soil Screening Values, AFP 42, Palmdale, CA | CH2M HiIl | ASC/EMR and AFCEE | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 03017.PDF | ||||
| AF Plant 42, CA | 15,915 | 1020 | Dec/18/1996 | Final Fate and Transport-Based Vadose Zone Soil Screening Values, Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMR, Aeronautical Systems Center and HQ AFCEE/ERD | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 01020.PDF | ||||
| AF Plant 42, CA | 15,916 | 4008 | Sep/30/2010 | Final Feasibility Study for 25 Installation Restoration Program Sites Air Force Plant 42, Palmdale, California | CH2MHill | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT006|FT017|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 04008.PDF | |||||
| AF Plant 42, CA | 15,917 | 3057 | Jan/31/1996 | Final Field Investigation Report Groundwater Monitoring Well Installation AFP 42 Wastewater Treatment Plant, Palmdale CA | CKY Inc. | USCOE Los Angeles District | WWTP | 03057.PDF | ||||
| AF Plant 42, CA | 15,918 | 1017v1 | Aug/31/1992 | Final Field Investigation Report, Fire Fighting Training Facility, Groundwater Monitoring Well Installation, 2 Volumes, Air Force Plant 42, Palmdale, California - Volume 1 | James M. Montgomery, Consulting Engineers, Inc. | USCOE, Sacramento District | FFTF | 01017v1.PDF | ||||
| AF Plant 42, CA | 15,920 | 1028 | Jun/29/2001 | Final Field Investigation Results and Proposed Site Cleanup Activities for Area of Concern 1 AFP 42 | CH2M Hill | ASC/ENVR and HQ AFCEE/ERD | AOC 1 | 01028.PDF | ||||
| AF Plant 42, CA | 15,921 | 1031 | Jun/30/2001 | Final Field Investigation Results and Proposed Site Cleanup Activities for Area of Concern 1 AFP 42, Palmdale, CA | CH2MHill | ASC/ENVR and HQ AFCEE/ERD | AOC 1 | 01031.PDF | ||||
| AF Plant 42, CA | 15,922 | 3104 | May/31/2007 | Final Field Sampling Plan for Remedial Investigation Activities at Installation Restoration Program Site 28, AFP 42 | CH2MHill | ASC/ENVR and AFCEE | SS028 | 03104.PDF | ||||
| AF Plant 42, CA | 15,923 | 3072 | Jan/31/2005 | Final Field Sampling Plan for Site Inspection at Areas of Concern 2 and 3 (Former Firing Ranges) AFP 42, Palmdale, CA | CH2MHill | ASC/ENVR and AFCEE | AOC 3|FR100 | 03072.PDF | ||||
| AF Plant 42, CA | 15,924 | 3087 | Jan/31/2006 | Final Field Sampling Plan for Supplemental Remedial Investigation Activities at Potential Subsurface Debris Areas IRP Site 27 | CH2MHill | ASC/ENVR | ST027 | 03087.PDF | ||||
| AF Plant 42, CA | 15,925 | 3102 | May/31/2007 | Final Field Sampling Plan for Supplemental Remedial Investigation Activities at the IRP Site 6 Extended Area, AFP 42 | CH2MHill | ASC/ENVR and AFCEE | FT006 | 03102.PDF | ||||
| AF Plant 42, CA | 15,926 | 1010 | Dec/31/1991 | Final Field Work Plan, Fire Fighter Training Facility, Groundwater Monitoring Well Installation, Air Force Plant 42, Palmdale CA | James M. Montgomery, Consulting Engineers, Inc. | USACE, Sacramento Engineering District | FFTF | 01010.PDF | ||||
| AF Plant 42, CA | 15,927 | 5024 | Jul/31/2010 | Final Groundwater Treatment System Installation and Startup Report for IRP Site 29 | CH2MHill | ASC/ENVR | OT029 | 05024.PDF | ||||
| AF Plant 42, CA | 15,928 | 2013 | Jan/31/2006 | Final Interim Removal Action Completion Report for IRP Site 4 | CH2MHill | ASC/ENVR | ST004 | 02013.PDF | ||||
| AF Plant 42, CA | 15,929 | 2015 | Jan/31/2006 | Final Interim Removal Action Completion Report for IRP Site 6 | CH2MHill | ASC/ENVR | FT006 | 02015.PDF | ||||
| AF Plant 42, CA | 15,930 | 1040 | Dec/28/2009 | Final Modified Comprehensive Evaluation Phase I Report Military Munitions Response Program (MMRP), AFP 42, California | Innovative Technical Solutions, Inc., Shaw Environmental and USACE - Omaha District | HQ AFMC | AOC 3|FR100 | 01040.PDF | ||||
| AF Plant 42, CA | 15,931 | 3119 | Feb/28/2010 | Final Monitoring, Startup, and Optimization Plan for Interim Remedial Activities at IRP Site 29, AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | OT029 | 03119.PDF | ||||
| AF Plant 42, CA | 15,932 | 3056 | Aug/31/2003 | Final Planning Document Addendum for Additional Remedial Investigations at IRP Sites 23 and 29 AFP 42, Palmdale CA | CH2MHill | ASC/EMR and AFCEE | OT029|SD023 | 03056.PDF | ||||
| AF Plant 42, CA | 15,933 | 3035 | Nov/30/1999 | Final Planning Document Addendum for Installation and Sampling of a Groundwater Monitoring Well at IRP Site 5, AFP 42 | CH2MHill, Inc. | ASC/EMR | FT005 | 03035.PDF | ||||
| AF Plant 42, CA | 15,934 | 3021 | Apr/01/1999 | Final Planning Document Addendum for Installation and Sampling of a Groundwater Monitoring Well at Operable Unit 3 | CH2M HiII | ASC/EMR and AFCEE | 03021.PDF | |||||
| AF Plant 42, CA | 15,935 | 3022 | Jul/31/1999 | Final Planning document Addendum for Organic Lead Confirmation Shallow Soil Sampling at IRP Sites 6, 7, 11,20, and 27 | CH2M HiIl | ASC/ENVR and AFCEE | DP011|FT006|SS007|SS020|ST027 | 03022.PDF | ||||
| AF Plant 42, CA | 15,936 | 3037 | Jun/30/2000 | Final Planning Document Addendum for TCE Soil Gas Survey at Plant Site 1, AFP 42, Palmdale, CA | CH2MHilI | ASC/EMR | PLANT01 | 03037.PDF | ||||
| AF Plant 42, CA | 15,937 | 1027 | Jun/29/2001 | Final Planning Document Addendum for TCE Source Area Investigation at Plant Site 1, AFP 42 | CH2M Hill | ASC/ENVR and HQ AFCEE/ERD | OT029 | 01027.PDF | ||||
| AF Plant 42, CA | 15,938 | 1035 | Jul/31/2007 | Final Preliminary Assessment/Site Inspection Report for Areas of Concern 2 and 3 AFP 42, Palmdale CA | CH2MHILL | ASC/ENVR and AFCEE | AOC 3|FR100 | 01035.PDF | ||||
| AF Plant 42, CA | 15,939 | 1029 | Nov/21/2001 | Final Proposed Paint Chip Pile Confirmation Sampling and Subsurface Debris Investigation at IRP Site 27, AFP 42 | Tim Smith | CH2M Hill | Tayseer Mahmoud and Tim Post | Department of Toxic Substances Control and Regional Water Quality Control Board | ST027 | 01029.PDF | ||
| AF Plant 42, CA | 15,940 | 3108 | Oct/30/2008 | Final Proposed Supplemental Remedial Investigation (RI) at the Site 27 Subsurface Debris Areas, Air Force Plant 42, Palmdale CA | James Laws | CH2MHill | Anantaramam Peddada and Jay Cass | DTSC and RWQCB Lahontan Region | ST027 | 03108.PDF | ||
| AF Plant 42, CA | 15,941 | 3118 | Dec/09/2009 | Final Proposed Supplemental Remedial Investigation at Installation Restoration Program Site 5, Air Force Plant 42, Palmdale CA and Quality Assurance Project Plan Addendum Site 5 Remedial Investigation AFP 42, Palmdale CA dated Sep 2009 and IRP Site 5 Reme | James Laws and Dennis Shelton | CH2MHill | Anantaramam Peddada and Jay Cass | DTSC and RWQCB, Lahontan Region | FT005 | 03118.PDF | ||
| AF Plant 42, CA | 15,942 | 5023 | May/31/2010 | Final Quarterly Interim Remedial Action-Operations Report Soil Vapor Extraction System at IRP Site 29 Sep through Dec 2009 | CH2MHill | ASC/ENVR | OT029 | 05023.PDF | ||||
| AF Plant 42, CA | 15,943 | 5025 | Sep/29/2010 | Final Remedial Action Plan - Interim Action for the Interim Remedial Action at Installation Restoration Site 29, AFP No. 42, Palmdale CA Los Angeles County | CA Regional Water Quality Control Board | ASC/ENVR | OT029 | 05025.PDF | ||||
| AF Plant 42, CA | 15,944 | 5019 | Jan/31/2009 | Final Remedial Action Plan/Interim Action for the Interim Remedial Action at IRP Site 29, AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | OT029 | 05019.PDF | ||||
| AF Plant 42, CA | 15,945 | 3016 | Aug/29/1997 | Final Remedial Investigation Field Sampling Plan and Quality Assurance Project Plan Addenda for Shallow Soil Investigations at IRP Sites 1,7,15, and 20, Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMR and AFCEE | SD001|SS007|SS015|SS020 | 03016.PDF | ||||
| AF Plant 42, CA | 15,946 | 3011 | Jul/15/1997 | Final Remedial Investigation Field Sampling Plan and Quality Assurance Project Plan for Shallow Soil Investigation at Sites 5 and 17 - Air Force Plant 42, Palmdale, California | Milasol C. Gaslan, P.E., Unit Chief | California EPA | George H. Warner | ASC/EMVR | FT005|FT017 | 03011.PDF | ||
| AF Plant 42, CA | 15,947 | 1019 | Dec/31/1996 | Final Remedial Investigation General Health and Safety Plan with Site-Specific Attachments (Sites 5 and 17), Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMR, Aeronautical Systems Center and HQ AFCEE/ERD | FT005|FT017 | 01019.PDF | ||||
| AF Plant 42, CA | 15,948 | 3025 | Aug/31/1998 | Final Remedial Investigation Planning Documents for Deep Soil Investigation at the Operable Units 1 and 2 IRP Sites | CH2M HiIl | ASC/ENVR and AFCEE | FT005|FT006|FT017|SD001|SS007|SS015|SS020 | 03025.PDF | ||||
| AF Plant 42, CA | 15,949 | 3019 | Nov/30/1998 | Final Remedial Investigation Planning Documents for the Soil Investigation at the Operable Unit 3 IRP Sites, Air Force Plant 42, Palmdale, CA | CH2M Hill | ASC/EMR and AFCEE | DP002|DP009|DP010|DP011|DP013|DP018|SS012 | 03019.PDF | ||||
| AF Plant 42, CA | 15,950 | 3033 | Mar/31/2000 | Final Remedial Investigation Planning Documents for the Soil Investigation at the Operable Unit 4 IRP Sites, AFP 42, Palmdale, CA | CH2MHiII | ASC/ENVR | DP016|DP021|SS003|SS014 | 03033.PDF | ||||
| AF Plant 42, CA | 15,951 | 3100 | Aug/31/2005 | Final Remedial Investigation Report Addendum Supplemental Deep Soil Investigation at IRP Site 23 | CH2MHill | ASC/ENVR and AFCEE | SD023 | 03100.PDF | ||||
| AF Plant 42, CA | 15,952 | 3075 | Aug/31/2005 | Final Remedial Investigation Report Addendum Supplemental Deep Soil Investigation at IRP Site 23, AFP 42, Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | SD023 | 03075.PDF | ||||
| AF Plant 42, CA | 15,953 | 3116 | Sep/30/2009 | Final Remedial Investigation Report for IRP Site 28 AFP 42 Palmdale CA | CH2MHill | ASC/ENVR and AFCEE | SS028 | 03116.PDF | ||||
| AF Plant 42, CA | 15,954 | 1022 | Dec/31/1996 | FINAL Remedial Investigation, General health and safety Plan with Site-Specific Attachments (Sites 5 and 17), Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMR and AFCEE | FT005|FT017 | 01022.PDF | ||||
| AF Plant 42, CA | 15,955 | 3114 | Sep/30/2009 | Final Remedial Investigtion Report Addendum for IRP Site 6 AFP 42 Palmdale, CA | CH2MHill | ASC/ENVR and AFCEE | FT006 | 03114.PDF | ||||
| AF Plant 42, CA | 15,956 | 3020 | Aug/31/1998 | Final Remediation Investigation Planning Documents for Shallow Soil Investigation at IRP Site 27, Air Force Plant 42, Palmdale, CA | CH2M HilI | ASC/EMR and AFCEE | ST027 | 03020.PDF | ||||
| AF Plant 42, CA | 15,957 | 3038 | Mar/31/2000 | Final Remediation Investigation Planning Documents for the Soil Investigation at the Operable Unit 4 IRP Sites AFP 42, Palmdale, CA | CH2MHilI | ASC/ENVR and AFCEE | DP016|DP021|SS003|SS014 | 03038.PDF | ||||
| AF Plant 42, CA | 15,958 | 5012 | Jul/31/2007 | Final Removal Action workplan (RAW) for the Removal Action at Area of Concern 3 - Former Small Arms Firing Range AFP 42 | CH2MHill | ASC/ENVR and AFCEE | AOC 3 | 05012.PDF | ||||
| AF Plant 42, CA | 15,959 | 2003 | Jun/30/2000 | Final Removal Action Workplan for IRP Site 27, AFP 42, Palmdale, CA | CH2M Hill | ASC/EMR and AFCEE | ST027 | 02003.PDF | ||||
| AF Plant 42, CA | 15,960 | 5005 | Dec/31/2004 | Final Removal Action Workplan for the Interim Removal Actions at IRP Sites 4 and 6, AFP 42, Palmdale, California | CH2MHill | ASC/ENVR and AFCEE | FT006|ST004 | 05005.PDF | ||||
| AF Plant 42, CA | 15,961 | 5001 | Nov/30/1991 | Final Report. Installation Restoration Program Decision Documents, 26 IRP Sites, U.S. Air Force Plant No. 42, Palmdale, California Sites, 1-FCD2, Fuel Contaminated Ditch, 2-P WD2, Paint Waste Disposal Ditch, 3-ERA7, Engine Run-Up Area in Plant Site 7, | Engineering-Science and EA Engineering, Science, and Technology, Inc. | USAF | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 05001.PDF | ||||
| AF Plant 42, CA | 15,962 | 12024 | May/31/2009 | Final Results of the 2008 Semianual Groundwater Monitoring Events at IRP Site 29 | CH2MHill | ASC/ENVR and AFCEE | OT029 | 12024.PDF | ||||
| AF Plant 42, CA | 15,963 | 3014 | Oct/30/1997 | Final Sampling and Analysis Plan for Groundwater Production Wells DW2-l, DW2-2, and FW-2b, Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMVR and AFCEE | FT005|FT017 | 03014.PDF | ||||
| AF Plant 42, CA | 15,964 | 4006 | May/31/2008 | Final Semiannual Treatability Study Report Soil Vapor Extraction System at IRP Site 29 January through June 2007 | CH2MHill | ASC/ENVR | OT029 | 04006.PDF | ||||
| AF Plant 42, CA | 15,965 | 3048 | Oct/30/2001 | Final Site Cleanup Update and Proposed Confirmation Sampling for Area of Concern (AOC) 1, AFP 42, Palmdale CA | CH2M Hill | Tayseer Mahmoud and Tim Post | DTSC and RWQCB, Lahontan Region | AOC 1 | 03048.PDF | |||
| AF Plant 42, CA | 15,966 | 2006 | Jan/31/2003 | Final Site Closure Report for Area of Concern 1 Air Force Plant 42 | CH2MHill | ASC/EMR and AFCEE | AOC 1 | 02006.PDF | ||||
| AF Plant 42, CA | 15,967 | 1011 | Dec/31/1991 | Final Site Safety and Health Plan, Fire Fighter Training Facility, Groundwater Monitoring Well Installation, Air Force Plant 42, Palmdale, California | James M. Montgomery, Consulting Engineers, Inc. | USACE, Sacramento, California | FFTF | 01011.PDF | ||||
| AF Plant 42, CA | 15,968 | 4007 | May/31/2008 | Final Soil Vapor Extraction System Installation and Startup Report for IRP Site 29 AFP 42, Palmdale CA | Ch2MHill | ASC/ENVR | OT029 | 04007.PDF | ||||
| AF Plant 42, CA | 15,969 | 3024 | Sep/30/1999 | Final Summary Report, Spinner Logging and Depth-Specific Sampling at Wells DW1-2 and DW2-2, Air Force Plant 42, Palmdale, California | CH2M HiIl | ASC/ENVR and AFCEE | DP011|FT006|SS007|SS020|ST027 | 03024.PDF | ||||
| AF Plant 42, CA | 15,970 | 3120 | Feb/28/2010 | Final Treatability Study Work Plan at Installation Restoration Program Site 29 Air Force Plant 42, Palmdale, CA | CH2MHill | ASC/ENVR and AFCEE | OT029 | 03120.PDF | ||||
| AF Plant 42, CA | 15,971 | 3015 | Oct/30/1997 | Final Work Plan for Installation and sampling of a Monitoring Well at UST Area T3-2/T3-3, Air Force Plant 42, Palindale, California | CH2M Hill | ASC/EMVR and AFCEE | AOC 6|AOC 7|FT005|FT017 | 03015.PDF | ||||
| AF Plant 42, CA | 15,972 | 5011 | Dec/31/2006 | Final Work Plan for Remedial Action at Area of Concern 2 - Former Aircraft Firing Range AFP 42 | CH2MHill | ASC/ENVR and AFCEE | FR100 | 05011.PDF | ||||
| AF Plant 42, CA | 15,973 | 3085 | Dec/31/2005 | Final Work Plan for Soil Vapor Extraction Pilot Test and In Situ Chemical Oxidation Treatability Studies and Monitoring Well Installations at IRP Site 29 | CH2MHill | ASC/ENVR and AFCEE | OT029 | 03085.PDF | ||||
| AF Plant 42, CA | 15,974 | 4005 | Jul/31/2007 | Final, Semiannual Treatability Study Report Soil Vapor Extraction System at IRP Site 29 July through December 2006 | CH2MHill | ASC/ENVR | OT029 | 04005.PDF | ||||
| AF Plant 42, CA | 15,975 | 9003 | Jun/13/1996 | Finding of No Significant Impact - Transfer of Sewage Treatment from Air Force Plant 42 Wastewater Treatment Plant, Palmdale, CA to the Los Angeles County Sanitation District | Kenneth E. Eikmann, Lieutenant General, USAF | USAF | AFP 42 | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 09003.PDF | |||
| AF Plant 42, CA | 15,976 | 3028 | Dec/08/1999 | Finding of No Significant Impact Demolition of the Firefighting Training Facility US Air Force Plant 42 | Gary R. Adams, SES | USAF | AFP 42 | FFTF|FT005 | 03028.PDF | |||
| AF Plant 42, CA | 15,977 | 3030 | Dec/08/1999 | Finding of No Significant Impact Demolition of the Wastewater Treatment Plant US Air Force 42 | Gary R. Adams, SES | USAF | AFP 42 | WWTP | 03030.PDF | |||
| AF Plant 42, CA | 15,978 | 3062 | May/31/2004 | General Field Sampling Plan, General Quality Assurance Project Plan, General Health and Safety Plan, AFP 42 | James Laws | CH2MHill | Robin Stankoff | ASC/EMR | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 03062.PDF | ||
| AF Plant 42, CA | 15,979 | 12002 | Jul/31/2002 | Installation and Sampling Report for Groundwater Monitoring Wells at IRP Sites, AFP 42, Palmdale, California | CH2MHill | ASC/ENVR and AFCEE | DP002|DP018|FT005|OT029|SD001|SD023 | 12002.PDF | ||||
| AF Plant 42, CA | 15,980 | 3010 | Dec/31/1996 | Installation Restoration Program (IRP) Final Remedial Investigation Field Sampling Plan and Quality Assurance Project Plan for Shallow Soil Investigation at IRP Sites 5 and 17, Air Force Plant 42, Palmdale, California | CH2M Hill | ASC/EMR Wright Patterson AFB and AFCEE | FT005|FT017 | 03010.PDF | ||||
| AF Plant 42, CA | 15,981 | 1003 | Oct/31/1983 | Installation Restoration Program Phase I, Program Records Search for Air Force Plant 42, California, Air Force Engineering and Services Center, Tyndall AFB FL | CH2M Hill | AFP 42 and Aeronautical Systems Division | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST027 | 01003.pdf | ||||
| AF Plant 42, CA | 15,982 | 3009 | Jun/30/1988 | Installation Restoration Program Phase II - Confirmation/Quantification Stage I, Volume I, U.S. Air Force Plant 42, Palmdale, California | Engineering Science | ASD/PMDA, Wright-Patterson AFB and AFSC/SGPB, Andrews AFB, USAFOEHL/TS, Brooks AFB | SD023|SD024|SD025 | 03009.PDF | ||||
| AF Plant 42, CA | 15,983 | 1009 | Dec/31/1988 | Installation Restoration Program Phase II and IVA, Stage 2, Air Monitoring Study Work Plan, Quality Assurance Project Plan for U.S. Air Force Plant No. 42 | EA Engineering, Science, and Technology, Inc. and AEROVIRONMENT INC. | EA Engineering, Science, and Technology, Inc. and USAF OEHL, Brooks AFB | FT005|FT006|FT017 | 01009.PDF | ||||
| AF Plant 42, CA | 15,984 | 1008 | Nov/23/1988 | Installation Restoration Program Phase II and IVA, Stage 2, Remedial Investigation/Feasibility Study, Quality Assurance Project Plan for Sites l/7-FCA, 6-OFTC, and 15-TEB2, U.S. Air Force Plant 42 | EA Engineering, Science, and Technology, Inc. | ASD/PMDA, HQ Aeronautical Systems Division, Wright Patterson AFB and HQ AFSC/SGPB, Andrews AFB | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SD024|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004|ST026 | 01008.PDF | ||||
| AF Plant 42, CA | 15,985 | 1001 | Feb/28/1987 | Installation Restoration Program Phase II, Confirmation/ Quantification Stage 1, Air Force Plant No. 42, Volume 1 | Engineering-Science, Inc., Pasadena, Ca. and Atlanta, Ga. | ASD/PMDA, Wright-Patterson AFB and AFSC/SGPB Andrews AFB and USAFOEHL/TS, Brooks AFB | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004 | 01001.pdf | ||||
| AF Plant 42, CA | 15,986 | 1002 | Feb/28/1987 | Installation Restoration Program Phase II, Confirmation/Quantification Stage 1, Air Force Plant No. 42, Volume II, Appendix J | Engineering-Science, Inc., Pasadena, Ca. and Atlanta, Ga. | ASD/PMDA, Wright-Patterson AFB and AFSC/SGPB Andrews AFB and USAFOEHL/TS, Brooks AFB | DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004 | 01002.pdf | ||||
| AF Plant 42, CA | 15,987 | 1006 | Dec/31/1987 | Installation Restoration Program Phase II, Confirmation/Quantification Stage 1, U.S. Air Force Plant No. 42, Results of Soil Vapor Survey | Engineering-Science, Inc. | ASD/PMDA, HQ AFSC/SGPB and OEHL/TS | AOC 1|AOC 3|AOC 4|AOC 5|AOC 6|AOC 7|DP002|DP009|DP010|DP011|DP013|DP016|DP018|DP021|DW1-2|DW2-2|FFTF|FR01|FR100|FT005|FT006|FT017|FW-2B|OT029|PLANT01|PLANT02|PLANT03|PLANT04|PLANT05|PLANT06|PLANT07|PLANT08|SD001|SD023|SD024|SD025|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|SS028|ST004|ST026|ST027|T2-11|T5-7|T5-9|T7-3|WWTP | 01006.PDF | ||||
| AF Plant 42, CA | 15,988 | 3008 | Oct/31/1985 | Installation Restoration Program Phase II, Stage I Technical Operations Plan, Air Force Plant 42, Palmsdale, California | Engineering Science | USAFOEHL/TSS, Brooks AFB and HQ AFSC/SGAR, Andrews AFB | DP002|DP009|DP010|DP011|DP016|DP018|DP021|FT005|FT006|FT017|SD001|SD023|SS003|SS007|SS008|SS012|SS014|SS015|SS020|SS022|ST004 | 03008.PDF | ||||
| AF Plant 42, CA | 15,989 | 3005 | Feb/28/1992 | Installation Restoration Program, Remedial Investigation/Feasibility Study, Final Report, for Sites 1-FCD2, 5-AFTC, 6-OFTC, 7-ERA2, 15-TEB2, and 17-NFTC, Volume I (includes Appendices A through F), U.S. Air Force Plant No. 42, Palmdale | EA Engineering, Science, and Technology, Inc. | ASC/ENVR and HQ AFCEE/ERD | FT005|FT006|FT017|SD001|SS007|SS015 | 03005.PDF | ||||
| AF Plant 42, CA | 15,990 | 3006 | Feb/28/1992 | Installation Restoration Program, Remedial Investigation/Feasibility Study, Final Report, for Sites l-FCD2, 5-AFTC, 6-OFTC, 7-ERA2, 15-TEB2, and 17-NFTC, Volume II (includes Appendices G through R), U.S. Air Force Plant No. 42, Palmdale, California | EA Engineering, Science, and Technology, Inc. | ASC/ENVR and HQ AFCEE/ERD | FT005|FT006|FT017|SD001|SS007|SS015 | 03006.PDF | ||||
| AF Plant 42, CA | 15,991 | 1005 | Jul/29/1985 | Investigation of Subsurface Contamination by JP-7 Jet Fuel at Site 2, U.S. Air Force Plant 42 | Gregg & Associates | California Regional Water Quality Control Board and Lockheed-California Company | DP002 | 01005.PDF | ||||
| AF Plant 42, CA | 15,992 | 3018 | Jul/28/1998 | IRP Results of May 1998 Sampling Event at Well DW2-2 at Air Force Plant 42, Palmdale, CA | CH2M HilI | ASC/EMR and AFCEE | 03018.PDF | |||||
| AF Plant 42, CA | 15,993 | 5008 | Jan/18/2005 | Letter, Air Force's Proposed Removal Actions at IRP Sites 4 and 6 | David Lawrence | ASC/ENVR WPAFB OH | John E. Scandura | Department of Toxic Subst Control/California EPA | FT006|ST004 | 05008.PDF | ||
| AF Plant 42, CA | 15,994 | 6004 | Aug/12/2005 | Letter, Applicable or Relevant and Appropriate Requirements (ARARS) Solicitation for In Situ Chemical Oxidation (ISCO) at Site 29, AFP 42 | Robin Stankoff | ASC/ENVR WPAFB OH | Tayseer Mahmoud | DTSC | OT029 | 06004.PDF | ||
| AF Plant 42, CA | 15,995 | 12020 | Sep/20/2006 | Letter, Approval of 2005 Semi-Annual Groundwater Monitoring Report for Sampling Event at IRP Site 29, AFP 42 | Emad B. Yemut | Dept of Toxic Substances Control | George H. Warner | ASC/ENVR and AFCEE | OT029 | 12020.PDF | ||
| AF Plant 42, CA | 15,996 | 12023 | Feb/29/2008 | Letter, Approval of 2007 Semi-Annual Groundwater Monitoring Report for Sampling Events atIRP Site 29, AFP 4, Palmdale CA | Manny Alonzo | Dept of Toxic Substances Control | George H. Warner | ASC/ENVR and AFCEE | OT029 | 12023.PDF | ||
| AF Plant 42, CA | 15,997 | 3073 | Feb/10/2005 | Letter, Approval of Final Field Sampling Plan for Site Inspection at Area of concern 2 and 3 (Former firing Ranges), AFP 42 | Emad B. Yemut | Dept of Toxic Substances Control, CA | Robin Stankoff | ASC/ENVR | AOC 3|FR100 | 03073.PDF | ||
| AF Plant 42, CA | 15,998 | 3088 | Jan/24/2006 | Letter, Approval of Final Field Sampling Plan for Supplemental Remedial Investigation Activities at IRP Site 27 | Emad B. Yemut | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | ST027 | 03088.PDF | ||
| AF Plant 42, CA | 15,999 | 2016 | Feb/15/2006 | Letter, Approval of Final Interim Removal Action Completion Report for Installation Restoration Program (IRP) Site 6, Operable Unit 2, Air Force Plant 42 (AFP 42) Palmdale CA | Emad B. Yemut | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | FT006 | 02016.PDF | ||
| AF Plant 42, CA | 16,000 | 2014 | Feb/01/2006 | Letter, Approval of Final Interim Removal Action Completion Report for IRP Site 4, Operable Unit 5, AFP 42 | Emad B. Yemut | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | ST004 | 02014.PDF | ||
| AF Plant 42, CA | 16,001 | 3079 | Sep/23/2005 | Letter, Approval of Final Remedial Investiation Report Addendum, Supplemental Deep Soil Investigation at Installation Restoration Program (IRP) Site 23, AFP 42 | Emad B. Yemut | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | SD023 | 03079.PDF | ||
| AF Plant 42, CA | 16,002 | 5006 | Jan/14/2005 | Letter, Approval of Final Removal Action Workplan (RAW) for Interim Removal Actions at Installation Restoration Program (IRP) Sites 4 and 6, AFP 42, Palmdale, CA | John E. Scandura | Department of Toxic Subst Control/California EPA | Robin Stankoff | ASC/ENVR | FT006|ST004 | 05006.PDF | ||
| AF Plant 42, CA | 16,003 | 5013 | Jul/27/2007 | Letter, Approval of Final Removal Action Workplan for Area of Concern 3 (AOC 3), Former Small Arms Firing Range, AFP 42 | John E. Scandura | Department of Toxic Subst Control/California EPA | George H. Warner | ASC/ENVR | AOC 3 | 05013.PDF | ||
| AF Plant 42, CA | 16,004 | 1036 | Jul/25/2007 | Letter, Approval of Final Repliminary Assessment/Site Inspection Report for Areas of Concern 2 and 3 (Former Firing Ranges) AFP 42 | Manny Alonzo | Dept of Toxic Substances Control CA | George H. Warner | ASC/ENVR, Wright-Patterson AFB | AOC 3|FR100 | 01036.PDF | ||
| AF Plant 42, CA | 16,005 | 4004 | Feb/01/2007 | Letter, Approval of Final Technical Memorandum, Bench-Scale In-Situ Chemical Oxidation (ISCO) Treatability Study at Installation Restoration Program (IRP) Site 29, AFP 42, Palmdale CA | Emad B. Yemut | Department of Toxic Subst Control/ California | George H. Warner | ASC/ENVR | OT029 | 04004.PDF | ||
| AF Plant 42, CA | 16,006 | 3091 | Feb/27/2006 | Letter, Approval of Final Work Plan for Soil Vapor Extraction Pilot Test and In-Situ Chemical Oxidation Treatability Studies and Monitoring Well Installations at IRP Site 29, AFP 42, Palmdale, CA | Emad B. Yemut | Department of Toxic Subst Control/California EPA | Robin Stankoff | ASC/ENVR | OT029 | 03091.PDF | ||
| AF Plant 42, CA | 16,007 | 3074 | Sep/21/2004 | Letter, Comments on Draft Field Sampling Plan (FSP) for Site Inspection at Area of concern 2 and 3 (Former Firing Ranges) Air Force Plant 42, Palmdale, CA | Tayseer Mahmoud | Dept of Toxic Substances Control, CA | Robin Stankoff | ASC/ENVR | AOC 3|FR100 | 03074.PDF | ||
| AF Plant 42, CA | 16,008 | 3077 | Aug/19/2005 | Letter, Comments on Draft Remedial Investigation Report Addendum Supplemental Deep Soil Investigation at IRP Site 23, AFP 42 | Greg Cash | CA Regional Water Quality Control Board | Robin Stankoff | ASC/ENVR | SD023 | 03077.PDF | ||
| AF Plant 42, CA | 16,009 | 3076 | Dec/27/2004 | Letter, Comments on Draft Remedial Investigation Report Addendum, Supplemental Deep Soil Investigation at IRP Site 23, AFP 42 | Tayseer Mahmoud | Dept of Toxic Substances Control, CA | Robin Stankoff | ASC/ENVR | SD023 | 03076.PDF | ||
| AF Plant 42, CA | 16,010 | 3081 | Oct/25/2005 | Letter, Comments on Draft Removal Action Completion Report for Installation Restoration Program Site 4, Operable Unit 5, AFP 42 | Tayseer Mahmoud | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | ST004 | 03081.PDF | ||
| AF Plant 42, CA | 16,011 | 3080 | Oct/05/2005 | Letter, Comments on Draft Removal Action Completion Report for Interim Removal Action at IRP Site 6, AFP 42 | Tayseer Mahmoud | Dept of Toxic Substances Control | Robin Stankoff | ASC/ENVR | FT006 | 03080.PDF |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .