AFP42 GFI Rev 1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- CA Group Optimized Remediation Contract Federal contract opportunity
- Solicitation number
- W9123821R0017
About this file
This document contains a list of government-furnished information related to a federal contract opportunity for optimized remediation services at Air Force Plant 42 in California. The contract solicitation was posted on March 9, 2021 by the Department of the Army Corps of Engineers Engineering District Sacramento under number W9123821R0017 for optimized remediation services at the installation to address ongoing groundwater treatment and vapor intrusion investigation efforts. The document provides 23 references to reports, plans, and correspondence related to environmental remediation and land use controls at the site to inform offerors. Key details include interim remedial action reports, monitoring and optimization plans, site conceptual models, groundwater treatment system designs and repairs, and correspondence with regulatory agencies regarding ongoing investigation and mitigation efforts.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GFI List Template
| GOVERNMENT-FURNISHED INFORMATION (GFI) | |
| ORC Name: | California |
| Installation: | Air Force Plant 42 |
| Date: | 1/28/21 |
| Item | Document Date | Document Title | Site | CD Number |
| 1 | 22-Mar-12 | Final Monitoring and Optimization Plan for Interim Remedial Activities, Air Force Plant 42, Bhate Environmental and CH2M Hill | OT-29 | 1 |
| 2 | 15-Oct-16 | Final Work Plan for Groundwater Treatment System, Air Force Plant 42, Installation Restoration Program Site 29, Palmdale California | OT-29 | 2 |
| 3 | 15-Mar-18 | Technical Memorandum Air Force Plant 42 Conceptual Site Model, Palmdale California, AECOM | OT-29 | 3 |
| 4 | 15-Dec-19 | Annual Land Use Control Inspections at Air Force Plant 42, Palmdale, California , Final Site Safety Documents, Final Accident Prevention Plan, SRS | FT05, DP-16, SS-19, SS-20 and SS-28 | 4 |
| 5 | 15-Dec-19 | Final Quality Control Plan for Annual Land Use Control Inspections, Air Force Plant (AFP) 42, Palmdale California, Sustainment and Restoration Services | FT05, DP-16, SS-19, SS-20 and SS-28 | 5 |
| 6 | 15-Dec-19 | Final Work Plan for Annual Land Use Control Inspections, Air Force Plant (AFP) 42, Palmdale, California, Sustainment and Restoration Services | FT05, DP-16, SS-19, SS-20 and SS-28 | 6 |
| 7 | 15-Jun-19 | Draft Electrical System Review and Pump Replacement at Plant Site 1, Air Force Plant 42 Palmdale, California, EGC. Inc. | OT-29 | 7 |
| 8 | 15-Sep-13 | Land Use Control Implementation Plan Air Force Plant 42, CH2M Hill | FT05, DP-16, SS-19, SS-20 and SS-28 | 8 |
| 9 | 15-Feb-17 | Final Electrical System Repairs / Groundwater Treatment System Restart Report, Air Force Plant 42, Installation Restoration Program Site 29, Palmdale California, Plexus | OT-29 | 9 |
| 10 | 15-Sep-17 | Final Monitoring and Optimization Plan for Interim Remedial Activities, Air Force Pant 42, Installation Restoration Program Site 29 Palmdale, California, Plexus, Inc. | OT-29 | 10 |
| 11 | 15-Sep-20 | Draft Work Plan Addendum for Production Well DW 1-4 Vertical Profile Study and Vapor Intrusion Investigation at Building 150 Air Force Plant 42 Installation Restoration Program Site 29 Palmdale, California AECOM | OT-29 | 11 |
| 12 | 15-Jan-21 | Boeing DW1-4 TCE Data, FPM Remediation | OT-29 | 12 |
| 13 | 22-Jan-21 | AFP42 Well Replacements FPM Remediation | OT-29 | 13 |
| 14 | 16-Nov-20 | Health and Safety Plan Addendum Production Well DW1-4 Vertical Profile Study and Vapor Intrusion Investigation at Building 150 Air Force Plant 42 Installation Restoration Program Site 29 Palmdale California DTSC Comments, letter | OT-29 | 14 |
| 15 | 7-Dec-20 | Responses to DTSC Comments on Draft/Final Work Plan Addendum for Production Well DW 1-4 Vertical Profile Study and Vapor Intrusion Investigation at Building 150, IRP Site 29, Palmdale CA AECOM | OT-29 | 15 |
| 16 | 15-Dec-20 | DTSC Comments on Air Force Responses to Department of Toxic Substances Control Comment Dated November 13, 2020, Draft/Final Work Plan for Production Well DW 1-4 Vertical Profile Study and Vapor Intrusion Investigation at Building 150 (Draft Final Work plan), Installation Restoration Program Site 29, Air Force Plant 42, Palmdale, California DTSC Letter 15 December 2020 | OT-29 | 16 |
| 17 | 26-Jan-21 | Draft/Final Third Quarter 2020 (1 July - 30 September) Interim Remedial Action Operations Report Installation Restoration Program Site 29 Air Force Plant 42 Palmdale California, FPM | OT-29 | 17 |
| 18 | 30-Sep-20 | Draft/Final Work Plan for Interim Remedial Activities, Appendix D Plan for Soil Vapor Extraction Rebound Testing, Installation Restoration Program Site 29, Air Force Plant 42, Palmdale, California FPM Remediation | OT-29 | 18 |
| 19 | 30-Sep-20 | Draft/Final Quality Program Plan, Interim Remedial Activities, Installation Restoration Program Site 29, Air Force Plant 42, Palmdale California FPM Remediation | OT-29 | 19 |
| 20 | 26-Jan-21 | Draft Final Work Plan Addendum for Production Well DW 1-4 Vertical Profile Study and Vapor Intrusion Investigation at Building 150, Installation Restoration Program Site 29, Palmdale, Los Angeles County, Lahontan Regional Water Quality Control Board 26 January 2021 letter | OT-29 | 20 |
| 21 | 27-Oct-20 | Draft Final Work Plan for Interim Remedial Activities Appendix D Plan for Soil Vapor Extraction Rebound Testing Installation Restoration Program Site 29 Air Force Plant 42 Palmdale, California Dated September 2020, Department of Toxics Substances Control letter, October 27, 2020 letter | OT-29 | 21 |
| 22 | 15-Jan-21 | Draft 2020 Annual Report on the Status of Land Use Controls on Restoration Sties FT05, DP016, SS019, SS029 and SS0028, Air Force Plant 42, Palmdale, California | FT05, DP-16, SS-19, SS-20 and SS-28 | 22 |
| 23 | 1-Feb-21 | Site 29 Treatment System Pictures and Information | OT-29 | 23 |
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 |
&"-,Bold"&12PWS Enclosure X GFI List XXX AFB &12Contract Number Enclosure 2 xx Month 2019 Page &P of &N
File details come from the government source that posted it. Updated .