SREL Contract1.map.pdf
PDF 2 MB Posted
- Attached to
- Sacramento River East Levee (SREL) Contract 1
- Solicitation number
- W9123820B0003
About this file
This solicitation is for the Sacramento River East Levee (SREL) Contract 1 project located along various segments of the Sacramento River East Levee from just north of US 50 to just west of Freeport Blvd in Sacramento, California. The work includes degrading and reconstructing over 2 miles of levee to support construction of both Deep Mix Method and slurry trench cutoff walls, constructing drained stability berms and seepage berms, reusing excavated soils for levee fill, importing additional fill as needed, managing excess soils, removing and replacing over 2 miles of paved bike paths, potholing and protecting utilities, and restoring all disturbed areas. The contractor must complete all work within the single 2020 construction season, with the line of flood protection fully restored no later than October 31, 2020 and work at Miller Park completed after Labor Day.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1085+00 1090+00
1095+00
1100+00
1105+00
1110+00
1115+00
1120+00
1125+00
1130+00
1135+00
1140+00
1145+00
1150+00
1155+00
1160+00
1165+00
1170+00
1175+00
1180+00
1185+00
1190+00
1195+00
1200+00
1205+00
1210+00
1215+00
1220+00
1225+00
1230+00
1235+00
1240+00
1245+00 1250+00
1255+00 1260+00
1265+00 1270+00
1275+00 1280+00
1285+00
1290+00
1295+00
1300+00
1305+00
1310+00
1315+00
1320+00
1325+00
1330+00
1335+00 1340+00
1345+00 1350+001355+001360+00
1365+00 1370+001375+00
1380+001385+00 1390+00
1395+00 1400+001405+00
1410+00 1415+00
1420+00
1425+00
1430+00
1435+00
1440+00
1445+00
1450+00
1455+00
1460+00
1465+00
1470+00
1475+00
1480+00
1485+00
1490+00
1495+00
1500+00
1505+00
1510+00
1515+00
1520+00
1525+00
1530+00
1535+00
1540+00
1545+00
1550+00
1555+00
1560+00 1565+00
1570+00 1575+00
1580+00 1590+00
1595+00 1600+00
1605+00
1610+00 1615+00
1620+00 1625+00
1630+00 1635+00 1645+00
1650+00 1655+00
1660+00 1665+00
1670+00 1675+00
1680+00
1685+00
Sacramento River
§̈¦5
§̈¦5
£¤50
FR
EE
PO
R
T
BL
VD
MEADOWVIEW RD
24TH
S
T
FLORIN RD
POCKET RD
FRUITRIDGE RD
RI
VE
RS
ID
E
BL
VD
STATIONS: 1094+50 - 1096+75 (225')
WELLS: 4 added to existing BERM: Waterside Levee Reconstruction
STATIONS: 1554+00 - 1570+00 (1550')
CUTOFF: SB to SCCB Wall (-10' to -30')
STATIONS: 1570+00 - 1600+00 (3000')
CUTOFF: SB Cutoff Wall (-20')
STATIONS: 1600+00 - 1640+00 (4000')
CUTOFF: SB Wall to (-20')
STATIONS: 1550+00 - 1554+50 (450')
CUTOFF: SB Wall to (-20' to -30')
STATIONS: 1534+40 - 1550+00 (1560')
CUTOFF: DMM to (-105')
STATIONS: 1291+50 - 1300+80 (930')
CUTOFF: DMM to SB Wall (-65' to -15')
STATIONS: 1282+90 - 1291+50 (860')
CUTOFF: DMM Wall to (-80' to -95')
STATIONS: 1199+00 - 1206+00 (700')
CUTOFF: SB Wall to (-30' to -35')
STATIONS: 1125+52 - 1130+00 (448')
BERM: Seepage Berm STATIONS: 1119+80 - 1125+50 (570')
BERM: SB Wall to -10'
STATIONS: 1117+00 - 1119+80 (280')
BERM: SB Wall to -10'
STATIONS: 1096+75 - 1102+00 (525')
BERM: Thicken Berm, Drained Berm
O 0 2,100 4,200
Feet
Date Saved: 3/18/2019 3:18:57 PM
1 in = 1,250 ft
SREL
CONTRACT 1
ARCF 2016